CN207915714U - A kind of new concrete pouring mold steel plate - Google Patents

A kind of new concrete pouring mold steel plate Download PDF

Info

Publication number
CN207915714U
CN207915714U CN201820062694.5U CN201820062694U CN207915714U CN 207915714 U CN207915714 U CN 207915714U CN 201820062694 U CN201820062694 U CN 201820062694U CN 207915714 U CN207915714 U CN 207915714U
Authority
CN
China
Prior art keywords
plate
steel plate
wall
plugboard
inserting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820062694.5U
Other languages
Chinese (zh)
Inventor
朱沛锡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Enping Yongsheng Metal Technology Co Ltd
Original Assignee
Enping Yongsheng Metal Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Enping Yongsheng Metal Technology Co Ltd filed Critical Enping Yongsheng Metal Technology Co Ltd
Priority to CN201820062694.5U priority Critical patent/CN207915714U/en
Application granted granted Critical
Publication of CN207915714U publication Critical patent/CN207915714U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of new concretes to pour mold steel plate, including left plate and right steel plate, the left plate and the opposite side of right steel plate offer the first inserting groove, left plate and the opposite side of right steel plate offer the first sliding groove, the madial wall of first inserting groove is connected to the inner bottom wall of the first sliding groove, one end of the first sliding groove respectively extends to the side surface of left plate and right steel plate, the inner wall of first inserting groove slidably connects the first plugboard, and the side of the first plugboard is fixedly connected with the first slide plate.The new concrete pours mold steel plate, achieve the effect that be fixedly connected left plate and right steel plate, after left plate is aligned with right steel plate, first slide plate drives the inner wall grafting with the first inserting groove and the first sliding groove respectively of the first plugboard, and then connect left plate with right Interal fixation, it is easy to be added to solve the problems, such as that the connection of normal concrete mold steel plate fixes time-consuming and welding using bolt.

Description

A kind of new concrete pouring mold steel plate
Technical field
The utility model is related to steel plate technical field, specially a kind of new concrete pours mold steel plate.
Background technology
Steel plate is to use pouring molten steel, tabular steel made of being suppressed after cooling.It is tabular, rectangle, it can directly roll System is sheared by wide strip.Steel plate is by thickness point, sheet metal<4 millimeters(It is most 0.2 millimeter thin), 4 ~ 60 millimeters of medium plate, 60 ~ 115 millimeters of super-thick steel plate.Steel plate divides hot rolling and cold rolling by rolling point.
The width of thin plate is 500 ~ 1500 millimeters;Thick width is 600 ~ 3000 millimeters.Thin plate is had common by steel grade point Steel, high-quality steel, steel alloy, spring steel, stainless steel, tool steel, heat resisting steel, bearing steel, silicon steel and ingot iron thin plate etc.;By special Industry purposes point, there is oil drum plate, enamel plate, projectile-resistant plate etc.;By Coating layer point, there are zinc coated sheet, dry plate, plating Flat lead, plastic clad sheet steel etc..
Most of steel plate used in concrete casting mold at present is all to fix or be welded by bolt, and make It is fixed with bolt, bolt could be carried out by needing after stablizing steel plate using tool fixes, and being bolted has the shortcomings that take, Welding equipment is then needed using welding simultaneously, is virtually increased manufacturing cost, and welding equipment needs power supply, for open air Electricity consumption difficulty is will result in for remote districts, so a kind of new concrete is needed to pour mold steel plate.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides a kind of new concrete pouring mold steel plate, solves The connection of normal concrete mold steel plate is fixed using bolt takes and welds the problem of being easy to increase cost.
(Two)Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of new concrete pouring Mold steel plate, including left plate and right steel plate, the left plate and the opposite side of right steel plate offer the first inserting groove, institute It states left plate and the opposite side of right steel plate offers the first sliding groove, the madial wall of first inserting groove and the first sliding groove Inner bottom wall is connected to, and one end of the first sliding groove respectively extends to the side surface of left plate and right steel plate.
The inner wall of first inserting groove slidably connects the first plugboard, and the side of first plugboard is fixedly connected There are the first slide plate, the surface of first slide plate and the inner wall of the first sliding groove to be slidably connected, the side difference of first slide plate The second inserting groove and second sliding slot are offered, the madial wall of second inserting groove is connected to the inner bottom wall of second sliding slot, described One end of second sliding slot extends to the side of the first slide plate, and the inner wall sliding plug of second inserting groove has the second plugboard, The side of second plugboard is fixedly connected with the second slide plate, and the surface of second slide plate and the inner wall of second sliding slot slide Connection, the side of second slide plate is fixedly connected with reinforcing plate.
Preferably, the left plate offers location hole close to the opposite side of right steel plate, and the right steel plate is close to left steel The opposite side of plate is fixedly connected with locating rod.
Preferably, the inner wall sliding plug on the surface of the locating rod and location hole, the surface of the locating rod and positioning The tapered shape of the inner wall in hole, the surface of the locating rod is adapted with the inner wall of location hole.
Preferably, the trapezoidal shape of the inner wall of first inserting groove and the surface of the first plugboard, first grafting The inner wall of slot is adapted with the surface of the first plugboard.
Preferably, the trapezoidal shape of the inner wall of second inserting groove and the surface of the second plugboard, second grafting The inner wall of slot is adapted with the surface of the second plugboard.
Preferably, the thread surface of the reinforcing plate is connected with fixing bolt, and one end of the fixing bolt, which extends to, to be added Another surface of strong plate.
(Three)Advantageous effect
The utility model provides a kind of new concrete pouring mold steel plate, has following advantageous effect:
(1), the new concrete pour mold steel plate, by be arranged the first inserting groove inner wall slidably connect first insert The side of fishplate bar, the first plugboard is fixedly connected with the first slide plate, and the surface of the first slide plate and the inner wall sliding of the first sliding groove connect It connects, has achieved the effect that be fixedly connected left plate and right steel plate, after left plate is aligned with right steel plate, the first slide plate drives The inner wall grafting with the first inserting groove and the first sliding groove respectively of first plugboard, and then left plate is connect with right Interal fixation, It is easy to increase cost to solve the problems, such as that the connection of normal concrete mold steel plate fixes time-consuming and welding using bolt.
(2), the new concrete pour mold steel plate, by be arranged the second inserting groove inner wall sliding plug have second insert The side of fishplate bar, the second plugboard is fixedly connected with the second slide plate, and the surface of the second slide plate and the inner wall sliding of second sliding slot connect It connects, the side of the second slide plate is fixedly connected with reinforcing plate, and the thread surface of reinforcing plate is connected with fixing bolt, has reached to left steel The effect that plate and right steel plate are reinforced, the second slide plate drive the second plugboard and the second inserting groove sliding plug, fixing bolt One end contact jack-up with left plate and right steel plate respectively so that left plate and right surface of steel plate uniform force avoid left plate There is discontinuity with the junction of right steel plate and leads to the problem of crack occur.
(3), the new concrete pour mold steel plate, by be arranged locating rod surface and location hole inner wall slide insert It connects, the surface of locating rod and the tapered shape of the inner wall of location hole, the surface of locating rod is adapted with the inner wall of location hole, reaches The effect of pre-connection, the surface of locating rod and the inner wall sliding plug of location hole are carried out to left plate and right steel plate, can be made The medial surface junction for obtaining left plate and right steel plate is kept on the same face, facilitates the first plugboard that it is fixed, to solve Normal concrete mold steel plate of having determined connection fixes the problem of time-consuming and welding is easy to be added to using bolt.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model reinforcing plate structure front view.
In figure:1 left plate, 2 right steel plates, 3 first inserting grooves, 4 the first sliding grooves, 5 first plugboards, 6 first slide plates, 7 Spiral shell is fixed in two inserting grooves, 8 second sliding slots, 9 second plugboards, 10 second slide plates, 11 reinforcing plates, 12 location holes, 13 locating rods, 14 Bolt.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of new concrete pouring mold steel plate, packet Left plate 1 and right steel plate 2 are included, left plate 1 offers location hole 12 close to the opposite side of right steel plate 2, and right steel plate 2 is close to left steel The opposite side of plate 1 is fixedly connected with locating rod 13, the surface of locating rod 13 and the inner wall sliding plug of location hole 12, locating rod 13 surface and the tapered shape of the inner wall of location hole 12, the surface of locating rod 13 is adapted with the inner wall of location hole 12, passes through The surface of locating rod 13 and the inner wall sliding plug of location hole 12 are set, and the surface of locating rod 13 is in the inner wall of location hole 12 The surface of cone-shaped, locating rod 13 is adapted with the inner wall of location hole 12, has been reached and has been connected in advance to left plate 1 and right steel plate 2 The effect connect, the surface of locating rod 13 and the inner wall sliding plug of location hole 12 enable to the interior of left plate 1 and right steel plate 2 Side junction is kept on the same face, facilitates the first plugboard 5 that it is fixed, to solve normal concrete mould steel Plate connection is fixed using bolt to be taken and the problem of welding is easy to be added to, left plate 1 and the opposite side of right steel plate 2 open up There is the first inserting groove 3, left plate 1 and the opposite side of right steel plate 2 offer the first sliding groove 4, the madial wall of the first inserting groove 3 It is connected to the inner bottom wall of the first sliding groove 4, one end of the first sliding groove 4 respectively extends to the side surface of left plate 1 and right steel plate 2.
The inner wall of first inserting groove 3 slidably connects the first plugboard 5, the inner wall of the first inserting groove 3 and the first plugboard 5 The trapezoidal shape in surface, the inner wall of the first inserting groove 3 is adapted with the surface of the first plugboard 5, the side of the first plugboard 5 It is fixedly connected with the first slide plate 6, the surface of the first slide plate 6 and the inner wall of the first sliding groove 4 are slidably connected, by the way that the first grafting is arranged The inner wall of slot 3 slidably connects the first plugboard 5, and the side of the first plugboard 5 is fixedly connected with the first slide plate 6, the first slide plate 6 Surface and the inner wall of the first sliding groove 4 be slidably connected, achieved the effect that be fixedly connected left plate 1 and right steel plate 2, it is left After steel plate 1 is aligned with right steel plate 2, the first slide plate 6 drive the first plugboard 5 respectively in the first inserting groove 3 and the first sliding groove 4 Wall grafting, and then left plate 1 is fixedly connected with right steel plate 2, use spiral shell to solve the connection of normal concrete mold steel plate Bolt fixes the problem of time-consuming and welding is easy to be added to, and the side of the first slide plate 6 offers the second inserting groove 7 and second cunning respectively The madial wall of slot 8, the second inserting groove 7 is connected to the inner bottom wall of second sliding slot 8, and one end of second sliding slot 8 extends to the first slide plate 6 Side, the inner wall sliding plug of the second inserting groove 7 has the second plugboard 9, the inner wall of the second inserting groove 7 and the second plugboard 9 The trapezoidal shape in surface, the inner wall of the second inserting groove 7 is adapted with the surface of the second plugboard 9, the side of the second plugboard 9 It is fixedly connected with the second slide plate 10, the surface of the second slide plate 10 and the inner wall of second sliding slot 8 are slidably connected, the side of the second slide plate 10 Face is fixedly connected with reinforcing plate 11, and the thread surface of reinforcing plate 11 is connected with fixing bolt 14, and one end of fixing bolt 14 extends To another surface of reinforcing plate 11, the inner wall sliding plug by the way that the second inserting groove 7 is arranged has the second plugboard 9, the second grafting The side of plate 9 is fixedly connected with the second slide plate 10, and the surface of the second slide plate 10 and the inner wall of second sliding slot 8 are slidably connected, and second The side of slide plate 10 is fixedly connected with reinforcing plate 11, and the thread surface of reinforcing plate 11 is connected with fixing bolt 14, has reached to a left side The effect that steel plate 1 and right steel plate 2 are reinforced, the second slide plate 10 drive the second plugboard 9 and 7 sliding plug of the second inserting groove, One end of fixing bolt 14 contacts jack-up with left plate 1 and right steel plate 2 respectively so that left plate 1 and 2 surface stress of right steel plate are equal It is even, avoid the problem that left plate 1 and the junction of right steel plate 2 discontinuity occur and lead to occur crack, to solve The connection of normal concrete mold steel plate fixes the problem of time-consuming and welding is easy to be added to using bolt.
In conclusion the new concrete pours mold steel plate, the inner wall by the way that the first inserting groove 3 is arranged slidably connects The side of first plugboard 5, the first plugboard 5 is fixedly connected with the first slide plate 6, surface and the first sliding groove 4 of the first slide plate 6 Inner wall is slidably connected, and has achieved the effect that be fixedly connected left plate 1 and right steel plate 2, left plate 1 is aligned with right steel plate 2 Afterwards, the first slide plate 6 drives the inner wall grafting with the first inserting groove 3 and the first sliding groove 4 respectively of the first plugboard 5, and then by left steel Plate 1 is fixedly connected with right steel plate 2, and the inner wall sliding plug by the way that the second inserting groove 7 is arranged has the second plugboard 9, the second grafting The side of plate 9 is fixedly connected with the second slide plate 10, and the surface of the second slide plate 10 and the inner wall of second sliding slot 8 are slidably connected, and second The side of slide plate 10 is fixedly connected with reinforcing plate 11, and the thread surface of reinforcing plate 11 is connected with fixing bolt 14, has reached to a left side The effect that steel plate 1 and right steel plate 2 are reinforced, the second slide plate 10 drive the second plugboard 9 and 7 sliding plug of the second inserting groove, One end of fixing bolt 14 contacts jack-up with left plate 1 and right steel plate 2 respectively so that left plate 1 and 2 surface stress of right steel plate are equal It is even, avoid the problem that left plate 1 and the junction of right steel plate 2 discontinuity occur and lead to occur crack, it is fixed by being arranged The inner wall sliding plug on the surface and location hole 12 of position bar 13, the surface of locating rod 13 and the inner wall of location hole 12 are tapered The surface of shape, locating rod 13 is adapted with the inner wall of location hole 12, has been reached and has been carried out pre-connection to left plate 1 and right steel plate 2 Effect, the surface of locating rod 13 and the inner wall sliding plug of location hole 12, enable to the medial surface of left plate 1 and right steel plate 2 Junction is kept on the same face, facilitates the first plugboard 5 that it is fixed, to solve normal concrete mold steel plate company It connects and fixes the problem of time-consuming and welding is easy to be added to using bolt.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of new concrete pours mold steel plate, including left plate(1)With right steel plate(2), it is characterised in that:The left steel Plate(1)With right steel plate(2)Opposite side offers the first inserting groove(3), the left plate(1)With right steel plate(2)Relatively Side offer the first sliding groove(4), first inserting groove(3)Madial wall and the first sliding groove(4)Inner bottom wall connection, The first sliding groove(4)One end respectively extend to left plate(1)With right steel plate(2)Side surface;
First inserting groove(3)Inner wall slidably connect the first plugboard(5), first plugboard(5)Side it is solid Surely it is connected with the first slide plate(6), first slide plate(6)Surface and the first sliding groove(4)Inner wall be slidably connected, described first Slide plate(6)Side offer the second inserting groove respectively(7)And second sliding slot(8), second inserting groove(7)Madial wall with Second sliding slot(8)Inner bottom wall connection, the second sliding slot(8)One end extend to the first slide plate(6)Side, described second Inserting groove(7)Inner wall sliding plug have the second plugboard(9), second plugboard(9)Side be fixedly connected with second Slide plate(10), second slide plate(10)Surface and second sliding slot(8)Inner wall be slidably connected, second slide plate(10)'s Side is fixedly connected with reinforcing plate(11).
2. a kind of new concrete according to claim 1 pours mold steel plate, it is characterised in that:The left plate(1) Close to right steel plate(2)Opposite side offers location hole(12), the right steel plate(2)Close to left plate(1)Opposite side It is fixedly connected with locating rod(13).
3. a kind of new concrete according to claim 2 pours mold steel plate, it is characterised in that:The locating rod(13) Surface and location hole(12)Inner wall sliding plug, the locating rod(13)Surface and location hole(12)Inner wall be in cone Shape, the locating rod(13)Surface and location hole(12)Inner wall be adapted.
4. a kind of new concrete according to claim 1 pours mold steel plate, it is characterised in that:First inserting groove (3)Inner wall and the first plugboard(5)The trapezoidal shape in surface, first inserting groove(3)Inner wall and the first plugboard (5)Surface be adapted.
5. a kind of new concrete according to claim 1 pours mold steel plate, it is characterised in that:Second inserting groove (7)Inner wall and the second plugboard(9)The trapezoidal shape in surface, second inserting groove(7)Inner wall and the second plugboard (9)Surface be adapted.
6. a kind of new concrete according to claim 1 pours mold steel plate, it is characterised in that:The reinforcing plate(11) Thread surface be connected with fixing bolt(14), the fixing bolt(14)One end extend to reinforcing plate(11)Another table Face.
CN201820062694.5U 2018-01-15 2018-01-15 A kind of new concrete pouring mold steel plate Expired - Fee Related CN207915714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820062694.5U CN207915714U (en) 2018-01-15 2018-01-15 A kind of new concrete pouring mold steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820062694.5U CN207915714U (en) 2018-01-15 2018-01-15 A kind of new concrete pouring mold steel plate

Publications (1)

Publication Number Publication Date
CN207915714U true CN207915714U (en) 2018-09-28

Family

ID=63604413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820062694.5U Expired - Fee Related CN207915714U (en) 2018-01-15 2018-01-15 A kind of new concrete pouring mold steel plate

Country Status (1)

Country Link
CN (1) CN207915714U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110774426A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Surface treatment method for glass fiber reinforced plastic mold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110774426A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Surface treatment method for glass fiber reinforced plastic mold
CN110774426B (en) * 2019-10-30 2021-06-11 中国建筑第八工程局有限公司 Surface treatment method for glass fiber reinforced plastic mold

Similar Documents

Publication Publication Date Title
CN207915714U (en) A kind of new concrete pouring mold steel plate
CN106862508B (en) A kind of arc-shaped narrow copper plate crystallizer
CN207181124U (en) A kind of category sampling mould
CN110170626B (en) Casting-rolling precooling pouring device
CN206967809U (en) A kind of mould thermocouple stationary fixture
CN210208580U (en) Cast-rolling precooling pouring device
CN201760575U (en) Cooling water seam of shaped blank continuous casting crystallizer
CN201279661Y (en) Composite joint of different material
CN208162592U (en) A kind of lead-acid accumulator cast welded mold
CN206667574U (en) A kind of composite self-heat-insulation concrete building block of predetermined coupling parts
CN207655873U (en) Dirt clears up scraper in a kind of crystallizer angle seam
CN206614014U (en) Get rid of band chill roll system
CN2652559Y (en) Uniform cooling high efficiency crystalizer for steelmaking continuous casting
CN209424833U (en) A kind of new steel plate butt welding exactitude position splicing apparatus
CN220116579U (en) Copper steel composite cooling strip
CN204602332U (en) A kind of discharge grid plate for screen analysis material
CN203621443U (en) Casting tube mounting structure for sprue cup of roller centrifugal-casting die
CN205242275U (en) Template is used in construction of pier mound seam
CN216325010U (en) Novel improved nano ceramic inner sleeve and annular cooling material cup
CN209531721U (en) Eliminate the edge roller of micro alloyed steel slab trapezoid cross section defect
CN217953148U (en) Microcrystal plate
CN213236507U (en) Movable duplex elbow
CN207823902U (en) A kind of Novel connection casting machine crystallizer foot roll and two, rear portion roller-way
CN207372274U (en) A kind of metal continuous cast fast sprue-replacing device
CN202162342U (en) Outer mold core for casting butterfly valve bodies

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20210115

CF01 Termination of patent right due to non-payment of annual fee