CN207936364U CN201820213190.9U CN201820213190U CN207936364U CN 207936364 U CN207936364 U CN 207936364U CN 201820213190 U CN201820213190 U CN 201820213190U CN 207936364 U CN207936364 U CN 207936364U
Authority
CN
China
Prior art keywords
extra large
room
large cable
purification
purification room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820213190.9U
Other languages
Chinese (zh)
Inventor
胡列翔
肖世杰
周自强
王少华
张永明
周则威
张悦
李国林
叶世杰
王玉芬
孙平飞
郎春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO ORIENT WIRES CABLES CO Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
NINGBO ORIENT WIRES CABLES CO Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO ORIENT WIRES CABLES CO Ltd, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical NINGBO ORIENT WIRES CABLES CO Ltd
Priority to CN201820213190.9U priority Critical patent/CN207936364U/en
Application granted granted Critical
Publication of CN207936364U publication Critical patent/CN207936364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrostatic Separation (AREA)

Abstract

The utility model discloses a kind of mobile purification house systems made for 500kV extra large cable connectors, including purification room and the temperature control modules being arranged in purification room, humidity control module, air-purifying module and lighting module, the place of entering in purification room is provided with Airshower chamber, feature is that the bottom in purification room is provided with multiple idler wheels, purify two of room it is opposite before, the through-hole passed through for extra large cable is provided on metope afterwards, with it is preceding, the adjacent left metope of metope is provided with opening afterwards, the extra large cable mounting groove moved into outside room in room is collectively formed for extra large cable connector with through-hole in opening, opening is hinged with renovating of can spinning upside down, extra large cable coordinates with through-hole sealing;Advantage is exploitation, polishing and the welding sequence during extra large cable connector makes can all complete outside purification room, and the insulation injection molding of extra large cable connector and vulcanization process are completed in purification room, it avoids to the pollution inside purification room, make the air purification grade in purification room that can be really achieved hundred grades, and it is easy to operate, production efficiency is high.

Description

A kind of mobile purification house system made for 500kV extra large cable connectors
Technical field
The utility model is related to the processing of extra large cable connector more particularly to a kind of movements made for 500kV extra large cable connectors Purify house system.
Background technology
It is the critical process for processing submarine cable that extra large cable connector, which makes, and the quality of extra large cable connector is directly determining submarine cable just Often whether operation.The requirement that extra large cable connector makes to construction environment is very strict, including temperature, humidity, air purity all need In a certain range, especially the connector of 500kV extra large cables makes for control, and construction environment standard is clean close to general surgical operation Cleanliness requirement, impurity of the grain size more than 70 μm and metal particle are likely to lead to the breakdown of extra large cable connector.
The making of extra large cable connector generally all carries out in purifying room, since purification room is fixed, traditional extra large cable connector Make since just being carried out in purify room pretreatment procedure, up to the completion of connector process, but this there are Railway Projects:
(1), extra large cable connector make in some treatment process for example exploit, polish, will produce a large amount of waste material and dust, Environment cleaning in this purification room to the later stage causes very big burden, the especially dust of some semiconductive materials, if accumulation Gap or corner in purification room can enter in connector in the manufacturing process of extra large cable connector, extra large cable using when will cause and put Electricity and cause cable connector to puncture;
(2), the welding of extra large cable conductor when, the flammable explosive gas such as acetylene, oxygen can be used, operated in the confined space, no Only inconvenient, danger also greatly increases, and ensures that pressure is very big to personnel safety;
(3), conventional purge room take up an area that big, weight is big, the mode of removal cable can only be taken, realize that extra large cable junction portion exists The disengaging in room is purified, but this mode not only increases the burden of Field Force, also there is certain influence on manufacturing schedule.
Invention content
The technical problem to be solved by the utility model is to provide it is a kind of it is easy to operate, production efficiency is high, and can avoid very More risk factors, to operating personnel's secure mobile purification house system made for 500kV extra large cable connectors safely.
Technical solution is used by the utility model solves above-mentioned technical problem:One kind being used for 500kV extra large cable connector systems The mobile purification house system made, including purify room and the temperature control modules being arranged in the purification room, humid control mould The place of entering of block, air-purifying module and lighting module, the purification room is provided with Airshower chamber, the bottom in the purification room Multiple idler wheels are provided with, the through-hole passed through for extra large cable is provided on two opposite forward and backward metopes in the purification room, with The adjacent left metope of the forward and backward metope is provided with opening, and the opening is collectively formed with the through-hole for extra large cable Connector moves into the extra large cable mounting groove in room outside room, and the opening is hinged with renovating of can spinning upside down, the extra large cable It seals and coordinates with the through-hole.
Further, the upper end in the purification room is fixedly installed integrated support, the temperature control modules, described Humidity control module, the air-purifying module and the lighting module are arranged on the integrated support.
Further, the internal or external of the purification room is provided with display module, facilitates inside or outside purification room Personnel understand temperature, humidity, air purification grade etc. in purification room in real time.
Further, it is provided with window on the metope in the purification room, external staff is facilitated to observe inside purification room Operational circumstances etc., at the same also can be in after-purification room brightness.
Compared with prior art, the utility model has the advantages that since the bottom in purification room is provided with multiple idler wheels, and it is net Change the extra large cable mounting groove for being provided with for extra large cable connector and being moved into outside room in room on the metope in room, the stripping in the making of extra large cable connector It cuts, polish and welding sequence can all be completed outside purification room, and the insulation injection molding of extra large cable connector and vulcanization process are in purification room It completes, avoids to the pollution inside purification room, make the air purification grade in purification room that can be really achieved hundred grades, while also keeping away Exempt from potential risk factor, ensures the safe operation of operating personnel;In addition, realizing extra large cable by way of mobile purification room The making of connector, easy to operate, production efficiency is high.
Description of the drawings
Fig. 1 is the external structure schematic diagram of the utility model;
Fig. 2 is the internal structure vertical view of the utility model.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing embodiment.
As shown, a kind of mobile purification house system made for 500kV extra large cable connectors, including purification room 1 and setting The upper end of temperature control modules, humidity control module, air-purifying module and lighting module in purification room 1, purification room 1 is solid Surely it is provided with integrated support 2, temperature control modules, humidity control module, air-purifying module and lighting module are arranged at integrated On frame 2, the place of entering in purification room 1 is provided with Airshower chamber 3, purifies and is provided with for sea on two opposite forward and backward metopes in room 1 The through-hole 4 that cable 9 passes through, the left metope adjacent with forward and backward metope are provided with opening 5, and opening 5 is collectively formed with through-hole 4 for sea Cable joint moves into the extra large cable mounting groove in room outside room, be hinged at opening 5 can spin upside down renovate 6, extra large cable 9 and through-hole 4 The bottom of sealing cooperation, purification room 1 is provided with multiple idler wheels 7.
In above-described embodiment, window 8 can be also set on the metope in purification room 1, the internal or external of purification room 1 also sets up There is display module.
In above-described embodiment, the manufacturing process of extra large cable connector is:
(1), first by extra large cable connector manufacturing process conductor welding, reagency cone exploitation and polishing operation purification room outside Portion machines, and avoids to the pollution inside purification room, when insulating injection step, starts and is hinged on purification 1 left metope of room Renovate 6, to the direction of extra large cable 9 move purification room 1, so that extra large cable junction portion is entered in extra large cable mounting groove, then be closed renovate 6, and the gap between extra large cable 9 and through-hole 4 is closed, so that extra large cable 9 is sealed with through-hole 4 and coordinates;
(2), by the tools such as mold, extruder equip move into purification room, be then shut off all door and windows, use special dedusting work Inner surface, extra large cable joint surface and the tool in tool cleaning and wiping purification room 1 equip surface, open temperature control modules, humidity Control module and air-purifying module, operating personnel withdraw from purification room 1 by Airshower chamber 3;
(3), when purification room 1 inside temperature be in 20 DEG C~26 DEG C, humidity reach 40%~70% and air purity reach It is no more than 3520PC/m to >=0.5 μm of population3Range when, operating personnel Special dustproof clothes, mask, shoe cover and gloves Enter purification room 1 by Airshower chamber 3, and carries out the connectors systems such as mold installation, injection molding, vulcanization in the controlled environment in purification room 1 Make process;
(4), after the completion of vulcanization process, withdraw from connector tools and equipment, opening renovates 6, is moved toward 9 opposite direction of extra large cable Dynamic purification room 1, makes extra large cable joint area remove outside purification room, completes the making of insulation injection step, and can quickly enter next Procedure.

Claims (4)

1. a kind of mobile purification house system made for 500kV extra large cable connectors, including purify room and be arranged in the purification The place of entering of temperature control modules, humidity control module, air-purifying module in room and lighting module, the purification room is set It is equipped with Airshower chamber, it is characterised in that:The bottom in the purification room is provided with multiple idler wheels, and two of the purification room are opposite Forward and backward metope on be provided with the through-hole passed through for extra large cable, the left metope adjacent with the forward and backward metope is provided with out Mouthful, the extra large cable mounting groove moved into outside room in room is collectively formed for extra large cable connector in the described opening and the through-hole, described Opening be hinged with renovating of can spinning upside down, the extra large cable coordinates with the through-hole sealing.
2. a kind of mobile purification house system made for 500kV extra large cable connectors as described in claim 1, it is characterised in that: The upper end in the purification room is fixedly installed integrated support, the temperature control modules, the humidity control module, described Air-purifying module and the lighting module be arranged on the integrated support.
3. a kind of mobile purification house system made for 500kV extra large cable connectors as described in claim 1, it is characterised in that: The internal or external of the purification room is provided with display module.
4. a kind of mobile purification house system made for 500kV extra large cable connectors as described in claim 1, it is characterised in that: It is provided with window on the metope in the purification room.
CN201820213190.9U 2018-02-07 2018-02-07 A kind of mobile purification house system made for 500kV extra large cable connectors Active CN207936364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820213190.9U CN207936364U (en) 2018-02-07 2018-02-07 A kind of mobile purification house system made for 500kV extra large cable connectors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820213190.9U CN207936364U (en) 2018-02-07 2018-02-07 A kind of mobile purification house system made for 500kV extra large cable connectors

Publications (1)

Publication Number Publication Date
CN207936364U true CN207936364U (en) 2018-10-02

Family

ID=63651822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820213190.9U Active CN207936364U (en) 2018-02-07 2018-02-07 A kind of mobile purification house system made for 500kV extra large cable connectors

Country Status (1)

Country Link
CN (1) CN207936364U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561982A (en) * 2018-02-07 2018-09-21 国网浙江省电力有限公司电力科学研究院 A kind of hundred grades of mobile purification house systems made for 500kV extra large cable connectors
CN112376960A (en) * 2020-11-04 2021-02-19 江苏亨通海洋光网系统有限公司 Submarine optical cable integrated management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561982A (en) * 2018-02-07 2018-09-21 国网浙江省电力有限公司电力科学研究院 A kind of hundred grades of mobile purification house systems made for 500kV extra large cable connectors
CN112376960A (en) * 2020-11-04 2021-02-19 江苏亨通海洋光网系统有限公司 Submarine optical cable integrated management system

Similar Documents

Publication Publication Date Title
CN207936364U (en) A kind of mobile purification house system made for 500kV extra large cable connectors
CN204018302U (en) A kind of dust cleaning case for the dedusting of ammeter housing
US6406360B1 (en) Device for cleaning vulcanization molds
CN108561982A (en) A kind of hundred grades of mobile purification house systems made for 500kV extra large cable connectors
CN203556604U (en) Filter core blowing machine
CN204920325U (en) Between dismantled and assembled dustless tool car
CN203778454U (en) Dust collecting system for floor production line
CN110880718B (en) Intermediate joint machining system and intermediate joint machining remote control system
CN203895811U (en) Assembling workshop used for extra high voltage GIS installation
CN204111601U (en) Melt for electrosmelted magnesite clinker stick together clean and carry cartridge system
CN207465263U (en) It is a kind of can anhydrous and oxygen-free operation Simple hand casing
CN204983780U (en) Combined electrical apparatus installation room with dust removal function
CN204769730U (en) Car car light plasma dust shaker
CN204974603U (en) Secondary equipment cleaning device of transformer substation
CN203286703U (en) Air conditioning equipment
CN211538568U (en) Mineral aggregate dust removal device for asphalt coiled material production line and production line
CN202779064U (en) Automatic dust removal device for products
CN209775498U (en) Waste gas collecting system for extruder and plastic extrusion system
CN203932714U (en) A kind of power distribution cabinet with vacuum cleaner
CN207076755U (en) A kind of electrolytic cell seals dust collection cover
CN207892296U (en) GIS Special dustproof canopies
CN205290506U (en) Intelligent machine hand
CN212041316U (en) Electric motor car handle baking finish device
CN204469417U (en) A kind of dust-precipitator adopting novel locellus blowing-out pulse to erupt deashing
CN109591272A (en) Extruder waste gas collecting system and method, plastic extrusion system and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant