CN207974146U - A kind of shallow embedding pipe gallery engineering integrative construction device - Google Patents

A kind of shallow embedding pipe gallery engineering integrative construction device Download PDF

Info

Publication number
CN207974146U
CN207974146U CN201721790853.5U CN201721790853U CN207974146U CN 207974146 U CN207974146 U CN 207974146U CN 201721790853 U CN201721790853 U CN 201721790853U CN 207974146 U CN207974146 U CN 207974146U
Authority
CN
China
Prior art keywords
pipe gallery
telescopic
cutterhead
construction device
shallow embedding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721790853.5U
Other languages
Chinese (zh)
Inventor
雷明锋
林越翔
黄毅翔
段强
罗文帮
施成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
China Construction Tunnel Construction Co Ltd
Original Assignee
Central South University
China Construction Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, China Construction Tunnel Construction Co Ltd filed Critical Central South University
Priority to CN201721790853.5U priority Critical patent/CN207974146U/en
Application granted granted Critical
Publication of CN207974146U publication Critical patent/CN207974146U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of shallow embedding pipe gallery engineering integrative construction devices, including are set on the steel plate of development end top and can be moved up and down along the development end top, the telescopic cutterhead for cutting the soil body;The fixation cutter head for cutting the soil body is provided on the development end lower steel plate;The fixation cutter head is provided with soil cabin close to the side of piping lane;Screw conveyor one end is set in the soil cabin, and the other end is set to above dregs conveyer belt one end;The dregs conveyer belt other end stretches out piping lane.Excavation system is integrated by the utility model with support system, has saved time and the construction cost of additional build supporting construction, has substantially increased construction efficiency.

Description

A kind of shallow embedding pipe gallery engineering integrative construction device
Technical field
The utility model is related to Urban Underground pipe gallery technical field of construction, especially a kind of shallow embedding pipe gallery engineering Integrative construction device
Background technology
In recent years, China pays much attention to Urban Underground pipe gallery construction, is actively developed in each big city and deploys construction Pilot work, the Urban Underground pipe gallery construction in China have also welcome the peak period built.However, building due to pipe gallery If work just starts to walk, therefore still remains many needs in construction technology and construction method and reinforce and improved place.
The country has certain Outcome accumulation, such as utility model patent for pipe gallery construction technology at present CN104912101A discloses a kind of the driving splicing structure and its construction method of pipe gallery.Using shield excavation machine and pushing tow Device thrustor is combined, it is proposed that a kind of novel pipe gallery driving splicing structure and construction method carry to a certain extent The high construction efficiency of pipe gallery.Utility model patent CN105625469A discloses a kind of prefabricated pipe gallery Construction method, it is proposed that allow hanging device spread with regard to bottom plate on carry out operation, paving with regard to inversely applying side after the completion of top plate Plate and top board structure, to save construction and the time cost of building temporary road.Utility model patent CN205743914U A kind of underground pipe gallery constructing device and assembly are disclosed, a kind of driving along prefabricated piping lane optimal crosssection is devised and fills It sets, and coordinates corresponding thrustor, a new approaches are provided to accelerate underground pipe gallery speed of application.
The existing pipe gallery construction technology of comprehensive analysis need to additionally be built as it can be seen that during building pipe gallery Side wall construction support system, or slope processing is carried out to abutment wall.This traditional construction technology not only increases quantities, Constrain the speed for building pipe gallery.Dregs caused by digging process simultaneously, can not reasonably utilize in time, increase Construction cost, also results in the wasting of resources.
For defect existing in Urban Underground pipe gallery construction technology, designs a kind of can realize and exempt from the new of supporting The technical issues of Urban Underground pipe gallery rapid construction means of type have become urgent need to resolve.
Utility model content
Technical problem to be solved in the utility model is, in view of the shortcomings of the prior art, providing a kind of shallow embedding pipe gallery Engineering integrative construction device improves construction efficiency, avoids the dismounting process of traditional support, support pattern is more flexible, avoids The wasting of resources of dregs outward transport.
In order to solve the above technical problems, technical solution used by the utility model is:A kind of shallow embedding pipe gallery engineering Integrative construction device, which is characterized in that including being set to development end top and can be moved up and down along the development end top Telescopic cutterhead;The development end lower part is provided with fixation cutter head;The fixation cutter head rear is provided with soil cabin;Screw conveyor One end is set in the soil cabin, and the other end is set to above dregs conveyer belt one end;The dregs conveyer belt other end stretches out Piping lane.
The cutter engine for driving the telescopic cutterhead and the fixation cutter head is provided on the soil cabin side wall.
The telescopic cutterhead both sides lower mobile telescopic backplate can respectively be connect with one piece in vertical direction.
The telescopic backplate bottom end and the very heavy top contact of backplate;Pass through more stulls between two pieces of telescopic backplates Connection.
The telescopic cutterhead top is hinged with flexible fagging;The flexible fagging is obliquely installed, and the flexible fagging Middle part is provided with stretching structure;The flexible fagging bottom end is hinged with horizontally disposed shield top plate.
The telescopic cutterhead bottom end is provided with knife rest jack.
The stretching structure includes multiple fixed hangnails, multiple hangnail boards;The fixed hangnail, hangnail board interval are set It sets, extension stem is provided on the hangnail board;When the telescopic cutterhead moves up, the extension stem, hangnail board It stretches out so that the stretching structure extends;When the telescopic cutterhead moves down, the extension stem is retracted, the hangnail Board is retracted so that the stretching structure shortens.
It further include top-pushing mechanism;The top-pushing mechanism includes pusher;The pusher is contacted with force bearing plate, force bearing plate four Week is consolidated in shield top plate and bottom plate and fixed backplate respectively.
Compared with prior art, it is had the beneficial effect that possessed by the utility model:The utility model will excavate system and branch Watch box system is integrated, and has saved time and the construction cost of additional build supporting construction, has substantially increased construction efficiency;Pass through The effect of pushing tow system realizes that support system advances with the system of excavation along tunneling direction, avoids the dismounting process of traditional support, Support pattern is more flexible, and construction method is also more succinct;Backfill system can rapidly remove the dregs in soil cabin, realize to slag The local use of soil avoids the wasting of resources of dregs outward transport, meets environmentally protective construction concept, while can be when shortest Interior recovery traffic above-ground or earth's surface.
Description of the drawings
Fig. 1 is one embodiment side view of the utility model.
Fig. 2 is one embodiment front view of the utility model.
Fig. 3 the utility model steel support structure figures.
Fig. 4 extension-type supporting board detail structure schematic diagrames.
The telescopic backplate detail structure schematic diagrames of Fig. 5.
Specific implementation mode
As shown in Figure 1 and Figure 2, one embodiment of the utility model includes excavation system 1, is moved for Rapid Excavation and in time Except dregs, is formed and build piping lane working space;Support system 2 is provided for providing temporary support for piping lane main structure construction The working environment of safety;Backfill system 3 realizes the local use to dregs, and the piping lane agent structure completed to construction is returned It fills out, fast quick-recovery road traffic or earth's surface;Pushing tow system 4 provides power for the advance of excavation system.
As shown in Figure 2, Figure 3, Figure 4, system is excavated by telescopic cutterhead 11, and fixation cutter head 12, stretch fagging 13, and cutter draws Hold up the composition such as 14 and cutterhead jack 15.Telescopic cutterhead 11 is hinged with flexible fagging 13, is lifted by cutterhead jack 15 With reduction cutterhead the cutting of the Pipe rack main body above section soil body is completed to adapt to different buried depth operating mode.Fixed cutterhead 12 The steel plate 19 being embedded in below development end completes the cutting of the piping lane body structure portion soil body.Extension-type supporting board 13 is embedded in pick It is hinged with shield top plate 111 into face top steel plate 110, by 13 internal structure of extension-type supporting board, branch is provided for telescopic cutterhead Support, balancing earth pressure power.Cutter engine 14 provides power for cutter normal operation.
Stretching structure in the middle part of flexible fagging is formed by fixing hangnail 16, extension stem 17 and hangnail board 18.By stretching The effect of contracting stick 17 puts down hangnail board 18 when telescopic cutterhead rises, it is made to be engaged with fixed hangnail 16;In flexible knife It when disk declines, first passes through cutterhead jack 15 and further lifts cutterhead 11, then pack up hangnail board 18, realize cutterhead to moving down It is dynamic.
Such as Fig. 5, support system 2 supports 22 (i.e. stulls 22) by telescopic backplate 21, steel and backplate jack 23 is constituted.It stretches Contracting formula backplate 21 is connected and flushes with telescopic cutterhead 11, backplate height is adjusted by backplate jacking equipment 23, to adapt to not With buried depth operating mode.Steel supports 22 distortions, is consolidated in left-and-right guard board, and enhancing inhibits the ability of wall deformation.Support system 2 is solid It ties in cutter head structure, advances along direction is excavated with the system of excavation, realize to having excavated, but do not complete piping lane main structure construction The temporary support of section eliminates traditional pattern foundation pit supporting structure work, improves construction efficiency, saved time and construction cost.
Backfill system 3 is made of soil cabin 31, screw conveyor 32 and dregs conveyer belt 33.Work progress uses cut and cover method Construction, the dregs in soil cabin 31 can be removed to earth's surface, provide backfilling material by screw conveyor 32 and dregs conveyer belt 33, To realize the local use of dregs, the wasting of resources for avoiding dregs from transporting outward meets environmentally protective construction concept.
Pushing tow system 4 includes force bearing plate 41 and pusher 42.Pusher 42 is made of at least one jack, and end is placed in Pipe rack, leading portion are placed in force bearing plate 41, are circumferentially uniformly distributed in shield surrounding.By the way that the jacking force of jack is arranged, it is The advance of excavation system provides power and adjustable driving attitude.
Into existing foundation pit, the device of the utility model is lifted, and completes the overlap joint between each system and assembling.According to reality Border working condition adjusts telescopic cutterhead and telescopic backplate by cutterhead jack and backplate jack, makes excavation system And it is flushed with earth's surface at the top of support system.
It is tunneled forward simultaneously by the telescopic cutterhead of excavation system and fixed cutterhead first, is formed and build pipe gallery Working space.
In tunneling process forward, synergy is supportted by telescopic backplate and steel, constrains side wall soil deformation, balances side Wall soil pressure, based on structure construction stable working environment is provided.
Then by backfilling system, by the associated working of screw conveyer and dregs conveyer belt, by the dregs in soil cabin It is transferred to construction to complete and reach the piping lane part after pre-provisioning request, as backfilling material.
After completing the construction of piping lane agent structure of respective section, by the pusher in pushing tow system, by whole dress It sets and pushes ahead, into next work cycle.

Claims (8)

1. a kind of shallow embedding pipe gallery engineering integrative construction device, which is characterized in that including being set to development end top and energy The telescopic cutterhead (11) moved up and down along the development end top;The development end lower part is provided with fixation cutter head (12);Institute It states fixation cutter head (12) rear and is provided with soil cabin (31);Screw conveyor (32) one end is set in the soil cabin (31), another End is set to above dregs conveyer belt (33) one end;Dregs conveyer belt (33) other end stretches out piping lane.
2. shallow embedding pipe gallery engineering integrative construction device according to claim 1, which is characterized in that the soil cabin (31) the cutter engine (14) for driving the telescopic cutterhead (11) and the fixation cutter head (12) is provided on side wall.
3. shallow embedding pipe gallery engineering integrative construction device according to claim 1, which is characterized in that described telescopic Cutterhead (11) both sides lower mobile telescopic backplate (21) can respectively be connect with one piece in vertical direction.
4. shallow embedding pipe gallery engineering integrative construction device according to claim 3, which is characterized in that described telescopic Backplate (21) bottom end is contacted with backplate jack (23);Between two pieces of telescopic backplates (21) even by more stulls (22) It connects.
5. shallow embedding pipe gallery engineering integrative construction device according to claim 1, which is characterized in that described telescopic Cutterhead (11) top is hinged with flexible fagging (13);The flexible fagging (13) is obliquely installed, and in the flexible fagging (13) Portion is provided with stretching structure;Flexible fagging (13) bottom end is hinged with horizontally disposed shield top plate (111).
6. shallow embedding pipe gallery engineering integrative construction device according to claim 5, which is characterized in that described telescopic Cutterhead (11) bottom end is provided with knife rest jack (15).
7. shallow embedding pipe gallery engineering integrative construction device according to claim 5, which is characterized in that the flexible knot Structure includes multiple fixed hangnails (16), multiple hangnail boards (18);The fixed hangnail (16), hangnail board (18) interval are set It sets, extension stem (17) is provided on the hangnail board (18);It is described flexible when the telescopic cutterhead (11) moves up Stick (17), hangnail board (18) stretch out so that the stretching structure extends;When the telescopic cutterhead (11) moves down, The extension stem (17) is retracted, and the hangnail board (18) is retracted so that the stretching structure shortens.
8. shallow embedding pipe gallery engineering integrative construction device according to claim 1, which is characterized in that further include pushing tow Mechanism;The top-pushing mechanism includes pusher (42);The pusher (42) contacts with force bearing plate (41), force bearing plate surrounding difference It is consolidated in shield top plate (111), bottom plate (112) and fixed backplate (24).
CN201721790853.5U 2017-12-20 2017-12-20 A kind of shallow embedding pipe gallery engineering integrative construction device Active CN207974146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721790853.5U CN207974146U (en) 2017-12-20 2017-12-20 A kind of shallow embedding pipe gallery engineering integrative construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721790853.5U CN207974146U (en) 2017-12-20 2017-12-20 A kind of shallow embedding pipe gallery engineering integrative construction device

Publications (1)

Publication Number Publication Date
CN207974146U true CN207974146U (en) 2018-10-16

Family

ID=63771572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721790853.5U Active CN207974146U (en) 2017-12-20 2017-12-20 A kind of shallow embedding pipe gallery engineering integrative construction device

Country Status (1)

Country Link
CN (1) CN207974146U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108018882A (en) * 2017-12-20 2018-05-11 中南大学 A kind of shallow embedding pipe gallery engineering integrative construction device
CN110042856A (en) * 2019-05-07 2019-07-23 东华理工大学 A kind of open caisson and excavation method for barrier lake dredging flow groove mechanical excavation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108018882A (en) * 2017-12-20 2018-05-11 中南大学 A kind of shallow embedding pipe gallery engineering integrative construction device
CN108018882B (en) * 2017-12-20 2023-09-26 中南大学 Shallow comprehensive pipe rack engineering integrated construction device
CN110042856A (en) * 2019-05-07 2019-07-23 东华理工大学 A kind of open caisson and excavation method for barrier lake dredging flow groove mechanical excavation
CN110042856B (en) * 2019-05-07 2024-01-23 东华理工大学 Open caisson for mechanical excavation of barrier lake drainage groove and excavation method

Similar Documents

Publication Publication Date Title
CN105298507A (en) Underground pipe gallery construction method of machine performing open excavation on upper portion and tunneling on lower portion
CN102410017B (en) Supporting type integrated tunneling-anchoring machine
CN103075163B (en) Support change process of second liner construction of large-cross-section tunnel
CN104564090A (en) Multifunctional tunnel repairing integrated machine
CN207974146U (en) A kind of shallow embedding pipe gallery engineering integrative construction device
WO2018133740A1 (en) Underground building and construction method for same
CN104373147B (en) Folding extension type roadway hydraulic bracket
CN109339096A (en) A kind of construction integrated constructing device of pipe gallery open cut precast assembly and its construction method
CN104632233A (en) Mechanical repair technology of distortional roadway and roadway repair machine
CN105570534A (en) Shallow-burial-depth pipe-jacking equipment capable of controlling ground structural deformation and construction method
CN106437734B (en) The shape of a hoof shield excavating device and tunnel excavation method of anhydrous soft soil tunnel
CN108018882A (en) A kind of shallow embedding pipe gallery engineering integrative construction device
CN211648075U (en) Gas drainage hole sealing slip casting device for coal mine
CN102587923A (en) Center shaft type precutting trough equipment
CN110821508A (en) Rock mining device and method for penetrating through surrounding rock of broken zone
CN108708397B (en) Frame laying method for standard sections of underground pipe gallery
CN106761764A (en) A kind of super-large diameter deep shaft simple shield device and shield method
CN211115999U (en) Rock mining device for penetrating through surrounding rock of broken zone
JP2022094289A (en) Top-down pipe propulsion vertical pit starting device in shield tunnel and construction method thereof
CN211549698U (en) Jacking working pit
CN212424722U (en) Coal loading machine for underground coal mine
CN107503374A (en) A kind of piping lane Operation Van
CN208749354U (en) Shallow buried covered excavation Urban Underground pipe gallery
CN102518458A (en) Structure of top beam part of underground bus stop and construction method thereof
CN108412515B (en) The big component transportation resources of TBM in a kind of tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant