CN207920131U - A kind of steel railing Fast Installation sample rack - Google Patents

A kind of steel railing Fast Installation sample rack Download PDF

Info

Publication number
CN207920131U
CN207920131U CN201820278545.2U CN201820278545U CN207920131U CN 207920131 U CN207920131 U CN 207920131U CN 201820278545 U CN201820278545 U CN 201820278545U CN 207920131 U CN207920131 U CN 207920131U
Authority
CN
China
Prior art keywords
square tube
frame square
frame
groove mechanism
sample rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820278545.2U
Other languages
Chinese (zh)
Inventor
周良
汪令卫
靳亮
徐家胜
吴银
周歆巍
石磊
赵璐
杨玫
陈九斤
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN201820278545.2U priority Critical patent/CN207920131U/en
Application granted granted Critical
Publication of CN207920131U publication Critical patent/CN207920131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of steel railing Fast Installation sample rack, it includes fixed groove mechanism and installation groove mechanism, fix the first frame square tube, the second frame square tube that groove mechanism includes vertically arranged, it is equipped with the first support slot in the first frame square tube, the epimere of the second frame square tube and/or hypomere, the first fixed link is equipped in the first support slot;Third frame square tube, the 4th frame square tube that groove mechanism includes vertically arranged are installed, third frame square tube, the upper end of the 4th frame square tube and/or hypomere are equipped with the second support slot, the second fixed link can be equipped in the second support slot.The utility model aim is to solve the technical issues of low efficiency and labor intensive are built in existing construction steel railing welding.

Description

A kind of steel railing Fast Installation sample rack
Technical field
The utility model belongs to construction equipment field, and in particular to a kind of steel railing Fast Installation sample rack.
Background technology
Construction of hydro project project includes the projects such as dam engineering, trash rack platform, access bridge, and height difference is larger, Above-mentioned building faces side and is required to that permanent steel railing is arranged, and personnel is avoided to fall.Steel railing is respectively arranged comprising a kind of top, bottom One of horizontal steel tube is provided with several vertical steel pipes between twice horizontal steel tube, and this steel pipe is needed when installing vertical steel pipe It first fixes and then is welded again.Conventional method is generally divided into two kinds:1)One people fixes vertical steel pipe, in addition a welding people One hand shield of member, is welded by weld handle plier on the other hand, and this method must arrange two construction personnel, and when welding, welding rod Spark is easy to splash fixed vertical steel pipe construction personnel;2)Vertical steel pipe is fixed in one people, and is welded, and is easy to peace Dress personnel damage.To sum up, the prior art there is technical issues that low construction efficiency and.
Invention content
Purpose of the utility model is to solve the welding of existing construction steel railing build that efficiency is low and labor intensive Technical problem.
Technical solution used by the utility model is:
A kind of steel railing Fast Installation sample rack, it includes fixed groove mechanism and installation groove mechanism, and fixed groove mechanism includes perpendicular The first frame square tube, the second frame square tube to setting, in the epimere and/or hypomere of the first frame square tube, the second frame square tube Equipped with the first support slot, the first fixed link is equipped in the first support slot;
Third frame square tube, the 4th frame square tube that groove mechanism includes vertically arranged, third frame square tube, the 4th frame are installed The upper end of frame square tube and/or hypomere are equipped with the second support slot, and the second fixed link can be equipped in the second support slot.
It is set between the first frame square tube and the second frame square tube and between third frame square tube and the 4th frame square tube There is back cord.
Above-mentioned first frame square tube is mutually parallel with the second frame square tube and third frame square tube with the 4th frame square tube, First frame square tube, the second frame square tube, third frame square tube, the upper surface of the 4th frame square tube are in the same plane, the One frame square tube, the second frame square tube, third frame square tube, the lower face of the 4th frame square tube are in the same plane.
It is connected by connecting square pipes between above-mentioned fixed groove mechanism and installation groove mechanism.
Above-mentioned connecting square pipes are at least 2, are mutually parallel and are horizontally installed between fixed groove mechanism and installation groove mechanism.
Using the above structure, by the way that installation is complete, railing steel pipe fixes sample rack to the utility model in advance, then utilizes Sample rack installs other and does not install railing steel pipe, can reduce railing installation personnel input, be greatly improved railing installment work efficiency, Ensure the quality of railing installation.
Description of the drawings
Fig. 1 is the structural schematic diagram of utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the side view of Fig. 1;
Fig. 4 and Fig. 5 is the scheme of installation of the utility model.
Specific implementation mode
As shown in Figure 1 to Figure 3, a kind of steel railing Fast Installation sample rack, it includes fixing groove mechanism 1 and installation groove mechanism 2, Fixed groove mechanism 1 includes the first vertically arranged frame square tube 3, the second frame square tube 4, in the first frame square tube 3, the second frame The epimere and/or hypomere of square tube 4 are equipped with the first support slot 5, and the first fixed link 6 is equipped in the first support slot 5;
It includes vertically arranged third frame square tube 7, the 4th frame square tube 8, third frame square tube 7, the to install groove mechanism 2 The upper end of four frame square tubes 8 and/or hypomere are equipped with the second support slot 10, and the second fixation can be equipped in the second support slot Bar.
Between the first frame square tube 3 and the second frame square tube 4 and third frame square tube 7 and the 4th frame square tube 8 it Between be equipped with back cord 9.
The first frame square tube 3 and the second frame square tube 4 and third frame square tube 7 and the 4th frame square tube 8 are mutually It is parallel, the first frame square tube 3, the second frame square tube 4, third frame square tube 7, the 4th frame square tube 8 upper surface be located at it is same In plane, the first frame square tube 3, the second frame square tube 4, third frame square tube 7, the 4th frame square tube 8 lower face be located at it is same In one plane.
It is connected by connecting square pipes 11 between the fixed groove mechanism 1 and installation groove mechanism 2.
The connecting square pipes 11 are at least 2, are mutually parallel and are horizontally installed on fixed groove mechanism 1 and installation groove mechanism 2 Between.
Specifically, when implementing, as shown in Figure 4 and Figure 5,1)By sample rack both ends fix groove mechanism in fixing groove with installed Vertical steel pipe 13 matches, and the first fixed link corresponding to fixing groove is then put into support notch, keeps sample rack whole and has installed Vertical steel pipe(Steel railing includes to be set to the horizontal steel tube 14 of top, bottom, and be set to vertical between top and bottom Steel pipe 13)It is fixed.
2)Then the steel pipe in mounting groove in installation groove mechanism is installed, specifically, steel pipe to be installed is put into In mounting groove, the second fixed link for having put corresponding to penstock installation slot is then put into support notch, to the steel of unwelded installation Pipe is fixed, and fixes all steel pipes to be installed successively using the above method, then fix to vertical steel pipe top and the bottom spot welding 12, most After remove sample rack, carry out last steel pipe integral solder and fix.
The steel pipe Fast Installation sample rack solves the problems, such as that traditional vertical steel pipe work efficiency is low, safety is poor, can carry significantly High installation effectiveness, while ensureing penstock installation quality.

Claims (4)

1. a kind of steel railing Fast Installation sample rack, it is characterised in that:It includes fixed groove mechanism(1)With installation groove mechanism(2)Gu Determine groove mechanism(1)Including the first vertically arranged frame square tube(3), the second frame square tube(4), in the first frame square tube(3), Two frame square tubes(4)Epimere and/or hypomere be equipped with the first support slot(5), in the first support slot(5)In be equipped with the first fixed link (6);
Groove mechanism is installed(2)Including vertically arranged third frame square tube(7), the 4th frame square tube(8), third frame square tube (7), the 4th frame square tube(8)Upper end and/or hypomere be equipped with the second support slot(10), can be equipped in the second support slot Second fixed link;
In the first frame square tube(3)With the second frame square tube(4)Between and third frame square tube(7)With the 4th frame square tube (8)Between be equipped with back cord(9).
2. steel railing Fast Installation sample rack according to claim 1, it is characterised in that:The first frame square tube(3)With Second frame square tube(4)And third frame square tube(7)With the 4th frame square tube(8)It is mutually parallel, the first frame square tube(3)、 Second frame square tube(4), third frame square tube(7), the 4th frame square tube(8)Upper surface it is in the same plane, the first frame Frame square tube(3), the second frame square tube(4), third frame square tube(7), the 4th frame square tube(8)Lower face be generally aligned in the same plane On.
3. steel railing Fast Installation sample rack according to claim 1 or 2, it is characterised in that:The fixed groove mechanism(1)With Groove mechanism is installed(2)Between pass through connecting square pipes(11)Connection.
4. steel railing Fast Installation sample rack according to claim 3, it is characterised in that:The connecting square pipes(11)At least It 2, is mutually parallel and is horizontally installed on fixed groove mechanism(1)With installation groove mechanism(2)Between.
CN201820278545.2U 2018-02-27 2018-02-27 A kind of steel railing Fast Installation sample rack Expired - Fee Related CN207920131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820278545.2U CN207920131U (en) 2018-02-27 2018-02-27 A kind of steel railing Fast Installation sample rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820278545.2U CN207920131U (en) 2018-02-27 2018-02-27 A kind of steel railing Fast Installation sample rack

Publications (1)

Publication Number Publication Date
CN207920131U true CN207920131U (en) 2018-09-28

Family

ID=63601901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820278545.2U Expired - Fee Related CN207920131U (en) 2018-02-27 2018-02-27 A kind of steel railing Fast Installation sample rack

Country Status (1)

Country Link
CN (1) CN207920131U (en)

Similar Documents

Publication Publication Date Title
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN207920131U (en) A kind of steel railing Fast Installation sample rack
CN111535196B (en) Bridge building templates link for civil engineering
CN210621831U (en) Water supply equipment base convenient to installation
CN208456187U (en) A kind of steel structural overhead weld job wind-proof shed
CN206859725U (en) A kind of building structure strengthening attachment means
CN209393780U (en) The processing unit (plant) of lightning protection telescopic joint
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN207021930U (en) A kind of photovoltaic solar installation work high above the ground support and system
CN208718346U (en) Building engineering outer scaffold wall connector
CN209397899U (en) Boiler water wall scaffold
CN205840326U (en) A kind of stair template fixing device
CN206111832U (en) Overhaul platform device in boiler furnace and folding joint thereof
CN206111759U (en) Overhaul platform device in boiler furnace and connecting card board thereof
CN206108839U (en) Overhaul platform device in boiler furnace and spacing round of mechanism of elasticity thereof
CN214302798U (en) Prevent hot wall inserted scaffold frame
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN220660573U (en) Wind power generation kuppe equipment frock
CN215829238U (en) Steel box girder structure
CN211665583U (en) A cutting ferrule formula limit structure for installation of steel case roof beam support method
CN211540055U (en) Be used for instrument, electric disk cabinet basis landing leg group to welded mould
CN211112073U (en) Novel converter flue bearing mechanism
CN214696062U (en) Platform frame modular structure of green steel construction
CN214885396U (en) Safety net protection frame of attached lifting platform
CN208303555U (en) A kind of simple plate-bending apparatus in building site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

CF01 Termination of patent right due to non-payment of annual fee