CN207919953U - Wall brick wet combining reinforcement structure - Google Patents
Wall brick wet combining reinforcement structure Download PDFInfo
- Publication number
- CN207919953U CN207919953U CN201820281127.9U CN201820281127U CN207919953U CN 207919953 U CN207919953 U CN 207919953U CN 201820281127 U CN201820281127 U CN 201820281127U CN 207919953 U CN207919953 U CN 207919953U
- Authority
- CN
- China
- Prior art keywords
- wall
- wall brick
- joint part
- hook joint
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011449 brick Substances 0.000 title claims abstract description 54
- 230000002787 reinforcement Effects 0.000 title claims abstract description 11
- 206010058109 Hangnail Diseases 0.000 claims abstract description 14
- 239000011083 cement mortar Substances 0.000 claims abstract description 5
- 238000003780 insertion Methods 0.000 claims abstract description 3
- 230000037431 insertion Effects 0.000 claims abstract description 3
- 229910001220 stainless steel Inorganic materials 0.000 claims description 9
- 239000010935 stainless steel Substances 0.000 claims description 9
- 239000000853 adhesive Substances 0.000 abstract description 2
- 230000001070 adhesive effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses wall brick wet combining reinforcement structures, wall brick is pasted onto by cement mortar on wall, hook joint part is between wall and wall brick, the top of hook joint part is fixed by screws on wall, the lower part of hook joint part is equipped with the hangnail card put in inside wall brick, the back side of wall brick is equipped with the skewed slot entered for the hangnail card insertion, and skewed slot is opened in the top at the wall brick back side, and the middle part of hook joint part is between upper and lower two blocks of wall bricks.By the connection of hook joint part and wall, enhance the adhesive force of wall brick and wall, improves the fastness that wall brick is pasted.
Description
Technical field
The utility model is related to cell curtain wall installing areas, and in particular to a kind of wall brick wet combining reinforcement structure.
Background technology
Surface decoration material of the wall brick as wall and ground is typically chosen in construction and decoration, when material is unqualified or applies
Work not at that time, between wall brick and structure sheaf will because paste in conjunction with loosely due to there is hollowing phenomenon.Wall brick hollowing is also classified into part
Occurring hollowing and wall itself between hollowing, corner hollowing, cement layer and wall, there are several situations such as hollowing, in the course of time
Phenomena such as will appear wall brick cracking, falling off.There is the security risk for injuring people by a crashing object in the wall brick for not only influencing beauty, and falling.
Utility model content
The utility model overcomes existing defect to provide a kind of wall brick wet combining reinforcement structure, improves the safety of wall brick fitting.
The utility model is achieved through the following technical solutions:
Wall brick wet combining reinforcement structure, wall brick are pasted onto by cement mortar on wall, hook joint part between wall and wall brick it
Between, the top of the hook joint part is fixed by screws on wall, and the lower part of the hook joint part, which is equipped with, puts in falling inside wall brick
Thorn card, the back side of the wall brick are equipped with the skewed slot entered for the hangnail card insertion, and the skewed slot is opened in the top at the wall brick back side, institute
The middle part of hook joint part is stated between upper and lower two blocks of wall bricks.
The further improvement project of the utility model is that the hook joint part is one piece of stainless steel plate, the top of stainless steel plate
Equipped with multiple screw holes.
The further improvement project of the utility model is that the hangnail card is formed for turned-out 30 ° by stainless steel plate ontology.
The further improvement project of the utility model is that the back side of the hangnail card is equipped with prevents with what the skewed slot offseted
Sliding bur.
The utility model has the following advantages compared with prior art:
The utility model is simple in structure, by the connection of hook joint part and wall, enhances the adhesive force of wall brick and wall, improves
The fastness that wall brick is pasted.In addition, the hook joint part of lower block of wall brick can be covered after the installation of upper block wall brick, by it is this layer by layer
Crimping, is linked to be an entirety by one block of block wall brick, avoids due to falling generation caused by the hollowing possibility of individual wall bricks, ensures
The safety that wall brick is pasted.
Description of the drawings
Fig. 1 is the utility model scheme of installation.
Fig. 2 is hook joint part front view.
Fig. 3 is hook joint part side view.
Specific implementation mode
Wall brick wet combining reinforcement structure as shown in Figure 1, 2, 3, wall brick 1 are pasted onto by cement mortar on wall 2, hook joint part
3 between wall 2 and wall brick 1, and the top of hook joint part 3 is fixed on by screw 4 on wall 2, and the lower part of the hook joint part 3 is set
There is the hangnail card 5 put in inside wall brick 1.The back side of wall brick 1 is equipped with the skewed slot 6 being inserted into for hangnail card 5, and skewed slot 6 is opened in wall brick 1
The top at the back side, the middle part of hook joint part 3 is between upper and lower two blocks of wall bricks 1.
In the present embodiment, hook joint part 3 is one piece of stainless steel plate, and the top of stainless steel plate is equipped with multiple screw holes 7, Neng Gougen
Factually border installation site chooses different screw holes.Hangnail card 5 is formed for turned-out 30 ° by stainless steel plate ontology.The back side of hangnail card 5
Equipped with the anti-skidding bur 8 to offset with skewed slot 6, prevents skewed slot and cause to generate sliding between card.
Installation method:Skewed slot is outputed at the wall brick back side with groover first, the hangnail card of hook joint part is pressed into skewed slot, then wall
Cement mortar is smeared in the brick back side together with hook joint part, and wall is smoothed, corrected later on wall brick, is beaten on construction wall using drill gun
Hole is screwed into swell fixture, and hook joint part is fixed on the wall, and then installs one block of wall brick above successively.
Claims (4)
1. wall brick wet combining reinforcement structure, wall brick(1)It is pasted onto wall by cement mortar(2)On, it is characterized in that:Hook joint part(3)
Between wall(2)And wall brick(1)Between, the hook joint part(3)Top pass through screw(4)It is fixed on wall(2)On, the hook
Fitting(3)Lower part be equipped with put in wall brick(1)Internal hangnail card(5), the wall brick(1)The back side be equipped with supply the hangnail card
(5)The skewed slot of insertion(6), the skewed slot(6)It is opened in wall brick(1)The top at the back side, the hook joint part(3)Middle part between upper
Lower two blocks of wall bricks(1)Between.
2. wall brick wet combining reinforcement structure according to claim 1, it is characterized in that:The hook joint part(3)For one block of stainless steel
The top of plate, stainless steel plate is equipped with multiple screw holes(7).
3. wall brick wet combining reinforcement structure according to claim 2, it is characterized in that:The hangnail card(5)By stainless steel plate
Turned-out 30 ° of ontology forms.
4. wall brick wet combining reinforcement structure according to claim 1 or 2 or 3, it is characterized in that:The hangnail card(5)The back of the body
Face is equipped with and the skewed slot(6)The anti-skidding bur to offset(8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820281127.9U CN207919953U (en) | 2018-02-28 | 2018-02-28 | Wall brick wet combining reinforcement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820281127.9U CN207919953U (en) | 2018-02-28 | 2018-02-28 | Wall brick wet combining reinforcement structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207919953U true CN207919953U (en) | 2018-09-28 |
Family
ID=63601640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820281127.9U Expired - Fee Related CN207919953U (en) | 2018-02-28 | 2018-02-28 | Wall brick wet combining reinforcement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207919953U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109826385A (en) * | 2019-03-14 | 2019-05-31 | 深圳瑞和建筑装饰股份有限公司 | Wall finiss assembled mounting structure and its construction method |
CN115370099A (en) * | 2021-05-17 | 2022-11-22 | 国山石材企业有限公司 | Anti-drop antidetonation fixed subassembly of slim building materials plate body |
-
2018
- 2018-02-28 CN CN201820281127.9U patent/CN207919953U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109826385A (en) * | 2019-03-14 | 2019-05-31 | 深圳瑞和建筑装饰股份有限公司 | Wall finiss assembled mounting structure and its construction method |
CN115370099A (en) * | 2021-05-17 | 2022-11-22 | 国山石材企业有限公司 | Anti-drop antidetonation fixed subassembly of slim building materials plate body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207919953U (en) | Wall brick wet combining reinforcement structure | |
CN203769274U (en) | Horizontal floor tile laying positioning device | |
CN204081199U (en) | A kind of plaster tablet suspended ceiling of novel crack resistence | |
CN103774817A (en) | Special-shaped decorative stone wall surface sticking method | |
CN210421694U (en) | Steel wire mesh connecting device of building element plastering layer | |
CN205712561U (en) | A kind of prefabricated panel | |
CN210395980U (en) | Wall brick dry hanging connection structure | |
CN203604390U (en) | Heat preservation board anchoring nail | |
CN207228439U (en) | A kind of viscous anchor combination ceramic thin plate decoration wall | |
CN202644918U (en) | Back hanging part for mounting of fluorocarbon decoration inorganic single-plate | |
CN206319581U (en) | A kind of wooden veneer template of the steel of strip corner protector | |
CN201687181U (en) | Ceramic tile joint strip and floorboard structure or building structure used in fitting-out works of buildings | |
CN208347248U (en) | A kind of ornamental skirting | |
CN103615090A (en) | Wet pasting and anchoring integrated oversized porcelain plate pasting structure | |
CN100453751C (en) | Side hidden anchoring parts for composite heat-preservation board and installation method thereof | |
CN206655426U (en) | A kind of furring tile | |
CN206128526U (en) | Ceramic tile mosaic module | |
CN110439312A (en) | The construction method of the hanging integrated plate for heat insulation external wall reconstruction of point | |
CN206408766U (en) | The CCA plate rock wool-steel plywood outer heat preservation systems fixed with fixture | |
CN202706402U (en) | Novel wall surface | |
CN203531308U (en) | Novel vitrified tile installation structure | |
CN204960225U (en) | Irregular bits of broken glass is pieced together material and is hung structure futilely | |
CN202882195U (en) | Concrete perforated brick capable of preventing plastering from peeling | |
CN205153417U (en) | Firm subsides wall brick that never drops | |
CN209585332U (en) | Integral heat preservation wall body structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 223005 No. 87-1 East Shenzhen Road, Huaian economic and Technological Development Zone, Jiangsu Patentee after: Jiangsu Hongsheng Construction Group Co.,Ltd. Address before: 223005 No. 87-1 East Shenzhen Road, Huaian economic and Technological Development Zone, Jiangsu Patentee before: JIANGSU HONGSHENG DECORATION ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |