CN207899165U - Flue gas desulfurization and dedusting spray equipment - Google Patents
Flue gas desulfurization and dedusting spray equipment Download PDFInfo
- Publication number
- CN207899165U CN207899165U CN201721435644.9U CN201721435644U CN207899165U CN 207899165 U CN207899165 U CN 207899165U CN 201721435644 U CN201721435644 U CN 201721435644U CN 207899165 U CN207899165 U CN 207899165U
- Authority
- CN
- China
- Prior art keywords
- spraying layer
- spray
- layer
- flue gas
- nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses flue gas desulfurization and dedusting spray equipments, including the first spraying layer and the second spraying layer, first spraying layer and the second spraying layer are staggered in vertical direction, first spraying layer and the second spraying layer are equipped with several nozzles, the projection of the nozzle of the nozzle of first spraying layer and the second spraying layer in the horizontal plane is uniformly distributed, and nozzle is misaligned in the vertical direction.The utility model has the advantages that:From the Plane Angle of single layer spraying layer, the arrangement of nozzles of each layer spraying layer is uniform sequential, sprayed slurry covering is uniform;From the space angle of entire spray equipment, arrangement of nozzles inside spray thrower is uniform sequential, sprayed slurry covering is uniform.So that the sprayed slurry inside the spray thrower of the sprayed slurry uniform fold of spraying layer, entire spray equipment also can uniform fold.The sprayed slurry drop being evenly distributed can make contact of the slurries with flue gas more uniform, increase the contact area of gas-liquid two-phase, while can also play the current balance function to flue gas.
Description
Technical field
The utility model is related to flue gas desulfurization and dedusting spray equipments.
Background technology
Major part power source in China's fires the emphasis that electric industry is Air Pollution Control in coal unit power industry at present
Industry.Existing most of coal units remove the sulfur dioxide in flue gas using wet fuel gas desulfurizing technology.Flue gas desulfurization is sprayed
Shower device is one of core equipment the most key in wet fuel gas desulfurizing technology system.Due to the cleaning function of liquid, de-
While except sulfur dioxide, existing conventional flue gas desulfurization sprinkle device can normally only realize the collaboration dedusting of 50%-70%
Efficiency.In September, 2014, National Development and Reform Committee, Chinese Ministry of Environmental Protection, the publication of three ministries and commissions of Bureau of Energy《Coal electricity energy-saving and emission-reduction upgrade takes action with transformation
Plan (2014-2020)》, propose to implement minimum discharge requirement in atmosphere pollution priority control area, i.e., in butt, benchmark oxygen
Under the conditions of content 6%, it is desirable that sulfur dioxide and granular material discharged concentration are respectively no higher than 35mg/Nm3And 5mg/Nm3.This requires
Flue gas desulfurization sprinkle device has higher, more stable desulfurization and dust removal performance.
Existing conventional flue gas desulfurization sprinkle device is largely the spraying layer by being layered setting in desulfuration spray tower tower body
Composition, every layer of spraying layer include that 1~2 spray is responsible for, separates several spray branch pipes from spray supervisor, from spray branch pipe both sides
Separate nozzle.Spray branch pipe is made of wear-resisting glass fibre reinforced plastic.There are two types of spray supervisor is general, one is the resistance to of reducing
Ground glass steel pipe, another kind are the line with rubber carbon steel pipes of not undergauge.Spray supervisor uses the abrasion-resistance glass steel pipe of reducing, due to glass
The elasticity modulus of Steel material is smaller, insufficient rigidity, it is more difficult to while conveying effect and supporting role are taken into account, therefore spray supervisor most
Large span is usually no more than 6 meters.It is more than 6 meters of spray supervisor for length, generally requires by being horizontally fixed on desulfurization spray
Supporting beam in tower tower body is supported, and supporting beam is at a distance from nozzle relatively close to and the appearance and size of supporting beam is generally all
It is larger, it is easy to be washed away by the short distance of sprayed slurry, leads to abrasion, fracture.Spray supervisor uses the line with rubber carbon steel of not undergauge
Pipe, the pressure sprayed in supervisor are gradually reduced along slurries flow direction, cause the grout distribution sprayed out uneven, meanwhile, from
Also easily there is the problem of fouling and clogging in the nozzle that spray supervisor end separates.
Large-sized spray supervisor is (such as:Caliber is more than DN800) it is highly detrimental to being evenly arranged for nozzle, influence spray slurry
The uniformity of liquid covering.If Fig. 1 is existing conventional flue gas desulfurization sprinkle device partial schematic diagram, close to spray supervisor both sides
Nozzle, its spacing H are more much bigger than the spacing h of other nozzles, cause the slurries coverage rate for spraying main pipe area too low, are easy production
The slurries covering of raw flue gas escape route, whole cross section is uneven, reduces desulfurization and efficiency of dust collection.
Large-sized spray supervisor and quadrate support beam can not only influence the uniformly distributed property of flue gas flow field, and it is de- also to increase flue gas
The flue gas resistance of sulphur spray equipment increases system energy consumption.In addition, spray supervisor is located in desulfuration spray tower tower body, it is not easy to examine
Maintenance is repaiied, safe operation reliability needs to be further increased.
Most of existing conventional flue gas desulfurization sprinkle devices, can generally be staggered two layers adjacent of spraying layer certain water
Straight angle degree, it is that the sprayed slurry of desulfurization tower section is made to cover to enable upper layer nozzle and underlying nozzle staggered positions, main purpose
Evenly, the formation of flue gas escape route is prevented, desulfuration efficiency is improved.If Fig. 2 is a kind of existing conventional flue gas desulfurization sprinkle
The adjacent two layers spraying layer arrangement schematic diagram of device, adjacent two layers spraying layer have been staggered β angles, but that there are some is not complete
The completely wrong nozzle opened, the distance being staggered between adjacent nozzle be also cannot keep it is consistent, it is very uneven, make entire spray-absorption
The sprayed slurry covering in area is not uniform enough, influences desulfurization and efficiency of dust collection.
For this purpose, engineers and technicians disclose a kind of spray equipment for desulfurizing tower, supervisor is arranged outside tower body, tower
Inside be provided with the combination of plural layer branch pipe, the combination of every layer of branch pipe has an arrangement of complex root arms parallel, every layer of same orientation it is parallel
Branch pipe converges outside tower body and is connected with supervisor.This spray equipment is conveniently replaceable maintenance supervisor, reduces cost.But still
There is also some defects:The program requires that 4~6 layers of plural layer branch pipe are arranged in tower, while requiring 5~8 plural numbers of every layer of setting
Root branch pipe, without reference to odd-level branch pipe and every layer of odd number root branch pipe, also without reference to lower 1~3 layer of the setting of cost of investment
Branch pipe assembled scheme;The spray direction for being located at the nozzle above branch pipe is identical as flue gas direction, be easy to cause flue gas and carries spray
Slurries are unfavorable for realizing high-effective dust-removing;The parallel branch pipe in every layer of same orientation converges outside tower body to be connected with supervisor, often
Root be responsible for circulating pump mutually in succession, that is, the branch pipe number of plies be arranged 4 layers when circulating pump quantity need 5~8, invest and
Operation expense is uneconomical.Therefore the program exists in practical engineering application compared with big limitation.
Engineers and technicians also disclose the desulfuration spray tower tower body with Load Regulation and flue gas flow equalizing function, the program
In each layer spray equipment by two be in that arranged crosswise divides spray equipment to form in the same plane.The program thinks to lead to
Stop transport one or the next accurate spray flux for adjusting absorbent slurry of several slurry circulating pumps are crossed, operating cost is reduced.But the program
In spray equipment come with some shortcomings, such as the program merely provides the arrangement of spray tube, adjacent without stressing
Specific location relationship between the nozzle of two layers of spray equipment and arrangement, therefore, it is difficult to ensure that the slurries that nozzle sprays can
Uniformly, the horizontal cross-section of desulfuration spray tower tower body is fully covered.Two are in spray dress in the same plane dividing for arranged crosswise
The branch pipe set is mutually parallel cross arrangement, and the spacing between adjacent branch pipe is 1.5~2m, when stop transport one layer of point of spray equipment after,
Spacing between the adjacent branch pipe of operating status becomes 3~4m, and spacing is excessive, it is difficult to realize to desulfuration spray tower tower body section
Uniformly, complete covering, therefore can not ensure higher desulfurization and dust removing effects.Every layer of spray equipment needs that two slurries are arranged
Circulating pump, cost of investment are uneconomical.
Utility model content
The purpose of this utility model is to provide flue gas desulfurization and dedusting spray equipments, can effectively solve the problem that existing spray dress
Set the non-uniform problem of sprinkling.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:Flue gas desulfurization and dedusting
Spray equipment, including spray column tower body, spray column tower body lower section is equipped with smoke inlet, demister is set in spray column tower body, described
Spray thrower is equipped in spray column tower body between smoke inlet and demister, the spray thrower includes the first spraying layer and second
Spraying layer, the first spraying layer and the second spraying layer are staggered in vertical direction, and the first spraying layer and the second spraying layer are equipped with
The projection of the nozzle of several nozzles, the nozzle of the first spraying layer and the second spraying layer in the horizontal plane is uniformly distributed, and the first spray
The nozzle of the nozzle of drenching layer and the second spraying layer is misaligned in the vertical direction.
Preferably, each layer first spraying layer and the second spraying layer include at least two sprays disposed in parallel
Pipe, and the spray tube of the spray tube of the first spraying layer and the second spraying layer overlaps in the vertical direction.
Preferably, on the spray tube of first spraying layer same cross section be equipped with from spray bottom of the tube draw bottom connect
Pipe and the side drawn from spray tube both sides are taken over, and the every side, which is taken over to take over the bottom of with, upper is connected with nozzle.
Preferably, shortest spray tube is equipped with and extends to spray column tower body inner wall in each layer first spraying layer
Branch pipe is connected with nozzle on the branch pipe.
Preferably, the both sides, same cross section of the spray tube of second spraying layer are taken over equipped with horizontally disposed side,
Every side, which is taken over, is connected with nozzle.
Preferably, each layer first spraying layer and the second spraying layer further include slurry circulating pump and circulating line,
The slurry circulating pump is arranged on circulating line, and the circulating line is arranged outside spray column tower body, the spray tube of same layer
It is connected with the circulation canal of this layer, the spray tube and circulating line are gradually reduced along slurry stream orient diameter.
Preferably, when the sum of quantity of the first spraying layer and the second spraying layer is even number, the spray in the first spraying layer
Spray tube in second spraying layer of last layer in the orientation Guan Yutong is fixed by the connecting rod connection;
When the sum of quantity of the first spraying layer and the second spraying layer is odd number, the spray tube in the first spraying layer and Tongfang
Spray tube in the second spraying layer of last layer of position is fixed by the connecting rod connection, the spray above the first spraying layer of top
The cross bar consistent with spray tube direction is fixed in tower tower body, spray tube is fixed by the connecting rod with cross bar and connect.
Preferably, the spacing on second spraying layer in same perpendicular between two nozzles in left and right is the first spray
0.4~0.6 times of the spacing between two nozzles is controlled on the same perpendicular of layer.
Preferably, the summation of first spraying layer and the second spraying layer is 2~8 layers, the first spraying layer and the second spray
Spacing between layer is 1.4m~2.5m.
Preferably, the nozzle is the hollow cone nozzles sprayed downwards, and spray angles are 60~120 degree.
Compared with prior art, the utility model has the advantages that:First spraying layer and the second spraying layer are handed in vertical direction
The projection of the nozzle of mistake setting, the nozzle of the first spraying layer and the second spraying layer in the horizontal plane is uniformly distributed, and is sprayed from single layer
The Plane Angle of layer, the arrangement of nozzles of each layer spraying layer is uniform sequential, sprayed slurry covering is uniform;From the sky of entire spray equipment
Between angle, arrangement of nozzles inside spray thrower is uniform sequential, sprayed slurry covering is uniform.So that the sprayed slurry of spraying layer is uniform
Covering, entire spray equipment spray thrower inside sprayed slurry also can uniform fold.
The sprayed slurry drop being evenly distributed can make contact of the slurries with flue gas more uniform, increase connecing for gas-liquid two-phase
Contacting surface is accumulated, while can also play the current balance function to flue gas, effectively reduces liquid-gas ratio L/G, improves desulfurization and efficiency of dust collection.
Description of the drawings
Fig. 1 is existing conventional flue gas desulfurization sprinkle device partial schematic diagram;
The spraying layer arrangement schematic diagram of the existing conventional flue gas desulfurization sprinkle devices of Fig. 2;
Fig. 3 is the structural schematic diagram of flue gas desulfurization sprinkle device of the present invention;
Fig. 4 is the structural schematic diagram of the first spraying layer of the invention;
Fig. 5 is the structural schematic diagram of the second spraying layer of the invention;
Fig. 6 is the arrangement schematic diagram of cross bar in the present invention;
Fig. 7 is the side schematic view of the first spraying layer spray tube and the second spraying layer spray tube of the invention;
Fig. 8 is the side schematic view of the first spraying layer spray tube and cross bar of the invention;
Fig. 9 is the schematic diagram planar projected after the first spraying layer nozzle and the second spraying layer nozzle of the invention are superimposed.
Specific implementation mode
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings.Below with reference to
The embodiment of attached drawing description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ",
The instructions such as " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside"
Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and simplification is retouched
It states, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and operation,
Therefore it is not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three
It is a etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be that machinery connects
It connects, can also be to be electrically connected or can communicate each other;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field
For those of ordinary skill, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
Refering to Fig. 3 be the utility model flue gas desulfurization and dedusting spray equipment embodiment, flue gas desulfurization and dedusting spray equipment,
Including spray column tower body 1,1 lower section of spray column tower body is equipped with smoke inlet 2, and demister 3, the spray column are set in spray column tower body
Spray thrower is equipped in tower body 1 between smoke inlet 2 and demister 3, the spray thrower is sprayed including the first spraying layer 4 and second
Drenching layer 5, the first spraying layer 4 and the second spraying layer 5 can be one layer more than, as shown in figure 3, have two layers of first spraying layers 4, one layer
Second spraying layer 5, but the first spraying layer 4 starts in bottom, the first spraying layer 4 and the second spraying layer 5 are handed in vertical direction
Mistake setting, so-called be staggered is exactly the first spraying layer 4 in bottom, and the second spraying layer 5 is on the first spraying layer 4, then
One layer of first spraying layer 4 is being arranged above in second spraying layer 5, and such setting is gone down, and the first spraying layer 4 and the second spraying layer 5 are
Equipped with several nozzles 12, as shown in figure 9, solid dot is the nozzle 12 of the first spraying layer 4 in figure, hollow dots are the second spraying layer 5
Nozzle 12, the projection of the nozzle 12 of the nozzle 12 of the first spraying layer 4 and the second spraying layer 5 in the horizontal plane is uniformly distributed, and
The nozzle 12 of the nozzle 12 of first spraying layer 4 and the second spraying layer 5 is misaligned in the vertical direction.
First spraying layer 4 and the second spraying layer 5 are staggered in vertical direction, the nozzle 12 and second of the first spraying layer 4
The projection of the nozzle 12 of spraying layer 5 in the horizontal plane is uniformly distributed, from the Plane Angle of single layer spraying layer, the spray of each layer spraying layer
Mouth 12 arranges that uniform sequential, sprayed slurry covering is uniform;From the space angle of entire spray thrower, internal nozzle 12 is arranged uniformly
Orderly, sprayed slurry covering is uniform.So that the sprayed slurry inside the sprayed slurry uniform fold of spraying layer, entire spray thrower
It can uniform fold.
The sprayed slurry drop being evenly distributed can make contact of the slurries with flue gas more uniform, increase connecing for gas-liquid two-phase
Contacting surface is accumulated, while can also play the current balance function to flue gas, effectively reduces liquid-gas ratio L/G, improves desulfurization and efficiency of dust collection.
Each layer 4 and second spraying layer 5 of the first spraying layer includes at least two spray tubes 8 disposed in parallel, and
The spray tube 8 of the spray tube 8 of first spraying layer 4 and the second spraying layer 5 overlaps in the vertical direction, and spray tube 8 is parallel uniformly to be set
Set the arrangement convenient for nozzle 12, it is easy to accomplish uniformly covering comprehensively, and bilevel spray tube 8 overlaps in the vertical direction,
The blocking to flue gas can be reduced, while two layers adjacent of spraying layer can be fixedly connected, it is previous so as to save
Crossbeam in structure, tower is interior to spray main pipe without large scale, and flue gas resistance can be greatly lowered, be also beneficial to the peace of raising system
Full operational reliability.
As shown in Figure 3, Figure 4, the both sides, same cross section of the spray tube 8 of first spraying layer 4 be equipped with side take over 9,
From the bottom take over 10 of 8 bottom of spray tube extraction, it is connected with nozzle 12 on the every side take over 9 and bottom take over 10, due to first
Since basecoat, increased bottom take over 10 can cover the region immediately below spray tube 8 spraying layer 4.
Shortest spray tube 8 is equipped with the branch pipe extended to 1 inner wall of spray column tower body in each layer first spraying layer 4
11, nozzle 12 is connected on the branch pipe 11, and the region between most short spray tube 8 and spray column tower body 1 carries out spray supplement, prevents
Only there is dead angle.
As shown in figure 5, the both sides of the spray tube 8 of second spraying layer 5, same cross section are equipped with horizontally disposed side
Take over 9 is connected with nozzle 12 on every side take over 9, and relative to the first spraying layer 4, there is no setting bottoms to take over for the second spraying layer 5
10, this is because in order to keep the nozzle 12 of two layers of spraying layer misaligned, the nozzle 12 of the first spraying layer 4 is farther from spray tube 8, institute
It assists covering to need bottom take over 10 to connect nozzle 12, and side of the side take over 9 of the second spraying layer 5 relative to the first spraying layer 4
Take over 9, will be closer to apart from spray tube 8, and covering can be completed so only needing horizontally disposed side take over 9 is arranged.
Each layer 4 and second spraying layer 5 of the first spraying layer further includes slurry circulating pump 13 and circulating line 16, institute
It states slurry circulating pump 13 to be arranged on circulating line 16, the circulating line 16 is arranged outside spray column tower body 1, the spray of same layer
Shower pipe 8 is connected across the spray interface tube 14 of spray column tower body 1, outside tower with expansion joint for pipeline 15 and circulating line 16, institute
It states spray tube 8 and circulating line 16 is gradually reduced along slurry stream orient diameter, slurries, which are separately provided, for each layer of spraying layer follows
Ring pump 13 can control sprinkling slurries amount according to practical exhaust gas volumn, and to cost-effective, and circulating line 16 is arranged in spray column
Outside tower body 1, the flue gas in spray column tower body 1 can be caused to stop to avoid coarse circulating line 16, spray tube 8 and circulation pipe
Road 16 is gradually reduced along slurry stream orient diameter, then ensure that the hydraulic pressure in spray tube 8 and circulating line 16 is constant.
When the sum of quantity of the first spraying layer 4 and the second spraying layer 5 is odd number, as shown in fig. 7, in the first spraying layer 4
Spray tube 8 be fixed by the connecting rod and connect with the spray tube 8 in second spraying layer of last layer 5 in same orientation, as shown in figure 8,
It is fixed with the cross bar 7 consistent with 8 direction of spray tube, the cross bar in the spray column tower body 1 of 4 top of the first spraying layer of top
7 quantity is identical as 8 quantity of spray tube of the first spraying layer 4, and spray tube 8 is fixed by the connecting rod with cross bar 7 and connect, and allows one layer
The frame structure that first spraying layer 4 and one layer of second composition of spraying layer 5 consolidate, ensures whole rigidity, from without spraying again
It drenches and support steel beam is set in tower tower body 1, reduce flue gas resistance.
Spacing L on second spraying layer 5 in same perpendicular between two nozzles 12 in left and right1It is the first spraying layer
Spacing L on 4 same perpendiculars between two nozzles 12 in left and right20.4~0.6 times, the first spraying layer 4 and the second spraying layer
5 12 stagger setting of nozzle realizes the covering of spray liquid gamut, is typically chosen on the second spraying layer 5 in same perpendicular left
Spacing between right two nozzles 12 is the spacing between two nozzles 12 in left and right on 4 same perpendicular of the first spraying layer
0.4 either 0.5 or 0.6 times etc..
The summation of first spraying layer, 4 and second spraying layer 5 is 2~8 layers, the first spraying layer 4 and the second spraying layer 5 it
Between spacing be 1.4m~2.5m, the spacing of the first spraying layer 4 and the second spraying layer 5 is too small, and spray liquid cannot fully and flue gas
Contact, spacing then easy tos produce flue gas escape route very much greatly, while can also increase the height of spray column tower body, general spacing selection
1.5m either 1.8m or 2.0m or 2.2m etc..
The nozzle 12 is the hollow cone nozzles 12 sprayed downwards, and spray angles are 60~120 degree.Downwards
Spray can increase the effect of giving a dinner of welcome of sprayed slurry, improve efficiency of dust collection.The spray angles of nozzle 12 are too small, sprayed slurry covering
Area is insufficient, influences coverage rate;The too big spray liquid of angle excessively disperses that flue gas escape route can be formed instead, general angle Selection
60 degree either 75 degree or 90 degree or 105 degree or 120 degree etc..
The spray tube 8, side take over 9 and bottom take over 10 are lined with the glass reinforced plastic pipe of wear-and corrosion-resistant layer using surfaces externally and internally.Institute
State the glass reinforced plastic pipe that coupling bar 6 and cross bar 7 are lined with wear-and corrosion-resistant layer using outer surface.Internal lining may be selected in the circulating line 16
There are the glass reinforced plastic pipe of wear-and corrosion-resistant layer or the internal carbon steel piping for being lined with wear-and corrosion-resistant layer.
As shown in fig. 6, the both ends of the end of the spray tube 8 and branch pipe 11, cross bar 7, by being arranged in desulfuration spray tower
The support base 17 of 1 inner wall of tower body is supported, and the nozzle 12 of one layer of first spraying layer 4 or one layer of second spraying layer 5 is by side
Battle array is structurally ordered to be arranged in same level height, and arrangement spacing is 400mm~1500mm;It is nearest apart from desulfuration spray tower tower body 1
Nozzle 12 at a distance from 1 inner wall of desulfuration spray tower tower body be 300mm~1000mm.
It is also possible that as shown in fig. 7, when the sum of quantity of the first spraying layer 4 and the second spraying layer 5 is even number, first sprays
Spray tube 8 in drenching layer 4 is fixed by the connecting rod with the spray tube 8 in second spraying layer of last layer 5 in same orientation to be connect.
The foregoing is merely specific embodiment of the utility model, but the technical characteristics of the utility model is not limited to
This, any those skilled in the art in the field of the utility model, made by changes or modifications all cover it is new in this practicality
Among the scope of the claims of type.
Claims (10)
1. flue gas desulfurization and dedusting spray equipment, including spray column tower body (1), spray column tower body (1) lower section is equipped with smoke inlet
(2), demister (3) is set in spray column tower body, it is characterised in that:It is located at smoke inlet (2) in the spray column tower body (1) and removes
Spray thrower is equipped between day with fog (3), the spray thrower includes the first spraying layer (4) and the second spraying layer (5), the first spraying layer
(4) it is staggered in vertical direction with the second spraying layer (5), the first spraying layer (4) and the second spraying layer (5) are equipped with several sprays
Mouth (12), the projection of the nozzle (12) of the first spraying layer (4) and the nozzle (12) of the second spraying layer (5) in the horizontal plane uniformly divide
Cloth, and the nozzle (12) of the first spraying layer (4) and the nozzle (12) of the second spraying layer (5) are misaligned in the vertical direction.
2. flue gas desulfurization and dedusting spray equipment as described in claim 1, it is characterised in that:Each layer first spraying layer
(4) and the second spraying layer (5) includes at least two spray tubes (8) disposed in parallel, and the spray tube of the first spraying layer (4)
(8) it is overlapped in the vertical direction with the spray tube of the second spraying layer (5) (8).
3. flue gas desulfurization and dedusting spray equipment as claimed in claim 2, it is characterised in that:The spray of first spraying layer (4)
The both sides of shower pipe (8), same cross section are equipped with that (9) are taken in horizontally disposed side, the bottom drawn from spray tube (8) bottom is taken over
(10), (9) are taken in the every side and bottom is taken on (10) and is connected with nozzle (12).
4. flue gas desulfurization and dedusting spray equipment as claimed in claim 3, it is characterised in that:Each layer first spraying layer
(4) shortest spray tube (8) is equipped with the branch pipe (11) extended to spray column tower body (1) inner wall in, connects on the branch pipe (11)
There is nozzle (12).
5. flue gas desulfurization and dedusting spray equipment as claimed in claim 2, it is characterised in that:The spray of second spraying layer (5)
Same cross section is taken over (9) equipped with horizontally disposed side in shower pipe (8), and every side, which is taken on (9), is connected with nozzle (12).
6. flue gas desulfurization and dedusting spray equipment as claimed in claim 2, it is characterised in that:Each layer first spraying layer
(4) and the second spraying layer (5) further includes slurry circulating pump (13) and circulating line (16), slurry circulating pump (13) setting
On circulating line (16), the circulating line (16) setting spray column tower body (1) outside, the spray tube (8) of same layer with
This layer of circulation canal is connected, and the spray tube (8) and circulating line (16) are gradually reduced along slurry stream orient diameter.
7. flue gas desulfurization and dedusting spray equipment as claimed in claim 2, it is characterised in that:When the first spraying layer (4) and second
When the sum of quantity of spraying layer (5) is even number, the spray tube (8) in the first spraying layer (4) is sprayed with the last layer second with orientation
Spray tube (8) in drenching layer (5) is fixed by the connecting rod connection;When the quantity of the first spraying layer (4) and the second spraying layer (5) it
With for odd number when, spray tube (8) in the first spraying layer (4) with the spray tube in second spraying layer of last layer (5) in orientation
(8) it is fixed by the connecting rod connection, is fixed with and sprays in the spray column tower body (1) above the first spraying layer (4) of top
The consistent cross bar (7) in (8) direction is managed, spray tube (8) is fixed by the connecting rod with cross bar (7) and connect.
8. the flue gas desulfurization and dedusting spray equipment as described in any one of claim 1 to 7, it is characterised in that:Second spray
Spacing in drenching layer (5) in same perpendicular between two nozzles (12) in left and right is the first spraying layer (4) same perpendicular
0.4~0.6 times of spacing between the nozzle (12) of upper left and right two.
9. the flue gas desulfurization and dedusting spray equipment as described in any one of claim 1 to 7, it is characterised in that:First spray
Drenching layer (4) and the summation of the second spraying layer (5) are 2~8 layers, and the spacing between the first spraying layer (4) and the second spraying layer (5) is
1.4m~2.5m.
10. the flue gas desulfurization and dedusting spray equipment as described in any one of claim 1 to 7, it is characterised in that:The nozzle
(12) it is the hollow cone nozzles (12) sprayed downwards, spray angles are 60~120 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721435644.9U CN207899165U (en) | 2017-11-01 | 2017-11-01 | Flue gas desulfurization and dedusting spray equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721435644.9U CN207899165U (en) | 2017-11-01 | 2017-11-01 | Flue gas desulfurization and dedusting spray equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207899165U true CN207899165U (en) | 2018-09-25 |
Family
ID=63570722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721435644.9U Active CN207899165U (en) | 2017-11-01 | 2017-11-01 | Flue gas desulfurization and dedusting spray equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207899165U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107837625A (en) * | 2017-11-01 | 2018-03-27 | 浙江菲达环保科技股份有限公司 | Flue gas desulfurization and dedusting spray equipment |
CN110405525A (en) * | 2019-08-22 | 2019-11-05 | 珠海格力智能装备有限公司 | Spray equipment, machining center and spraying control method thereof |
-
2017
- 2017-11-01 CN CN201721435644.9U patent/CN207899165U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107837625A (en) * | 2017-11-01 | 2018-03-27 | 浙江菲达环保科技股份有限公司 | Flue gas desulfurization and dedusting spray equipment |
CN110405525A (en) * | 2019-08-22 | 2019-11-05 | 珠海格力智能装备有限公司 | Spray equipment, machining center and spraying control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107837625A (en) | Flue gas desulfurization and dedusting spray equipment | |
KR960000011B1 (en) | Spray level apparatus and methods for flue gas desulphurisation | |
CN207899165U (en) | Flue gas desulfurization and dedusting spray equipment | |
CN106731620A (en) | A kind of spray desulfurizing tower | |
CN205850575U (en) | A kind of fairing for wet desulphurization absorption tower | |
CN107376628A (en) | A kind of adjusting type desulfuration absorbing tower suitable for multi-state | |
CN207507222U (en) | A kind of drag-reduction energy-saving carries the desulfuration absorbing tower of effect | |
CN203577624U (en) | Desulfurizing absorption tower | |
CN202506311U (en) | Improved structure for tubular air distributor of desulfurizing tower | |
CN201643975U (en) | Spraying device of circulating slurry for desulfurizing flue gas | |
CN204563884U (en) | A kind of desulfurizing tower | |
CN207287130U (en) | A kind of adjusting type desulfuration absorbing tower suitable for multi-state | |
CN205127726U (en) | Double tower is two -way to spray multicycle desulfurization absorption tower | |
CN115646180A (en) | Ultralow emission control equipment of coal-fired coupling sludge combustion flue gas SO2 | |
CN205934792U (en) | Municipal administration road guardrail | |
CN100393393C (en) | Arrangement for sprinkling and pre-washing flue gas in entrance of flue gas-desulfurizing absorption tower | |
CN207805373U (en) | A kind of block-resistant type spray type desulphurization tower | |
CN207507249U (en) | A kind of odor purification tower and odor purification tower group | |
CN203990995U (en) | A kind of desulfurization atomizing lance | |
CN203355603U (en) | Smoke purification system adopting wet method | |
CN208116320U (en) | A kind of pair of dust gas pipeline removes the device of dust stratification online | |
CN207153466U (en) | A kind of fold-line-shaped gas-liquid part flow arrangement with collecting tank | |
CN105536495A (en) | Side discharge type desulfurizing tower | |
CN205662717U (en) | Novel energy -conserving gas -liquid reposition of redundant personnel dyeing machine | |
CN205475034U (en) | Movable type sprays dust device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |