CN207959219U - Surpass hundred meters of full packages grinding coagulation soil transport systems - Google Patents

Surpass hundred meters of full packages grinding coagulation soil transport systems Download PDF

Info

Publication number
CN207959219U
CN207959219U CN201820275741.4U CN201820275741U CN207959219U CN 207959219 U CN207959219 U CN 207959219U CN 201820275741 U CN201820275741 U CN 201820275741U CN 207959219 U CN207959219 U CN 207959219U
Authority
CN
China
Prior art keywords
full packages
batch
dam
coagulation soil
grinding coagulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820275741.4U
Other languages
Chinese (zh)
Inventor
卢山
覃晓航
王薇
黄树鹏
叶纯信
韩自
经友泉
韦东杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceec Guangxi Hydroelectric Construction Bureau
Original Assignee
Ceec Guangxi Hydroelectric Construction Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Guangxi Hydroelectric Construction Bureau filed Critical Ceec Guangxi Hydroelectric Construction Bureau
Priority to CN201820275741.4U priority Critical patent/CN207959219U/en
Application granted granted Critical
Publication of CN207959219U publication Critical patent/CN207959219U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The utility model, which provides, surpasses hundred meters of full packages grinding coagulation soil transport systems, dome dam dam body is along vertically and horizontally all using curvilinear structures, normal concrete graduation three is used between the dam foundation and riverbed of the dome dam dam body, is connected using High Pressure Consolidation Grouting column and conventional consolidation grouting column between the normal concrete graduation three and riverbed;It is disposed with the first grouting collector drain, the first collector drain and the second collector drain from bottom to up along dome dam dam body, the medium position of dome dam dam body is provided with flushing sluice, pier in the top setting of the dome dam dam body, it is provided with overflow duct between the middle pier, overflow gates of segmental shape is installed on the overflow duct.This Arch Dam Structure can well adapt to karst area condition, while utilize mechanical structure well using the structure of hyperbolic, ensure that stability and the safety of dam, additionally it is possible to greatly shorten construction period.

Description

Surpass hundred meters of full packages grinding coagulation soil transport systems
Technical field
The utility model belongs to RCC double curvature arch dam technical field of construction, more particularly to surpass hundred meters of full packages roll it is mixed Solidifying soil transport system.
Background technology
Ten thousand openning Hydropower Project dam sites are located on northern disk Jiang Ganliu leather Xianghes, are the 4th steps of northern disk Jiang Ganliu Power station.Power station water retaining structure be parabolic type RCC double curvature arch dam, maximum height of dam 167.50m, at present in the world Highest RCC double curvature arch dam is influenced by the landform limitation that the Dam Site slopes Shan Gao are steep, valley is dangerously steep, and dam concrete exists It pours to EL.1350.0m, is put in storage using full packages and automobile mode.Dam body EL.1350.0m ~ EL.1452.5m elevations Between arrange that two a diameter of 800 full packages, 47 ° of mean obliquity, single full packages overall length surpass hundred meters, undertake dam body altogether About 650,000 side's grinding coagulation soil of EL.1350.0m or more conveys task, and average moon placing intensity is required in 4~50,000 m3.
Grinding coagulation soil is a kind of dry concrete, general continuously to be constructed using logical storehouse thin layer, to intensity of putting in storage, coagulation Native workability, aggregate separated, stone roller property are more demanding.Since full packages system conveying height difference is big, circuit is long, is ensureing grinding coagulation Soil property amount and reaching do not block, do not detach on the basis of, to improve concrete conveyance ability, to technique, material, equipment performance, Field management etc. has new requirement.
Currently, put in storage and pour to certain elevation using road dump truck is built in dam body, need to seek other can expire Foot puts in storage intensity requirement, and can meet grinding concrete construction condition, ensures the mode of rationally putting in storage of quality.Three kinds of generally use Three kinds of scheme, i.e. tower belt crane, negative pressure of vacuum chute, full packages modes of putting in storage.
Wherein use the combination of tower crane band and belt in use, there are the problem of:(1)Tower belt crane work half Diameter is small, and amplitude peak only has 80m, and dam overall length reaches 426m, it is difficult to cover;(2)By the high steep topography of this engineering and storehouse surface with mix It is influenced with building relative position, belt feeder installation route is long, and is difficult to arrange;(3)Acquisition expenses is higher than other schemes, installation and fortune The cost that row is safeguarded is also relatively high;(4)Aggregate separated easily occurs.
By the way of negative pressure of vacuum chute and automobile combination in use, there are the problem of:(1)Support system needs One-time-reach-place, early investment are high;(2)Different gradation concrete material gliding speed is difficult to differentiate between control;(3)Pipe shaft and hopper it is close Closing property requires high, vacuum condition difficulty realization in pipe;(4)Pipe shaft is easy to wear;(5)Maintenance cost is higher.
In use using full packages mode of movement, although support system needs one-time-reach-place, early investment is high, energy Enough the problems such as effectively preventing aggregate separated.Therefore, consider and conveyed using full packages.
But during actually investigating, find to convey the full packages of such overlength, in use, there are following The problem of several aspects:" aggregate that full packages transfers out separation big " and " plugging occurs in full packages " cumulative frequency up to 72.1%, Between 0%~80%, belong to A class factors, that is, influences where surpassing the main problem of hundred meters of full packages conveying capacitys, as long as reducing to the greatest extent " the aggregate separation that full packages transfers out is big " and " plugging occurs in full packages " both of these problems occur, and can increase substantially super Hundred meters of full packages grinding coagulation soil conveying capacitys.
Utility model content
The main purpose of the utility model is to provide surpass hundred meters of full packages grinding coagulation soil transport systems, this concrete conveyance Device can be used in the conveying of the extra long distance and elevation of grinding coagulation soil, ensure that the same of conveying capacity in transmission process When, it is effectively reduced the aggregate that full packages transfers out and detaches big problem, and then ensure that conveying quality;This is to lead to It crosses using above-mentioned conveying device, can effectively reduce the problem of full packages blocks, and then ensure that the reliability of conveying.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Surpass hundred meters of full packages roll it is mixed Solidifying soil transport system, it includes the grinding coagulation soil raw material system for mixing and stirring concrete, the grinding coagulation soil raw material system It is connected with concrete warehousing device by conveying road, the full packages delivery system of the concrete warehousing device and more parallel arrangements System is connected, and the full packages transport system support is mounted on the top of carriage, and along dam body right bank difference elevation arrangement, described The bottom end of full packages transport system is disposed to extend in the surface of body to be poured of building a dam.
The grinding coagulation soil raw material system includes the reinforced gabion being arranged in conveying both sides of the road, the conveying road Entry position is provided with weighbridge, and the weighbridge is connected with weight house, and measures the weight of weighing of weighbridge;Place inside the weighbridge It is provided with the first batch can and the second batch can, the first batching plant is provided between first batch can and the second batch can, in the second material It is also disposed with third batch can, the 4th batch can, the 5th batch can, the 6th batch can after tank;The third batch can and the 4th batch can Between be provided with the second batching plant, third batching plant is provided between the 5th batch can and the 6th batch can, in the 6th batch can Tail portion is provided with substation.
The side of first batching plant, the second batching plant and third batching plant position is disposed with additive library Room, the first truss basis, the first batch bin basis, the second truss basis, the second batch bin basis, third truss basis, third Batch bin basis and the 4th truss basis.
The feed track road is provided with turn-round.
The concrete warehousing device includes plateau of putting in storage, and the plateau of putting in storage is arranged in the end of conveying road, is entering The high edge of table in storehouse is provided with bank of keeping off a car, and No.1 lower hopper and No. two are installed with side by side on the lateral wall of the plateau of putting in storage Lower hopper.
The full packages transport system includes No.1 full packages and No. two full packages, the No.1 full packages and the parallel cloth of No. two full packages Set, the feeding end of the No.1 full packages and No. two full packages respectively with the No.1 lower hopper of concrete warehousing device and the second lower hopper It docks, No.1 control valve is installed in the middle part of the No.1 full packages, No. two control valves are installed in the middle part of No. two full packages Door, the No.1 control valve are connected with No. three full packages, No. four full packages are connected with after No. two control valves later;It is described No. three full packages and No. four full packages parallel arrangement, are separately installed with that No.1 goes out port strobe and No. two go out port strobe in its tail portion.
The No.1 control valve and No. two control valves use identical structure, in No.1 control valve position Feed end is provided with non-standard section, its discharge end is provided with vertical accelerating sections, the gradient W that the No.1 full packages is arranged is less than The gradient Z that No. three full packages are arranged;The gradient W is not less than 45 °.
The full packages transport system is integrally fixedly mounted on the top of carriage, and the No.1 goes out port strobe and No. two outlets Gate is docked with self-tipping type automobile.
The No.1 full packages, No. two full packages, No. three full packages and No. four full packages side pipe wall on multiple shake equidistantly is installed Dynamic motor, is communicated with multiple exhaust pipes being equally spaced vertically on its push pipe wall.
The No.1 control valve, No. two control valves, No.1 go out port strobe and No. two go out port strobe and all use slide valve, The valve plate of the slide valve is opened and closed by rack and pinion drive mechanism, and rack is equipped on the side wall of valve plate, described Rack and pinion engaged transmission, the gear are mounted on the output shaft of decelerating motor.
The utility model has the advantages that:
1, exist by using the existing RCC dam of above-mentioned full packages grinding coagulation soil transport system effective solution Dam body rolls build a dam during the problems of, ensure that mixing and stirring and conveying for entire grinding coagulation soil, in transmission process, The problem of effective solution generation plugging and aggregate separated, it ensure that conveying quality, while improving transfer efficiency, it is final to protect The quality for having demonstrate,proved entire RCC dam, effectively reduces construction cost.
2, by being arranged exhaust pipe on full packages, effective solution full packages blanking is uneven continuous, manage in easily occur it is true Sky, the problem of causing pipe shaft to tremble, ensure that exhaust capacity, by the smooth discharge of pipe interior air-flow by the way that exhaust pipe is arranged.
3, by the vibrating motor, the problem of full packages blocks effectively is alleviated.Reach plus shaken to disappear and has blocked up effect Fruit is obviously without regard to the excessive effect for occurring to squeeze jolt ramming of power.In addition, adjusting bulkhgead gate gearbox speed ratio to 800 Turn/min, gate opening/closing power is enhanced, and gate opening/closing when this engineering concrete conveyance is more suitable for.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model integral arrangement plan view.
Fig. 2 is the utility model grinding coagulation soil raw material system arrangement figure.
Fig. 3 be in the utility model Fig. 1 No.1 full packages and No. three full packages along P-P cross-sectional views.
Fig. 4 be in the utility model Fig. 1 No. two full packages and No. four full packages along Q-Q cross-sectional views.
Fig. 5 is S partial approaches figure in the utility model 3.
Fig. 6 is the utility model concrete warehousing device partial approach figure.
In figure:Convey 6, No. two road 1, turn-round 2, transport vehicle 3, plateau of putting in storage 4, bank 5 of keeping off a car, No.1 lower hopper blankings Struggle against 7, No. two full packages 8, No.1 full packages 9,12, No. three full packages 13 of the full packages of control valve 11, four of No.1 control valve 10, two, No.1 goes out port strobe 14, two and goes out port strobe 15, reinforced gabion 16, weighbridge 17, weight house 18, additive storehouse 19, the first truss Basic 20, first batch bin basis 21, the second truss basis 22, the second batch bin basis 23, third truss basis 24, third are matched Feed bin basis 25 and the 4th truss basis 26, the first batch can 27, the first batching plant 28, the second batch can 29, third batch can 30, second Batching plant 31, the 4th batch can 32, the 5th batch can 33, third batching plant 34, the 6th batch can 35, substation 36, Laboratory room 37, Constructed barricade 38, self-tipping type automobile 39, carriage 40, vertical accelerating sections 41, it is non-standard section 42, dam body right bank 43, exhaust pipe 44, vibrating motor 45;
A ~ N, corresponding position control point.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Referring to Fig. 1-6, surpass hundred meters of full packages grinding coagulation soil transport systems, it includes the grinding coagulation for mixing and stirring concrete Native raw material system, the grinding coagulation soil raw material system are connected by conveying road 1 with concrete warehousing device, the concrete The full packages transport system that warehousing apparatus is arranged in parallel with more is connected, and the full packages transport system support is mounted on carriage 40 Top, and along the different elevation arrangements of dam body right bank 43, the bottom end of the full packages transport system, which is disposed to extend, to be waited pouring The surface of dam body.By using the existing RCC dam of above-mentioned full packages grinding coagulation soil transport system effective solution The problems of during dam body is rolled and built a dam, mixing and stirring and conveying for entire grinding coagulation soil is ensure that, in transmission process In, the problem of effective solution generation plugging and aggregate separated, it ensure that conveying quality, while improving transfer efficiency, most The quality that ensure that entire RCC dam eventually, effectively reduces construction cost.
Further, the grinding coagulation soil raw material system includes the reinforced gabion 16 being arranged in 1 both sides of conveying road, institute The entry position for stating conveying road 1 is provided with weighbridge 17, and the weighbridge 17 is connected with weight house 18, and measures the weight of weighing of weighbridge 17 Amount;Place inside the weighbridge 17 is provided with the first batch can 27 and the second batch can 29, first batch can, 27 and second batch can It is provided with the first batching plant 28 between 29, third batch can 30, the 4th batch can 32, are also disposed with after the second batch can 29 Five batch cans 33, the 6th batch can 35;It is provided with the second batching plant 31 between 30 and the 4th batch can 32 of the third batch can, the described 5th It is provided with third batching plant 34 between batch can 33 and the 6th batch can 35, the tail portion of the 6th batch can 35 is provided with substation 36.Institute The side for stating 34 position of the first batching plant 28, the second batching plant 31 and third batching plant is disposed with additive storehouse 19, the first truss basis 20, the first batch bin basis 21, the second truss basis 22, the second batch bin basis 23, third truss base Plinth 24, third batch bin basis 25 and the 4th truss basis 26.It can be by using above-mentioned grinding coagulation soil raw material system Mixing and stirring for row grinding coagulation soil, it is excessively sticky since the concrete of existing RCC dam is in transmission process, it is often stifled Pipe is filled up, therefore, when preparing grinding coagulation soil, is accredited under field technician assists in additive producer, after test of many times, Plasticity-maintaining agent broiler diets finally are mixed, its component is made to reduce 50% so that the sticky phenomenon of grinding coagulation soil is obviously changed Kind, it is smooth that haulage vehicle topples over discharging, basic noresidue, and full packages also falls smooth, and collophore phenomenon greatly improves, and has reached countermeasure Target.
Further, it is provided with turn-round 2 on the conveying road 1.It can be facilitated by the turn-round 2 and transported It is moved backward or is given another the right of way in the process.
Further, the concrete warehousing device includes plateau 4 of putting in storage, and the setting of plateau 4 of putting in storage is in conveying road 1 End, the edge for plateau 4 of putting in storage is provided with bank 5 of keeping off a car, one is installed with side by side on the lateral wall of the plateau 4 of putting in storage Number lower hopper 6 and No. two lower hoppers 7.Easily the grinding coagulation soil on transport vehicle can be inclined by the plateau 4 of putting in storage It pours into inside lower hopper, and then facilitates its subsequent conveying.
Further, the full packages transport system includes No.1 full packages 9 and No. two full packages 8, the No.1 full packages 9 and No. two Full packages 8 is arranged in parallel, the feeding end of the No.1 full packages 9 and No. two full packages 8 respectively with the No.1 blanking of concrete warehousing device Bucket 6 and the second lower hopper 7 dock, and the middle part of the No.1 full packages 9 is equipped with No.1 control valve 10, No. two full packages 8 Middle part is equipped with No. two control valves 11, and No. three full packages 13, No. two control are connected with after the No.1 control valve 10 It is connected with No. four full packages 12 after valve 11;No. three full packages 13 and No. four full packages 12 are arranged in parallel, and pacify respectively in its tail portion Go out port strobe 14 equipped with No.1 and No. two go out port strobe 15.It can be used in grinding coagulation by using above-mentioned full packages transport system The conveying of soil, and transfer efficiency ensure that using two-wire arrangement.
Further, the No.1 control valve 10 and No. two control valves 11 use identical structure, are controlled in No.1 The feed end of 10 position of valve is provided with non-standard section 42, its discharge end is provided with vertical accelerating sections 41, the No.1 The gradient W that full packages 9 is arranged is less than the gradient Z that No. three full packages 13 are arranged;The gradient W is not less than 45 °.By using above-mentioned Slope design ensure that the smooth of full packages conveying, while can effectively alleviate asking for aggregate separated in transmission process Topic.
Moreover, the problem of aggregate separated occurs in it by 41 effective solution of vertical accelerating sections.
Further, the full packages transport system is integrally fixedly mounted on the top of carriage 40, and the No.1 exports lock Door 14 and No. two go out port strobe 15 and docked with self-tipping type automobile 39.Final fortune can be carried out by the self-tipping type automobile 39 It is defeated.
Further, between the side pipe wall of the full packages 13 of full packages 8, three of the No.1 full packages 9, two and No. four full packages 12 is first-class Away from multiple vibrating motors 45 are equipped with, it is communicated with multiple exhaust pipes 44 being equally spaced vertically on its push pipe wall.Pass through institute The exhaust pipe 44 stated can be effectively discharged out tube body additional air so that blanking is smooth, pipe shaft shake situation also be improved significantly. The full packages 13 of full packages 8, three of No.1 full packages 9, two and No. four full packages 12 can be carried out effectively by the vibrating motor 45 Vibration, and then effectively alleviate the problem of it is blocked.
Further, 10, No. two control valves 11 of the No.1 control valve, No.1 go out port strobe 14 and No. two outlet locks Door 15 all uses slide valve, and the valve plate of the slide valve is opened and closed by rack and pinion drive mechanism, in the side wall of valve plate On rack is installed, the rack and pinion engaged transmission, the gear is mounted on the output shaft of decelerating motor.By using In the above-mentioned slide valve course of work, be capable of the opening and closing of convenient regulating gate, it is carried out to close when needing or When unlatching, it is only necessary to start decelerating motor, by decelerating motor band moving gear, then flashboard be driven in turn with wheel and rack Open the gate.
Embodiment 2:
The carrying method for surpassing hundred meters of full packages grinding coagulation soil transport systems described in any one, includes the following steps:
Step1:Start grinding coagulation soil raw material system, mixing for grinding coagulation soil is carried out by multiple batching plants With in mixing process, additive is added into concrete by additive storehouse 19;
Step2:By transport vehicle 3, the grinding coagulation soil after batching plant is mixed and stirred is transported to coagulation along conveying road 1 Native warehousing apparatus puts in storage in plateau 4;
Step3:Grinding coagulation soil is poured into inside No.1 lower hopper 6 or No. two lower hoppers 7 by transport vehicle 3, and is led to It crosses lower hopper and enters corresponding No.1 full packages 9 or No. two full packages 8;
Step4:In grinding coagulation soil blanking process, by adjust No.1 control valve 10 or No. two control valves 11 into And blanking velocity is adjusted, ensure that aggregate separated will not occur for blanking process;
Step5:When grinding coagulation soil reaches the bottom of No. three full packages 13 or No. four full packages 12, opens corresponding No.1 and go out Port strobe 14 or No. two go out port strobe 15, by the blanking of grinding coagulation soil in self-tipping type automobile 39;
Step6:Grinding coagulation soil is transported to by self-tipping type automobile 39 storehouse surface for rolling dam again, and then roll building a dam Construction.
Embodiment 3:
In the present embodiment, the point of the A ~ N is arranged as:Respectively X points and Y points.
A(6428. 062 4973. 857)、H(6419. 538 4967. 491);
B(6412. 862 4977. 908)、I(6418. 154 4969. 619);
C(6409. 539 4974. 664)、J(6415. 243 4970. 396);
D(6427. 030 4969. 992)、K(6408. 814 4913 .943);
E(6420. 661 4971. 694)、L(6405. 903 4914. 721);
F(6414. 091 4973. 449)、M(6406. 629 4859. 540);
G(6412. 968 4969. 246)、N(6403. 717 4860. 318);
By using the device of the utility model, had the following advantages with traditional method comparison:
Economic benefit:
(1)Direct economic benefit
In traditional transmission process, full packages occurs and blocks, problem tube coupling need to be removed, artificial pneumatic pick clears up concrete conglomeration Afterwards, it puts in back, peace is torn work open and carried out with right bank door machine.Pacify and about 3000 yuan every time of labour costs, the installation cost such as tears, clears up open.Again Plugging number occurs for averagely every month 22 times before improving, after improvement every month be reduced to 6 times, warehouse charges of having a rest caused by plugging Loss is disregarded, and single plugging processing cost saves about 4.8 ten thousand yuan of fund in one month.
If the aggregate separation that full packages transfers out is big, human assistance disperses outside coarse aggregate, also needs to increase per machine-team storehouse surface If 1 1.6m3 hydraulic hoe is used for the storehouse surface secondary agitation of concrete material, backhoe passes in and out storehouse surface by left and right banks door machine, every Class increases about 3600 yuan of expense.Plugging number occurs for averagely every month 27 times before improving again, after improvement every month be reduced to 7 It is secondary, then aggregate separated is saved in one month handle about 7.2 ten thousand yuan of fund.
The processing of saving in single month " the aggregate separation that full packages transfers out is big ", the expense of " plugging occurs in full packages " problem are total About 120,000 yuan of meter.
(2)Indirect economic effect
Full packages continues to optimize improvement during improving, because of processing plugging, processing grinding coagulation soil aggregate separated etc. during pouring Situation holding time is reduced, and storehouse situation of having a rest is few, and unit interval production capacity is effectively improved, and duration benefit is apparent.By contrast, single Class's yield is promoted up to 44.6%.
Social benefit:
Improved full packages blocks, aggregate separated situation is few, is not often occur storehouse phenomenon of having a rest in the construction process, from And the key effect for ensureing dam concrete construction quality is played, which may extend to precipitous with operational management skill " V " font dam abutment and dam body notch concreting equivalent type engineering have same economic benefit.
Monthly RCC Dam is total after improving pours 33 machine-teams, and each machine-team is as an inspection time, most Investigation result statistics is found afterwards, is influenced to surpass hundred meters of full packages grinding coagulation soil transportation problem frequencies of occurrences and is down to 3.0%.Surpass in the moon Hundred meters of full packages grinding coagulation soil convey about 6.2 ten thousand m3 of total amount, and unit interval production capacity reaches 1879m3/ machine-teams, carried again It is high.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model System, the technical solution that the scope of protection of the utility model should be recorded with claim include the technical solution of claim record The equivalents of middle technical characteristic are protection domain.Equivalent replacement i.e. within this range is improved, also in the utility model Protection domain within.

Claims (9)

1. surpass hundred meters of full packages grinding coagulation soil transport systems, it is characterised in that:It includes the grinding coagulation for mixing and stirring concrete Native raw material system, the grinding coagulation soil raw material system is by conveying road(1)It is connected with concrete warehousing device, the coagulation The full packages transport system that native warehousing apparatus is arranged in parallel with more is connected, and the full packages transport system support is mounted on carriage (40)Top, and along dam body right bank(43)The bottom end of different elevation arrangements, the full packages transport system is disposed to extend In the surface of body to be poured of building a dam.
2. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 1, it is characterised in that:The grinding coagulation soil Raw material system includes setting in conveying road(1)The reinforced gabion of both sides(16), the conveying road(1)Entry position setting There is weighbridge(17), the weighbridge(17)With weight house(18)It is connected, and measures weighbridge(17)Weight of weighing;The weighbridge(17)It is interior The place in portion is provided with the first batch can(27)With the second batch can(29), first batch can(27)With the second batch can(29)Between set It is equipped with the first batching plant(28), in the second batch can(29)It is also disposed with third batch can later(30), the 4th batch can(32), Five batch cans(33), the 6th batch can(35);The third batch can(30)With the 4th batch can(32)Between be provided with the second batching plant (31), the 5th batch can(33)With the 6th batch can(35)Between be provided with third batching plant(34), in the 6th batch can(35)'s Tail portion is provided with substation(36).
3. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 2, it is characterised in that:First batching plant (28), the second batching plant(31)With third batching plant(34)The side of position is disposed with additive storehouse(19), One truss basis(20), the first batch bin basis(21), the second truss basis(22), the second batch bin basis(23), third purlin Frame basis(24), third batch bin basis(25)With the 4th truss basis(26).
4. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 1, it is characterised in that:The conveying road (1)On be provided with turn-round(2).
5. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 1, it is characterised in that:The concrete warehousing Device includes plateau of putting in storage(4), the plateau of putting in storage(4)Setting is in conveying road(1)End, in plateau of putting in storage(4)Side Edge is provided with bank of keeping off a car(5), the plateau of putting in storage(4)Lateral wall on be installed with No.1 lower hopper side by side(6)With No. two Lower hopper(7).
6. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 1, it is characterised in that:The full packages delivery system System includes No.1 full packages(9)With No. two full packages(8), the No.1 full packages(9)With No. two full packages(8)Parallel arrangement, the No.1 Full packages(9)With No. two full packages(8)Feeding end respectively with the No.1 lower hopper of concrete warehousing device(6)With the second lower hopper (7)Docking, the No.1 full packages(9)Middle part No.1 control valve is installed(10), No. two full packages(8)Middle part installation There are No. two control valves(11), the No.1 control valve(10)It is connected with No. three full packages later(13), No. two control valves Door(11)It is connected with No. four full packages later(12);No. three full packages(13)With No. four full packages(12)Parallel arrangement, in its tail portion It is separately installed with No.1 and goes out port strobe(14)Go out port strobe with No. two(15).
7. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 6, it is characterised in that:The No.1 control valve Door(10)With No. two control valves(11)Using identical structure, in No.1 control valve(10)The feed end of position is arranged There is non-standard section(42), its discharge end is provided with vertical accelerating sections(41), the No.1 full packages(9)The gradient W arranged is small In No. three full packages(13)The gradient Z arranged;The gradient W is not less than 45 °.
8. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 6, it is characterised in that:The full packages delivery system System is whole to be fixedly mounted on carriage(40)Top, the No.1 goes out port strobe(14)Go out port strobe with No. two(15)With self-unloading Formula automobile(39)Docking.
9. surpassing hundred meters of full packages grinding coagulation soil transport systems according to claim 6, it is characterised in that:The No.1 full packages (9), No. two full packages(8), No. three full packages(13)With No. four full packages(12)Side pipe wall on multiple vibrating motors are equidistantly installed (45), it is communicated with multiple exhaust pipes being equally spaced vertically on its push pipe wall(44);
The No.1 control valve(10), No. two control valves(11), No.1 go out port strobe(14)Go out port strobe with No. two(15) Slide valve, the valve plate of the slide valve is all used to open and close by rack and pinion drive mechanism, pacify on the side wall of valve plate Equipped with rack, the rack and pinion engaged transmission, the gear is mounted on the output shaft of decelerating motor.
CN201820275741.4U 2018-02-26 2018-02-26 Surpass hundred meters of full packages grinding coagulation soil transport systems Active CN207959219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820275741.4U CN207959219U (en) 2018-02-26 2018-02-26 Surpass hundred meters of full packages grinding coagulation soil transport systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820275741.4U CN207959219U (en) 2018-02-26 2018-02-26 Surpass hundred meters of full packages grinding coagulation soil transport systems

Publications (1)

Publication Number Publication Date
CN207959219U true CN207959219U (en) 2018-10-12

Family

ID=63740060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820275741.4U Active CN207959219U (en) 2018-02-26 2018-02-26 Surpass hundred meters of full packages grinding coagulation soil transport systems

Country Status (1)

Country Link
CN (1) CN207959219U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193692A (en) * 2018-02-26 2018-06-22 中国能源建设集团广西水电工程局有限公司 Surpass hundred meters of full packages grinding coagulation soil transport systems and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193692A (en) * 2018-02-26 2018-06-22 中国能源建设集团广西水电工程局有限公司 Surpass hundred meters of full packages grinding coagulation soil transport systems and method

Similar Documents

Publication Publication Date Title
CN111749430B (en) Automatic conveying system for construction waste of high-rise building
US9593850B2 (en) Bottom ash dewatering system using a remote submerged scraper conveyor
CN201842751U (en) Sludge solidification treatment machine
CN111283875A (en) Environment-friendly concrete mixing building based on storage bin top full-spread structure
CN108193692A (en) Surpass hundred meters of full packages grinding coagulation soil transport systems and method
CN207959219U (en) Surpass hundred meters of full packages grinding coagulation soil transport systems
CN102336428B (en) Method for taking phosphogypsum under wet-process deslagging conditions
CN115946234A (en) Automatic feeding system that supplies of grit material
CN114622938B (en) Mining system and method of coal-based solid waste conveying and filling integrated machine
CN205555549U (en) Energy -concerving and environment -protective top is piled portal and is got stock ground
CN110116041A (en) A kind of building waste classification crushing apparatus
CN105775783A (en) Coal storage system of coal-fired power plant
CN110482245A (en) Environment protection type multifunctional dry bulk cargo harbour and construction method
US20150192294A1 (en) Methods and Systems For Dewatering Bottom Ash Using A Remote Submerged Scraper Conveyor
CN206765100U (en) Sunk type concrete mixing plant
CN206796209U (en) A kind of environment-friendly type concrete mixing plant
CN205471315U (en) Autoloading system of grit material for concrete
CN110469363B (en) Vertical sand silo sand discharging device capable of discharging materials continuously and stably
CN201250404Y (en) Sand spreader for construction on slope of face rockfill dam
CN212502940U (en) Loading attachment of two thorax lime shaft kilns
CN103148683A (en) Coal slurry-drying production line
CN103134288A (en) Drying treatment system of slurry
CN109095022B (en) Totally-enclosed horizontal coal storage tank system
CN207904926U (en) The grinding coagulation soil full packages of RCC dam conveys feeding equipment