CN207934209U - Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure - Google Patents
Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure Download PDFInfo
- Publication number
- CN207934209U CN207934209U CN201721856742.XU CN201721856742U CN207934209U CN 207934209 U CN207934209 U CN 207934209U CN 201721856742 U CN201721856742 U CN 201721856742U CN 207934209 U CN207934209 U CN 207934209U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- mast
- tenon
- earthly branches
- twelve earthly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of wallboard mast part mortise-tenon joint structure and with the assembled architecture of the structure, belong to building field.The wallboard mast part mortise-tenon joint structure includes the first wallboard, the second wallboard and several mast mortise-tenon joint parts, and the mast mortise-tenon joint part includes mast joggle part and mast fourth of the twelve Earthly Branches fitting, wherein:The mast joggle part includes the first square steel tube, the first reinforcing sleeve, junction steel plate and tenon;Mast fourth of the twelve Earthly Branches fitting is embedded in second wallboard, mast fourth of the twelve Earthly Branches fitting includes the second square steel tube, the second reinforcing sleeve and hollow fourth of the twelve Earthly Branches pipe, it is provided with vertical gap on the direction of relatively described second reinforcing sleeve of the hollow fourth of the twelve Earthly Branches pipe, the side of second wallboard is provided with straight slot;Gap between first wallboard and the second wallboard is sealed using fluid sealant.The utility model can realize the batch production batch production manufacture of assembled architecture, improve the tightness degree between wallboard, reduce live manual work, improve working efficiency.
Description
Technical field
The utility model is related to building field, particularly relates to a kind of wallboard mast part mortise-tenon joint structure and there is the structure
Assembled architecture.
Background technology
Conventional industries of the dwelling construction as China are chronically at extensive production phase, the energy and raw materials consumption
Excessive, industrialization degree is not high, labor productivity and with low content of technology, therefore with the fast development of China's economy, building production
Industry modernization is gradually paid attention to by society, becomes focus and fast development.Building industry industrialization is promoted, is advantageously implemented energy saving
Emission reduction promotes green safe construction, improves construction quality, improve living environment, promote upgrading of industrial structures.
Assembled architecture be realize the industrialized inevitable choice of building industry, assembled architecture be the part that will build or entirely
Portion's component is prefabricated in the factory completion, then transports the room for building up component by reliable connection type assembles to construction site
Room.Main structural component of the wallboard as assembled architecture, wet construction, hot work are more when assembling at the scene, and installation process is complicated,
Low construction efficiency, processing need a large amount of labour cost, high labor cost to be not easy to live standardized management, do not meet when installing
The requirement of assembled architecture rapid construction, to reduce industrialization and the assembling degree of assembled architecture.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of wallboard mast part mortise-tenon joint structure and there is the knot
The assembled architecture of structure can realize the batch production batch production manufacture of assembled architecture, improve the tightness degree between wallboard,
Live manual work is reduced, working efficiency is improved, cost of labor is reduced, improves industrialization and the assembling journey of assembled architecture
Degree.
In order to solve the above technical problems, the utility model offer technical solution is as follows:
On the one hand, the utility model provides a kind of wallboard mast part mortise-tenon joint structure, including the first wallboard, with described the
The second adjacent wallboard of one wallboard is used to splice the mast mortise-tenon joint part of first wallboard and the second wallboard, institute with several
It includes mast joggle part and mast fourth of the twelve Earthly Branches fitting to state mast mortise-tenon joint part, wherein:
The mast joggle part includes the first square steel tube and the first reinforcing sleeve for being solidly set on first square steel tube, institute
It states and is installed with several junction steel plates on the side of the first reinforcing sleeve, the end of the junction steel plate is provided with tenon, described
First square steel tube and the first reinforcing sleeve are embedded in first wallboard, and the junction steel plate is perpendicular to first wallboard
Side and be embedded in first wallboard, the tenon be parallel to the side of first wallboard and with first wallboard
Side between have certain distance;
Mast fourth of the twelve Earthly Branches fitting is embedded in second wallboard, and mast fourth of the twelve Earthly Branches fitting includes the second square steel tube and solid set
The second reinforcing sleeve on second square steel tube is installed with several on the side of second reinforcing sleeve for being socketed
The hollow fourth of the twelve Earthly Branches of the tenon is managed, and vertical gap, institute are provided on the direction of relatively described second reinforcing sleeve of the hollow fourth of the twelve Earthly Branches pipe
The side for stating the second wallboard is provided with straight slot corresponding with the vertical gap;
First wallboard and the second wallboard spliced by the mast joggle part and mast fourth of the twelve Earthly Branches fitting after described first
It is sealed using fluid sealant in gap between wallboard and the second wallboard.
Further, the tenon is cylinder tenon, and the hollow fourth of the twelve Earthly Branches pipe is that the hollow circular fourth of the twelve Earthly Branches is managed.
Further, the tenon is square column tenon, and the hollow fourth of the twelve Earthly Branches pipe is that the hollow square fourth of the twelve Earthly Branches is managed.
Further, the tenon is triangular prism tenon, and the hollow fourth of the twelve Earthly Branches pipe is that the three-pointed hollow star fourth of the twelve Earthly Branches is managed.
Further, the side of second wallboard is fluted in the setting of the top of the hollow fourth of the twelve Earthly Branches pipe, and the groove is used
It is inserted into the tenon in the hollow fourth of the twelve Earthly Branches pipe in placement.
Further, the side of second wallboard is provided with the pin hole for joints cement mortar, the end of the pin hole
End reaches the upper surface of the groove.
Further, it is provided with for installing on second wallboard being embedded with the hollow fourth of the twelve Earthly Branches and manage corresponding position
The through-hole of the tenon, the through-hole are connected with straight slot.
Further, there are two junction steel plate, two junction steel plates are located at described for setting on each first reinforcing sleeve
The both ends of one reinforcing sleeve;There are two the hollow fourths of the twelve Earthly Branches to manage for setting on each second reinforcing sleeve, and two hollow fourths of the twelve Earthly Branches pipes are located at described the
The both ends of two reinforcing sleeves;The quantity of the mast joggle part is identical as the quantity of mast fourth of the twelve Earthly Branches fitting.
Further, the end of the tenon and/or the upper end of the hollow fourth of the twelve Earthly Branches pipe are provided with chamfering structure.
On the other hand, the utility model provides a kind of assembled architecture, including above-mentioned wallboard mast part mortise-tenon joint knot
Structure.
The utility model has the advantages that:
The wallboard mast part mortise-tenon joint structure of the utility model and the assembled architecture with the structure, including the first wall
Plate, second wallboard adjacent with the first wallboard and several mast mortise-tenon joint parts, wherein mast mortise-tenon joint part includes mast
Joggle part and mast fourth of the twelve Earthly Branches fitting.In factory process, by the first square steel tube of mast joggle part, the first reinforcing sleeve and connection steel
Plate is embedded in the first wallboard, at this time the tenon of mast joggle part be parallel to the first wallboard side and with the side of the first wallboard
There is a certain distance between face;Mast fourth of the twelve Earthly Branches fitting is embedded in the second wallboard, the side at the center and the second wallboard of hollow fourth of the twelve Earthly Branches pipe
There is a certain distance in face, and the size of distance is identical at a distance from the center of tenon to the first wallboard side, and hollow fourth of the twelve Earthly Branches pipe is opposite
Vertical gap is provided on the direction of second reinforcing sleeve, the side of the second wallboard is provided with lead to corresponding with vertical gap
Slot, vertical gap and straight slot of same size and it is all higher than width equal to junction steel plate;It is only needed when assembling at the scene by the
The tenon of mast joggle part is inserted into the second wallboard in hollow fourth of the twelve Earthly Branches pipe, then between the first wallboard and the second wallboard in one wallboard
Gap in using fluid sealant realize sealing, complete building in the first wallboard the second wallboard adjacent thereto splicing.
To sum up, the first wallboard in the utility model and the second wallboard need not be there are gaps in splicing, can be with
Directly tenon is inserted into the hollow fourth of the twelve Earthly Branches pipe being embedded in the second wallboard, so as to improve the first wallboard and the second wallboard
Compactness reduces live manual work, improves working efficiency, reduces cost of labor;Simultaneously in factory process can directly by
Mast mortise-tenon joint part is embedded in wallboard, disclosure satisfy that the demand of modular assembly, saves field-erection time;In addition, adopting
The splicing precision that the first wallboard and the second wallboard can be improved with multiple mast mortise-tenon joint parts, avoids the first wallboard and the second wall
Plate run-off the straight, the gap between the first wallboard and the second wallboard are sealed using fluid sealant, can improve fastness.
Description of the drawings
Fig. 1 is the structural schematic diagram of the wallboard mast part mortise-tenon joint constructive embodiment one of the utility model, wherein figure (a)
For the overall structure diagram of embodiment one, figure (b) is the structural schematic diagram of mast fourth of the twelve Earthly Branches fitting in embodiment one, and figure (c) is real
Apply the structural schematic diagram of mast joggle part in example one;
Fig. 2 is the structural schematic diagram of the wallboard mast part mortise-tenon joint constructive embodiment two of the utility model, wherein figure (a)
For the overall structure diagram of embodiment two, figure (b) is the structural schematic diagram of mast fourth of the twelve Earthly Branches fitting in embodiment two, and figure (c) is real
The structural schematic diagram that tenon in mast joggle part is square column tenon is applied in example two, figure (d) is mast joggle part in embodiment two
Middle tenon is the structural schematic diagram of cuboid tenon;
Fig. 3 is the structural schematic diagram of the wallboard mast part mortise-tenon joint constructive embodiment three of the utility model, wherein figure (a)
For the overall structure diagram of embodiment three, figure (b) is the structural schematic diagram of mast fourth of the twelve Earthly Branches fitting in embodiment three, and figure (c) is real
Apply the structural schematic diagram of mast joggle part in example three;
Fig. 4 is the side structure schematic diagram of the second wallboard of the wallboard mast part mortise-tenon joint structure of the utility model.
Specific implementation mode
In order to make the technical problems, technical solutions and advantages to be solved by the utility model clearer, below in conjunction with attached drawing
And specific embodiment is described in detail.
On the one hand, the utility model provides a kind of wallboard mast part mortise-tenon joint structure, as shown in Fig. 1~4, including the
One wallboard 1,1', 1 ", with the first wallboard 1,1', 1 " the second adjacent wallboard 2,2', 2 " and several for splicing the first wallboard
1, the wallboard of 1', 1 " and second 2,2', 2 " mast mortise-tenon joint part, mast mortise-tenon joint part includes mast joggle part 3,3', 3 "
With mast fourth of the twelve Earthly Branches fitting 4,4', 4 ", wherein:
Mast joggle part 3,3', 3 " are including first square steel tube 3-1,3-1', 3-1 " and are solidly set on first square steel tube 3-1,3-
First reinforcing sleeve 3-2,3-2', 3-2 " on 1', 3-1 ", first reinforcing sleeve 3-2,3-2', 3-2 " side on be installed with
Several junction steel plates 3-3,3-3', 3-3 ", junction steel plate 3-3,3-3', 3-3 " end be provided with tenon 3-4,3-41',
3-42', 3-4 ", first square steel tube 3-1,3-1', 3-1 " and first reinforcing sleeve 3-2,3-2', 3-2 " are embedded in the first wall
Plate 1,1', in 1 ", junction steel plate 3-3,3-3', 3-3 " perpendicular to the first wallboard 1,1', 1 " side and be embedded in the first wallboard
1,1', in 1 ", tenon 3-4,3-41', 3-42', 3-4 " be parallel to the first wallboard 1,1', 1 " side and with the first wallboard 1,
1', 1 " side between have certain distance;
Mast fourth of the twelve Earthly Branches fitting 4,4', 4 " are embedded in the second wallboard 2,2', in 2 ", and mast fourth of the twelve Earthly Branches fitting 4,4', 4 " include second party
Steel pipe 4-1,4-1', 4-1 " and second reinforcing sleeve 4-2,4-2', 4- being solidly set on second square steel tube 4-1,4-1', 4-1 "
2 ", second reinforcing sleeve 4-2,4-2', 4-2 " side on be installed with several for be socketed tenon 3-4,3-41', 3-42',
Hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', the 4-3 " of 3-4 ", hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " are with respect to second reinforcing sleeve 4-2,4-2', 4-
Be provided with vertical gap 4-4,4-4', 4-4 " on 2 " direction, the second wallboard 2,2', 2 " side be provided with and vertical gap
The corresponding straight slot 2-1,2-1' of 4-4,4-4', 4-4 ", 2-1 ";
First wallboard 1,1', 1 " and second wallboard 2,2', 2 " by mast joggle part 3,3', 3 " and mast fourth of the twelve Earthly Branches fitting 4,
After 4', 4 " splicings the first wallboard 1,1', 1 " with use fluid sealant sealing in the gap between second wallboard 2,2', 2 ".
The wallboard mast part mortise-tenon joint structure of the utility model, in factory process, by mast joggle part 3,3', 3 "
First square steel tube 3-1,3-1', 3-1 ", first reinforcing sleeve 3-2,3-2', 3-2 " and junction steel plate 3-3,3-3', 3-3 " are pre-
It is embedded in the first wallboard 1,1', in 1 ", mast joggle part 3,3', 3 " tenon 3-4,3-41', 3-42', 3-4 " are parallel to the at this time
One wallboard 1,1', 1 " side and with the first wallboard 1,1', 1 " side between have a certain distance;By mast fourth of the twelve Earthly Branches fitting 4,
4', 4 " are embedded in the second wallboard 2,2', in 2 ", hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', center and the second wallboard 2 of 4-3 ", 2', 2 "
There is a certain distance in side, the size of distance and tenon 3-4,3-41', 3-42', 3-4 " center to the first wallboard 1,1',
, hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " side with respect to second reinforcing sleeve 4-2,4-2', 4-2 " identical apart from size of 1 " side
Set up vertical gap 4-4,4-4', 4-4 ", the second wallboard 2,2', 2 " side be provided with and vertical gap 4-4,4-
The corresponding straight slot 2-1,2-1' of 4', 4-4 ", 2-1 ", the width of vertical gap 4-4,4-4', 4-4 " and straight slot 2-1,2-1', 2-1 "
It spends identical and is all higher than width equal to junction steel plate 3-3,3-3', 3-3 ";At the scene assemble when only need by the first wallboard 1,
Mast joggle part 3,3', 3 " tenon 3-4,3-41', 3-42', 3-4 " are inserted into hollow in the second wallboard 2,2', 2 " in 1', 1 "
It is then close with use in the gap between the second wallboard 2,2', 2 " in the first wallboard 1,1', 1 " in fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 "
Sealing realize sealing, complete building in the first wallboard 1,1', 1 " the second wallboard 2 adjacent thereto, 2', 2 " splicing.To sum up,
The wallboard 2 of the first wallboard 1,1', 1 " and second, 2' in the utility model, 2 " need not be there are gaps in splicing, can be with
Tenon 3-4,3-41', 3-42', 3-4 " are directly inserted into the hollow fourth of the twelve Earthly Branches pipe 4-3, the 4- being embedded in the second wallboard 2,2', 2 "
In 3', 4-3 ", so as to improve the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " compactness, reduce that scene is artificial to be made
Industry improves working efficiency, reduces cost of labor;Can mast mortise-tenon joint part be directly embedded in wall in factory process simultaneously
In plate, the demand of modular assembly disclosure satisfy that, save field-erection time;In addition, using multiple mast mortise-tenon joint part energy
Enough improve the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " splicing precision, avoid the first wallboard 1,1', 1 " and second wall
Plate 2,2', 2 " run-off the straights, the gap between the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " are sealed using fluid sealant, energy
Enough improve fastness.
Preferably, tenon 3-4,3-41', 3-42', 3-4 " and hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " planform have it is more
The tenon 3-4,3-41', 3-42', 3-4 " of the utility model and hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " is given below in kind of form
Three kinds of structure types:
Embodiment one:
As shown in Figure 1, tenon uses cylinder tenon 3-4, hollow fourth of the twelve Earthly Branches pipe to use hollow circular fourth of the twelve Earthly Branches pipe 4-3.
Embodiment two:
As shown in Fig. 2, tenon uses square column tenon 3-41' or cuboid tenon 3-42', short side during hollow fourth of the twelve Earthly Branches pipe uses
Shape fourth of the twelve Earthly Branches pipe 4-3'.
Embodiment three:
As shown in figure 3, tenon uses triangular prism tenon 3-4 ", hollow fourth of the twelve Earthly Branches pipe to use three-pointed hollow star fourth of the twelve Earthly Branches pipe 4-3 ".
The sequencing of the above structure type is only for ease of description, the not quality of representative structure form, tenon 3-4,3-
The planform of 41', 3-42', 3-4 " and hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " are not limited to three of the above form.
Further, the second wallboard 2,2', 2 " side hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " top setting it is fluted
2-2, groove 2-2 are inserted into hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', tenon 3-4,3-41' in 4-3 ", 3-42', 3-4 " for placing.
The structure design may be implemented from the second wallboard 2,2', 2 " side complete the first wallboard 1,1', 1 " installation, assemble at the scene
When, first by tenon 3-4,3-41', 3-42', 3-4 " be placed into the second wallboard 2,2', 2 " groove 2-2 in, make junction steel plate
3-3,3-3', 3-3 " are directed at straight slot 2-1,2-1', 2-1 ", then land the first wallboard 1,1', 1 " so that the first wallboard 1,1',
In 1 " tenon 3-4,3-41', 3-42', 3-4 " be inserted into from top to bottom hollow fourth of the twelve Earthly Branches pipe 4-3,4-3' in the second wallboard 2,2', 2 ",
In 4-3 ", realize the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " splicing.Further, second wallboard 2,2', 2 "
Side is provided with the pin hole 2-3 for joints cement mortar, and the end of pin hole 2-3 reaches the upper surface of groove 2-2.First wallboard
1, after splicing is realized in the wallboard of 1', 1 " and second 2,2', 2 ", by the pin hole 2-3 on the second wallboard 2,2', 2 " sides, in groove
Joints cement mortar in 2-2, with improve the first wallboard 1,1', 1 " with second wallboard 2,2', 2 " leakproofness, raising fastness.
To facilitate installation, can from the second wallboard 2,2', 2 " top realize the first wallboard 1,1', 1 " installation, it is excellent
Selection of land is provided in pre-buried hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', the corresponding positions 4-3 " for installing on the second wallboard 2,2', 2 "
The through-hole of tenon 3-4,3-41', 3-42', 3-4 ", through-hole are connected with straight slot 2-1,2-1', 2-1 ", the size and tenon of through-hole
3-4,3-41', 3-42', the size of 3-4 " are corresponding, respectively less than hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " size.It assembles at the scene
When, it, can be by tenon in the first wallboard 1,1', 1 " by the through-hole and straight slot 2-1,2-1', 2-1 " on the second wallboard 2,2', 2 "
Head 3-4,3-41', 3-42', 3-4 " are sequentially inserted into the hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4- in the second wallboard 2,2', 2 " from top to bottom
In 3 ", realize the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " splicing.During insertion, by mast joggle part 3,
3', 3 " tenon 3-4,3-41', 3-42', 3-4 " are inserted into through-hole, junction steel plate 3-3,3-3', 3-3 " insertion straight slot 2-1,
In 2-1', 2-1 ", to ensure in the first wallboard 1,1', 1 " that mast joggle part 3,3', 3 " can be sequentially inserted into the from top to bottom
Mast fourth of the twelve Earthly Branches fitting 4 in two wallboards 2,2', 2 ", 4', in 4 ".
In order to easy to assembly, rigging error is avoided, improves installation accuracy, each first reinforcing sleeve 3-2,3-2', 3-2 "
There are two junction steel plate 3-3,3-3', 3-3 " for upper setting, and two junction steel plate 3-3,3-3', 3-3 " are located at the first reinforcing sleeve
The both ends of 3-2,3-2', 3-2 ";There are two the hollow fourth of the twelve Earthly Branches pipe 4-3,4- for setting on each second reinforcing sleeve 4-1,4-1', 4-1 "
3', 4-3 ", two hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " are located at the both ends of second reinforcing sleeve 4-1,4-1', 4-1 ";Mast joggle
Part 3,3', 3 " quantity and mast fourth of the twelve Earthly Branches fitting 4,4', 4 " quantity it is identical.Further, mast joggle part 3,3', 3 " and mast
Fourth of the twelve Earthly Branches fitting 4,4', 4 " quantity be preferably 2-5.
In the utility model, for the ease of by tenon 3-4,3-41', 3-42', 3-4 " be inserted into hollow fourth of the twelve Earthly Branches pipe 4-3,4-3',
In 4-3 ", working efficiency is improved, preferably sets the upper end opening of hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " to taper.More into one
Step, tenon 3-4,3-41', 3-42', the end of 3-4 " and/or hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " upper end be provided with down
Corner structure.
On the other hand, the utility model provides a kind of assembled architecture, including above-mentioned wallboard mast part mortise-tenon joint knot
Structure.
The assembled architecture of the utility model, the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " in splicing not
It needs there are gap, directly tenon 3-4,3-41', 3-42', 3-4 " can be inserted into and are embedded in the second wallboard 2,2', 2 "
Hollow fourth of the twelve Earthly Branches pipe 4-3,4-3', 4-3 " in, so as to improve the first wallboard 1,1', 1 " with the second wallboard 2,2', 2 " it is close
Property, live manual work is reduced, working efficiency is improved, reduces cost of labor;It simultaneously can be directly by mast in factory process
Mortise-tenon joint part is embedded in wallboard, disclosure satisfy that the demand of modular assembly, saves field-erection time;In addition, using more
A mast mortise-tenon joint part can improve the first wallboard 1,1', 1 " and second wallboard 2,2', 2 " splicing precision, avoid the first wall
Plate 1,1', 1 " and second wallboard 2,2', 2 " run-off the straights, the gap between the first wallboard 1,1', 1 " and second wallboard 2,2', 2 "
It is sealed using fluid sealant, fastness can be improved.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art
For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement
The scope of protection of the utility model is also should be regarded as with retouching.
Claims (10)
1. a kind of wallboard mast part mortise-tenon joint structure, which is characterized in that including the first wallboard, adjacent with first wallboard
Second wallboard is used to splice the mast mortise-tenon joint part of first wallboard and the second wallboard with several, and the mast Tenon connects
Fitting includes mast joggle part and mast fourth of the twelve Earthly Branches fitting, wherein:
The mast joggle part includes the first square steel tube and the first reinforcing sleeve for being solidly set on first square steel tube, and described the
It is installed with several junction steel plates on the side of one reinforcing sleeve, the end of the junction steel plate is provided with tenon, and described first
Square steel tube and the first reinforcing sleeve are embedded in first wallboard, and the junction steel plate is perpendicular to the side of first wallboard
Face is simultaneously embedded in first wallboard, the tenon be parallel to the side of first wallboard and with the side of first wallboard
There is certain distance between face;
Mast fourth of the twelve Earthly Branches fitting is embedded in second wallboard, and mast fourth of the twelve Earthly Branches fitting includes the second square steel tube and is solidly set on institute
The second reinforcing sleeve on the second square steel tube is stated, it is described for being socketed that several are installed on the side of second reinforcing sleeve
The hollow fourth of the twelve Earthly Branches of tenon is managed, and the hollow fourth of the twelve Earthly Branches manages and is provided with vertical gap on the direction of relatively described second reinforcing sleeve, and described the
The side of two wallboards is provided with straight slot corresponding with the vertical gap;
First wallboard and the second wallboard spliced by the mast joggle part and mast fourth of the twelve Earthly Branches fitting after in first wallboard
It is sealed using fluid sealant in gap between the second wallboard.
2. wallboard mast part mortise-tenon joint structure according to claim 1, which is characterized in that the tenon is cylinder tenon
Head, the hollow fourth of the twelve Earthly Branches pipe is that the hollow circular fourth of the twelve Earthly Branches is managed.
3. wallboard mast part mortise-tenon joint structure according to claim 1, which is characterized in that the tenon is square column tenon
Head, the hollow fourth of the twelve Earthly Branches pipe is that the hollow square fourth of the twelve Earthly Branches is managed.
4. wallboard mast part mortise-tenon joint structure according to claim 1, which is characterized in that the tenon is triangular prism tenon
Head, the hollow fourth of the twelve Earthly Branches pipe is that the three-pointed hollow star fourth of the twelve Earthly Branches is managed.
5. according to any wallboard mast part mortise-tenon joint structures of claim 1-4, which is characterized in that second wallboard
Side the hollow fourth of the twelve Earthly Branches pipe top setting it is fluted, the groove for place be inserted into the hollow fourth of the twelve Earthly Branches pipe
Tenon.
6. wallboard mast part mortise-tenon joint structure according to claim 5, which is characterized in that the side of second wallboard
It is provided with the pin hole for joints cement mortar, the end of the pin hole reaches the upper surface of the groove.
7. according to any wallboard mast part mortise-tenon joint structures of claim 1-4, which is characterized in that second wallboard
On be provided with through-hole for installing the tenon, the through-hole and straight slot being embedded with the hollow fourth of the twelve Earthly Branches and manage corresponding position
It is connected.
8. according to any wallboard mast part mortise-tenon joint structures of claim 1-4, which is characterized in that each first reinforces
There are two junction steel plates, two junction steel plates to be located at the both ends of first reinforcing sleeve for setting on casing;Each second reinforces
There are two the hollow fourths of the twelve Earthly Branches to manage for setting on casing, and two hollow fourth of the twelve Earthly Branches pipes are positioned at the both ends of second reinforcing sleeve;The mast joggle
The quantity of part is identical as the quantity of mast fourth of the twelve Earthly Branches fitting.
9. wallboard mast part mortise-tenon joint structure according to claim 8, which is characterized in that the end of the tenon and/
Or the upper end of the hollow fourth of the twelve Earthly Branches pipe is provided with chamfering structure.
10. a kind of assembled architecture, which is characterized in that including any wallboard mast part mortise-tenon joints of claim 1-9
Structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721856742.XU CN207934209U (en) | 2017-12-26 | 2017-12-26 | Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721856742.XU CN207934209U (en) | 2017-12-26 | 2017-12-26 | Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207934209U true CN207934209U (en) | 2018-10-02 |
Family
ID=63647009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721856742.XU Expired - Fee Related CN207934209U (en) | 2017-12-26 | 2017-12-26 | Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207934209U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853751A (en) * | 2019-04-12 | 2019-06-07 | 浙江交工集团股份有限公司 | It is a kind of to solve lock Quick connection part for prefabricated member |
CN111894148A (en) * | 2020-06-23 | 2020-11-06 | 中铁第一勘察设计院集团有限公司 | Prefabricated wallboard splice of assembled based on elasticity circle socket joint |
CN112324220A (en) * | 2020-09-17 | 2021-02-05 | 中煤科工集团沈阳设计研究院有限公司 | Assembled light composite anti-explosion partition plane wall |
-
2017
- 2017-12-26 CN CN201721856742.XU patent/CN207934209U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853751A (en) * | 2019-04-12 | 2019-06-07 | 浙江交工集团股份有限公司 | It is a kind of to solve lock Quick connection part for prefabricated member |
CN109853751B (en) * | 2019-04-12 | 2024-02-02 | 浙江交工集团股份有限公司 | Unlocking type quick connector for assembly type component |
CN111894148A (en) * | 2020-06-23 | 2020-11-06 | 中铁第一勘察设计院集团有限公司 | Prefabricated wallboard splice of assembled based on elasticity circle socket joint |
CN112324220A (en) * | 2020-09-17 | 2021-02-05 | 中煤科工集团沈阳设计研究院有限公司 | Assembled light composite anti-explosion partition plane wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207934209U (en) | Wallboard mast part mortise-tenon joint structure and the assembled architecture with the structure | |
CN104195950A (en) | Steel-concrete composite beam cable-stayed bridge glued joint connecting method | |
CN105696817A (en) | Multilayer cold-formed steel integrally prefabricated house and splicing method thereof | |
CN105421614B (en) | The construction method of precast shear wall dry type vertical connection nodes | |
CN206784615U (en) | Assembled architecture wallboard connection structure for splicing | |
CN208380099U (en) | Concrete casting device | |
CN214220351U (en) | Energy-saving assembled building wall | |
CN103758208B (en) | Assembled integral composite frame structure | |
CN214144673U (en) | Combined house building steel formwork based on mortise-tenon joint | |
CN207568074U (en) | A kind of secondary structure member reinforcing steel bar connecting node | |
CN206607689U (en) | Precast beam and wallboard connecting structure and building | |
CN210459741U (en) | Basic brick assembly body | |
CN207453108U (en) | A kind of full prefabricated buildings system | |
CN110273493A (en) | Building body and construction method with constructional column and connection brick | |
CN110374126A (en) | Basic brick assembly and its construction method | |
CN110374241A (en) | A kind of floor bottom mould block, floor and the method for constructing floor | |
CN205976361U (en) | Prefabricated type elevartor shaft | |
CN107116665B (en) | Cross form for porous concrete pile and manufacturing and construction method thereof | |
CN206396997U (en) | Precast wall body, prefabricated unit body and building system | |
CN212801648U (en) | Prefabricated piping lane assembles interim positioner | |
CN215211674U (en) | Be used for building outer wall prefab for molding | |
CN213952602U (en) | Assembled wall for house building construction | |
CN216305536U (en) | Splicing device of ultra-low energy consumption integrated heat preservation assembled multi-storey house | |
CN117702949A (en) | Connection structure between reinforced concrete prefabricated walls, box-shaped house and construction method | |
CN203856083U (en) | Connection structure of wall of electric power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181002 Termination date: 20181226 |
|
CF01 | Termination of patent right due to non-payment of annual fee |