CN207920091U - A kind of mounting structure of pre-buried wire box - Google Patents
A kind of mounting structure of pre-buried wire box Download PDFInfo
- Publication number
- CN207920091U CN207920091U CN201721788639.6U CN201721788639U CN207920091U CN 207920091 U CN207920091 U CN 207920091U CN 201721788639 U CN201721788639 U CN 201721788639U CN 207920091 U CN207920091 U CN 207920091U
- Authority
- CN
- China
- Prior art keywords
- box body
- connecting rod
- mounting structure
- buried wire
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000009434 installation Methods 0.000 claims description 12
- 210000002268 wool Anatomy 0.000 claims description 11
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 239000006260 foam Substances 0.000 claims description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 abstract description 12
- 229910052782 aluminium Inorganic materials 0.000 abstract description 12
- 238000007598 dipping method Methods 0.000 abstract description 12
- 239000004568 cement Substances 0.000 description 14
- 238000010276 construction Methods 0.000 description 12
- 230000003014 reinforcing effect Effects 0.000 description 7
- 238000005553 drilling Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000007665 sagging Methods 0.000 description 3
- 229920002472 Starch Polymers 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000010616 electrical installation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 235000019698 starch Nutrition 0.000 description 2
- 239000008107 starch Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005662 electromechanics Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Connection Or Junction Boxes (AREA)
Abstract
The utility model discloses a kind of mounting structures of pre-buried wire box, it is characterised in that it includes the box body of a side opening, there are two connecting rods disposed in parallel for tool on the box body, the connecting rod is arranged along the length direction or width direction of the box body, and both ends extend to outside the box body;The both ends of the connecting rod are separately fixed on the two neighboring embedded bar in position to be installed;The connecting rod is located at position of the wire box far from open side, and the connecting rod is made of flexible flexible material.The utility model have it is reasonable in design, it is easy to use, can in the case where not damaging aluminum dipping form, convenient for it is fixed the advantages that.
Description
Technical field
The utility model is related to technical field of building construction, in particular to a kind of mounting structure of pre-buried wire box.
Background technology
The set aside pre-embedded of electric pipeline plays an important role electromechanics installation, it and other processes complement each other and
Mutually restrict;Control the construction quality of set aside pre-embedded, can not only shorten the construction period with it is cost-effective, and for the later stage equipment pacify
Dress lays the first stone.But as building trade is higher and higher to product quality requirement, traditional wooden model has been difficult to meet day in the market
The standard requirement for becoming stringent.Then, aluminum dipping form comes into being, and has gradually replaced biography with very extensive in skyscraper in recent years
The trend of system wooden model.The relatively traditional wood-mode technology of aluminum dipping form technique, can realize better entity quality, but also bring simultaneously electrical
The difficulty of construction of pipeline set aside pre-embedded, it is proposed that higher mounting process requirement.In traditional wooden model construction, it is typically employed in wood
It punches on mould, then the mounting structure of electrical pre-buried wire box is fixed on wooden model with tied silk.But after being constructed using aluminum dipping form,
Aluminum dipping form can be damaged by drilling to aluminum dipping form, reduce the recycling rate of waterused of aluminum dipping form, and aluminum dipping form surface can also be made easily to form concrete slurry sagging,
Influence aluminum dipping form outer plate surface perception.Therefore, fixed electrical built-in line can be convenient in the case where not damaging aluminum dipping form by being badly in need of one kind
The mounting structure of box becomes urgent problem to be solved.
Utility model content
In view of the above shortcomings of the prior art, technical problem to be solved in the utility model is:How a kind of knot is provided
Structure reasonable design, it is easy to use, the mounting structure of fixed pre-buried wire box can be convenient in the case where not damaging aluminum dipping form.
In order to solve the above-mentioned technical problem, the utility model uses the following technical solution:
A kind of mounting structure of pre-buried wire box, which is characterized in that embedded bar and side including walling body to be poured are opened
Mouthful box body, there are two connecting rod disposed in parallel, length direction or width of the connecting rod along the box body for tool on the box body
Direction is arranged, and both ends extend to outside the box body;It is two neighboring pre- that the both ends of the connecting rod are separately fixed at position to be installed
It buries on reinforcing bar;The connecting rod is located at position of the wire box far from open side, and the connecting rod uses flexible flexible material
It is made.
Using the above structure, the both ends of connecting rod are secured to the embedded bar poured in wall by tied silk or other modes
On, to realize the pre-buried fixation of box body, without drilling in template, is conducive to the turnover rate for improving template, reduces and use
Cost will not impact the appearance of template, and template surface concrete is effectively prevent to starch sagging.And connecting rod is located remotely from box body
The position of open side so that after box body is fixed on reinforcing bar, can protrude outward to a greater degree, and since connecting rod uses bendable
Bent flexible material is made so as to interior extruding box body after template installation, makes rod deformation, deformed bullet of the box body in connecting rod
It is close to template under force effect, occurs gap when preventing cement from smashing shake between box body and template, cement is caused to pour into box body, influences
The electrical installation in later stage.
Further, the open side covering of the box body is provided with dismountable cover board.
The open side of box body is typically convenient for later stage installation switch panel or socket panel, and when wall pours, box body is logical
It is often to be close to template, but when cement pours and smashes shake, may make to generate gap between box body and template so that cement enters
Box body in, be not easily cleaned after solidification, influence electrical construction, it is using the above structure, dismountable in the open side covering of box body
Cover board can prevent cement from entering in box body, be convenient for subsequent electrical construction.
Further, the cover board is made of EPE pearl wool plate.
Since EPE pearl wool plate has shrinkage, after being bonded with template, even if cement makes box body move slightly when smashing shake
Position, can also make up gap between the two, prevent cement from entering between box body and template.And after form removal, EPE pearl wool plate
The extruding force of template is lost, is restored, metope can be protruded slightly, wire box is searched convenient for the later stage.In addition, EPE pearl wool plate holds
Easily openable so that dismounting is very convenient.
Further, foam or shredded paper are filled in the box body.
In this way, the support strength in the middle part of cover board can be improved, prevent EPE pearl wool plate from deforming under the extruding of template
And form medial recess.
Further, the connecting rod is formed using plastic injection.
It pours in wall, will not be reused, using plastic injection since pre-buried wire box can be embedded to after construction
At can be by the cost of ground connecting rod, and plastic part be easily deformable, has preferable flexible.
Further, the same end of two connecting rods all has the extension being arranged along the opening direction away from the box body
Hook.
It when installation, will first can hang on the reinforcing bar poured in wall, carry out Primary Location, then will connect
The other end of bar is fixed with adjacent reinforcing bar so that operation can be completed in a people, easier for installation.
Further, it is evenly equipped with multiple through-holes for radially penetrating through setting on the connecting rod, has on the hook and is used for
The bolt being plugged in the through-hole.
In this way so that hook is removably attachable to by bolt on connecting rod, convenient for being carried out according to the environment of construction site
Adjustment, it is easier for installation.
In conclusion the utility model have it is reasonable in design, it is easy to use, can be the case where not damaging aluminum dipping form
Under, it is convenient for the advantages that fixed.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
When specific implementation:As shown in Figure 1, a kind of mounting structure of pre-buried wire box, includes the embedded bar of walling body to be poured
The box body 1 of (not shown) and a side opening, there are two connecting rod 2 disposed in parallel, the connecting rods 2 for tool on the box body 1
Length direction or width direction along the box body 1 are arranged, and both ends extend to outside the box body 1;The both ends of the connecting rod 2 point
It is not fixed on the two neighboring embedded bar in position to be installed;The connecting rod 2 is located at position of the wire box 1 far from open side,
And the connecting rod 2 is made of flexible flexible material.
Using the above structure, the both ends of connecting rod are secured to the embedded bar poured in wall by tied silk or other modes
On, to realize the pre-buried fixation of box body, without drilling in template, is conducive to the turnover rate for improving template, reduces and use
Cost will not impact the appearance of template, and template surface concrete is effectively prevent to starch sagging.And connecting rod is located remotely from box body
The position of open side so that after box body is fixed on reinforcing bar, can protrude outward to a greater degree, and since connecting rod uses bendable
Bent flexible material is made so as to interior extruding box body after template installation, makes rod deformation, deformed bullet of the box body in connecting rod
It is close to template under force effect, occurs gap when preventing cement from smashing shake between box body and template, cement is caused to pour into box body, influences
The electrical installation in later stage.
When implementation, the open side covering of the box body 1 is provided with dismountable cover board 3.
The open side of box body is typically convenient for later stage installation switch panel or socket panel, and when wall pours, box body is logical
It is often to be close to template, but when cement pours and smashes shake, may make to generate gap between box body and template so that cement enters
Box body in, be not easily cleaned after solidification, influence electrical construction, it is using the above structure, dismountable in the open side covering of box body
Cover board can prevent cement from entering in box body, be convenient for subsequent electrical construction.
When implementation, the cover board 3 is made of EPE pearl wool plate.
Since EPE pearl wool plate has shrinkage, after being bonded with template, even if cement makes box body move slightly when smashing shake
Position, can also make up gap between the two, prevent cement from entering between box body and template.And after form removal, EPE pearl wool plate
The extruding force of template is lost, is restored, metope can be protruded slightly, wire box is searched convenient for the later stage.In addition, EPE pearl wool plate holds
Easily openable so that dismounting is very convenient.
When implementation, foam or shredded paper are filled in the box body 1.
In this way, the support strength in the middle part of cover board can be improved, prevent EPE pearl wool plate from deforming under the extruding of template
And form medial recess.
When implementation, the connecting rod 2 is formed using plastic injection.
It pours in wall, will not be reused, using plastic injection since pre-buried wire box can be embedded to after construction
At can be by the cost of ground connecting rod, and plastic part be easily deformable, has preferable flexible.
When implementation, the same end of two connecting rods 2 all has the extension being arranged along the opening direction away from the box body 1
Hook.
It when installation, will first can hang on the reinforcing bar poured in wall, carry out Primary Location, then will connect
The other end of bar is fixed with adjacent reinforcing bar so that operation can be completed in a people, easier for installation.
Further, it is evenly equipped with multiple through-holes for radially penetrating through setting on the connecting rod, has on the hook and is used for
The bolt being plugged in the through-hole.
In this way so that hook is removably attachable to by bolt on connecting rod, convenient for being carried out according to the environment of construction site
Adjustment, it is easier for installation.
The above is only the preferred embodiment of the utility model only, is not limitation with the utility model, all at this
All any modification, equivalent and improvement etc., should be included in the utility model made by within the spirit and principle of utility model
Protection domain within.
Claims (7)
1. a kind of mounting structure of pre-buried wire box, which is characterized in that the embedded bar including walling body to be poured and a side opening
Box body (1), there are two connecting rod disposed in parallel (2), length of the connecting rod (2) along the box body (1) for tool on the box body (1)
Direction or width direction setting are spent, and both ends extend to the box body (1) outside;The both ends of the connecting rod (2), which are separately fixed at, waits for
On the two neighboring embedded bar of installation site;The connecting rod (2) is located at position of the box body (1) far from open side, and described
Connecting rod (2) is made of flexible flexible material.
2. the mounting structure of pre-buried wire box as described in claim 1, which is characterized in that the open side of the box body (1) covers
It is provided with dismountable cover board (3).
3. the mounting structure of pre-buried wire box as claimed in claim 2, which is characterized in that the cover board (3) uses EPE pearl wool
Plate is made.
4. the mounting structure of pre-buried wire box as claimed in claim 3, which is characterized in that be filled with foam in the box body (1)
Or shredded paper.
5. the mounting structure of pre-buried wire box as described in claim 1, which is characterized in that the connecting rod (2) uses plastic injection
It forms.
6. the mounting structure of pre-buried wire box as claimed in claim 5, which is characterized in that the same end of two connecting rods (2)
All have the hook being arranged along the opening direction away from the box body (1).
7. the mounting structure of pre-buried wire box as claimed in claim 6, which is characterized in that be evenly equipped on the connecting rod (2) multiple
The through-hole of setting is radially penetrated through, there is the bolt for being plugged in the through-hole on the hook.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721788639.6U CN207920091U (en) | 2017-12-19 | 2017-12-19 | A kind of mounting structure of pre-buried wire box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721788639.6U CN207920091U (en) | 2017-12-19 | 2017-12-19 | A kind of mounting structure of pre-buried wire box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207920091U true CN207920091U (en) | 2018-09-28 |
Family
ID=63607237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721788639.6U Expired - Fee Related CN207920091U (en) | 2017-12-19 | 2017-12-19 | A kind of mounting structure of pre-buried wire box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207920091U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206312A (en) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | A kind of concrete wall pipeline construction method |
CN111009872A (en) * | 2019-12-31 | 2020-04-14 | 华南理工大学 | Pre-buried cable support and construction method of cable trench |
-
2017
- 2017-12-19 CN CN201721788639.6U patent/CN207920091U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206312A (en) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | A kind of concrete wall pipeline construction method |
CN111009872A (en) * | 2019-12-31 | 2020-04-14 | 华南理工大学 | Pre-buried cable support and construction method of cable trench |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108035547A (en) | A kind of electric wire box pre-embedded construction method | |
CN207920091U (en) | A kind of mounting structure of pre-buried wire box | |
CN207633758U (en) | A kind of shear wall pours support device | |
CN206753064U (en) | A kind of aluminum alloy mould plate pull-tab system | |
CN102733596A (en) | Construction method of fair-faced concrete structure node templates | |
CN107968369A (en) | A kind of pre-buried wire box of construction | |
CN107268847A (en) | Assembled exempts to tear concrete blinding and its manufacture method open | |
CN107119803A (en) | A kind of Core Walls Structure wall and beams of concrete connecting node and construction technology | |
CN105958396A (en) | Novel cable fixing apparatus | |
CN206796130U (en) | A kind of concrete mold with reserving hole | |
CN207588394U (en) | A kind of pre-buried wire box | |
CN207609178U (en) | Building element and the suspender coordinated with building element | |
CN204139600U (en) | Switchbox inner support mould | |
CN207376661U (en) | A kind of plugging structure of poured band of outer wall of basement | |
CN207620371U (en) | Collapsible vertical lifting mold device | |
CN207664562U (en) | A kind of pre-buried wire box convenient for construction | |
CN207256490U (en) | A kind of prefabricated component hole-forming device and mould | |
CN209854929U (en) | Precast concrete high strength metal connecting piece | |
CN106245828A (en) | The method of construction of heat insulation integrated body of wall | |
CN207344806U (en) | Assembled architecture wallboard is with die assembly and assembled architecture wallboard mould | |
CN207772039U (en) | A kind of prefabricated components leakage muscle hole mortar leakage prevention rubber stopper | |
CN201474264U (en) | Junction box fixer used on cast-in-place concrete shear wall and framed column | |
CN203284973U (en) | Construction technological structure of reinforced concrete cast-in-place hollow floor | |
CN206822480U (en) | embedded object hook | |
CN204152048U (en) | A kind of honeycomb core carrying anti-floating fastener |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |