CN207974023U - Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier - Google Patents

Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier Download PDF

Info

Publication number
CN207974023U
CN207974023U CN201721610625.5U CN201721610625U CN207974023U CN 207974023 U CN207974023 U CN 207974023U CN 201721610625 U CN201721610625 U CN 201721610625U CN 207974023 U CN207974023 U CN 207974023U
Authority
CN
China
Prior art keywords
bridge pier
pushing
electronic control
control unit
hydraulic jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721610625.5U
Other languages
Chinese (zh)
Inventor
田兵
杨晖
吴楠
徐建辉
代和松
刘本良
秦俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Qiao Tian Heavy Industry Co Ltd
Original Assignee
Jiangxi Qiao Tian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Qiao Tian Heavy Industry Co Ltd filed Critical Jiangxi Qiao Tian Heavy Industry Co Ltd
Priority to CN201721610625.5U priority Critical patent/CN207974023U/en
Application granted granted Critical
Publication of CN207974023U publication Critical patent/CN207974023U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of incremental launching construction by multipoint jacking device of multi-joint multi-span steel beam based on independent non-rigid bridge pier, one hydraulic jack pushing unit is set on each bridge pier, there are one successively incremeantal launching method slide constructions for setting at hydraulic jack pushing unit, hydraulic jack pushing unit connects girder steel with successively incremeantal launching method sliding equipment by pushing reaction track, pushing reaction track is along bridge to arrangement, it is provided with plug pin system between hydraulic jack pushing unit and pushing reaction track, displacement of bridge pier range-measurement system is provided between successively incremeantal launching method slide construction and bridge pier;The beneficial effects of the utility model:Each standing pier, which can be controlled, to be allowed to synchronize pushing tow within the scope of offset deviation value, to ensure that bridge pier is not destroyed by jacking force, and improves girder steel construction quality and speed.

Description

Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier
Technical field
The utility model is related to technical field of bridge construction, it particularly relates to which a kind of multi-joint multi-span steel beam is based on independently The incremental launching construction by multipoint jacking device of non-rigid bridge pier.
Background technology
With the enlargement of China's infrastructure construction, need the project ambient enviroment built increasingly complicated, especially across The bridge girder steel of navigation channel, highway, existing railway line etc. is constructed, and in order to not influence former facility operation and ensures security needs, Do not allow to use free cantilever erection technique, segment lifting that heavy mechanical equipment is needed to be transported and lifted, and existing continuous thousand Cooperation steel hinge line in jin top draws (notification number CN101831874A and CN102359071A), and each pushing tow point is both needed to setting slideway, And since horizontal reacting force is larger, bridge pier need to be carried out reinforce or continuous jack is directly fixed on slideway front end, separately due to The natural resiliency modulus feature and steel hinge line quantity of steel hinge line are more, each continuous jack displacement for acquiring and controlling in system It is transmitted by the inequality elastic elongation factor of steel hinge line, the effect of synchronous push is not achieved in practice of construction at all.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Utility model content
For above-mentioned technical problem in the related technology, the utility model proposes a kind of multi-joint multi-span steel beams based on independent non- The incremental launching construction by multipoint jacking device of Rigid Pier, can solve defect existing in the prior art.
To realize the above-mentioned technical purpose, the technical solution of the utility model is realized in:
A kind of incremental launching construction by multipoint jacking device of multi-joint multi-span steel beam based on independent non-rigid bridge pier is arranged one on each bridge pier A hydraulic jack pushing unit, there are one successively incremeantal launching method slide constructions for setting at the hydraulic jack pushing unit, described Hydraulic jack pushing unit connects girder steel, the pushing reaction track with successively incremeantal launching method sliding equipment by pushing reaction track Along bridge to arrangement, plug pin system is provided between the hydraulic jack pushing unit and the pushing reaction track, it is described Displacement of bridge pier range-measurement system is provided between successively incremeantal launching method slide construction and bridge pier;
Each hydraulic jack pushing unit is communicated to connect there are one hydraulic station, and each hydraulic station communicates to connect There are one local electronic control unit system, each local electronic control unit system communication is connected with main electronic control unit system and corresponding Displacement of bridge pier range-measurement system.
Further, the communication terminal of the main electronic control unit system connects the communication terminal of each local electronic control unit system, respectively The hydraulic control signal output end of local electronic control unit system connects corresponding hydraulic station control signal input, the hydraulic station The corresponding local electronic control unit system of status signal output connection hydraulic station state signal input terminal, each displacement of bridge pier ranging The jack displacement signal input terminal of the corresponding local electronic control unit system of signal output end connection of system.
The beneficial effects of the utility model:The steel girder erection under complex environment across navigation channel, railway, highway can be achieved to ask Topic;The thrustor being arranged on multiple bridge piers can be controlled simultaneously, reinforcement protection need not be carried out to bridge pier, and by right The real-time monitoring of each bridge pier can ensure that bridge pier is not damaged, and compared with prior art, this scheme passes through the jacking force to pipe bending cylinder Comprehensive Control is carried out with pushing tow speed, is the operating mode for being truly realized girder steel incremental launching construction by multipoint jacking, keeps supporting point horizontal force close It is 0, improves the construction quality and speed of girder steel, eliminates slideway, Bridge Pier reinforcement, solve pushing tow horizontal reacting force To the damage risk of bridge pier, under the guiding role of horizontal reacting force track, pushing tow, which also ensure that, will not occur lateral shift.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is that multiple spot of the multi-joint multi-span steel beam based on independent non-rigid bridge pier according to the utility model embodiment is same Walk the fitting arrangement of thrustor;
Fig. 2 is enlarged diagram at M in Fig. 1;
Fig. 3 is Multipoint synchronous top of the multi-joint multi-span steel beam based on independent non-rigid bridge pier described in the utility model embodiment The control principle drawing of pushing device.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, the every other embodiment that those of ordinary skill in the art are obtained all belongs to In the range of the utility model protection.
As shown in Figs. 1-3,1. a kind of multi-joint multi-span steel beams according to the utility model embodiment are non-just based on independence Property bridge pier incremental launching construction by multipoint jacking device, a hydraulic jack pushing unit 3, the hydraulic jack are set on each bridge pier 1 Pushing up setting at pushing unit 3, there are one successively incremeantal launching method slide construction 4, the hydraulic jack pushing unit 3 and successively incremeantal launching methods to slide Motivation structure 4 connects girder steel 2 by pushing reaction track 6, and the pushing reaction track 6 is along bridge to arrangement, the hydraulic jack Plug pin system 5, the successively incremeantal launching method slide construction 4 and bridge pier are provided between pushing unit 3 and the pushing reaction track 6 Between be provided with displacement of bridge pier range-measurement system 7;Each hydraulic jack pushing unit 3 is communicated to connect there are one hydraulic station 8, Each hydraulic station 8 communicates to connect that there are one local electronic control unit system 9, each local 9 communication links of electronic control unit system It is connected to main electronic control unit system 10 and corresponding displacement of bridge pier range-measurement system 7.
Wherein, the communication terminal of the main electronic control unit system 10 connects the communication terminal of each local electronic control unit system 9, each The hydraulic control signal output end of ground electronic control unit system 9 connects corresponding 8 control signal input of hydraulic station, the hydraulic station 8 status signal output connection corresponds to the hydraulic station state signal input terminal of local electronic control unit system 9, and each displacement of bridge pier is surveyed Signal output end connection away from system 7 corresponds to the jack displacement signal input terminal of local electronic control unit system 9.
In order to facilitate the above-mentioned technical proposal of the utility model is understood, below by way of new to this practicality in specifically used mode The above-mentioned technical proposal of type is described in detail.
When specifically used, according to a kind of multi-joint multi-span steel beam described in the utility model based on independent non-rigid bridge pier Incremental launching construction by multipoint jacking device includes following steps in Specific construction:
S1 init state checks:Each displacement of bridge pier range-measurement system 7 acquires 0 point of 1 initial level displacement of bridge pier, and it is arranged In a bridge pier point be with reference to origin, main electronic control unit system 10 checks the oil cylinder position of each successively incremeantal launching method slide construction 4 and specifies Its piston rod is in retraction end-state, sends out enabling signal;
S2 starts each hydraulic jack pushing unit 3, and plug pin system 5 carries out fastening screw, after the completion of bolt, sends out Bolt completes signal;
S3 enters synchronous push process:Main electronic control unit system 10 receive other each point displacement of bridge pier amount data in real time with It is compared with reference to origin described in step S1, and fine tuning flow and pressure signal, adjustment is sent out to each local electronic control unit system 9 The oil cylinder jacking force and speed of fulcrum between each hydraulic jack pushing unit 3 and girder steel 2 realize girder steel 2 during pushing tow Dynamic adjusts each displacement of bridge pier amount, while main electronic control unit system 10 is flexible by the oil cylinder of each hydraulic jack pushing unit 3 Displacement sensor monitors each oil cylinder pushing tow stroke distances, and when oil cylinder stroke reaches positive foremost position, oil cylinder stops;
S4 plug pin systems 5 are pulled pin, and after the completion of pulling pin, are sent out to pull pin and are completed signal;
S5 is recycled, and main electronic control unit system 10 sends to each successively incremeantal launching method slide construction 4 and instructs, successively incremeantal launching method sliding knot The oil cylinder retraction predetermined stroke of structure 4, and bolt positioning is carried out, realize a pushing tow process;So cycle, until main electronic control unit System 10 receives the signal instruction for stopping successively incremeantal launching method.
In conclusion by means of the utility model above-mentioned technical proposal, it can be achieved that under complex environment across navigation channel, railway, The steel girder erection problem of highway;The thrustor being arranged on multiple bridge piers can be controlled simultaneously, it need not be to bridge pier Reinforcement protection is carried out, and by can ensure that bridge pier is not damaged to the real-time monitoring of each bridge pier, compared with prior art, this scheme is logical It crosses and Comprehensive Control is carried out to the jacking force and pushing tow speed of pipe bending cylinder, be the work for being truly realized girder steel incremental launching construction by multipoint jacking Condition makes supporting point horizontal force be close to 0, improves the construction quality and speed of girder steel, eliminates slideway, Bridge Pier reinforces work Make, solves damage risk of the pushing tow horizontal reacting force to bridge pier, under the guiding role of horizontal reacting force track, pushing tow also ensure that Lateral shift will not occur.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (2)

1. a kind of incremental launching construction by multipoint jacking device of multi-joint multi-span steel beam based on independent non-rigid bridge pier, which is characterized in that
Each bridge pier(1)One hydraulic jack pushing unit of upper setting(3), the hydraulic jack pushing unit(3)Place is set Successively incremeantal launching method slide construction there are one setting(4), the hydraulic jack pushing unit(3)With successively incremeantal launching method slide construction(4)It is logical Cross pushing reaction track(6)Connect girder steel(2), the pushing reaction track(6)Along bridge to arrangement, the hydraulic jack pushing tow Unit(3)With the pushing reaction track(6)Between be provided with plug pin system(5), the successively incremeantal launching method slide construction(4)With Displacement of bridge pier range-measurement system is provided between bridge pier(7);
Each hydraulic jack pushing unit(3)There are one hydraulic stations for communication connection(8), each hydraulic station(8)It is logical There are one local electronic control unit systems for letter connection(9), each local electronic control unit system(9)Communication link is connected to main electronic control unit System(10)With corresponding displacement of bridge pier range-measurement system(7).
2. a kind of incremental launching construction by multipoint jacking dress of the multi-joint multi-span steel beam according to claim 1 based on independent non-rigid bridge pier It sets, which is characterized in that the main electronic control unit system(10)Each local electronic control unit system of communication terminal connection(9)Communication End, each local electronic control unit system(9)Hydraulic control signal output end connect corresponding hydraulic station(8)Control signal input End, the hydraulic station(8)The corresponding local electronic control unit system of status signal output connection(9)Hydraulic station status signal it is defeated Enter end, each displacement of bridge pier range-measurement system(7)The corresponding local electronic control unit system of signal output end connection(9)Jack displacement Signal input part.
CN201721610625.5U 2017-11-28 2017-11-28 Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier Active CN207974023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721610625.5U CN207974023U (en) 2017-11-28 2017-11-28 Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721610625.5U CN207974023U (en) 2017-11-28 2017-11-28 Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier

Publications (1)

Publication Number Publication Date
CN207974023U true CN207974023U (en) 2018-10-16

Family

ID=63771124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721610625.5U Active CN207974023U (en) 2017-11-28 2017-11-28 Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier

Country Status (1)

Country Link
CN (1) CN207974023U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107815975A (en) * 2017-11-28 2018-03-20 江西乔田重工有限公司 Incremental launching construction by multipoint jacking device and construction method of the multi-joint multi-span steel beam based on independent non-rigid bridge pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107815975A (en) * 2017-11-28 2018-03-20 江西乔田重工有限公司 Incremental launching construction by multipoint jacking device and construction method of the multi-joint multi-span steel beam based on independent non-rigid bridge pier

Similar Documents

Publication Publication Date Title
CN107815975A (en) Incremental launching construction by multipoint jacking device and construction method of the multi-joint multi-span steel beam based on independent non-rigid bridge pier
CN100503980C (en) Method for construction of multi-point integral top pulling steel case beam
CN207974023U (en) Incremental launching construction by multipoint jacking device of the multi-joint multi-span steel beam based on independent non-rigid bridge pier
CN104328745B (en) Across the rotary body device of the little bridge beam of high ferro and construction method thereof on a kind of low-angle
CN102400696A (en) Timbering machine and tunneling machine applying same
CN103924528A (en) Overall long-distance pushing slippage construction method for large-span bridge box girder structure of large-span bridge
CN208328721U (en) Cross spacing and deviation-rectifying system suitable for box girder incremental launching method construction
CN206625845U (en) A kind of inverted arch trestle
CN201778277U (en) Hydraulic-lifting street-crossing pedestrian bridge
CN204112239U (en) Across the rotary body device of the little bridge beam of high ferro on a kind of low-angle
CN107060831A (en) One kind is used for tunnel groove constructing device
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN111350131A (en) Construction method of three-span bridge tail beam feeding bridge girder erection machine
CN207878277U (en) A kind of large size girder steel pricks the towed equipment of screw-thread steel and continuous hydraulic top based on essence
CN206844127U (en) A kind of steep side slope forced action type drawing-die
CN214783345U (en) Bridge deck hoisting system of central double-cable-plane cable-stayed bridge
CN110172915A (en) A kind of high tower shaped form crossbeam Joint Re-bar Construction
CN203546622U (en) Folding-turning retractable type cantilever beam system of lower guide beam walking type bridge girder erection machine
CN208594948U (en) Tunnel bottom ash material conveyer
CN107858932B (en) Dragging device and construction method for large steel beam based on finish rolling deformed steel bar and continuous hydraulic roof
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN203362177U (en) Hydraulic traction device for drift template
CN203668779U (en) Double-block type ballastless track sleeper interval adjusting device
CN203006882U (en) Steering mechanism of full-automatic propelling device
CN206785405U (en) One kind is used for tunnel groove constructing device