CN207957526U - A kind of platform sling tooling - Google Patents

A kind of platform sling tooling Download PDF

Info

Publication number
CN207957526U
CN207957526U CN201820304543.6U CN201820304543U CN207957526U CN 207957526 U CN207957526 U CN 207957526U CN 201820304543 U CN201820304543 U CN 201820304543U CN 207957526 U CN207957526 U CN 207957526U
Authority
CN
China
Prior art keywords
davit
bearing frame
plank
platform sling
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820304543.6U
Other languages
Chinese (zh)
Inventor
李铮
温贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kemeng Wind Power Equipment Tangshan Co ltd
Original Assignee
Plus China (bazhou) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Plus China (bazhou) Technology Co Ltd filed Critical Plus China (bazhou) Technology Co Ltd
Priority to CN201820304543.6U priority Critical patent/CN207957526U/en
Application granted granted Critical
Publication of CN207957526U publication Critical patent/CN207957526U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of platform sling tooling, for lifting plank comprising bearing frame and multiple davits;When lifting, the bearing frame is placed on above the plank lifted;Multiple davits are connected to the lower section of the bearing frame and are inserted into the bottom of plank from the opposite both sides of plank, and then for holding up the plank.The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.

Description

A kind of platform sling tooling
Technical field
The utility model is related to tooling technical fields, more particularly, to a kind of platform sling tooling for lifting sheet metal.
Background technology
Currently, the lifting device of the existing steel plate loading-unloading vehicle in market is mainly the side such as magnetic suction disc, vacuum cup sheet, suspension hook Case.
And when steel plate etc. is relatively thin by lifting plank, above-mentioned technical solution cannot be satisfied the requirement of lifting, due to plank Bao Erchang, intensity is relatively low, and handling vehicle can not have been lifted steadily through the above technical solution.
Utility model content
The purpose of this utility model is to provide a kind of platform sling tooling, to solve existing in the prior art can not steadily hang The technical issues of loading that thinner thickness, length are longer and intensity relatively low thin plate.
In order to solve the above technical problems, a kind of platform sling tooling provided by the utility model, for lifting plank comprising: Bearing frame and multiple davits;
When lifting, the bearing frame is placed on above the plank lifted;
Multiple davits are connected to the lower section of the bearing frame and are inserted into the bottom of plank from the opposite both sides of plank, And then for holding up the plank.
The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.
In any of the above-described technical solution, further, the davit setting is in the same plane.
In any of the above-described technical solution, further, the davit is parallel to the bottom surface of the bearing frame or holds Carry frame itself.
It is set that is, plane residing for multiple davits is parallel with the bottom surface of the bearing frame or bearing frame itself It sets.
In any of the above-described technical solution, further, the davit includes along by the left and right in lifting panel length direction The first davit and the second davit of both sides setting;
First davit and the second davit are arranged along by the length direction interval of lifting plank respectively.
In any of the above-described technical solution, further, first davit and the second davit are symmetrical arranged.
In any of the above-described technical solution, further, the quantity of first davit and the second davit is at least respectively 3 It is a.
In any of the above-described technical solution, further, it is arranged in the bearing frame to the davit fast demountable On.
In any of the above-described technical solution, further, the both sides of the bearing frame are provided with for connecting described hang The connecting plate of column, the connecting plate stretch out downwards the bottom surface of the bearing frame, and connecting plate middle and lower part is provided with for inserting The mounting hole of the davit.
In any of the above-described technical solution, further, after the davit is inserted on the mounting hole, locking screw is utilized The lockings such as female or split pin prevent davit to be detached from the connecting plate.
In any of the above-described technical solution, further, several are provided on the bearing frame for having lifted institute State the lifting lug and/or hanging ring of bearing frame.
In any of the above-described technical solution, further, the bearing frame generally rectangular frame comprising length side To two girders of setting, and it is arranged in the width direction and connects the crossbeam between two girders.
Using above-mentioned technical proposal, the utility model has the advantages that:
The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.
Description of the drawings
It below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific implementation mode or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, other drawings may also be obtained based on these drawings.
Fig. 1 is the stereogram for the platform sling tooling that the utility model embodiment provides;
Fig. 2 is the front view for the platform sling tooling that the utility model embodiment provides;
Fig. 3 is the partial illustrations of platform sling tooling shown in Fig. 2;
Fig. 4 is the vertical view for the platform sling tooling that the utility model embodiment provides;
Fig. 5 is the side view for the platform sling tooling that the utility model embodiment provides.
Reference numeral:
10- bearing frames;11- connecting plates;12- stiffener plates;
13- girders;14- crossbeams;20- davits;
The first davits of 20a-;The second davits of 20b-;21- locking nuts;
30- lifting lugs.
Specific implementation mode
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally The every other embodiment that field those of ordinary skill is obtained without making creative work, belongs to this practicality Novel protected range.
It is in the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for description purposes only, and are not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, it can understand above-mentioned art with concrete condition The concrete meaning of language in the present invention.
The utility model discloses a kind of platform sling toolings, for lifting plank comprising:It bearing frame and multiple hangs Column.
When lifting, the bearing frame is placed on above the plank lifted.
Multiple davits are connected to the lower section of the bearing frame and are inserted into the bottom of plank from the opposite both sides of plank, And then for holding up the plank.
The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.
Explanation is further explained to the utility model with reference to specific embodiment.
Fig. 1 is the stereogram for the platform sling tooling that the utility model embodiment provides;Fig. 2 provides for the utility model embodiment Platform sling tooling front view;Fig. 3 is the partial illustrations of platform sling tooling shown in Fig. 2;Fig. 4 provides for the utility model embodiment Platform sling tooling vertical view;Fig. 5 is the side view for the platform sling tooling that the utility model embodiment provides.
As shown in Figures 1 to 5, a kind of platform sling tooling provided in this embodiment, for lifting plank comprising:Bearing frame Frame 10 and multiple davits 20;
When lifting, the bearing frame 10 is placed on above the plank lifted;
Multiple davits 20 are connected to the lower section of the bearing frame 10 and are inserted into plank from the opposite both sides of plank Bottom, and then for holding up the plank.
The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.
In any of the above-described technical solution, it is further preferable that the setting of the davit 20 is in the same plane.
With reference to shown in Fig. 2, Fig. 3 and Fig. 5, bearing frame 10 is the rectangular frame of setting in the same plane on the whole.
In any of the above-described technical solution, further, the davit 20 be parallel to the bearing frame 10 bottom surface or Person's bearing frame 10 itself.
That is, the plane and the bottom surface of the bearing frame 10 or bearing frame 10 itself residing for multiple davits 20 are flat Row setting.
In any of the above-described technical solution, further, as shown in figure 5, the davit 20 includes along long by lifting plank Spend the first davit 20a and the second davit 20b of the left and right sides setting in direction;
The first davit 20a and the second davit 20b is arranged along by the length direction interval of lifting plank respectively.
In any of the above-described technical solution, further, the first davit 20a and the second davit 20b are symmetrical arranged.
Certainly, in specific implementation, according to circumstances asymmetric manner can also be used to be arranged, only needs to meet steady lifting Play the requirement of plank.
In any of the above-described technical solution, further, the quantity of the first davit 20a and the second davit 20b according to The length of the planks such as the steel plate lifted is arranged, and 3-16 can wherein be arranged in conventional arrangement.
In the present embodiment, the quantity of the first davit 20a is 5, and the quantity of the second davit 20b is also 5. The first davit 20a and the second davit 20b is oppositely arranged on the both sides of plank.
1500mm is divided into 2500mm between the two neighboring first davit 20a or the second davit 20b.
And distance of the davit apart from the bottom surface of bearing frame is determined according to the thickness and quantity of the plank of lifting, in this implementation In example, there are the intervals of 150-300mm between davit and the bottom surface of bearing frame, you can to load overall thickness as 150-300mm Plank.
And the diameter of davit is then according to the lifting strength of materials, the weight of the quantity of davit and spacing distance, carrying of itself To determine.
In the present embodiment, davit is made of No. 45 steel, and diameter dimension is φ 20mm~60mm.
In any of the above-described technical solution, further, it is arranged in the bearing frame to 20 fast demountable of the davit On frame 10.
In use, bearing frame is put on the planks such as steel plate, by davit, fast inserted is on bearing frame one by one, lifting After translation falls and hangs bearing frame, all davits are removed one by one, bearing frame is removed, so that it may to realize the slinger of plank Make.
In any of the above-described technical solution, further, there are many mode of fast assembling-disassembling, it is therefore preferable to pluggable mode.Institute The both sides for stating bearing frame 10 are provided with connecting plate 11 for connecting the davit 20, and the connecting plate 11 stretches out downwards institute The bottom surface of bearing frame 10 is stated, 11 middle and lower part of connecting plate is provided with the mounting hole for inserting the davit 20.
In any of the above-described technical solution, further, after the davit 20 is inserted on the mounting hole, locking is utilized Nuts 21 etc. lock, and davit 20 is prevented to be detached from the connecting plate 11.
Certainly, the mode of locking is also very much, and the outboard end of davit is inserted in for example, by using pins such as split pins, prevents davit from existing It is fallen when work.
In order to ensure the bonding strength of connecting plate, stiffener plate 12 can also be set between connecting plate and bearing frame.
In any of the above-described technical solution, further, several are provided on the bearing frame 10 for lifting The lifting lug 30 of the bearing frame 10.
Lifting lug is preferably welded on the top surface of bearing frame in fact, and quantity is 4, and four lifting lugs are equably laid in and hold The upper of frame is carried, is steadily sling to realize.
In lifting, the suspenders such as steel wire rope are connect with lifting lug, are sling bearing frame and steel plate by lifting lug.
It is, of course, also possible to which the scheme using hanging ring substitutes lifting lug, it is only necessary to which satisfaction has lifted bearing frame requirement.
In any of the above-described technical solution, further, the generally rectangular frame of the bearing frame 10 comprising length Two girders 13 of direction setting, and be arranged in the width direction and connect the crossbeam 14 between two girders 13.
The width of bearing frame is arranged according to plank demand.
More preferably, the length of the bearing frame 10 be 5000mm 15000mm, width be 1000mm extremely 3000mm。
In the present embodiment, between the length of girder is 7000mm 10000mm;And crossbeam length then be 1500mm extremely 2500mm。
Using above-mentioned technical proposal, the utility model has the advantages that:
The utility model is simple in structure, easy to use, can easily lift thin and long steel plate, quick and at low cost.
In the present embodiment, it is 2~5mm that the hoisting fixture of the utility model, which can easily lift thickness, and length is very long For 8~12 meters of sheet metal.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it System;Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should Understand:It still can be with technical scheme described in the above embodiments is modified, either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacements, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of platform sling tooling, for lifting plank, which is characterized in that it includes:Bearing frame and multiple davits;
When lifting, the bearing frame is placed on above the plank lifted;
Multiple davits are connected to the lower section of the bearing frame and are inserted into the bottom of plank from the opposite both sides of plank, in turn For holding up the plank.
2. platform sling tooling according to claim 1, which is characterized in that the davit setting is in the same plane.
3. platform sling tooling according to claim 1, which is characterized in that the davit is parallel to the bottom surface of the bearing frame Or bearing frame itself.
4. platform sling tooling according to claim 1, which is characterized in that the davit includes along by lifting panel length direction The left and right sides setting the first davit and the second davit;
First davit and the second davit are arranged along by the length direction interval of lifting plank respectively.
5. platform sling tooling according to claim 4, which is characterized in that first davit and the second davit are symmetrical arranged.
6. platform sling tooling according to claim 4, which is characterized in that the quantity of first davit and the second davit is at least Respectively 3.
7. platform sling tooling according to claim 1, which is characterized in that be arranged to the davit fast demountable and held described It carries on frame.
8. platform sling tooling according to claim 7, which is characterized in that the both sides of the bearing frame are provided with for connecting The connecting plate of the davit, the connecting plate stretch out downwards the bottom surface of the bearing frame, and the setting of connecting plate middle and lower part is useful In the mounting hole for inserting the davit.
9. platform sling tooling according to claim 8, which is characterized in that after the davit is inserted on the mounting hole, profit It is locked with locking nut or split pin, davit is prevented to be detached from the connecting plate.
10. platform sling tooling according to claim 1, which is characterized in that be provided with several on the bearing frame and be used for The lifting lug and/or hanging ring of the bearing frame are lifted;
The bearing frame generally rectangular frame comprising two girders of length direction setting, and set in the width direction It sets and connects the crossbeam between two girders.
CN201820304543.6U 2018-03-06 2018-03-06 A kind of platform sling tooling Active CN207957526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820304543.6U CN207957526U (en) 2018-03-06 2018-03-06 A kind of platform sling tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820304543.6U CN207957526U (en) 2018-03-06 2018-03-06 A kind of platform sling tooling

Publications (1)

Publication Number Publication Date
CN207957526U true CN207957526U (en) 2018-10-12

Family

ID=63741257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820304543.6U Active CN207957526U (en) 2018-03-06 2018-03-06 A kind of platform sling tooling

Country Status (1)

Country Link
CN (1) CN207957526U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280999A (en) * 2019-06-27 2019-09-27 中船澄西船舶修造有限公司 A kind of tooling for horizontal lifting hydraulic nut peculiar to vessel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280999A (en) * 2019-06-27 2019-09-27 中船澄西船舶修造有限公司 A kind of tooling for horizontal lifting hydraulic nut peculiar to vessel
CN110280999B (en) * 2019-06-27 2023-12-26 中船澄西船舶修造有限公司 Tool for horizontally hoisting marine hydraulic nuts

Similar Documents

Publication Publication Date Title
CN205932941U (en) A device for handling of precast box girder template
CN207957526U (en) A kind of platform sling tooling
CN111547613A (en) Novel balance beam hanger
CN219689108U (en) Steel beam hoisting and stabilizing device
CN209778055U (en) Universal lifting appliance for lifting cylinder cover
CN209758847U (en) Lifting hook capable of automatically unhooking
CN211687913U (en) Full-machine hanger
CN206156583U (en) Hoist is used in axle type product hoist and mount
CN202346590U (en) Hanger special for dry-type transformer with shell
CN208120553U (en) A kind of simple hanging beam
CN205555856U (en) PK prestressed concrete superimposed sheet hoist and hoist and mount frame
CN204689351U (en) A kind of H profile steel structural elements suspender
CN212687336U (en) Novel balance beam hanger
CN208617207U (en) A kind of battery hanger
CN203095390U (en) Mounting structure of FPSO (floating production storage and offloading) module lifting eye
CN206278817U (en) A kind of lifting beam device for handling sheet material
CN209322301U (en) Caisson Automatic coupling and decoupling hook
CN208413637U (en) A kind of crane hanger
CN105752816A (en) Large gantry crane and height-increasing lifting beam capable of increasing the lifting height of large gantry crane
CN108358040A (en) A kind of crane hanger
CN205709430U (en) A kind of improve large-sized gantry sling rise increase hanging beam and large-sized gantry hangs
CN205772783U (en) Steel beam column boom hoisting
CN204823651U (en) But balancing area bolt location hoist
CN215711097U (en) Hook structure for automatic casting line
CN109179188A (en) The installation method of super large abnormity furred ceiling shipped and lifting integrated auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230711

Address after: 063200 North of Shilihai West Road and West of Shilihai Middle Road, Equipment Manufacturing Park, Caofeidian Industrial Zone, Tangshan, Hebei

Patentee after: Kemeng wind power equipment Tangshan Co.,Ltd.

Address before: 065000 Liuzhuang Village, Chaheji Township, Langfang, Hebei Province

Patentee before: CAMZONE (BAZHOU) TECHNOLOGY Co.,Ltd.