CN207920131U - A kind of steel railing Fast Installation sample rack - Google Patents
A kind of steel railing Fast Installation sample rack Download PDFInfo
- Publication number
- CN207920131U CN207920131U CN201820278545.2U CN201820278545U CN207920131U CN 207920131 U CN207920131 U CN 207920131U CN 201820278545 U CN201820278545 U CN 201820278545U CN 207920131 U CN207920131 U CN 207920131U
- Authority
- CN
- China
- Prior art keywords
- square tube
- frame square
- frame
- groove mechanism
- sample rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 37
- 239000010959 steel Substances 0.000 title claims abstract description 37
- 238000009434 installation Methods 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 abstract description 7
- 238000003466 welding Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 1
- 239000010813 municipal solid waste Substances 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of steel railing Fast Installation sample rack, it includes fixed groove mechanism and installation groove mechanism, fix the first frame square tube, the second frame square tube that groove mechanism includes vertically arranged, it is equipped with the first support slot in the first frame square tube, the epimere of the second frame square tube and/or hypomere, the first fixed link is equipped in the first support slot;Third frame square tube, the 4th frame square tube that groove mechanism includes vertically arranged are installed, third frame square tube, the upper end of the 4th frame square tube and/or hypomere are equipped with the second support slot, the second fixed link can be equipped in the second support slot.The utility model aim is to solve the technical issues of low efficiency and labor intensive are built in existing construction steel railing welding.
Description
Technical field
The utility model belongs to construction equipment field, and in particular to a kind of steel railing Fast Installation sample rack.
Background technology
Construction of hydro project project includes the projects such as dam engineering, trash rack platform, access bridge, and height difference is larger,
Above-mentioned building faces side and is required to that permanent steel railing is arranged, and personnel is avoided to fall.Steel railing is respectively arranged comprising a kind of top, bottom
One of horizontal steel tube is provided with several vertical steel pipes between twice horizontal steel tube, and this steel pipe is needed when installing vertical steel pipe
It first fixes and then is welded again.Conventional method is generally divided into two kinds:1)One people fixes vertical steel pipe, in addition a welding people
One hand shield of member, is welded by weld handle plier on the other hand, and this method must arrange two construction personnel, and when welding, welding rod
Spark is easy to splash fixed vertical steel pipe construction personnel;2)Vertical steel pipe is fixed in one people, and is welded, and is easy to peace
Dress personnel damage.To sum up, the prior art there is technical issues that low construction efficiency and.
Invention content
Purpose of the utility model is to solve the welding of existing construction steel railing build that efficiency is low and labor intensive
Technical problem.
Technical solution used by the utility model is:
A kind of steel railing Fast Installation sample rack, it includes fixed groove mechanism and installation groove mechanism, and fixed groove mechanism includes perpendicular
The first frame square tube, the second frame square tube to setting, in the epimere and/or hypomere of the first frame square tube, the second frame square tube
Equipped with the first support slot, the first fixed link is equipped in the first support slot;
Third frame square tube, the 4th frame square tube that groove mechanism includes vertically arranged, third frame square tube, the 4th frame are installed
The upper end of frame square tube and/or hypomere are equipped with the second support slot, and the second fixed link can be equipped in the second support slot.
It is set between the first frame square tube and the second frame square tube and between third frame square tube and the 4th frame square tube
There is back cord.
Above-mentioned first frame square tube is mutually parallel with the second frame square tube and third frame square tube with the 4th frame square tube,
First frame square tube, the second frame square tube, third frame square tube, the upper surface of the 4th frame square tube are in the same plane, the
One frame square tube, the second frame square tube, third frame square tube, the lower face of the 4th frame square tube are in the same plane.
It is connected by connecting square pipes between above-mentioned fixed groove mechanism and installation groove mechanism.
Above-mentioned connecting square pipes are at least 2, are mutually parallel and are horizontally installed between fixed groove mechanism and installation groove mechanism.
Using the above structure, by the way that installation is complete, railing steel pipe fixes sample rack to the utility model in advance, then utilizes
Sample rack installs other and does not install railing steel pipe, can reduce railing installation personnel input, be greatly improved railing installment work efficiency,
Ensure the quality of railing installation.
Description of the drawings
Fig. 1 is the structural schematic diagram of utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the side view of Fig. 1;
Fig. 4 and Fig. 5 is the scheme of installation of the utility model.
Specific implementation mode
As shown in Figure 1 to Figure 3, a kind of steel railing Fast Installation sample rack, it includes fixing groove mechanism 1 and installation groove mechanism 2,
Fixed groove mechanism 1 includes the first vertically arranged frame square tube 3, the second frame square tube 4, in the first frame square tube 3, the second frame
The epimere and/or hypomere of square tube 4 are equipped with the first support slot 5, and the first fixed link 6 is equipped in the first support slot 5;
It includes vertically arranged third frame square tube 7, the 4th frame square tube 8, third frame square tube 7, the to install groove mechanism 2
The upper end of four frame square tubes 8 and/or hypomere are equipped with the second support slot 10, and the second fixation can be equipped in the second support slot
Bar.
Between the first frame square tube 3 and the second frame square tube 4 and third frame square tube 7 and the 4th frame square tube 8 it
Between be equipped with back cord 9.
The first frame square tube 3 and the second frame square tube 4 and third frame square tube 7 and the 4th frame square tube 8 are mutually
It is parallel, the first frame square tube 3, the second frame square tube 4, third frame square tube 7, the 4th frame square tube 8 upper surface be located at it is same
In plane, the first frame square tube 3, the second frame square tube 4, third frame square tube 7, the 4th frame square tube 8 lower face be located at it is same
In one plane.
It is connected by connecting square pipes 11 between the fixed groove mechanism 1 and installation groove mechanism 2.
The connecting square pipes 11 are at least 2, are mutually parallel and are horizontally installed on fixed groove mechanism 1 and installation groove mechanism 2
Between.
Specifically, when implementing, as shown in Figure 4 and Figure 5,1)By sample rack both ends fix groove mechanism in fixing groove with installed
Vertical steel pipe 13 matches, and the first fixed link corresponding to fixing groove is then put into support notch, keeps sample rack whole and has installed
Vertical steel pipe(Steel railing includes to be set to the horizontal steel tube 14 of top, bottom, and be set to vertical between top and bottom
Steel pipe 13)It is fixed.
2)Then the steel pipe in mounting groove in installation groove mechanism is installed, specifically, steel pipe to be installed is put into
In mounting groove, the second fixed link for having put corresponding to penstock installation slot is then put into support notch, to the steel of unwelded installation
Pipe is fixed, and fixes all steel pipes to be installed successively using the above method, then fix to vertical steel pipe top and the bottom spot welding 12, most
After remove sample rack, carry out last steel pipe integral solder and fix.
The steel pipe Fast Installation sample rack solves the problems, such as that traditional vertical steel pipe work efficiency is low, safety is poor, can carry significantly
High installation effectiveness, while ensureing penstock installation quality.
Claims (4)
1. a kind of steel railing Fast Installation sample rack, it is characterised in that:It includes fixed groove mechanism(1)With installation groove mechanism(2)Gu
Determine groove mechanism(1)Including the first vertically arranged frame square tube(3), the second frame square tube(4), in the first frame square tube(3),
Two frame square tubes(4)Epimere and/or hypomere be equipped with the first support slot(5), in the first support slot(5)In be equipped with the first fixed link
(6);
Groove mechanism is installed(2)Including vertically arranged third frame square tube(7), the 4th frame square tube(8), third frame square tube
(7), the 4th frame square tube(8)Upper end and/or hypomere be equipped with the second support slot(10), can be equipped in the second support slot
Second fixed link;
In the first frame square tube(3)With the second frame square tube(4)Between and third frame square tube(7)With the 4th frame square tube
(8)Between be equipped with back cord(9).
2. steel railing Fast Installation sample rack according to claim 1, it is characterised in that:The first frame square tube(3)With
Second frame square tube(4)And third frame square tube(7)With the 4th frame square tube(8)It is mutually parallel, the first frame square tube(3)、
Second frame square tube(4), third frame square tube(7), the 4th frame square tube(8)Upper surface it is in the same plane, the first frame
Frame square tube(3), the second frame square tube(4), third frame square tube(7), the 4th frame square tube(8)Lower face be generally aligned in the same plane
On.
3. steel railing Fast Installation sample rack according to claim 1 or 2, it is characterised in that:The fixed groove mechanism(1)With
Groove mechanism is installed(2)Between pass through connecting square pipes(11)Connection.
4. steel railing Fast Installation sample rack according to claim 3, it is characterised in that:The connecting square pipes(11)At least
It 2, is mutually parallel and is horizontally installed on fixed groove mechanism(1)With installation groove mechanism(2)Between.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820278545.2U CN207920131U (en) | 2018-02-27 | 2018-02-27 | A kind of steel railing Fast Installation sample rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820278545.2U CN207920131U (en) | 2018-02-27 | 2018-02-27 | A kind of steel railing Fast Installation sample rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207920131U true CN207920131U (en) | 2018-09-28 |
Family
ID=63601901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820278545.2U Expired - Fee Related CN207920131U (en) | 2018-02-27 | 2018-02-27 | A kind of steel railing Fast Installation sample rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207920131U (en) |
-
2018
- 2018-02-27 CN CN201820278545.2U patent/CN207920131U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204040439U (en) | A kind of reducing operation platform installed for steel rectangle column | |
CN207920131U (en) | A kind of steel railing Fast Installation sample rack | |
CN111535196B (en) | Bridge building templates link for civil engineering | |
CN210621831U (en) | Water supply equipment base convenient to installation | |
CN208456187U (en) | A kind of steel structural overhead weld job wind-proof shed | |
CN206859725U (en) | A kind of building structure strengthening attachment means | |
CN209393780U (en) | The processing unit (plant) of lightning protection telescopic joint | |
CN209941512U (en) | Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge | |
CN207021930U (en) | A kind of photovoltaic solar installation work high above the ground support and system | |
CN208718346U (en) | Building engineering outer scaffold wall connector | |
CN209397899U (en) | Boiler water wall scaffold | |
CN205840326U (en) | A kind of stair template fixing device | |
CN206111832U (en) | Overhaul platform device in boiler furnace and folding joint thereof | |
CN206111759U (en) | Overhaul platform device in boiler furnace and connecting card board thereof | |
CN206108839U (en) | Overhaul platform device in boiler furnace and spacing round of mechanism of elasticity thereof | |
CN214302798U (en) | Prevent hot wall inserted scaffold frame | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building | |
CN220660573U (en) | Wind power generation kuppe equipment frock | |
CN215829238U (en) | Steel box girder structure | |
CN211665583U (en) | A cutting ferrule formula limit structure for installation of steel case roof beam support method | |
CN211540055U (en) | Be used for instrument, electric disk cabinet basis landing leg group to welded mould | |
CN211112073U (en) | Novel converter flue bearing mechanism | |
CN214696062U (en) | Platform frame modular structure of green steel construction | |
CN214885396U (en) | Safety net protection frame of attached lifting platform | |
CN208303555U (en) | A kind of simple plate-bending apparatus in building site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |