CN207974473U - A kind of paving structure on floor and metope - Google Patents

A kind of paving structure on floor and metope Download PDF

Info

Publication number
CN207974473U
CN207974473U CN201721921843.0U CN201721921843U CN207974473U CN 207974473 U CN207974473 U CN 207974473U CN 201721921843 U CN201721921843 U CN 201721921843U CN 207974473 U CN207974473 U CN 207974473U
Authority
CN
China
Prior art keywords
floor
metope
wall face
layer
coat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721921843.0U
Other languages
Chinese (zh)
Inventor
周雪萍
周东珊
钟诚
步挺
武鹏
余文钊
许伟
李梦珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201721921843.0U priority Critical patent/CN207974473U/en
Application granted granted Critical
Publication of CN207974473U publication Critical patent/CN207974473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the paving structures on a kind of floor and metope, including floor leveling layer, metope screed-coat, the mat formation floor on the floor leveling layer and the wall face decorating layer on the metope screed-coat;The lower end of the metope screed-coat is connected on the floor leveling layer;The floor is located at the lower section of the wall face decorating layer, and interval gap is formed between the lower end of the wall face decorating layer and the floor;The skirting for blocking the interval gap is connected on the wall face decorating layer.By connecting skirting on wall face decorating layer, the gap between floor and wall face decorating layer can be blocked, performance attractive in appearance and practicability are improved, realize the smart and stress stability of Floor edge for connection with wall, simple operation, quickly.

Description

A kind of paving structure on floor and metope
Technical field
The utility model is related to interior decoration technology more particularly to the paving structures on a kind of floor and metope.
Background technology
It is continued to develop as indoor decorating industrializes, various forms of assembled ground pavement technologies are researched and developed in succession Success, more and more assembled flooring products emerge in large numbers on the market, and the bridging arrangement mode of flooring product is more, but for ground Face product is still the emphasis studied at present from the overlap joint of different matured products.
In the prior art, because construction needs, between floor and wall face decorating layer it is general all between be separated with certain gap, should The presence in gap influences beauty, and dust is fallen into the gap, it is also difficult to be swept.
Utility model content
The purpose of this utility model is to provide a kind of floors that can seal the gap between floor and wall face decorating layer With the paving structure of metope.
Technical solutions of the utility model provide a kind of paving structure on floor and metope, including floor leveling layer, metope are looked for Flat bed, the mat formation floor on the floor leveling layer and the wall face decorating layer on the metope screed-coat;
The lower end of the metope screed-coat is connected on the floor leveling layer;
The floor is located at the lower section of the wall face decorating layer, between the lower end of the wall face decorating layer and the floor It is formed with interval gap;
The skirting for blocking the interval gap is connected on the wall face decorating layer.
Further, the skirting includes backboard, the top plate that is connected on the top of the backboard and is connected to described Bottom plate on the bottom end of backboard;
The top plate and the bottom plate are respectively facing the wall face decorating layer and extend;
It is provided with recess portion on the backboard, screw is provided in the recess portion, the skirting passes through the screw It is fastened on the wall face decorating layer;
End cap is configured on the recess portion.
Further, the filling with sealant layer between the top of the backboard and the wall face decorating layer;
The sealant layer is also filled between the bottom end of the backboard and the floor.
Further, it is extended with top plate extension board towards the direction of the bottom plate on the top plate, the top plate extends Plate is bonded with the wall face decorating layer.
Further, Elastic buckle is provided on the end cap, the Elastic buckle engaging is within the recess.
Further, it is extended with lug boss in the recess portion, bending part is set on the Elastic buckle;
The bending part is fastened togather with the lug boss.
Further, it is connected with L-type connector between the lower end of the wall face decorating layer and the metope screed-coat.
Further, it is connected with U-shaped connector in the lower end of the metope screed-coat, the U-shaped connector passes through fastening Part is connected on the floor leveling layer.
Further, the floor is solid wooden floor board, or is compoiste wood floor, or is porcelain-plastic floor, or is stone plastic floor.
Further, gap adjustment elastic element is provided between the solid wooden floor board and the metope screed-coat, or Person is provided with the gap adjustment elastic element between the compoiste wood floor and the metope screed-coat.
Using above-mentioned technical proposal, have the advantages that:
By connecting skirting on wall face decorating layer, the gap between floor and wall face decorating layer can be blocked, is improved Performance attractive in appearance and practicability, realize the smart and stress stability of Floor edge for connection with wall, simple operation, quickly.
The paving structure on floor provided by the utility model and metope is produced in factory industry metaplasia, is only needed at finishing scene Simply to be installed, scene realizes rapid construction without masterful technique worker without the too many construction time, And avoid the messy situation in traditional fitment operation scene.
Description of the drawings
Fig. 1 is the schematic diagram of the paving structure on floor and metope that one embodiment of the utility model provides;
Fig. 2 is the structural schematic diagram of skirting shown in FIG. 1;
Fig. 3 is the explosive view of skirting shown in Fig. 2;
Fig. 4 is the schematic diagram for the U-shaped connector being connected on the lower end of metope screed-coat;
Fig. 5 is the schematic diagram of the paving structure of solid wooden floor board and metope that one embodiment of the utility model provides;
Fig. 6 is the schematic diagram of the paving structure of compoiste wood floor and metope that one embodiment of the utility model provides.
Specific implementation mode
Further illustrate specific embodiment of the present utility model below in conjunction with the accompanying drawings.Wherein identical parts phase Same reference numeral indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper" and "lower" refers to that the direction in attached drawing, word "inner" and "outside" refer respectively to the side towards or away from geometric center of specific component To.
As shown in Figure 1, the paving structure on the offer of one embodiment of the utility model floor and metope, including floor leveling layer 1, Metope screed-coat 2, the mat formation floor 3 on floor leveling layer 1 and the wall face decorating layer on metope screed-coat 24.
The lower end of metope screed-coat 2 is connected on floor leveling layer 1.
Floor 3 is located at the lower section of wall face decorating layer 4, and compartment is formed between the lower end of wall face decorating layer 4 and floor 3 Gap 5.
The skirting 6 for blocking interval gap 5 is connected on wall face decorating layer 4.
Metope screed-coat 2 is levelling for being carried out to metope 100, and lower end is fixed on floor leveling layer.Metope screed-coat 2 For plank.
Floor leveling layer 1 is used for floor leveling, can be with plank, or concrete structure.Mat formation on ground on floor 3 On face screed-coat 1.
Wall face decorating layer 4 can be used for decorating interior, can arrange color, picture etc. in the above, installation On metope screed-coat 2.
The lower end of wall face decorating layer 4 is located at the top on floor 3, is thus formed with interval gap 5 therebetween.
Skirting 6 is mounted on wall face decorating layer 4, and interval gap 5 is covered, and plays the role of blocking interval gap 5, Performance attractive in appearance and practicability are improved, realizes the smart and stress stability of Floor edge for connection with wall, simple operation, quickly.
Preferably, as Figure 2-3, skirting 6 includes backboard 61,611 and of top plate being connected on the top of backboard 61 The bottom plate 612 being connected on the bottom end of backboard 61.
Top plate 611 and bottom plate 612 are respectively facing the extension of wall face decorating layer 4.
It is provided with recess portion 615 on backboard 61, screw 63 is provided in recess portion 615.
Skirting 6 is fastened on by screw 63 on wall face decorating layer 4, and end cap 62 is configured on recess portion 615.
Backboard 61, top plate 611, bottom plate 612 are integrally formed.
When assembling, top plate 611 is contacted with wall face decorating layer 4, and bottom plate 612 and its extension board 614 above are located at compartment In gap 5.The lower part of backboard 61 shelters from interval gap 5.
Certainly, in assembling, the direction of skirting can also be inverted, top plate 611 and the position of bottom plate 612 is made to exchange.
By the way that recess portion 615 is arranged on backboard 61, screw 63 is arranged in recess portion 615, so that the head of screw Backboard 61 will not be exposed, then end cap 62 is buckled on recess portion 615 again, play the role of blocking screw.
Preferably, as shown in Figs. 1-3, the filling with sealant layer 10 between the top of backboard 61 and wall face decorating layer 4, to The connection gap on the top and wall face decorating layer 4 of seal back plate 61.
Sealant layer 10 is also filled between the bottom end of backboard 61 and floor 3, to which screening is fully sealed in spaced slot 5 Gear.
Preferably, as Figure 2-3, top plate extension board 613 is extended with towards the direction of bottom plate 612 on top plate 611, push up Plate extension board 613 is bonded with wall face decorating layer 4, may be implemented to be stably connected with, and is conducive to installation.
Preferably, as shown in figure 3, being provided with Elastic buckle 621 on end cap 62, Elastic buckle 621 is fastened on recess portion 615 It is interior.Elastic buckle 621 is the buckle with elastic deformation ability, is conducive to plastic buckle and metal buckle, by by Elastic buckle 621 are fastened in recess portion 615, may be implemented end cap 62 being fastened on recess portion 615.
Preferably, as shown in figure 3, be extended with lug boss 616 in recess portion 615, bending part is set on Elastic buckle 621 622.When assembling, bending part 621 is fastened togather with lug boss 616, improves connective stability, avoids end cap 62 automatically de- It falls.
Preferably, as shown in Figure 1, being connected with L-type connector between the lower end of wall face decorating layer 4 and metope screed-coat 2 7, improve connective stability between the two.
Preferably, as shown in Figure 1 and Figure 4, U-shaped connector 8, U-shaped connector 8 are connected in the lower end of metope screed-coat 2 It is connected on floor leveling layer 1 by fastener 9.Fastener 9 can be bolt.The lower end of metope screed-coat 2 is inserted in U-shaped company In fitting 8, U-shaped connector 8 is fixed on floor leveling layer 1, and fastener 9 can connect U-shaped connector 8 and floor leveling layer 1, Floor leveling layer 1 and metope screed-coat 2 can also be connected, improves connection floor leveling layer 1 and metope screed-coat 2 between the two Connective stability and diversity, while U-shaped connector 8 plays the role of guiding and limit to metope screed-coat 2.
Preferably, floor 2 can be solid wooden floor board, or be compoiste wood floor, or be porcelain-plastic floor, or be stone plastic floor.
Solid wooden floor board is the floor decorative material formed after natural timber drying, processing.Solid wooden floor board also known as log Plate is the floor being directly processed into solid wood.It has the texture that timber is grown naturally, is the non-conductor of heat, can play the winter The cool effect of warm summer, has comfortable foot feeling, advantage safe to use.
Compoiste wood floor is consolidated floor, is usually to be formed by four layer materials are compound, i.e. wearing layer, decorative layer, highly dense Spend substrate layer, balance (moisture-proof) layer.Its is wear-resisting, stability is good, be easy nursing, sexual valence is relatively high, fire protecting performance is good.
It by high molecular material adds PVC to be made to porcelain-plastic floor, more environmentally friendly, not will produce and puts during manufacture and use Penetrating property substance and formaldehyde.
Stone plastic floor is PVC sheet floor, and natural marble powder is used to constitute high density, high microsteping reticular structure Solid base, surface coated with superpower wear-resistant macromolecule PVC wearing layers, it is durable.
Preferably, as seen in figs. 5-6, gap adjustment elasticity member is provided between solid wooden floor board 31 and metope screed-coat 2 Part 30, or gap adjustment elastic element 30 is provided between compoiste wood floor 32 and metope screed-coat 2.Gap adjustment elasticity Element 30 is used to adjust the gap between solid wooden floor board 31 or compoiste wood floor 32 and metope screed-coat 2, to absorb solid wooden floor board 31 or compoiste wood floor 32 expand with heat and contract with cold.
Gap adjustment elastic element 30 can be with elastic piece or spring.
Porcelain-plastic floor and stone plastic floor may be used scheme shown in FIG. 1 and mat formation.
As needed, above-mentioned each technical solution can be combined, to reach best-of-breed technology effect.
Above-described is only the principles of the present invention and preferred embodiment.It should be pointed out that for the general of this field For logical technical staff, on the basis of the utility model principle, several other modifications can also be made, this practicality is also should be regarded as Novel protection domain.

Claims (10)

1. the paving structure on a kind of floor and metope, which is characterized in that including floor leveling layer, metope screed-coat, mat formation in institute State the floor on floor leveling layer and the wall face decorating layer on the metope screed-coat;
The lower end of the metope screed-coat is connected on the floor leveling layer;
The floor is located at the lower section of the wall face decorating layer, is formed between the lower end of the wall face decorating layer and the floor There is interval gap;
The skirting for blocking the interval gap is connected on the wall face decorating layer.
2. the paving structure on floor according to claim 1 and metope, which is characterized in that the skirting include backboard, The top plate being connected on the top of the backboard and the bottom plate being connected on the bottom end of the backboard;
The top plate and the bottom plate are respectively facing the wall face decorating layer and extend;
It is provided with recess portion on the backboard, screw is provided in the recess portion, the skirting is fastened by the screw On the wall face decorating layer;
End cap is configured on the recess portion.
3. the paving structure on floor according to claim 2 and metope, which is characterized in that on the top of the backboard and institute State filling with sealant layer between wall face decorating layer;
The sealant layer is also filled between the bottom end of the backboard and the floor.
4. the paving structure on floor according to claim 2 and metope, which is characterized in that on the top plate described in The direction of bottom plate is extended with top plate extension board, and the top plate extension board is bonded with the wall face decorating layer.
5. the paving structure on floor according to claim 2 and metope, which is characterized in that be provided with bullet on the end cap Property buckle, Elastic buckle engaging is within the recess.
6. the paving structure on floor according to claim 5 and metope, which is characterized in that be extended in the recess portion convex Bending part is arranged on the Elastic buckle in the portion of rising;
The bending part is fastened togather with the lug boss.
7. the paving structure on floor according to claim 1 and metope, which is characterized in that under the wall face decorating layer It is connected with L-type connector between end and the metope screed-coat.
8. the paving structure on floor according to claim 1 and metope, which is characterized in that under the metope screed-coat End is connected with U-shaped connector, and the U-shaped connector is connected to by fastener on the floor leveling layer.
9. the paving structure on the floor and metope according to any claim in claim 1-8, which is characterized in that described Floor is solid wooden floor board, or is compoiste wood floor, or is porcelain-plastic floor, or is stone plastic floor.
10. the paving structure on floor according to claim 9 and metope, which is characterized in that in the solid wooden floor board and institute State and be provided with gap adjustment elastic element between metope screed-coat, or the compoiste wood floor and the metope screed-coat it Between be provided with the gap adjustment elastic element.
CN201721921843.0U 2017-12-30 2017-12-30 A kind of paving structure on floor and metope Active CN207974473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721921843.0U CN207974473U (en) 2017-12-30 2017-12-30 A kind of paving structure on floor and metope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721921843.0U CN207974473U (en) 2017-12-30 2017-12-30 A kind of paving structure on floor and metope

Publications (1)

Publication Number Publication Date
CN207974473U true CN207974473U (en) 2018-10-16

Family

ID=63768366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721921843.0U Active CN207974473U (en) 2017-12-30 2017-12-30 A kind of paving structure on floor and metope

Country Status (1)

Country Link
CN (1) CN207974473U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219371A (en) * 2019-07-12 2019-09-10 四川省玖典装配式装修有限公司 Assembled furred ceiling and metope Demountable
CN110241998A (en) * 2019-06-20 2019-09-17 金螳螂精装科技(苏州)有限公司 A kind of assembled wallboard mounting structure of quick adjusting degree of plainness for wall surface
CN111101684A (en) * 2020-01-13 2020-05-05 泉州台商投资区源平信息技术有限公司 Floor laying method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241998A (en) * 2019-06-20 2019-09-17 金螳螂精装科技(苏州)有限公司 A kind of assembled wallboard mounting structure of quick adjusting degree of plainness for wall surface
CN110219371A (en) * 2019-07-12 2019-09-10 四川省玖典装配式装修有限公司 Assembled furred ceiling and metope Demountable
CN111101684A (en) * 2020-01-13 2020-05-05 泉州台商投资区源平信息技术有限公司 Floor laying method

Similar Documents

Publication Publication Date Title
US20220220747A1 (en) Panel
US11753832B2 (en) Engineered waterproof plastic composite flooring and wall covering planks
CN207974473U (en) A kind of paving structure on floor and metope
EP3397825B1 (en) Floor panel for forming a floor covering
CA2380303A1 (en) Floor covering plate
CA2493579A1 (en) Arrangement of parts comprising connecting elements
KR100996878B1 (en) Self-assembly tile
CN101107409A (en) Floor panel
UA127998C2 (en) Panel, in particular a floor panel or wall panel, and panel covering
CN207974448U (en) A kind of kitchen threshold stone connection structure
CN111997299A (en) High-hardness aluminum alloy floor with hardened powder coating
CN207032775U (en) A kind of flame-proof abrasion-resistant PVC floor
CN207999024U (en) A kind of kitchen threshold stone connection component
CN205976316U (en) Interior decoration floor
CN209025366U (en) Heat insulating decorative board hanging structure
CN203097214U (en) Novel floor
CN206016163U (en) A kind of spliced PVC athletic floors
CN202391062U (en) Novel composite floor
KR20120017177A (en) Floor with a heat conductive structure
CN205935493U (en) Fireproof thermal -insulation decorating plate
CN201881439U (en) Volcano honeycomb stone bonded solid wood slip-resistance assembling plate
CN207974466U (en) A kind of toilet threshold stone connecting elements
CN203373944U (en) Novel multi-layer solid wood floor
CN200978512Y (en) Wood-plastic floor
CN202913615U (en) Pasting-free composite floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant