CN207920152U - Civil engineering work construction bracket - Google Patents

Civil engineering work construction bracket Download PDF

Info

Publication number
CN207920152U
CN207920152U CN201820318327.7U CN201820318327U CN207920152U CN 207920152 U CN207920152 U CN 207920152U CN 201820318327 U CN201820318327 U CN 201820318327U CN 207920152 U CN207920152 U CN 207920152U
Authority
CN
China
Prior art keywords
plate
fixedly connected
civil engineering
support plate
engineering work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820318327.7U
Other languages
Chinese (zh)
Inventor
罗平
杨小川
郑新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing College of Finance and Economics
Original Assignee
Chongqing College of Finance and Economics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing College of Finance and Economics filed Critical Chongqing College of Finance and Economics
Priority to CN201820318327.7U priority Critical patent/CN207920152U/en
Application granted granted Critical
Publication of CN207920152U publication Critical patent/CN207920152U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses civil engineering work construction brackets, including bottom plate, it is fixedly connected with supporting rod at the top of the bottom plate, it is fixedly connected with support plate at the top of the supporting rod, the inner cavity of the support plate is laterally fixedly connected there are two slide bar, and the surface of the slide bar is arranged that there are two sliding sleeves, and there are two expansion plates for the inner cavity setting of the support plate, the expansion plate is fixedly connected close to the side of sliding sleeve with sliding sleeve, and side of the sliding sleeve far from expansion plate is fixedly connected with shell.The utility model is by being arranged being used cooperatively for bottom plate, supporting rod, the first reinforcing plate, loading plate, location hole, locating rod, the second reinforcing plate, support plate, groove, shell, slide bar, expansion plate, sliding sleeve, limiting plate, sliding block and spring, solve the problems, such as that existing civil engineering work construction bracket cannot increase usable floor area, the civil engineering work construction bracket, have the advantages of can increasing usable floor area, is worthy to be popularized.

Description

Civil engineering work construction bracket
Technical field
The utility model is related to technical field of civil engineering, specially civil engineering work construction bracket.
Background technology
Civil engineering is the general designation for the science and technology for building all kinds of job facilities, it both referred to applied material, equipment and The technical activities such as the exploration, design, construction, maintenance, the repair that are carried out, also refer to the object of engineering construction, that is, build on the ground or In underground, land or water, be directly or indirectly human lives, production, military affairs, Scientific Research Service various job facilities, such as room Room, road, railway, pipeline, tunnel, bridge, canal, dykes and dams, harbour, power station, airport, ocean platform, water supply and drainage and Protection works etc., civil engineering refer in addition to building construction, to create, reconstructing or extending the building of all kinds of engineerings, construct Every technical work such as the prospecting, planning, design, construction, installation and the maintenance that are carried out such as object and related auxiliary facility and its complete At engineering entity.
It needs that holder is used to be supported building in terms of civil engineering work construction, existing individual supporting rack Usable floor area be all changeless, the adjusting of size cannot be carried out, when need support larger area building when, still need to Prepare more supporting rack, more supporting rack can also occupy a large amount of space, to which the use to user is brought not Just.
Utility model content
The purpose of this utility model is to provide civil engineering work construction bracket, the excellent of usable floor area can be increased by having Point solves the problems, such as that existing civil engineering work construction bracket cannot increase usable floor area.
To achieve the above object, the utility model provides the following technical solutions:Civil engineering work construction bracket, including bottom Plate is fixedly connected with supporting rod at the top of the bottom plate, support plate, the support plate is fixedly connected at the top of the supporting rod Inner cavity be laterally fixedly connected there are two slide bar, the surface of the slide bar is arranged that there are two sliding sleeves, and the inner cavity of the support plate is set Set there are two expansion plate, the expansion plate is fixedly connected close to the side of sliding sleeve with sliding sleeve, the sliding sleeve far from expansion plate one Side is fixedly connected with shell, and the inner cavity of the shell is provided with spring, and side of the spring far from sliding sleeve is fixedly connected limited Position plate, side of the limiting plate far from spring are fixedly connected with locating rod, and the front surface and back surface of the support plate are opened Equipped with location hole, the one end of the locating rod far from limiting plate is through to the outside of shell and extends to the inner cavity of location hole, and two The opposite side of a expansion plate is through to the outside of support plate and is fixedly connected with loading plate.
Preferably, the bottom on the supporting rod surface is fixedly connected with the first reinforcing plate, the bottom of first reinforcing plate It is fixedly connected with bottom plate, the quantity of first reinforcing plate is four.
Preferably, the second reinforcing plate, the top of second reinforcing plate are fixedly connected at the top of the supporting rod surface It is fixedly connected with support plate, the quantity of second reinforcing plate is four.
Preferably, the quantity of the location hole is several, and the both sides of the slide bar, which are fixed with the inner wall of support plate, to be connected It connects, the bottom of the loading plate opens up fluted, and the both sides of the limiting plate have been fixedly connected with sliding block, and the sliding block is far from limit The side of position plate and the inner wall of shell are slidably connected.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model is by being arranged bottom plate, supporting rod, the first reinforcing plate, loading plate, location hole, locating rod, second Reinforcing plate, support plate, groove, shell, slide bar, expansion plate, sliding sleeve, limiting plate, sliding block and spring are used cooperatively, and are solved existing The problem of some civil engineering work construction brackets cannot increase usable floor area, the civil engineering work construction bracket, having can The advantages of increasing usable floor area, is worthy to be popularized.
2, the utility model increases stability when being connected between supporting rod and bottom plate by the way that the first reinforcing plate is arranged, By the way that the second reinforcing plate is arranged, stability when being connected between supporting rod and support plate is increased, by the way that sliding block is arranged, is increased Stability when limiting plate is moved forward and backward, by the way that groove is arranged, convenient for users to pulling loading plate.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the upward view of the utility model loading plate;
Fig. 3 is the overhead sectional view of the utility model support plate;
Fig. 4 is the overhead sectional view of the utility model shell.
In figure:1 bottom plate, 2 supporting rods, 3 first reinforcing plates, 4 loading plates, 5 location holes, 6 locating rods, 7 second reinforcing plates, 8 Support plate, 9 grooves, 10 shells, 11 slide bars, 12 expansion plates, 13 sliding sleeves, 14 limiting plates, 15 sliding blocks, 16 springs.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, civil engineering work construction bracket, including bottom plate 1, the top of bottom plate 1 are fixedly connected with support Bar 2, the top of supporting rod 2 are fixedly connected with support plate 8, and the inner cavity of support plate 8 is laterally fixedly connected with that there are two slide bar 11, slide bars 11 surface is arranged there are two sliding sleeve 13, and there are two expansion plates 12 for the inner cavity setting of support plate 8, and expansion plate 12 is close to sliding sleeve 13 Side is fixedly connected with sliding sleeve 13, and side of the sliding sleeve 13 far from expansion plate 12 is fixedly connected with shell 10, and the inner cavity of shell 10 is set It is equipped with spring 16, side of the spring 16 far from sliding sleeve 13 is fixedly connected with limiting plate 14, side of the limiting plate 14 far from spring 16 It is fixedly connected with locating rod 6, the front surface and back surface of support plate 8 offer location hole 5, and locating rod 6 is far from limiting plate 14 One end be through to the outside of shell 10 and extend to the inner cavity of location hole 5, two opposite sides of expansion plate 12 are through to The outside of support plate 8 is simultaneously fixedly connected with loading plate 4, and the bottom on 2 surface of supporting rod is fixedly connected with the first reinforcing plate 3, and first The bottom of reinforcing plate 3 is fixedly connected with bottom plate 1, and the quantity of the first reinforcing plate 3 is four, and the top on 2 surface of supporting rod, which is fixed, to be connected It is connected to the second reinforcing plate 7, the top of the second reinforcing plate 7 is fixedly connected with support plate 8, and the quantity of the second reinforcing plate 7 is four, fixed The quantity in position hole 5 is several, and the both sides of slide bar 11 are fixedly connected with the inner wall of support plate 8, and the bottom of loading plate 4 offers The both sides of groove 9, limiting plate 14 have been fixedly connected with sliding block 15, the inner wall of sliding block 15 side far from limiting plate 14 and shell 10 It is slidably connected, by the way that the first reinforcing plate 3 is arranged, increases stability when being connected between supporting rod 2 and bottom plate 1, pass through setting Second reinforcing plate 7 increases stability when being connected between supporting rod 2 and support plate 8, by the way that sliding block 15 is arranged, increases limit Stability when position plate 14 is moved forward and backward, by the way that groove 9 is arranged, convenient for users to pulling loading plate 4, by the way that bottom plate 1, branch is arranged Strut 2, loading plate 4, location hole 5, locating rod 6, the second reinforcing plate 7, support plate 8, groove 9, shell 10, is slided first reinforcing plate 3 Bar 11, expansion plate 12, sliding sleeve 13, limiting plate 14, sliding block 15 and spring 16 are used cooperatively, and are solved existing civil engineering and are built The problem of construction bracket cannot increase usable floor area is built, the civil engineering work construction bracket, usable floor area can be increased by having Advantage is worthy to be popularized.
In use, user by locating rod 6 by the inner cavity for being pressed into support plate 8, subsequent user passes through groove 9 and pulls carrying Plate 4 drives sliding sleeve 13 to be slided on the surface of slide bar 11 far from support plate 8, loading plate 4 by expansion plate 12, and sliding sleeve 13 drives shell 10 movement, user according to bearing area need adjust expansion plate 12 stretch out length, after length adjustment, locating rod After 6 is corresponding with the new position of location hole 5,16 support limit plate 14 of spring resets rapidly, and limiting plate 14 drives locating rod 6 to stick into The inner cavity of new location hole 5, is fixed the position of shell 10 with this, and the position for avoiding loading plate 4 is at will moved, at this time Bearing area has become larger, and subsequent user supports building.
In summary:The civil engineering work construction bracket, by the way that bottom plate 1 is arranged, supporting rod 2, the first reinforcing plate 3, holds Support plate 4, location hole 5, locating rod 6, the second reinforcing plate 7, support plate 8, groove 9, shell 10, slide bar 11, expansion plate 12, sliding sleeve 13, limiting plate 14, sliding block 15 and spring 16 are used cooperatively, and to solve existing civil engineering work construction bracket cannot increase The problem of usable floor area.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. civil engineering work construction bracket, including bottom plate (1), it is characterised in that:It is fixedly connected at the top of the bottom plate (1) Supporting rod (2), support plate (8) is fixedly connected at the top of the supporting rod (2), and the inner cavity of the support plate (8) is laterally fixed Connection is there are two slide bar (11), and the surface of the slide bar (11) is arranged that there are two sliding sleeves (13), and the inner cavity of the support plate (8) is set It sets there are two expansion plate (12), the expansion plate (12) is fixedly connected close to the side of sliding sleeve (13) with sliding sleeve (13), the cunning Side of the set (13) far from expansion plate (12) is fixedly connected with shell (10), and the inner cavity of the shell (10) is provided with spring (16), side of the spring (16) far from sliding sleeve (13) is fixedly connected with limiting plate (14), and the limiting plate (14) is far from bullet The side of spring (16) is fixedly connected with locating rod (6), and the front surface and back surface of the support plate (8) offer location hole (5), the one end of the locating rod (6) far from limiting plate (14) is through to the outside of shell (10) and extends to location hole (5) Inner cavity, two opposite sides of expansion plate (12) are through to the outside of support plate (8) and are fixedly connected with loading plate (4).
2. civil engineering work construction bracket according to claim 1, it is characterised in that:Supporting rod (2) surface Bottom is fixedly connected with the first reinforcing plate (3), and the bottom of first reinforcing plate (3) is fixedly connected with bottom plate (1), and described first The quantity of reinforcing plate (3) is four.
3. civil engineering work construction bracket according to claim 1, it is characterised in that:Supporting rod (2) surface Top is fixedly connected with the second reinforcing plate (7), and the top of second reinforcing plate (7) is fixedly connected with support plate (8), and described The quantity of two reinforcing plates (7) is four.
4. civil engineering work construction bracket according to claim 1, it is characterised in that:The quantity of the location hole (5) For several, the both sides of the slide bar (11) are fixedly connected with the inner wall of support plate (8), and the bottom of the loading plate (4) is opened Equipped with groove (9), the both sides of the limiting plate (14) have been fixedly connected with sliding block (15), and the sliding block (15) is far from limiting plate (14) inner wall of side and shell (10) is slidably connected.
CN201820318327.7U 2018-03-07 2018-03-07 Civil engineering work construction bracket Expired - Fee Related CN207920152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820318327.7U CN207920152U (en) 2018-03-07 2018-03-07 Civil engineering work construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820318327.7U CN207920152U (en) 2018-03-07 2018-03-07 Civil engineering work construction bracket

Publications (1)

Publication Number Publication Date
CN207920152U true CN207920152U (en) 2018-09-28

Family

ID=63597704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820318327.7U Expired - Fee Related CN207920152U (en) 2018-03-07 2018-03-07 Civil engineering work construction bracket

Country Status (1)

Country Link
CN (1) CN207920152U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541558A (en) * 2019-09-11 2019-12-06 严仁海 Building construction scaffold fastener
CN110644798A (en) * 2019-07-29 2020-01-03 南京浦裕投资有限公司 Anti-toppling support for building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644798A (en) * 2019-07-29 2020-01-03 南京浦裕投资有限公司 Anti-toppling support for building
CN110541558A (en) * 2019-09-11 2019-12-06 严仁海 Building construction scaffold fastener

Similar Documents

Publication Publication Date Title
CN207920152U (en) Civil engineering work construction bracket
CN106198934A (en) Block and the assay device of crack gushing water and test method are fallen in the landslide of a kind of crack rock
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN208530637U (en) A kind of adjustable pipeline arranging frame for civil engineering of placement space
CN209556433U (en) A kind of civil engineering support frame for placing pipe fitting
CN211369535U (en) Template reinforcing apparatus for civil engineering
CN207383113U (en) A kind of adjustable tree reinforcement protection frame
CN207879366U (en) Across the efficient fully mechanized mining support apparatus of the big magnification high inclination-angle of limit for height
CN203130107U (en) Hydraulic tunnel inverted arch operation trolley
CN209323505U (en) A kind of building combination pilework of strong applicability
CN210424157U (en) Supporting and protecting device for water conservancy and hydropower
CN113026860A (en) Regulation type gardens rainwater collection device
CN209443437U (en) A kind of gabion net for Yangtze River waterway regulation
CN209493274U (en) A kind of jacking apparatus of civil engineering
CN210766333U (en) Novel bridge with internal structure design
CN213573330U (en) Protective net for hydraulic engineering
CN221399022U (en) Foundation pit supporting structure
CN220847598U (en) Foundation supporting structure
CN207807693U (en) A kind of adjustable pipe rack of civil engineering
CN209244271U (en) A kind of civil construction vertical forming fixture
CN109881719A (en) A kind of experimental provision of simulating excavation
CN211624649U (en) Special multi-functional measuring device of civil engineering
CN206477537U (en) One kind exempts from base treatment vitrified tile thin plate stone material dry suspending structure
CN213980251U (en) Building foundation ditch side slope combination formula protector
CN208133220U (en) It is framed that one kind shaking control push-and-pull

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20190307

CF01 Termination of patent right due to non-payment of annual fee