CN111489635A - Overall process engineering cost progress management system - Google Patents
Overall process engineering cost progress management system Download PDFInfo
- Publication number
- CN111489635A CN111489635A CN202010296413.4A CN202010296413A CN111489635A CN 111489635 A CN111489635 A CN 111489635A CN 202010296413 A CN202010296413 A CN 202010296413A CN 111489635 A CN111489635 A CN 111489635A
- Authority
- CN
- China
- Prior art keywords
- rod
- plate
- bottom plate
- indicating
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F9/00—Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Drawing Aids And Blackboards (AREA)
Abstract
The invention relates to a whole-process engineering cost progress management system, which belongs to the technical field of building auxiliary equipment and comprises a bottom plate, wherein a side plate is arranged at the edge of one side of the bottom plate, a plurality of accommodating grooves are formed in the side plate, an indicating plate is arranged in each accommodating groove, fixing rods are arranged at four corners of the indicating plate, a telescopic rod is arranged and slidably connected in each fixing rod, the end part of each telescopic rod is fixedly connected to the bottom wall of each accommodating groove, a butting rod is arranged on the bottom wall of each accommodating groove in a penetrating and slidably connected mode, the bottom plate and the side plate are arranged in a hollow mode, first driving pieces are arranged in the hollow bottom plate and the hollow side plate, an operator drives the butting rod to slide on the bottom wall of each accommodating groove through the first driving pieces, so that the butting rod can push out the indicating plate from the accommodating groove, the progress is indicated to be completed, when, the use process is simple and convenient, and is convenient for operators to use.
Description
Technical Field
The invention relates to the technical field of construction auxiliary equipment, in particular to a whole-process engineering cost progress management system.
Background
The construction cost directly means the construction price of the project. The three elements of project pricing are volume, price and fee. In a broad sense, the construction cost covers construction engineering cost (civil engineering major and installation major), highway engineering cost, water transportation engineering cost, railway engineering cost, hydraulic engineering cost, electric power engineering cost, communication engineering cost, aerospace engineering cost and the like. The construction cost is the total cost for some construction, and the core content is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, construction settlement, completion settlement and the like.
Chinese patent that the bulletin number of authorizing is CN206178967U discloses an engineering cost progress management system, including base, branch and stabilizer bar, the bottom mounting of branch is on the base, and the top of branch articulates at the middle part of stabilizer bar, the both ends of stabilizer bar all are equipped with the cavity, are equipped with a plurality of progress management units in the cavity, progress management unit is including changeing the rod and instructing the strip, change the rod and rotate to connect on the stabilizer bar, instruct the strip winding on changeing the rod, and instruct the one end of strip to fix on changeing the rod, the other end is fixed with the link, be equipped with the through-hole that supplies to instruct the strip to remove on the stabilizer bar, be equipped with the drawer that is used for depositing the weight in the base, be equipped with the couple on the. After a working procedure is finished by a worker, a heavy object or a weight is hung on the hanging ring, and the weight pulls the rotating rod to rotate, so that the indication strip is pulled downwards to remind a construction worker of finishing the working procedure. After the fabrication staff checks the procedure, another weight is taken and hung on the other side to balance the balance rod.
The above prior art solutions have the following drawbacks: the weight all need be taken out and the couple is hung on the link when operating personnel uses at every turn to drive and instruct the strip to fall and remind the cost personnel, need again to instruct the strip winding once more on changeing the roller after instructing the strip and finishing using, so that instruct the strip to fall next time and instruct the cost personnel, the use is comparatively troublesome, and the operating personnel of being not convenient for uses.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a whole-process engineering cost progress management system which is convenient for operators to use.
The above object of the present invention is achieved by the following technical solutions:
a whole-process engineering cost progress management system comprises a bottom plate, wherein a side plate is arranged on one side edge of the bottom plate, which is vertical to the bottom plate, a plurality of accommodating grooves are formed in the side plate along the width direction of the side plate, an indicating plate is arranged in each accommodating groove, the surface of the indicating plate facing the accommodating groove and positioned at four corners of the indicating plate are provided with fixing rods, each fixing rod is internally provided with a telescopic rod which is connected with the fixing rod in a sliding way, the end part of the telescopic rod far away from the fixed rod is fixedly connected to the bottom walls of the containing tanks, the bottom wall of each containing tank and the middle part of the containing tank are all penetrated and connected with a butting rod in a sliding way, bottom plate and curb plate all are the cavity setting, and hollow bottom plate and hollow curb plate are intercommunication setting each other, are provided with in cavity and bottom plate and the hollow curb plate to be used for driving the butt rod and slide on the diapire of holding tank, in order to butt the indicator board to the first driving piece outside the holding tank.
By adopting the technical scheme, the indicator plate is provided with the mark of each progress in the construction cost, when a certain progress in the construction cost process is completed, an operator drives the abutting rod to be positioned on the bottom wall of the accommodating tank to slide through the first driving piece, so that the abutting rod pushes the indicator plate out of the accommodating tank, when the indicator plate is positioned outside the accommodating tank, the progress is completed, when the indicator plate is positioned in the accommodating tank, the progress is still in progress, when the indicator plate needs to be reset, the operator pushes the indicator plate to drive the indicator plate to be positioned in the accommodating tank, the use process is simple and convenient, and the use is convenient for the operator; dead lever and telescopic link can play the effect of direction to the removal of indicator panel, prevent that the deviation from appearing in the position between indicator panel and the holding tank.
The present invention in a preferred example may be further configured to: the first driving piece comprises a first linkage rod which is arranged in the hollow side plate and is positioned at the position of each indicating plate, a second linkage rod is arranged in the bottom plate and at the position of each indicating plate, the end parts of the first linkage rod and the second linkage rod are fixedly connected together, the end part of the abutting rod positioned in the side plate is provided with a fixed block, the end part of the first linkage rod far away from the second linkage rod is provided with an abutting block, the cross sections of the fixed block and the abutting block are arranged in a right-angled triangle shape, the inclined planes of the fixed block and the abutting block are mutually parallel and oppositely arranged, the bottom plate is provided with a second driving piece for driving the second linkage rod to drive the first linkage rod to move along the length direction of the first linkage rod, the second driving piece is used for driving the inclined plane on the abutting block to abut against the inclined plane on the fixing block so as to drive the abutting rod to abut the indicating plate outside the accommodating groove.
Through adopting above-mentioned technical scheme, when needs drive the butt joint pole and lie in the diapire of holding tank and remove, drive the second trace through the second driving piece and drive first trace and drive the length direction removal of first trace, first trace can drive the mutual butt in inclined plane of butt joint piece and fixed block this moment, thereby make the butt joint piece drive the fixed block and remove, it moves to make the fixed block drive the butt joint pole and lie in the diapire of holding tank, thereby make the butt joint pole release the holding tank with the indicator board, the setting that adopts first trace and second trace makes all parts all be located bottom plate and curb plate, whole progress management system's pleasing to the eye degree has been improved, and its simple structure, the drive effect to the butt joint pole is better.
The present invention in a preferred example may be further configured to: the position that just is located every butt pole place in the curb plate all is provided with first spring, on the butt pole was located to first spring housing, the one end fixed connection of first spring was on the inner wall of curb plate, and other end fixed connection is on the fixed block.
Through adopting above-mentioned technical scheme, when first spring is in the natural state, the indicator plate is located the holding tank this moment, after the inclined plane that first tie rod drove butt piece and fixed block butt each other, the fixed block can drive first spring and be in compression state, the butt pole is located the diapire of holding tank and moves this moment, make the butt pole release the holding tank with the indicator plate, after the butt pole is with the ejecting holding tank of indicator plate, the elasticity that the butt pole can resist first spring resumes the normal position, thereby make the indicator plate can directly push in the holding tank after finishing using, the drive effect of butt pole has been improved.
The present invention in a preferred example may be further configured to: and a plurality of second springs are arranged between the surface of the second linkage rod, which deviates from the indicating plate, and the inner wall of the bottom plate, one ends of the second springs are fixedly connected to the second linkage rod, and the other ends of the second springs are fixedly connected to the inner wall of the bottom plate.
Through adopting above-mentioned technical scheme, after the second trace removed along the length direction of first trace, the second trace can drive the second spring and be extruded to compression state, and the butt joint pole can be with the ejecting holding tank of indicator panel this moment, and after first trace and second trace used up, the elasticity that the second spring can be resisted to the second trace restores the normal position to make the butt joint piece restore the normal position, make things convenient for next with the ejecting holding tank of indicator panel, further improved the drive effect to the butt joint pole.
The present invention in a preferred example may be further configured to: the bottom plate is internally provided with a rod body at the position where each second spring is located, the rod body is arranged to be of a telescopic structure, the telescopic structure comprises a connecting rod, one end of the connecting rod is fixedly connected to the inner wall of the bottom plate, an inserting rod is inserted into the connecting rod and is connected with the connecting rod in a sliding mode, the end portion, far away from the connecting rod, of the inserting rod is fixedly connected to the second interlocking rod, the second springs are located in the rod bodies, and the two ends of each second spring are respectively connected to the bottom wall, far away from the inserting position, of the connecting.
Through adopting above-mentioned technical scheme, connecting rod and inserted bar can play the effect of direction to the compression of second spring, prevent that the second trace from inclining when removing to prevent that the second trace from driving the slope of first trace, improved the butt effect that first trace drove between butt joint piece and the fixed block, thereby further improved the drive effect to the butt joint pole.
The present invention in a preferred example may be further configured to: the second driving piece comprises sliding blocks which are connected to the bottom plate in a sliding mode along the direction of the indicating plates, the sliding blocks are connected with pressing rods in a penetrating mode and are used for being abutted to the end portions, far away from the first linkage rods, of the second linkage rods in a sliding mode, the pressing rods are perpendicular to the end portions, far away from the second linkage rods, of the pressing rods and are provided with connecting plates, third springs are arranged between the connecting plates and the sliding blocks, the third springs are sleeved on the pressing rods, one ends of the third springs are connected to the connecting plates, and the other ends of the third springs are connected to the sliding blocks.
Through adopting above-mentioned technical scheme, when needs drive the length direction removal of second trace along first trace, operating personnel is through pressing the connecting plate, make the connecting plate drive to press the trace to remove towards the second trace, the connecting plate can drive the third spring and be in compression state this moment, thereby make to press the trace to drive the length direction removal of second trace along first trace, make the ejecting holding tank of indicator plate with the butt joint pole, after finishing using, the connecting plate can drive the elasticity reconversion that the press the trace resisted the third spring, thereby make things convenient for next use, the drive effect to the second trace has been improved. Operating personnel drives through pressing the connecting plate and presses the depression bar removal and can be with the ejecting holding tank of indicator board, and the use is convenient simple.
The present invention in a preferred example may be further configured to: offer on the bottom plate and be used for supplying the bar opening that the pressure bar passed, bar open-ended length direction sets up along the length direction of perpendicular to second interlock pole, the bar opening is intercommunication setting each other with hollow bottom plate, the both sides of sliding block are all seted up flutedly, two relative faces of recess are used for respectively with the outer wall and the inner wall butt of bottom plate.
Through adopting above-mentioned technical scheme, the sliding block can drive the open-ended length direction removal of recess edge strip for same connecting plate and press the position that the depression bar can move to arbitrary one second trace place drive the second trace, have practiced thrift whole progress management system's manufacturing and production cost, have improved the result of use of connecting plate and press the depression bar.
The present invention in a preferred example may be further configured to: a plurality of indication blocks are arranged on the bottom plate along the length direction of the strip-shaped opening, the indication blocks are respectively arranged at the positions where the second linkage rods are located, and the indication blocks are used for indicating the positions of the second linkage rods.
Through adopting above-mentioned technical scheme, the instruction piece conveniently indicates the position of every second trace of operating personnel to make things convenient for operating personnel to press the connecting plate at the assigned position.
The present invention in a preferred example may be further configured to: the tip that the holding tank diapire was kept away from to the dead lever is provided with first magnet board, the spread groove has all been seted up, every in the four corners that just is located the spread groove to the spread groove on the face of holding tank, every equal fixed second magnet board that is provided with in the spread groove, the second magnet board is used for adsorbing each other with first magnet board.
Through adopting above-mentioned technical scheme, first magnet board and second magnet board can make the indicator panel can dismantle and be connected to the dead lever on to the convenient cost progress indicator panel of difference is changed, adopts first magnet board and second magnet board convenience fixed the indicator panel, thereby the operating personnel of being convenient for changes the indicator panel.
The present invention in a preferred example may be further configured to: and suckers are arranged at four corners of the bottom plate below the bottom plate.
Through adopting above-mentioned technical scheme, the sucking disc can drive whole progress management system and fix to the desktop on to when preventing that operating personnel from driving the sliding block and moving along the open-ended length direction of bar, drive whole progress management system and be located the desktop and move.
In summary, the invention includes at least one of the following beneficial technical effects:
an operator can press the connecting plate to drive the pressing rod to resist the elastic force of the third spring to move towards the second linkage rod, the second linkage rod can resist the elastic force of the second spring to drive the first linkage rod to move along the length direction of the first linkage rod, so that the first linkage rod drives the abutting block to abut against the inclined surface of the fixed block, at the moment, the fixed block can resist the elastic force of the first spring to drive the abutting rod to move on the bottom wall of the accommodating tank, so that the abutting rod pushes the indicating plate out of the accommodating tank, the manufacturing cost indicating progress is completed, the operator can drive the indicating plate to push the accommodating tank out by pressing the connecting plate, when the operator loosens the connecting plate, the abutting rod can resist the elastic force of the first spring to restore the original position, when the operator does not need to use the indicating plate, the indicating plate is directly pushed into the accommodating tank, the operation, and the whole management system does not adopt any electrical components, so that the manufacturing and production cost is saved.
Drawings
FIG. 1 is a schematic overall structure;
fig. 2 is a schematic view showing an exploded structure of a fixing rod, a telescopic rod, a first magnetic plate and a second magnetic plate;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is a schematic sectional view for showing the first, second and third springs;
fig. 5 is an enlarged view of a portion B in fig. 4.
In the figure, 1, a bottom plate; 11. a side plate; 12. accommodating grooves; 121. an indicator panel; 122. fixing the rod; 123. a telescopic rod; 124. a butting rod; 13. a first linkage rod; 131. a second linkage rod; 132. a fixed block; 133. a butting block; 134. a first spring; 135. a second spring; 136. a connecting rod; 137. a plug rod; 14. a slider; 141. a pressing lever; 142. a connecting plate; 143. a third spring; 144. a strip-shaped opening; 145. a groove; 15. an indication block; 16. a first magnet plate; 161. connecting grooves; 162. a second magnet plate; 17. and (4) sucking discs.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the overall process engineering cost progress management system disclosed by the invention comprises a bottom plate 1, wherein a side plate 11 is arranged on one side edge of the bottom plate 1 perpendicular to the bottom plate 1, a plurality of accommodating grooves 12 are formed in the side plate 11 along the width direction of the side plate 11, and an indicating plate 121 is arranged in each accommodating groove 12.
Referring to fig. 1 and 2, in order to fix the entire schedule management system to a desktop, thereby facilitating the use of an operator, suction cups 17 are provided under the base plate 1 and at four corners of the base plate 1.
With reference to fig. 1 and 3, in order to allow the indication plate 121 to move out of or into the accommodating groove 12, fixing rods 122 are disposed on the surface of the indication plate 121 facing the accommodating groove 12 and at four corners of the indication plate 121, a telescopic rod 123 is disposed and slidably connected in each fixing rod 122, and an end of the telescopic rod 123 far away from the fixing rods 122 is fixedly connected to the bottom wall of the accommodating groove 12.
In this embodiment, when the indicating plate 121 is located outside the accommodating groove 12, the manufacturing cost progress on the indicating plate 121 is completed, and when the indicating plate 121 is located outside the accommodating groove 12, the manufacturing cost progress on the indicating plate 121 is not completed.
With reference to fig. 2 and 3, in order to detachably connect the indication plate 121 to the fixing rod 122, so that the cost staff can replace the different cost progress indication plates 121, the end portion of the fixing rod 122 far away from the bottom wall of the accommodating groove 12 is provided with the first magnet plate 16, the indication plate 121 faces the accommodating groove 12 and four corners of the indication plate 121 are provided with connecting grooves 161, each connecting groove 161 is internally and fixedly provided with the second magnet plate 162, and the second magnet plate 162 is used for being adsorbed to the first magnet plate 16.
An operator can drive the indicating plate 121 to take down by driving the first magnet plate 16 and the second magnet plate 162 to be separated from the adsorption relation by force, and the new indicating plate 121 drives the second magnet plate 162 to be adsorbed by the first magnet plate 16, so that the fixing of the indicating plate 121 can be completed, and the operation is convenient and simple.
As shown in fig. 4, in order to drive the indicating plate 121 to move out of the accommodating groove 12, the bottom wall of each accommodating groove 12 is provided with a middle part of the accommodating groove 12, a butt rod 124 is inserted into the middle part of the accommodating groove 12 and connected with the middle part of the accommodating groove in a sliding manner, the bottom plate 1 and the side plate 11 are both hollow, and the hollow bottom plate 1 and the hollow side plate 11 are communicated with each other.
As shown in fig. 4, in order to drive the abutting rod 124 to move on the bottom wall of the receiving groove 12, a first driving element is disposed in the hollow bottom plate 1 and the hollow side plate 11 for driving the abutting rod 124 to slide on the bottom wall of the receiving groove 12 so as to abut the indicating plate 121 outside the receiving groove 12.
As shown in fig. 4, the first driving member includes a first linkage rod 13 disposed in the hollow side plate 11 and located at the position of each indicator panel 121, a second linkage rod 131 is disposed in the bottom plate 1 and located at the position of each indicator panel 121, the end portions of the first linkage rod 13 and the second linkage rod 131 are fixedly connected to each other, a fixed block 132 is disposed at the end portion of the abutting rod 124 located in the side plate 11, an abutting block 133 is disposed at the end portion of the first linkage rod 13 away from the second linkage rod 131, the cross sections of the fixed block 132 and the abutting block 133 are disposed in a right triangle, and the inclined surfaces of the fixed block 132 and the abutting block 133 are parallel to each other and are disposed oppositely.
Through driving the length direction removal of second trace 131 and first trace 13 along first trace 13, make first trace 13 drive the inclined plane of butt joint piece 133 and the mutual butt of the inclined plane of fixed block 132, thereby make butt joint piece 133 drive the fixed block 132 and remove, make fixed block 132 drive butt joint pole 124 and be located the diapire of holding tank 12 and move, make butt joint pole 124 release holding tank 12 with indicator panel 121, make indicator panel 121 play the effect of instruction to the cost personnel.
As shown in fig. 4, in order to enable the fixing block 132 to drive the abutting rod 124 to restore the original position after driving the abutting rod 124 to push the indicating plate 121 out of the accommodating groove 12, a first spring 134 is disposed in the side plate 11 at a position where each abutting rod 124 is located, the first spring 134 is sleeved on the abutting rod 124, one end of the first spring 134 is fixedly connected to the inner wall of the side plate 11, and the other end of the first spring 134 is fixedly connected to the fixing block 132; when the fixing block 132 drives the abutting rod 124 to eject the indicating plate 121 out of the accommodating groove 12, at this time, the first spring 134 is in a compressed state, and after the indicating plate 121 is ejected out of the accommodating groove 12, the indicating plate 121 can move into the accommodating groove 12 against the elastic force of the first spring 134, so that an operator can conveniently push the indicating plate 121 into the accommodating groove 12 when the indicating plate 121 is not needed to be used.
As shown in fig. 4, in order to drive the second linking rod 131 to drive the first linking rod 13 to move along the length direction of the first linking rod 13, a second driving member for driving the second linking rod 131 to drive the first linking rod 13 to move along the length direction of the first linking rod 13 is disposed on the bottom plate 1, and the second driving member is used to drive the inclined surface on the abutting block 133 to abut against the inclined surface on the fixing block 132 so as to drive the abutting rod 124 to abut the indicating plate 121 to the outside of the accommodating groove 12.
Referring to fig. 4 and 5, in order to drive the abutting rod 124 to push the indicating plate 121 out of the accommodating groove 12 and then drive the abutting rod 133 to return to the original position after the abutting rod 133 abuts against the inclined surface of the fixed block 132, a plurality of second springs 135 are disposed between the surface of the second linkage rod 131 departing from the indicating plate 121 and the inner wall of the bottom plate 1, one end of each second spring 135 is fixedly connected to the corresponding second linkage rod 131, and the other end of each second spring 135 is fixedly connected to the inner wall of the bottom plate 1.
Referring to fig. 4 and 5, in order to prevent the second linkage 131 from tilting when the second spring 135 is pressed, thereby preventing the second linkage 131 from driving the first linkage 13 to tilt, a rod is disposed in the bottom plate 1 and at each position where the second spring 135 is located, the rod is set to be a telescopic structure, the telescopic structure includes a connecting rod 136 having one end fixedly connected to the inner wall of the bottom plate 1, an inserting rod 137 is inserted and slidably connected in the connecting rod 136, an end of the inserting rod 137 far away from the connecting rod 136 is fixedly connected to the second linkage 131, the second spring 135 is located in the rod, and two ends of the second spring 135 are respectively connected to the bottom wall of the connecting rod 136 and the bottom wall of the inserting rod 137 far away from the inserting position.
The second driving member can drive the second linkage rod 131 to move along the length direction of the first linkage rod 13, so that the second linkage rod 131 drives the insertion rod 137 to move in the connecting rod 136, so that the insertion rod 137 extrudes the second spring 135 and drives the second spring 135 to be extruded to a compressed state, at this time, the abutting block 133 abuts against the fixed block 132, the abutting rod 124 is driven to push the indicating plate 121 out of the accommodating groove 12, after the indicating plate 121 is pushed out of the accommodating groove 12, the second linkage rod 131 can resist the elastic force of the second spring 135 to restore the original position, and the indicating plate 121 is conveniently driven next time.
Referring to fig. 4 and 5, in order to drive the second linkage rod 131 to move along the length direction of the first linkage rod 13, the second driving member includes a sliding block 14 slidably connected to the bottom plate 1 along the direction of the plurality of indicator plates 121, a pressing rod 141 is inserted into the sliding block 14 and slidably connected to the end of the second linkage rod 131 far from the first linkage rod 13, a connecting plate 142 is disposed at the end of the pressing rod 141 far from the second linkage rod 131, which is perpendicular to the pressing rod 141, a third spring 143 is disposed between the connecting plate 142 and the sliding block 14, the third spring 143 is sleeved on the pressing rod 141, one end of the third spring 143 is connected to the connecting plate 142, and the other end is connected to the sliding block 14.
When the second linkage 131 needs to be driven to move along the length direction of the first linkage 13, an operator presses the connecting plate 142, so that the connecting plate 142 drives the pressing rod 141 to move towards the second linkage 131, at this time, the connecting plate 142 can drive the third spring 143 to be in a compression state, so that the pressing rod 141 drives the second linkage 131 to move along the length direction of the first linkage 13, so that the indicator plate 121 is ejected out of the accommodating groove 12 by the abutting rod 124, after the use is finished, the connecting plate 142 can drive the pressing rod 141 to resist the elastic force of the third spring 143 to restore, so that the next use is facilitated, and the driving effect on the second linkage 131 is improved.
With reference to fig. 4 and 5, in order to drive the sliding block 14 to move along the directions of the plurality of indicator boards 121, the connecting plate 142 and the pressing rod 141 on the same sliding block 14 can drive any one of the second linkage rods 131, the bottom plate 1 is provided with a bar-shaped opening 144 for the pressing rod 141 to pass through, the bar-shaped opening 144 is arranged along the length direction perpendicular to the second linkage rods 131, the bar-shaped opening 144 is communicated with the hollow bottom plate 1, the two sides of the sliding block 14 are provided with grooves 145, and two opposite surfaces of the grooves 145 are respectively used for abutting against the outer wall and the inner wall of the bottom plate 1.
With reference to fig. 4 and 5, in order to indicate the position of each second linkage 131, so as to facilitate an operator to move the sliding block 14 to a position where any one of the second linkages 131 is located, a plurality of indication blocks 15 are disposed on the bottom plate 1 along the length direction of the strip-shaped opening 144, and the plurality of indication blocks 15 are respectively disposed at the position where each second linkage 131 is located.
The implementation principle of the embodiment is as follows: writing the whole manufacturing cost process on each indicator board 121, after a certain process is completed, the operator drives the sliding block 14 to slide along the strip-shaped opening 144, so that the sliding block 14 moves to the position of the indicator board 121 corresponding to the progress, by pressing the connecting plate 142, the connecting plate 142 drives the pressing rod 141 to move towards the second linkage rod 131 against the elastic force of the third spring 143, the second linkage rod 131 can drive the inserting rod 137 to move in the connecting rod 136 against the elastic force of the second spring 135, so as to drive the first linkage rod 13 to move along the length direction of the first linkage rod 13, so that the first linkage rod 13 drives the abutting block 133 to abut against the inclined surface of the fixed block 132, at this time, the fixed block 132 can drive the abutting rod 124 to move on the bottom wall of the accommodating groove 12 against the elastic force of the first spring 134, so that the abutting rod 124 pushes the indicator board 121 out of the accommodating groove 12, indicating that the manufacturing cost process is completed, operating personnel can drive the ejecting holding tank 12 of indicator panel 121 through pressing down connecting plate 142, when operating personnel unclamped connecting plate 142, the elasticity that first spring 134 can be resisted to butt pole 124 resumes the normal position, operating personnel need not use indicator panel 121 time, promote indicator panel 121 and drive dead lever 122 and be located telescopic link 123 and move, directly push in holding tank 12 with indicator panel 121 can, operating personnel drives sliding block 14 and removes and press down connecting plate 142 and can accomplish the release to indicator panel 121, and the operation is convenient and simple, the cost of being convenient for personnel use, and whole management system does not adopt any electrical components, and the manufacturing and production cost is saved.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.
Claims (10)
1. A whole-process engineering cost progress management system is characterized in that: comprises a bottom plate (1), a side plate (11) is arranged on one side edge of the bottom plate (1) perpendicularly to the bottom plate (1), a plurality of accommodating grooves (12) are formed in the side plate (11) along the width direction of the side plate (11), an indicating plate (121) is arranged in each accommodating groove (12), fixing rods (122) are arranged on the surfaces, facing the accommodating grooves (12), of the indicating plates (121) and positioned at four corners of the indicating plates (121), each fixing rod (122) is internally provided with and slidably connected with a telescopic rod (123), the end parts, far away from the fixing rods (122), of the telescopic rods (123) are fixedly connected to the bottom walls of the accommodating grooves (12), abutting rods (124) are arranged on the bottom walls of the accommodating grooves (12) and positioned in the middle parts of the accommodating grooves (12) in a penetrating and slidably connected mode, the bottom plate (1) and the side plate (11) are both arranged in a hollow mode, the hollow bottom plate (1) and the hollow, a first driving piece used for driving the abutting rod (124) to slide on the bottom wall of the accommodating groove (12) and abutting the indicating plate (121) to the outside of the accommodating groove (12) is arranged in the hollow side plate (11) and the bottom plate (1).
2. The overall process project cost progress management system of claim 1 wherein: first driving piece is including setting up first interlock pole (13) in hollow curb plate (11) and being located every indicator panel (121) position, the position that just is located every indicator panel (121) position in bottom plate (1) all is provided with second interlock pole (131), the tip mutual fixed connection of first interlock pole (13) and second interlock pole (131) is in the same place, the tip that butt joint pole (124) are located curb plate (11) is provided with fixed block (132), the tip that second interlock pole (131) were kept away from in first interlock pole (13) is provided with butt joint piece (133), the cross section of fixed block (132) and butt joint piece (133) all is right triangle set up, the inclined plane of fixed block (132) and butt joint piece (133) is parallel to each other and sets up relatively, be provided with on bottom plate (1) and be used for driving second interlock pole (131) and drive first interlock pole (13) and move along the second drive of the length direction of first interlock pole (13) and set up The second driving piece is used for driving the inclined plane on the abutting block (133) to abut against the inclined plane on the fixing block (132) so as to drive the abutting rod (124) to abut the indicating plate (121) to the outside of the accommodating groove (12).
3. The overall process project cost progress management system of claim 2, wherein: the structure is characterized in that a first spring (134) is arranged in the side plate (11) and at the position where each abutting rod (124) is located, the abutting rods (124) are sleeved with the first springs (134), one end of each first spring (134) is fixedly connected to the inner wall of the side plate (11), and the other end of each first spring is fixedly connected to a fixing block (132).
4. The overall process project cost progress management system of claim 2, wherein: a plurality of second springs (135) are arranged between the surface, deviating from the indicating plate (121), of the second linkage rod (131) and the inner wall of the bottom plate (1), one ends of the second springs (135) are fixedly connected to the second linkage rod (131), and the other ends of the second springs are fixedly connected to the inner wall of the bottom plate (1).
5. The overall process project cost progress management system of claim 4 wherein: the utility model discloses a but bottom plate (1) is just located the position at every second spring (135) place and all is provided with the body of rod in bottom plate (1), the body of rod sets up to extending structure, and extending structure includes connecting rod (136) on one end fixed connection bottom plate (1) inner wall, peg graft and sliding connection have peg graft pole (137) in connecting rod (136), tip fixed connection that connecting rod (136) were kept away from to peg graft pole (137) is on second trace (131), second spring (135) are located the pole internally, the both ends of second spring (135) are connected to respectively on the diapire that connecting rod (136) and peg graft pole (137) kept away from its grafting position.
6. The overall process project cost progress management system of claim 5 wherein: the second driving piece comprises a sliding block (14) which is connected to the bottom plate (1) in a sliding mode along the direction of the indicating plates (121), the sliding block (14) is provided with a pressing rod (141) which is connected with the end portion, away from the first linkage rod (13), of the second linkage rod (131) in a penetrating mode, the pressing rod (141) is connected with a pressing rod (141) in a penetrating mode, the end portion, away from the second linkage rod (131), of the pressing rod (141) is perpendicular to the pressing rod (141) and provided with a connecting plate (142), a third spring (143) is arranged between the connecting plate (142) and the sliding block (14), the pressing rod (141) is sleeved with the third spring (143), one end of the third spring (143) is connected to the connecting plate (142), and the other end of the.
7. The overall process project cost progress management system of claim 6 wherein: the novel sliding block is characterized in that a strip-shaped opening (144) used for allowing the pressing rod (141) to penetrate is formed in the bottom plate (1), the length direction of the strip-shaped opening (144) is arranged along the length direction perpendicular to the second linkage rod (131), the strip-shaped opening (144) is communicated with the hollow bottom plate (1), grooves (145) are formed in two sides of the sliding block (14), and two opposite faces of the grooves (145) are used for being abutted to the outer wall and the inner wall of the bottom plate (1) respectively.
8. The overall process project cost progress management system of claim 7 wherein: a plurality of indicating blocks (15) are arranged on the bottom plate (1) along the length direction of the strip-shaped opening (144), the indicating blocks (15) are respectively arranged at the positions of the second linkage rods (131), and the indicating blocks (15) are used for indicating the positions of the second linkage rods (131).
9. The overall process project cost progress management system of claim 1 wherein: the tip that holding tank (12) diapire was kept away from in dead lever (122) is provided with first magnet board (16), spread groove (161) have all been seted up towards on the face of holding tank (12) in indicator plate (121) and the four corners that is located indicator plate (121), every all fixed second magnet board (162) that are provided with in spread groove (161), second magnet board (162) are used for adsorbing each other with first magnet board (16).
10. The overall process project cost progress management system of claim 1 wherein: sucking discs (17) are arranged below the bottom plate (1) and at four corners of the bottom plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010296413.4A CN111489635B (en) | 2020-04-15 | 2020-04-15 | Overall process engineering cost progress management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010296413.4A CN111489635B (en) | 2020-04-15 | 2020-04-15 | Overall process engineering cost progress management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111489635A true CN111489635A (en) | 2020-08-04 |
CN111489635B CN111489635B (en) | 2021-10-01 |
Family
ID=71810961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010296413.4A Expired - Fee Related CN111489635B (en) | 2020-04-15 | 2020-04-15 | Overall process engineering cost progress management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111489635B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113223423A (en) * | 2021-05-14 | 2021-08-06 | 童画控股有限公司 | Advertisement design display device capable of displaying advertisement effects in multiple ways |
Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3639223A1 (en) * | 1986-11-15 | 1988-05-19 | Bradley Milton Gmbh | FIELD SIGN WITH CORNER AREA CONNECTIONS |
CN2213366Y (en) * | 1994-08-01 | 1995-11-22 | 宋增厚 | Automatic changeable multi-picture bill board |
US6314453B1 (en) * | 1999-02-17 | 2001-11-06 | Hewlett-Packard Company | Method for sharing and executing inaccessible dynamic processes for replica consistency among a plurality of existing applications |
US20060015475A1 (en) * | 2000-10-25 | 2006-01-19 | Birkner Charles C | Integrated construction project management system with handheld computer and checklist |
CN204222411U (en) * | 2014-11-21 | 2015-03-25 | 黑龙江建筑职业技术学院 | A kind of button Headings-seal for countant use special frame |
CN205050192U (en) * | 2015-10-14 | 2016-02-24 | 李旭辉 | Engineering cost progress management system |
CN107067881A (en) * | 2017-03-10 | 2017-08-18 | 鲁东大学 | A kind of evolutionary operator teaching aid |
CN206774136U (en) * | 2017-05-25 | 2017-12-19 | 国网河南省电力公司桐柏县供电公司 | A kind of cement electric pole identifies board apparatus |
CN207561493U (en) * | 2017-09-13 | 2018-07-03 | 广州市新誉工程咨询有限公司 | A kind of project cost toolbox for budget |
CN108538212A (en) * | 2018-05-31 | 2018-09-14 | 重庆雄富光电科技有限公司 | A kind of led display screens |
CN207938027U (en) * | 2018-03-23 | 2018-10-02 | 赵云勇 | A kind of project cost schedule management apparatus |
CN208848242U (en) * | 2018-09-17 | 2019-05-10 | 重庆工业职业技术学院 | A kind of project cost schedule management apparatus |
CN208922337U (en) * | 2018-11-23 | 2019-05-31 | 浙江鼎力工程项目管理有限公司 | A kind of project cost auxiliary examination tool |
CN209168628U (en) * | 2018-12-13 | 2019-07-26 | 嘉兴诚欣工程咨询有限公司 | A kind of project cost progress monitoring apparatus |
CN209168095U (en) * | 2018-12-13 | 2019-07-26 | 嘉兴诚欣工程咨询有限公司 | Civil engineering cost progress control equipment |
CN110170084A (en) * | 2019-07-05 | 2019-08-27 | 常州市第一人民医院 | A kind of novopen apparatus for placing |
CN209357413U (en) * | 2019-01-09 | 2019-09-06 | 曲银芳 | Project cost schedule management apparatus |
CN209947270U (en) * | 2019-02-14 | 2020-01-14 | 赵锦涛 | Sand table for engineering management |
CN210006405U (en) * | 2019-07-30 | 2020-01-31 | 甘肃领凡信息技术咨询服务有限公司 | Engineering cost progress management device |
CN210072443U (en) * | 2019-09-10 | 2020-02-14 | 安丽敏 | Production progress data statistics device |
CN210077206U (en) * | 2019-04-25 | 2020-02-18 | 贵州广播电视大学(贵州职业技术学院) | But manual display device is used in government affairs center business handling that multi-angle was watched |
CN110820632A (en) * | 2019-12-02 | 2020-02-21 | 绍兴上虞渡进电子科技有限公司 | Railway and highway intersection road interception system |
CN111000408A (en) * | 2019-12-26 | 2020-04-14 | 北京师范大学珠海分校 | Pharmacy goods shelves |
-
2020
- 2020-04-15 CN CN202010296413.4A patent/CN111489635B/en not_active Expired - Fee Related
Patent Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3639223A1 (en) * | 1986-11-15 | 1988-05-19 | Bradley Milton Gmbh | FIELD SIGN WITH CORNER AREA CONNECTIONS |
CN2213366Y (en) * | 1994-08-01 | 1995-11-22 | 宋增厚 | Automatic changeable multi-picture bill board |
US6314453B1 (en) * | 1999-02-17 | 2001-11-06 | Hewlett-Packard Company | Method for sharing and executing inaccessible dynamic processes for replica consistency among a plurality of existing applications |
US20060015475A1 (en) * | 2000-10-25 | 2006-01-19 | Birkner Charles C | Integrated construction project management system with handheld computer and checklist |
CN204222411U (en) * | 2014-11-21 | 2015-03-25 | 黑龙江建筑职业技术学院 | A kind of button Headings-seal for countant use special frame |
CN205050192U (en) * | 2015-10-14 | 2016-02-24 | 李旭辉 | Engineering cost progress management system |
CN107067881A (en) * | 2017-03-10 | 2017-08-18 | 鲁东大学 | A kind of evolutionary operator teaching aid |
CN206774136U (en) * | 2017-05-25 | 2017-12-19 | 国网河南省电力公司桐柏县供电公司 | A kind of cement electric pole identifies board apparatus |
CN207561493U (en) * | 2017-09-13 | 2018-07-03 | 广州市新誉工程咨询有限公司 | A kind of project cost toolbox for budget |
CN207938027U (en) * | 2018-03-23 | 2018-10-02 | 赵云勇 | A kind of project cost schedule management apparatus |
CN108538212A (en) * | 2018-05-31 | 2018-09-14 | 重庆雄富光电科技有限公司 | A kind of led display screens |
CN208848242U (en) * | 2018-09-17 | 2019-05-10 | 重庆工业职业技术学院 | A kind of project cost schedule management apparatus |
CN208922337U (en) * | 2018-11-23 | 2019-05-31 | 浙江鼎力工程项目管理有限公司 | A kind of project cost auxiliary examination tool |
CN209168628U (en) * | 2018-12-13 | 2019-07-26 | 嘉兴诚欣工程咨询有限公司 | A kind of project cost progress monitoring apparatus |
CN209168095U (en) * | 2018-12-13 | 2019-07-26 | 嘉兴诚欣工程咨询有限公司 | Civil engineering cost progress control equipment |
CN209357413U (en) * | 2019-01-09 | 2019-09-06 | 曲银芳 | Project cost schedule management apparatus |
CN209947270U (en) * | 2019-02-14 | 2020-01-14 | 赵锦涛 | Sand table for engineering management |
CN210077206U (en) * | 2019-04-25 | 2020-02-18 | 贵州广播电视大学(贵州职业技术学院) | But manual display device is used in government affairs center business handling that multi-angle was watched |
CN110170084A (en) * | 2019-07-05 | 2019-08-27 | 常州市第一人民医院 | A kind of novopen apparatus for placing |
CN210006405U (en) * | 2019-07-30 | 2020-01-31 | 甘肃领凡信息技术咨询服务有限公司 | Engineering cost progress management device |
CN210072443U (en) * | 2019-09-10 | 2020-02-14 | 安丽敏 | Production progress data statistics device |
CN110820632A (en) * | 2019-12-02 | 2020-02-21 | 绍兴上虞渡进电子科技有限公司 | Railway and highway intersection road interception system |
CN111000408A (en) * | 2019-12-26 | 2020-04-14 | 北京师范大学珠海分校 | Pharmacy goods shelves |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113223423A (en) * | 2021-05-14 | 2021-08-06 | 童画控股有限公司 | Advertisement design display device capable of displaying advertisement effects in multiple ways |
CN113223423B (en) * | 2021-05-14 | 2022-08-30 | 童画控股有限公司 | Advertisement design display device capable of displaying advertisement effects in multiple ways |
Also Published As
Publication number | Publication date |
---|---|
CN111489635B (en) | 2021-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111489635B (en) | Overall process engineering cost progress management system | |
CN116607820A (en) | Main supporting steel frame structure of assembled floor | |
CN217859672U (en) | Construction steel bar welding device | |
CN208575977U (en) | One kind using grooving apparatus convenient for bamboo and wood splicing | |
CN215519282U (en) | Polyphenyl thermal insulation module convenient to assembly | |
CN114734629B (en) | 3D printing equipment with stable locking mechanism | |
CN214461178U (en) | Steel house assembling connecting part | |
CN215888594U (en) | Steel structure connecting piece | |
CN212670866U (en) | Butt joint steel structure convenient to install | |
CN210167648U (en) | Combined power distribution cabinet | |
CN112092145A (en) | Green plate and preparation system and method thereof | |
CN220059153U (en) | Outdoor planting fence | |
CN221242070U (en) | Paper goods shelf | |
CN216740896U (en) | Vertical displacement pull rod of stereo garage | |
CN220056130U (en) | Standard knot connection structure | |
CN219427690U (en) | Platemaking roller | |
CN220508100U (en) | Health monitoring device of structure vibration | |
CN214631308U (en) | Show stage property splicing apparatus | |
CN218861471U (en) | Dangerous reinforced structure is removed with reservoir to hydraulic engineering | |
CN220790311U (en) | Metal surface hard polyurethane sandwich board convenient to assemble | |
CN215829370U (en) | Open channel triangular weir | |
CN221058547U (en) | Modular combined communication cabinet | |
CN211621117U (en) | Pitch road that municipal works were used pours limit structure | |
CN221194093U (en) | Insulating offset plate that laying efficiency is high | |
CN211990331U (en) | Steel plate leveling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211001 |