CN205242275U - Template is used in construction of pier mound seam - Google Patents

Template is used in construction of pier mound seam Download PDF

Info

Publication number
CN205242275U
CN205242275U CN201521098793.1U CN201521098793U CN205242275U CN 205242275 U CN205242275 U CN 205242275U CN 201521098793 U CN201521098793 U CN 201521098793U CN 205242275 U CN205242275 U CN 205242275U
Authority
CN
China
Prior art keywords
gap
pier
wedge
template
otic placode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521098793.1U
Other languages
Chinese (zh)
Inventor
王祥军
谢亮
杨波
蒋平文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Wuxin Steel Formwork Co Ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN201521098793.1U priority Critical patent/CN205242275U/en
Application granted granted Critical
Publication of CN205242275U publication Critical patent/CN205242275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a template is used in construction of pier mound seam, including foundation forms (1), still include a lesson or multisection gap template (2), same a lesson gap template (2) by four gap template unit (20) use two liang for two sets of component the about a set of being divided into, every group is two gap template unit (20) between the inner round pin hub connection that adopts, the outer end with foundation forms (1) be whole through bolted connection, wedge (3) are installed and are stitched two of every group between the both sides in the mound gap template unit (20) between, two of every group gap template unit (20) between outer end fixed mounting have full cycle crimp mechanism (4), full cycle crimp mechanism (4) withstand wedge (3) in order to prevent wedge (3) not hard up. The utility model relates to a template is used in construction of pier mound seam that is used for closely spaced simple structure in 400mm between two pier shafts, use convenient operation, the shaping is effectual, production efficiency is high.

Description

A kind of bridge pier pier seam construction template
Technical field
The utility model relates to a kind of template, particularly relates to a kind of bridge pier pier seam construction mouldPlate.
Background technology
In high-speed railway, construction of the highway process of construction, have on a kind of Pier Design only by twoVertical pier stud composition, these two detached pier intercolumniation spacing are less, and workman there is no working space,Cause template removing and formwork erection all very difficult. When such pier stud of tradition construction, as use steel formThe mode that construction generally adopts two pier studs to pour into a mould respectively completes, in the time of second pier stud of castToo little because of gap between pier seam, workman operating space is little, formwork assembling and disassembling difficulty, and efficiency of construction is veryLow.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of between two pier shaftsSpacing be less than 400mm simple in structure, use easy to operate, good forming effect, production efficiencyHigh bridge pier pier seam construction template.
In order to solve the problems of the technologies described above, the bridge pier pier seam construction mould that the utility model providesPlate, comprises foundation forms, also comprises a joint or more piece gap template, the gap described in same jointTemplate by four gap modular units taking between two as a component as left and right two groups form, two every groupThe inner between described gap modular unit adopts bearing pin to connect, outer end and described basic mouldPlate is bolted as entirety, and wedge is installed on two institutes of every group between pier seam both sidesBetween the gap modular unit of stating, the outer end between the gap modular unit described in two of every groupBe installed with stopping mechanism, described stopping mechanism withstands described wedge with described in preventingWedge loosening.
Between gap modular unit described in two groups two in left and right by the knot of mother-son mouth is setConfiguration formula mortar leakage prevention and faulting of slab ends.
Described gap modular unit comprise panel, reinforcement, end angle steel, pin joint otic placode andFixing otic placode, described reinforcement is located at the back side of described panel, and described panel is by outsideOblique line section and the straightway composition of inner side, described in described end angle steel and pin joint otic placode are located atThe end of straightway, described fixing otic placode is located at the outer end of described oblique line section, described inPin joint otic placode on offer mounting hole, described stopping mechanism is arranged on described fixing otic placodeUpper, the inner between the gap modular unit described in two every group is by described pin joint otic placodeThe described mounting hole offering adopts bearing pin to connect.
On gap modular unit described in seam, be provided with block, so that the peace of described wedgeFill and prevent to vibrate and cause described wedge to fall in casting process.
Described wedge comprises trapezoidal plate, be located at the retaining seat on the large end of described trapezoidal plateWith the rectangular shaft of small end front end that is located at described trapezoidal plate, described rectangular shaft end is tipShape.
Described stopping mechanism comprises holder and is arranged on the retaining spiral shell on described holderBar.
Described stopping mechanism is designed with adjustable screw thread, the fine setting that guarantee can be suitable.
Adopt bridge pier pier seam construction template, foundation forms and the gap template of technique schemeBe bolted as entirety, wedge is installed between the gap template of pier seam both sides, forSupport gap template, the position that can cross adjustment wedge makes template reach design size requirement, onlyMove back the gap template of mechanism and both sides and fix, and withstand wedge, prevent that wedge is loosening. CausePier seam mid portion is two parallel surfaces, so every gap modular unit comprises oblique line section and straightLine segment, does not have pattern draft when the template demoulding of straightway, is difficult to the demoulding, therefore at pin joint earOn plate, offer mounting hole, taking off after wedge, the template of both sides, gap can longitudinally be unclamped,Depart from concrete surface. Left and right two groups of gap modular units between by the structure shape of mother-son mouth is setFormula mortar leakage prevention and faulting of slab ends.
Wedge comprises retaining seat, trapezoidal plate and rectangular shaft, and the rectangular shaft end of wedge is pointHead, rectangular shaft one end of wedge snap in pier seam both sides two gap templates end angle steel itBetween, for ensureing the relative position of two template mid portions, the other end by stopping mechanism withGap template unit side portion is fixed, and is stuck between two gap templates, for supporting the seam of both sidesGap template.
Stopping mechanism comprises holder and retaining screw rod, and described holder is by bearing pin and both sidesGap template is fixed, and withstands wedge by retaining screw rod, prevents that wedge is loosening.
On the modular unit of gap, be provided with block so that the installation of wedge and prevent castIn process, vibrate and cause wedge to fall.
Described stopping mechanism is designed with adjustable screw thread, the fine setting that guarantee can be suitable.
Bridge pier pier seam construction template, easy to operate, good forming effect, the pier stud of both sides, gapCan build simultaneously, greatly improve production efficiency, reduce construction cost.
In sum, the utility model is that one is less than 400mm for spacing between two pier shaftsSimple in structure, use easy to operate, good forming effect, bridge pier pier seam that production efficiency is high to executeWork template.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation of gap modular unit.
Fig. 3 is the structural representation of wedge.
Fig. 4 is the structural representation of stopping mechanism.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Referring to Fig. 1, bridge pier pier seam construction template, comprises foundation forms 1, also comprises a jointOr more piece gap template 2, the gap template 2 described in same joint is by four gap modular units 20Taking between two as a component is as the two groups of compositions in left and right, between every group of two gap modular units 20The inner bearing pin that adopts connects, and outer end and foundation forms 1 are bolted as entirety, wedgeBetween the 3 two gap modular units 20 of every group that are installed between pier seam both sides, every group twoOuter end between piece gap modular unit 20 is installed with stopping mechanism 4, stopping mechanism 4Withstand wedge 3 loosening to prevent wedge 3.
Preferably, between two gap modular units 20 of two groups of left and right by mother-son mouth is setVersion mortar leakage prevention and faulting of slab ends.
Referring to Fig. 2, gap modular unit 20 comprises panel 21, reinforcement 22, end angle steel23, pin joint otic placode 24 and fixing otic placode 25, reinforcement 22 is located at the back side of panel 21, facePlate 21 is made up of the oblique line section 28 in outside and the straightway 27 of inner side, end angle steel 23 and pinEar connecting plate 24 is located at the end of straightway 27, and fixing otic placode 25 is located at the outer end of oblique line section 28Portion, offers mounting hole 29 on pin joint otic placode 24, stopping mechanism 4 is arranged on fixing otic placode 25Upper, the inner between every group of two gap modular units 20 is by offering on pin joint otic placode 24Described mounting hole 29 adopt bearing pin connect.
On the described gap modular unit 20 of seam, be provided with block 26 so that wedge 3Installation and prevent from vibrating and causing wedge 3 to fall in casting process.
Referring to Fig. 3, wedge 3 comprises trapezoidal plate 32, be located on the large end of trapezoidal plate 32Retaining seat 31 and be located at the rectangular shaft 33 of the small end front end of trapezoidal plate 32, rectangular shaft 33 endsFor pointed shape.
Referring to Fig. 4, stopping mechanism 4 comprises holder 41 and is arranged on stopping on holder 41Move back screw rod 42. Holder 41 is by the fixing otic placode of the gap modular unit 20 of bearing pin and both sides25 are fixedly connected with, and withstand wedge 3 by retaining screw rod 42, prevent that wedge 3 is loosening.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, bridge pier pier seam provided by the utility model constructionBy template, foundation forms 1 is connected to entirety with gap template 2 by connecting bolt, by controlThe relative position of wedge 3 processed makes template reach design size; Stopping mechanism 4 is installed on gapIn template 2, so that prevent from vibrating and causing wedge 3 to slide in casting process backward.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, bridge pier pier seam provided by the utility model constructionBy the using method of template be: when formwork erection, gap template 2 is first installed, then foundation forms is installed1, foundation forms 1 and gap template 2 are bolted as entirety, then wedge 3 is installed,Make template reach design size by the relative position of controlling wedge 3, then retaining machine is installedStructure 4, adjusts template, makes template reach casting condition;
While receiving mould, first remove foundation forms 1 and establish with the connecting bolt utilization lifting of gap template 2For hanging away foundation forms 1, then remove stopping mechanism 4, then remove wedge 3, finally utilizeExternal force is removed gap template 2.

Claims (7)

1. a bridge pier pier seam construction template, comprises foundation forms (1), it is characterized in that: alsoComprise a joint or more piece gap template (2), the gap template (2) described in same joint is by four gapsModular unit (20) taking between two as a component as left and right two groups of compositions, the gap described in two every groupThe inner between modular unit (20) adopts bearing pin to connect, outer end and described foundation forms (1)Be bolted as entirety, wedge (3) is installed between pier seam both sides every group twoBetween described gap modular unit (20), the gap modular unit (20) described in two of every groupBetween outer end be installed with stopping mechanism (4), described stopping mechanism (4) withstands describedWedge (3) is loosening to prevent described wedge (3).
2. bridge pier pier seam construction template according to claim 1, is characterized in that: a left sideBetween gap modular unit (20) described in two of right two groups by the structure of mother-son mouth is setForm mortar leakage prevention and faulting of slab ends.
3. bridge pier pier seam construction template according to claim 1 and 2, is characterized in that:Described gap modular unit (20) comprise panel (21), reinforcement (22), end angle steel (23),Pin joint otic placode (24) and fixing otic placode (25), described reinforcement (22) is located at described panel(21) the back side, described panel (21) is by the oblique line section (28) in outside and the straightway of inner side(27) composition, described end angle steel (23) and pin joint otic placode (24) are located at described straightway(27) end, described fixing otic placode (25) is located at the outer end of described oblique line section (28),On described pin joint otic placode (24), offer mounting hole (29), described stopping mechanism (4) is installedUpper at described fixing otic placode (25), between the gap modular unit (20) described in two every groupInner by described mounting hole (29) the employing pin offering on described pin joint otic placode (24)Axle connects.
4. bridge pier pier seam construction template according to claim 3, is characterized in that: instituteOn the gap modular unit (20) of stating, be provided with block (26), so that described wedge (3)Installation and prevent from vibrating in casting process and cause described wedge (3) to fall.
5. bridge pier pier seam construction template according to claim 1 and 2, is characterized in that:Described wedge (3) comprises trapezoidal plate (32), is located on the large end of described trapezoidal plate (32)Retaining seat (31) and be located at the rectangular shaft (33) of the small end front end of described trapezoidal plate 32, instituteRectangular shaft (33) end of stating is pointed shape.
6. bridge pier pier seam construction template according to claim 1 and 2, is characterized in that:Described stopping mechanism (4) comprises holder (41) and is arranged on described holder (41)Retaining screw rod (42).
7. bridge pier pier seam construction template according to claim 6, is characterized in that: instituteThe stopping mechanism (4) of stating is provided with adjustable screw thread, the fine setting that guarantee can be suitable.
CN201521098793.1U 2015-12-24 2015-12-24 Template is used in construction of pier mound seam Active CN205242275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521098793.1U CN205242275U (en) 2015-12-24 2015-12-24 Template is used in construction of pier mound seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521098793.1U CN205242275U (en) 2015-12-24 2015-12-24 Template is used in construction of pier mound seam

Publications (1)

Publication Number Publication Date
CN205242275U true CN205242275U (en) 2016-05-18

Family

ID=55941355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521098793.1U Active CN205242275U (en) 2015-12-24 2015-12-24 Template is used in construction of pier mound seam

Country Status (1)

Country Link
CN (1) CN205242275U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105463995A (en) * 2015-12-24 2016-04-06 湖南中铁五新钢模有限责任公司 Formwork for bridge pier seam construction and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105463995A (en) * 2015-12-24 2016-04-06 湖南中铁五新钢模有限责任公司 Formwork for bridge pier seam construction and use method thereof
CN105463995B (en) * 2015-12-24 2017-01-18 湖南中铁五新钢模有限责任公司 Formwork for bridge pier seam construction and use method thereof

Similar Documents

Publication Publication Date Title
CN208844916U (en) Assembled hoard strip hangs mould
CN106917505A (en) A kind of transparent plastic template for building and preparation method thereof
CN205242275U (en) Template is used in construction of pier mound seam
CN105463995B (en) Formwork for bridge pier seam construction and use method thereof
CN204570393U (en) A kind of double-block type bed plate limited impression builds servicing unit
CN202831617U (en) Large-scale integrated steel template
CN209469000U (en) Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate
CN104912333B (en) wall construction system and construction method
CN104015261B (en) Combined, scalable prefabricated concrete element built-in fitting positions loose tool and construction technology thereof
CN209195024U (en) It is a kind of convenient for location and installation and the engineering template of disassembly
CN212802523U (en) Novel formwork support device for building construction
CN210947751U (en) Cast in situ concrete assembled template bearing structure
CN208415909U (en) A kind of plastic-steel composite construction engineering pattern plate
CN209523465U (en) A kind of castable block wall pours device
CN208088138U (en) A kind of suitable bridge is to large size, thin walled hollow vase pier steel form
CN207526113U (en) A kind of reinforcing mold of windowsill coping formwork
CN206170290U (en) C type cement template convenient to form removal
CN204869174U (en) A construction mould that is used for limekiln to hang jar pouring material
CN206186038U (en) Connecting and fixing device
CN205291221U (en) Prefabricated mould of concrete guardrail
CN210508370U (en) Auxiliary device is pour to constructional column
CN207314847U (en) Building engineering shuttering fixing device
CN109208890A (en) Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate
CN207048240U (en) Assembling type outer wall plate positioning connection structure in a kind of concrete residence
CN209579980U (en) A kind of concrete segment casting combing all-in-one machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant