CN207938027U - A kind of project cost schedule management apparatus - Google Patents

A kind of project cost schedule management apparatus Download PDF

Info

Publication number
CN207938027U
CN207938027U CN201820406895.2U CN201820406895U CN207938027U CN 207938027 U CN207938027 U CN 207938027U CN 201820406895 U CN201820406895 U CN 201820406895U CN 207938027 U CN207938027 U CN 207938027U
Authority
CN
China
Prior art keywords
scale
project
holding tank
management apparatus
schedule management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820406895.2U
Other languages
Chinese (zh)
Inventor
赵云勇
崔拴玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820406895.2U priority Critical patent/CN207938027U/en
Application granted granted Critical
Publication of CN207938027U publication Critical patent/CN207938027U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of project cost schedule management apparatus,Including into scale,Run through at the progress disk center and is connected with shaft,The shaft side is connected with pointer,The shaft side connects support column,Support column bottom connect base,It is described into being equipped with holding tank at scale one side edge,Multiple weighted spherical balls are equipped in the holding tank,Holding tank side at the progress disk center is equipped with project board,The utility model is by being arranged into scale,After staff completes some project process,It need to only rotate into scale,It will refer to be directed to and arrive corresponding project board,Cost personnel is reminded to complete this project,Weighted spherical ball freely drops to holding tank bottom end,Make to fix into scale,If the slow or a certain project that works goes wrong,The button of respective item board instruction from above lamp can be pressed,Respective item board instruction from above lamp is set to light,Reach prompting effect,By that can will be write down to the opinion of a certain project,It is put into corresponding accomodation case.

Description

A kind of project cost schedule management apparatus
Technical field
The utility model is related to a kind of project cost schedule management apparatus, belong to Project Cost Field.
Background technology
Currently, project cost, existing cost can be made before bid to the engineering accepted by being responsible for the enterprise of bid Flow is that the information that staff provides according to owner and the information oneself obtained to site inspection carry out the engineering of undertaking The work that cost calculates.It is cumbersome due to cost work, need the work to cost staff to exercise supervision, and at present can only It is exercised supervision to the cost work of cost staff by related personnel, does not meet the requirement now to office automatic, together When need extra work personnel, cause the waste of human resources.
And staff is not aware that whether cost personnel goes and finds out what's going on, can not Two-way Feedback information, be unfavorable for work Development.
Utility model content
The utility model proposes a kind of project cost schedule management apparatus, solve in the prior art, the utilization of file cabinet Rate is not high, and space has certain waste and crowded and closed file cabinet stuffy, and the time has grown the money of the archives in file cabinet Material will be mouldy or recruits worm, serious the problem of also archives being caused thoroughly to damage, the utility model by being arranged into scale, when After staff completes some project process, it need to only rotate into scale, will refer to for corresponding project board is arrived, remind cost Personnel complete this project, and weighted spherical ball freely drops to holding tank bottom end, makes to fix into scale, if working slow or a certain project It goes wrong, the button of respective item board instruction from above lamp can be pressed, so that respective item board instruction from above lamp is lighted, reach It is put into corresponding accomodation case to effect is reminded by that can will be write down to the opinion of a certain project.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
A kind of project cost schedule management apparatus of the utility model, including into scale, through connecting at the progress disk center It is connected to shaft, the shaft side is connected with pointer, and the shaft side connects support column, and the support column bottom connects bottom Seat, it is described into holding tank is equipped at scale one side edge, multiple weighted spherical balls are equipped in the holding tank, the holding tank is close to institute It states side at progress disk center and is equipped with project board, the project board is equipped with indicator light, described to be equipped with multiple appearances into scale outside Receive cabinet, the accomodation case is equipped with button, and the button is electrically connected with the indicator light, and cabinet door is equipped with below the button, The cabinet door is pivotally connected with the accomodation case, and the cabinet door side is additionally provided with arc port.
As a kind of optimal technical scheme of the utility model, side of the holding tank at the progress disk center Opening, and the receiving groove shape is annular.
As a kind of optimal technical scheme of the utility model, the project board quantity is multiple, and annular spread is in institute It states into scale side.
As a kind of optimal technical scheme of the utility model, the shaft is rotatablely connected at the progress disk center, The cabinet door bottom is connect by magnetic piece with the accomodation case.
As a kind of optimal technical scheme of the utility model, be equipped with accumulator in the support column, the accumulator with The indicator light is electrically connected.
As a kind of optimal technical scheme of the utility model, the base top both sides are equipped with accommodating case, the pedestal Bottom periphery is equipped with universal wheel.
The advantageous effect that the utility model is reached is:The utility model is by being arranged into scale, when staff completes After some project process, it need to only rotate into scale, will refer to for corresponding project board is arrived, cost personnel is reminded to complete this Mesh, weighted spherical ball freely drop to holding tank bottom end, make to fix into scale, can if the slow or a certain project that works goes wrong To press the button of respective item board instruction from above lamp, so that respective item board instruction from above lamp is lighted, reaches prompting effect, By that can will be write down to the opinion of a certain project, it is put into corresponding accomodation case.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality Novel embodiment for explaining the utility model, does not constitute limitations of the present invention together.In the accompanying drawings:
Fig. 1 is the structure chart of the utility model;
Fig. 2 is the utility model into scale side view.
In figure:1, into scale;2, shaft;3, pointer;4, support column;5, pedestal;6, holding tank;7, weighted spherical ball;8, project Board;9, indicator light;10, accomodation case;11, button;12, cabinet door;13, arc port;14, accommodating case.
Specific implementation mode
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment 1
As shown in Figs. 1-2, the utility model provides a kind of project cost schedule management apparatus, including into scale 1, it is described into Through shaft 2 is connected at 1 center of scale, 2 side of the shaft is connected with pointer 3, and 2 side of the shaft connects support column 4, 4 bottom connect base 5 of the support column, it is described into holding tank 6 is equipped at 1 one side edge of scale, it is equipped in the holding tank 6 more A weighted spherical ball 7, the holding tank 6 are equipped with project board 8 close to described into side at 1 center of scale, and the project board 8, which is equipped with, to be referred to Show lamp 9, described to be equipped with multiple accomodation cases 10 into 1 outside of scale, the accomodation case 10 is equipped with button 11, the button 11 and institute The electric connection of indicator light 9 is stated, 11 lower section of the button is equipped with cabinet door 12, and the cabinet door 12 is pivotally connected with the accomodation case 10, 12 side of the cabinet door is additionally provided with arc port 13.
The holding tank 6 is close described into the side opening at 1 center of scale, and 6 shape of the holding tank is annular, is matched Heavy ball 7 freely drops to 6 bottom end of holding tank, makes to fix into scale 1, and 8 quantity of project board is multiple, and annular spread is in institute It states into 1 side of scale, after staff completes some project process, need to only rotate into scale 1, pointer 3 is corresponding to arriving Project board 8, the shaft 2, into rotation connection at 1 center of scale, facilitate and rotate into scale 1,12 bottom of the cabinet door with described Portion is connect by magnetic piece with the accomodation case 10, and cabinet door 12 is closed automatically by the magnetic action of magnetic piece and the accomodation case 10 It closes, accumulator is equipped in the support column 4, the accumulator is electrically connected with the indicator light 9, is powered for indicator light 9, described 5 top both sides of pedestal are equipped with accommodating case 14, and paper and pen is placed in accommodating case 14, and 5 bottom periphery of the pedestal is equipped with universal wheel.
When the utility model is used, by being arranged into scale 1, after staff completes some project process, only need It rotates into scale 1, by pointer 3 to arriving corresponding project board 8, cost personnel is reminded to complete this project, under 7 freedom of weighted spherical ball 6 bottom end of holding tank is dropped to, makes to fix into scale 1, if the slow or a certain project that works goes wrong, respective item can be pressed The button 11 of 8 instruction from above lamp 9 of board makes respective item board instruction from above lamp 9 light, reaches prompting effect, by can be with The opinion of a certain project will be write down, is put into corresponding accomodation case 10, paper and pen is placed in accommodating case 14.
Finally it should be noted that:The preferred embodiment that these are only the utility model, is not limited to this practicality It is novel, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art, It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc. With replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all include It is within the protection scope of the utility model.

Claims (6)

1. a kind of project cost schedule management apparatus, including into scale (1), which is characterized in that described into passing through at scale (1) center It wears and is connected with shaft (2), shaft (2) side is connected with pointer (3), shaft (2) the side connection support column (4), institute State support column (4) bottom connect base (5), it is described into being equipped with holding tank (6), the holding tank (6) at scale (1) one side edge Interior to be equipped with multiple weighted spherical balls (7), the holding tank (6) is equipped with project board (8), institute close to described into side at scale (1) center It states project board (8) and is equipped with indicator light (9), it is described to be equipped with multiple accomodation cases (10), the accomodation case (10) into scale (1) outside It is equipped with button (11), the button (11) is electrically connected with the indicator light (9), and cabinet door is equipped with below the button (11) (12), the cabinet door (12) is pivotally connected with the accomodation case (10), and cabinet door (12) side is additionally provided with arc port (13).
2. a kind of project cost schedule management apparatus according to claim 1, which is characterized in that the holding tank (6) is leaned on It is close described into the side opening at scale (1) center, and the holding tank (6) shape is annular.
3. a kind of project cost schedule management apparatus according to claim 1, which is characterized in that project board (8) number Amount be it is multiple, and annular spread described into scale (1) side.
4. a kind of project cost schedule management apparatus according to claim 1, which is characterized in that the shaft (2) and institute It states into rotation connection at scale (1) center, cabinet door (12) bottom is connect by magnetic piece with the accomodation case (10).
5. a kind of project cost schedule management apparatus according to claim 1, which is characterized in that in the support column (4) Equipped with accumulator, the accumulator is electrically connected with the indicator light (9).
6. a kind of project cost schedule management apparatus according to claim 1, which is characterized in that at the top of the pedestal (5) Both sides are equipped with accommodating case (14), and pedestal (5) bottom periphery is equipped with universal wheel.
CN201820406895.2U 2018-03-23 2018-03-23 A kind of project cost schedule management apparatus Expired - Fee Related CN207938027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820406895.2U CN207938027U (en) 2018-03-23 2018-03-23 A kind of project cost schedule management apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820406895.2U CN207938027U (en) 2018-03-23 2018-03-23 A kind of project cost schedule management apparatus

Publications (1)

Publication Number Publication Date
CN207938027U true CN207938027U (en) 2018-10-02

Family

ID=63655840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820406895.2U Expired - Fee Related CN207938027U (en) 2018-03-23 2018-03-23 A kind of project cost schedule management apparatus

Country Status (1)

Country Link
CN (1) CN207938027U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111489635A (en) * 2020-04-15 2020-08-04 中道明华建设工程项目咨询有限责任公司 Overall process engineering cost progress management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111489635A (en) * 2020-04-15 2020-08-04 中道明华建设工程项目咨询有限责任公司 Overall process engineering cost progress management system
CN111489635B (en) * 2020-04-15 2021-10-01 中道明华建设工程项目咨询有限责任公司 Overall process engineering cost progress management system

Similar Documents

Publication Publication Date Title
CN207938027U (en) A kind of project cost schedule management apparatus
CN202228891U (en) Camera support
CN206846415U (en) A kind of pupil's multi-function desk lamp with prompting function
CN209570234U (en) A kind of water meter of band protection cover structure
CN110743152A (en) Counter capable of being calibrated more accurately
CN109497704A (en) A kind of rotatable telescopic computer rack
CN209672812U (en) A kind of grating type soil sample drying unit
CN208813953U (en) A kind of spliced dustbin
CN211049897U (en) Portable medical kit
CN207600710U (en) A kind of shuttlecock wind tunnel detecting device
CN207186402U (en) One kind detachable mattress
CN208622104U (en) A kind of inventory management system scanning device based on two dimensional code
CN208484700U (en) A kind of transport device of the logistics with anti-drop function
CN209199420U (en) A kind of mathematics angle demonstration teaching aid
CN208694152U (en) A kind of intelligence slides conditioning disk
CN208640212U (en) A kind of chargeable experience platform
CN206862435U (en) A kind of new spiral cover water meter
CN207819535U (en) A kind of charging unit
CN207115784U (en) A kind of medical teaching aid device of radioactivity
CN207527237U (en) Body and mind custodial care facility with physiology sign monitoring function
CN207152946U (en) A kind of physical culture rope skipping unit
CN205430464U (en) Network private tutor device
CN206787656U (en) A kind of new water meter
CN206378890U (en) A kind of Multifunctional U disk and mobile storage
CN212149877U (en) Novel gift box structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

Termination date: 20200323

CF01 Termination of patent right due to non-payment of annual fee