CN207933821U - A kind of compound ballastless track system of rail traffic Superimposed - Google Patents

A kind of compound ballastless track system of rail traffic Superimposed Download PDF

Info

Publication number
CN207933821U
CN207933821U CN201820326941.8U CN201820326941U CN207933821U CN 207933821 U CN207933821 U CN 207933821U CN 201820326941 U CN201820326941 U CN 201820326941U CN 207933821 U CN207933821 U CN 207933821U
Authority
CN
China
Prior art keywords
compound
sleeper
armored concrete
anchor bolt
ballastless track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820326941.8U
Other languages
Chinese (zh)
Inventor
李爱基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Anping Railway Engineering Technical Consulting Co Ltd
Original Assignee
Qingdao Anping Railway Engineering Technical Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Anping Railway Engineering Technical Consulting Co Ltd filed Critical Qingdao Anping Railway Engineering Technical Consulting Co Ltd
Priority to CN201820326941.8U priority Critical patent/CN207933821U/en
Application granted granted Critical
Publication of CN207933821U publication Critical patent/CN207933821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of compound ballastless track system of rail traffic Superimposed, including basis, armored concrete railway roadbed, armored concrete buttress, compound sleeper, sleeper anchor bolt, anchor bolt sleeve, fastener system, rail under line, basic top is laid with armored concrete railway roadbed under the line, and snap-fastener node spacing is uniformly arranged armored concrete buttress at the top of armored concrete railway roadbed, and compound sleeper is equipped at the top of the armored concrete buttress.The utility model proposes a kind of compound ballastless track systems of rail traffic Superimposed, the compound ballastless track system of rail traffic Superimposed replaces " flush type " structure with " Superimposed " structure, compound sleeper is stacked on armored concrete buttress, instead of traditional reinforced concrete sleeper embedded structure, the easy replacement of critical component is realized, the making of the high molecular materials such as polyurethane, rubber, rubber and plastic can be used in compound sleeper.

Description

A kind of compound ballastless track system of rail traffic Superimposed
Technical field
The utility model is related to urban rail transit technology field more particularly to a kind of rail traffic Superimposed are compound Ballastless track system.
Background technology
In the field of track traffic using wheel track standard, there are two types of types for existing ballastless track structure, and one is board-like Non-fragment orbit, another kind are sleeper flush type non-fragment orbits, both ballastless track structures are including rail, fastener and without Zha Dao After train dynamics effect is transferred to ballastless track bed by parts, rail and the fasteners such as bed, concrete railway board and concrete sleeper are The critical component of main load component and ballastless track bed, the two is reinforced concrete structure, and such structure once occurs Hurt, replace, repair it is extremely difficult, it is especially true for sleeper flush type non-fragment orbit, since concrete sleeper is straight Connect be embedded to it is concrete road bed in, in addition to remove rebuild cannot substantially repair replacements, in addition, tradition ballastless track bed it is equal Using reinforced concrete structure, cause orbit rigidity bigger than normal, vibration and noise caused by train operation is larger, in vibration and noise Sensitive location has to take track vibration damping denoising measure, and investment is caused to increase.Therefore, the utility model proposes a kind of friendships of track The general compound ballastless track system of Superimposed.
Utility model content
In view of the above-mentioned problems, the utility model proposes a kind of compound ballastless track system of rail traffic Superimposed, it should The compound ballastless track system of rail traffic Superimposed replaces " flush type " structure with " Superimposed " structure, i.e., by compound sleeper It is stacked on armored concrete buttress, instead of traditional reinforced concrete sleeper embedded structure, realizes critical component It easily replaces, the making of the high molecular materials such as polyurethane, rubber, rubber and plastic can be used in compound sleeper, and armored concrete dosage is reduced, and portion Point high molecular material, which can be realized, to be recycled, energy-saving and emission-reduction, environmentally protective, and compound sleeper good insulating advantageously reduces spuious Electric current, compound sleeper elasticity preferably, can optimize ballastless track system rigidity, are conducive to optimize wheel track dynamic response, be conducive to really Protect concrete road bed design life, be conducive to vibration and noise reducing, advantageously reduce maintenance workload, using from lower and On construction method, armored concrete buttress surface smoothness and anchor bolt sleeve portion are ensured by precision measurement system, Construction efficiency can be greatly improved, it, can be more by replacing the compound sleeper of different-thickness when phenomena such as foundation settlement occurs in the later stage The insufficient defect of buckle up part adjustment amount, it is ensured that circuit normal operation, the system can be used for subway, light rail, inter-city passenger rail, common iron The railway traffic engineerings such as road and high-speed railway.
To solve the above problems, the utility model provides a kind of compound non-fragment orbit system of rail traffic Superimposed System, including basis, armored concrete railway roadbed, armored concrete buttress, compound sleeper, sleeper anchor bolt, anchor bolt under line Sleeve, fastener system, rail, basic top is laid with armored concrete railway roadbed under the line, and at the top of armored concrete railway roadbed Snap-fastener node spacing is uniformly arranged armored concrete buttress, and compound sleeper is equipped at the top of the armored concrete buttress, And compound sleeper is coupled by sleeper anchor bolt and anchor bolt sleeve with armored concrete buttress, at the top of the compound sleeper It is equipped with fastener system, rail is equipped at the top of the fastener system.
Further improvement lies in that:The armored concrete buttress is cast on armored concrete railway roadbed, passes through accurate measurement System ensures armored concrete buttress surface smoothness and anchor bolt sleeve portion.
Further improvement lies in that:The compound sleeper is stacked on armored concrete buttress.
Further improvement lies in that:Pass through sleeper anchor bolt and anchoring between the compound sleeper and armored concrete buttress The two is reliably connected by bolt collar.
Further improvement lies in that:The making of the high molecular materials such as polyurethane, rubber, rubber and plastic, portion can be used in the compound sleeper Divide high molecular material that can realize to recycle.
Further improvement lies in that:Rail is fixed on compound sleeper by the fastener system.
The beneficial effects of the utility model are:The utility model proposes a kind of compound no tiny fragments of stone, coal, etc. rails of rail traffic Superimposed Road system, the compound ballastless track system of rail traffic Superimposed replace " flush type " structure with " Superimposed " structure, i.e., Compound sleeper is stacked on armored concrete buttress, instead of traditional reinforced concrete sleeper embedded structure, is realized The making of the high molecular materials such as polyurethane, rubber, rubber and plastic can be used in the easy replacement of critical component, compound sleeper, and armored concrete is used Amount is reduced, and part high molecular material can be realized and be recycled, energy-saving and emission-reduction, environmentally protective, compound sleeper good insulating, favorably In reducing stray electrical current, compound sleeper elasticity preferably, can optimize ballastless track system rigidity, be conducive to optimization wheel track dynamic and ring It answers, it is advantageously ensured that concrete road bed design life, is conducive to vibration and noise reducing, advantageously reduces maintenance work Amount, using construction method from bottom to top, ensures armored concrete buttress surface smoothness and anchoring by precision measurement system Bolt collar position, you can construction efficiency is greatly improved, when phenomena such as foundation settlement occurs in the later stage, by replacing different-thickness Compound sleeper can make up the insufficient defect of fastener adjustment amount, it is ensured that circuit normal operation, the system can be used for subway, light rail, city The railway traffic engineerings such as border railway, common railway and high-speed railway.
Description of the drawings
Fig. 1 is the utility model main view schematic cross-sectional view.
Fig. 2 is the utility model exploded perspective view.
Fig. 3 is the utility model schematic top plan view.
Wherein:It is basic under 1- lines, 2- armored concrete railway roadbeds, 3- armored concrete buttresses, 4- compound sleepers, 5- sleeper anchors Fixing bolt, 6- anchor bolt sleeves, 7- fastener systems, 8- rail.
Specific implementation mode
In order to deepen the understanding to the utility model, the utility model is further described below in conjunction with embodiment, The present embodiment is only used for explaining the utility model, does not constitute the restriction to scope of protection of the utility model.
According to Fig. 1,2,3, a kind of compound ballastless track system of rail traffic Superimposed is present embodiments provided, Including basis 1, armored concrete railway roadbed 2, armored concrete buttress 3, compound sleeper 4, sleeper anchor bolt 5, anchoring spiral shell under line Bolt sleeve 6, fastener system 7, rail 8, the top on basis 1 is laid with armored concrete railway roadbed 2, and reinforced concrete dirt road under the line 2 top snap-fastener node spacing of bed are uniformly arranged armored concrete buttress 3, and the top of the armored concrete buttress 3 is equipped with Compound sleeper 4, and compound sleeper 4 is coupled by sleeper anchor bolt 5 and anchor bolt sleeve 6 with armored concrete buttress 3, institute It states 4 top of compound sleeper and is equipped with fastener system 7,7 top of the fastener system is equipped with rail 8, the armored concrete branch Pier 3 is cast on armored concrete railway roadbed 2, ensures 3 surface smoothness of armored concrete buttress and anchor by precision measurement system 6 position of fixing bolt sleeve, the compound sleeper 4 are stacked on armored concrete buttress 3, the compound sleeper 4 and reinforced concrete The two is reliably connected by sleeper anchor bolt 5 and anchor bolt sleeve 6 between native buttress 3, the fastener system 7 is by rail 8 are fixed on compound sleeper 4.
The compound ballastless track system of rail traffic Superimposed replaces " flush type " structure with " Superimposed " structure, i.e., Compound sleeper 4 is stacked on armored concrete buttress, instead of traditional reinforced concrete sleeper embedded structure, is realized The making of the high molecular materials such as polyurethane, rubber, rubber and plastic can be used in the easy replacement of critical component, compound sleeper 4, and armored concrete is used Amount is reduced, and part high molecular material can be realized and be recycled, energy-saving and emission-reduction, environmentally protective, and 4 good insulating of compound sleeper has Conducive to stray electrical current is reduced, 4 elasticity of compound sleeper preferably, can optimize ballastless track system rigidity, be conducive to optimize wheel track dynamic Response advantageously reduces maintenance work it is advantageously ensured that concrete road bed design life, is conducive to vibration and noise reducing Amount, using construction method from bottom to top, ensures 3 surface smoothness of armored concrete buttress and anchoring by precision measurement system 6 position of bolt collar, you can construction efficiency is greatly improved, when phenomena such as foundation settlement occurs in the later stage, by replacing different-thickness Compound sleeper 4, the insufficient defect of fastener adjustment amount can be made up, it is ensured that circuit normal operation, the system can be used for subway, light The railway traffic engineerings such as rail, inter-city passenger rail, common railway and high-speed railway.
Operation principle:After railroad embankment, train operation is on rail 8, by rail 8 and fastener system 7 by train dynamics Effect is transferred on compound sleeper 4, and is acted on train dynamics by sleeper anchor bolt 5 and anchor bolt sleeve 6 by it and being passed It is handed on armored concrete buttress 3 and armored concrete railway roadbed 2, is finally transmitted under line on basis 1.

Claims (5)

1. a kind of compound ballastless track system of rail traffic Superimposed, it is characterised in that:Including basic under line(1), reinforcing bar It is concrete road bed(2), armored concrete buttress(3), compound sleeper(4), sleeper anchor bolt(5), anchor bolt sleeve(6)、 Fastener system(7), rail(8), basis under the line(1)Top be laid with armored concrete railway roadbed(2), and reinforced concrete dirt road Bed(2)Top snap-fastener node spacing is uniformly arranged armored concrete buttress(3), the armored concrete buttress(3)Top It is equipped with compound sleeper(4), and compound sleeper(4)Pass through sleeper anchor bolt(5)And anchor bolt sleeve(6)With reinforced concrete Native buttress(3)It is coupled, the compound sleeper(4)Top is equipped with fastener system(7), the fastener system(7)Top is equipped with Rail(8).
2. a kind of compound ballastless track system of rail traffic Superimposed according to claim 1, it is characterised in that:Institute State armored concrete buttress(3)It is cast in armored concrete railway roadbed(2)On, armored concrete branch is ensured by precision measurement system Pier(3)Surface smoothness and anchor bolt sleeve(6)Position.
3. a kind of compound ballastless track system of rail traffic Superimposed according to claim 1, it is characterised in that:Institute State compound sleeper(4)It is stacked in armored concrete buttress(3)On.
4. a kind of compound ballastless track system of rail traffic Superimposed according to claim 1, it is characterised in that:Institute State compound sleeper(4)With armored concrete buttress(3)Between pass through sleeper anchor bolt(5)With anchor bolt sleeve(6)By two Person is reliably connected.
5. a kind of compound ballastless track system of rail traffic Superimposed according to claim 1, it is characterised in that:Institute State fastener system(7)By rail(8)It is fixed on compound sleeper(4)On.
CN201820326941.8U 2018-03-10 2018-03-10 A kind of compound ballastless track system of rail traffic Superimposed Expired - Fee Related CN207933821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820326941.8U CN207933821U (en) 2018-03-10 2018-03-10 A kind of compound ballastless track system of rail traffic Superimposed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820326941.8U CN207933821U (en) 2018-03-10 2018-03-10 A kind of compound ballastless track system of rail traffic Superimposed

Publications (1)

Publication Number Publication Date
CN207933821U true CN207933821U (en) 2018-10-02

Family

ID=63654934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820326941.8U Expired - Fee Related CN207933821U (en) 2018-03-10 2018-03-10 A kind of compound ballastless track system of rail traffic Superimposed

Country Status (1)

Country Link
CN (1) CN207933821U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277700A (en) * 2018-03-10 2018-07-13 青岛安平轨道工程技术咨询有限公司 A kind of compound ballastless track system of rail traffic Superimposed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277700A (en) * 2018-03-10 2018-07-13 青岛安平轨道工程技术咨询有限公司 A kind of compound ballastless track system of rail traffic Superimposed

Similar Documents

Publication Publication Date Title
WO2017185906A1 (en) Transitional structure for turnout and non-turnout zones in low-set, mid-to-low speed magnetic levitation lines
CN203546524U (en) Medium-and-low-speed magnetically-suspended traffic integral-type road-bed track structure
US20130264394A1 (en) Pre-stressed concrete track slab of slab-type ballast-less track
CN204959479U (en) Embedded frame track board and track structure thereof
CN209798444U (en) Truss sleeper type ballastless track for ultra-large-gradient toothed rail railway
WO2017185917A1 (en) Inter-segment limiting structure having clawed ends for track-bearing beam in single track section of low-set line of mid-to-low speed magnetic levitation transportation project
Tayabji et al. Concrete slab track state of the practice
CN108277700A (en) A kind of compound ballastless track system of rail traffic Superimposed
CN207933821U (en) A kind of compound ballastless track system of rail traffic Superimposed
CN202064239U (en) Embedded telescoping type concrete turnout board
CN108589433A (en) A kind of support type assembled ballastless track structure
WO2011079675A1 (en) Construction method for double-block ballastless track bed on bridge
CN107805977A (en) Elastic shoe and resilient sleeper-bearing component and non-fragment orbit for non-fragment orbit
CN202073037U (en) Bridge ballastless track structure
CN208995842U (en) Level crossing mouth railway roadbed
CN207176403U (en) Elastic shoe and resilient sleeper-bearing component and non-fragment orbit for non-fragment orbit
CN114717882B (en) Full-assembled ballastless track capable of preventing train derailing and overturning
CN217324965U (en) Face track laying base bridge that combines forever
CN216156258U (en) Railway track supporting structure
CN112211037B (en) Ballast track with adjustable rigid foundation and sleeper thereof
CN206385393U (en) Non-fragment orbit
CN204162955U (en) Soft clay area modern tram subgrade stiffness transition structure
CN212316562U (en) Combined type damping track structure
Momoya New railway roadbed design
CN209066192U (en) Elastic long sleeper buried-type ballastless track structure on a kind of Railway Steel Truss Girder Bridges

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

CF01 Termination of patent right due to non-payment of annual fee