CN207894255U - A kind of double crucible rapidly pre-warming stoves of electric up-down - Google Patents

A kind of double crucible rapidly pre-warming stoves of electric up-down Download PDF

Info

Publication number
CN207894255U
CN207894255U CN201820026594.7U CN201820026594U CN207894255U CN 207894255 U CN207894255 U CN 207894255U CN 201820026594 U CN201820026594 U CN 201820026594U CN 207894255 U CN207894255 U CN 207894255U
Authority
CN
China
Prior art keywords
electric
burner hearth
furnace body
double crucible
rapidly pre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820026594.7U
Other languages
Chinese (zh)
Inventor
李海军
孙鸣高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Shenhua Heating Technology Co., Ltd.
Original Assignee
LUOYANG HUAXULIER ELECTRIC STOVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOYANG HUAXULIER ELECTRIC STOVE CO Ltd filed Critical LUOYANG HUAXULIER ELECTRIC STOVE CO Ltd
Priority to CN201820026594.7U priority Critical patent/CN207894255U/en
Application granted granted Critical
Publication of CN207894255U publication Critical patent/CN207894255U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of double crucible rapidly pre-warming stoves of electric up-down, including furnace body and two fire doors, there are two burner hearths for setting in furnace body, burner hearth is in the hollow structure of upper and lower side opening, it is both provided with jacking system in each burner hearth, the jacking system includes lifting pedestal, electric lifting mechanism, traction rope and pulley blocks, the lifting pedestal is located in burner hearth, electric lifting mechanism is between burner hearth and furnace body, electric lifting mechanism connects one end of traction rope, and the other end of traction rope is connected to after the pulley blocks being set at the top of furnace body on lifting pedestal.

Description

A kind of double crucible rapidly pre-warming stoves of electric up-down
Technical field
The utility model belongs to metallurgical technology field more particularly to a kind of double crucible rapidly pre-warming stoves of electric up-down.
Background technology
Currently, present China's gold or other noble metals, melting generally uses intermediate frequency furnace, to avoid crucible in intermediate frequency furnace Steep temperature rise causes crucible rupture to need to preheat crucible.Existing preheating furnace is conventional crucibles stove, traditional crucible furnace It is single burner hearth, production efficiency is relatively low, and when picking and placeing crucible, very inconvenient, and there are certain danger.
Invention content
In order to solve the problems in the existing technology, the purpose of this utility model is to propose a kind of double crucibles of electric up-down Rapidly pre-warming stove.
In order to realize that above-mentioned purpose of utility model, the utility model use technical solution as described below:
A kind of double crucible rapidly pre-warming stoves of electric up-down, including furnace body and two fire doors, furnace body is interior to be arranged there are two burner hearth, Burner hearth is in the hollow structure of upper and lower side opening, and jacking system is both provided in each burner hearth, and the jacking system includes lifting Pedestal, electric lifting mechanism, traction rope and pulley blocks, the lifting pedestal are located in burner hearth, and electric lifting mechanism is located at burner hearth Between furnace body, electric lifting mechanism connects one end of traction rope, and the other end of traction rope is on being set at the top of furnace body It is connected on lifting pedestal after pulley blocks.
Further, four parallel support posts are both provided in the bottom of each burner hearth, on each support post Being respectively provided with one can be along the guiding mechanism that support post slides up and down, lifting pedestal lower end and the Guiding machine on four support posts Structure is fixedly connected.
Further, the guiding mechanism includes guide sleeve and connecting plate, and guide sleeve is set on support post, the company One end of fishplate bar is fixedly connected on guide sleeve, and the other end of connecting plate is fixedly connected on lifting pedestal.
Further, globar for heating is provided in burner hearth.
Further, the pulley blocks include two pulleys, and one of pulley is located at the surface of burner hearth, another cunning Wheel is positioned at the surface of electric lifting mechanism.
Further, two are to be slidably connected between fire door and furnace body.
Further, the electric lifting mechanism is electric pushrod.
Due to the adoption of the above technical scheme, the utility model has following superiority:
1, the utility model realizes an independent crucible installation position of warm area two, can be improved by the way that two burner hearths are arranged Production efficiency, deceleration thermal loss.
2, by the way that two jacking systems are arranged so that the crucible lifting on lifting pedestal is easy to operate simple, two liftings Pedestal independently controls, and is independently taken out convenient for the crucible on each lifting pedestal.
3, by the way that guiding mechanism is arranged, it is ensured that lifting pedestal lifting is steady.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the sectional view of Fig. 1;
Fig. 3 is the side view of Fig. 2;
In figure:1- furnace bodies, 2- burner hearths, 3- fire doors, 4- globars, 5- pulleys, 6- traction ropes, 7- electric lifting mechanisms, 8- Guiding mechanism, 9- lifting pedestals, 10- support posts.
Specific implementation mode
The technical solution of the utility model is described in further detail with reference to the accompanying drawings and embodiments.
As shown in Figure 1, 2, 3, the double crucible rapidly pre-warming stoves of a kind of electric up-down, including furnace body 1 and two fire doors 3, furnace body 1 There are two burner hearth 2, burner hearth 2 is in the hollow structure of upper and lower side opening, and jacking system is both provided in each burner hearth 2 for interior setting, The jacking system includes lifting pedestal 9, electric lifting mechanism 7, traction rope 6 and pulley blocks, and the lifting pedestal 9 is located at burner hearth In 2, for electric lifting mechanism 7 between burner hearth 2 and furnace body 1, electric lifting mechanism 7 connects one end of traction rope 6, traction rope 6 The other end be connected to after the pulley blocks being set at the top of furnace body on lifting pedestal 9.
Four parallel support posts 10 are both provided in the bottom of each burner hearth 2, are all provided on each support post 10 Setting one can be along the guiding mechanism 8 that support post slides up and down, 9 lower end of lifting pedestal and the guiding mechanism on four support posts 8 are fixedly connected.
As the preferred of the present embodiment, the guiding mechanism 8 includes guide sleeve and connecting plate, and it is vertical that guide sleeve is set in support On column, one end of the connecting plate is fixedly connected on guide sleeve, and the other end of connecting plate is fixedly connected on lifting pedestal.
Globar for heating is provided in burner hearth.
The pulley blocks include two pulleys 5, and one of pulley is located at the surface of burner hearth, another pulley is located at electricity The surface of dynamic elevating mechanism.
Two are to be slidably connected between fire door and furnace body, and idler wheel is provided on fire door, guide rail, stove are provided on furnace body Door is mounted on by idler wheel on guide rail, slides unlatching and the closure for realizing fire door on guide rail by idler wheel.
The electric lifting mechanism is electric pushrod, and in the present invention, the push rod portion of electric pushrod is towards down-set.
The utility model slides fire door 3 when specifically used, will wait for that preheated crucible is put into 9 top of lifting pedestal, control electricity Dynamic elevating mechanism 7, and be driven by traction rope 6, and through pulley blocks deflecting, lifting pedestal 9 is pulled, while guiding mechanism 8 ensures The steady lifting of lifting pedestal 9, then rises to extreme higher position by lifting pedestal 9, will wait for that preheated crucible is placed on lifting pedestal 9 and pushes up Then portion controls electric lifting mechanism 7 and is down to bottom through the cooperation of traction rope 6, pulley blocks and 9 its own gravity of lifting pedestal, so Fire door 3 is closed afterwards, globar 4 is controlled, begins to warm up preheated crucible, after the completion of heating, is slided fire door, is controlled electric lifting mechanism 7, through traction rope, pulley blocks, lifting pedestal 9 is promoted, takes out crucible.

Claims (7)

1. a kind of double crucible rapidly pre-warming stoves of electric up-down, including furnace body and two fire doors, it is characterised in that:It is provided in furnace body Two burner hearths, burner hearth are in the hollow structure of upper and lower side opening, and jacking system, the jacking system are both provided in each burner hearth Including lifting pedestal, electric lifting mechanism, traction rope and pulley blocks, the lifting pedestal is located in burner hearth, electric lifting mechanism Between burner hearth and furnace body, electric lifting mechanism connects one end of traction rope, and the other end of traction rope is around being set in furnace body It is connected on lifting pedestal after pulley blocks on top.
2. the double crucible rapidly pre-warming stoves of electric up-down according to claim 1, it is characterised in that:At the bottom of each burner hearth Portion is both provided with four parallel support posts, be respectively provided on each support post one can be slided up and down along support post lead To mechanism, lifting pedestal lower end is fixedly connected with the guiding mechanism on four support posts.
3. the double crucible rapidly pre-warming stoves of electric up-down according to claim 2, it is characterised in that:The guiding mechanism includes Guide sleeve and connecting plate, guide sleeve are set on support post, and one end of the connecting plate is fixedly connected on guide sleeve, connection The other end of plate is fixedly connected on lifting pedestal.
4. the double crucible rapidly pre-warming stoves of electric up-down according to claim 1 or 2, it is characterised in that:It is arranged in burner hearth It is useful for the globar of heating.
5. the double crucible rapidly pre-warming stoves of electric up-down according to claim 1, it is characterised in that:The pulley blocks include two A pulley, one of pulley are located at the surface of burner hearth, another pulley is located at the surface of electric lifting mechanism.
6. the double crucible rapidly pre-warming stoves of electric up-down according to claim 1, it is characterised in that:Two fire doors and furnace body it Between be to be slidably connected.
7. the double crucible rapidly pre-warming stoves of electric up-down according to claim 1, it is characterised in that:The electric lifting mechanism For electric pushrod.
CN201820026594.7U 2018-01-08 2018-01-08 A kind of double crucible rapidly pre-warming stoves of electric up-down Active CN207894255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820026594.7U CN207894255U (en) 2018-01-08 2018-01-08 A kind of double crucible rapidly pre-warming stoves of electric up-down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820026594.7U CN207894255U (en) 2018-01-08 2018-01-08 A kind of double crucible rapidly pre-warming stoves of electric up-down

Publications (1)

Publication Number Publication Date
CN207894255U true CN207894255U (en) 2018-09-21

Family

ID=63551458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820026594.7U Active CN207894255U (en) 2018-01-08 2018-01-08 A kind of double crucible rapidly pre-warming stoves of electric up-down

Country Status (1)

Country Link
CN (1) CN207894255U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117287977A (en) * 2023-11-24 2023-12-26 杭州嘉悦智能设备有限公司 Carbonization preheating furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117287977A (en) * 2023-11-24 2023-12-26 杭州嘉悦智能设备有限公司 Carbonization preheating furnace
CN117287977B (en) * 2023-11-24 2024-02-13 杭州嘉悦智能设备有限公司 Carbonization preheating furnace

Similar Documents

Publication Publication Date Title
CN210220642U (en) Energy-saving environment-friendly electromagnetic induction aluminum melting furnace
CN207894255U (en) A kind of double crucible rapidly pre-warming stoves of electric up-down
CN207877811U (en) Aluminium section bar ageing furnace
CN205967388U (en) Ladle adds cover carriage
CN103322803A (en) Silicon carbide rod heating lifting electric furnace
CN205798421U (en) A kind of automatic lid on/off unit for ladle
CN210237841U (en) Ingot furnace of movable heater
CN212962819U (en) Trolley furnace
CN101876507B (en) Bell-type electric elevator furnace
CN201348431Y (en) Vertical energy-saving rapid aluminum melting furnace
CN211168666U (en) Clay fire clay production and processing conveyer
CN201276481Y (en) Glass chemistry strengthening furnace
CN203253763U (en) Elevating mechanism for mold heating device
CN208296602U (en) A kind of furnace structure of roaster
CN206940943U (en) Door of annealing furnace hoisting mechanism
CN106152792A (en) A kind of push rod furnace fire door elevating mechanism
CN206839152U (en) Molten iron transmits anti-error mechanism
CN207132717U (en) Heat accumulating type stepping hearth furnace
CN211147316U (en) Hydrogen annealing furnace
CN101989798B (en) Far infrared heating device
CN219756984U (en) Furnace door lifting mechanism of high-temperature electric furnace
CN205843381U (en) A kind of push rod furnace fire door elevating mechanism
CN208108793U (en) Lift middle frequency furnace furnace bottom
CN206618265U (en) A kind of novel metal casting electric furnace
CN213496461U (en) Natural gas baking device for scrap steel smelting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 471000 No. 18 Aimin Road, Baiying Village, Luoyang High-tech Zone, Henan Province

Patentee after: Luoyang Shenhua Heating Technology Co., Ltd.

Address before: 471000 No. 18 Aimin Road, Baiying Village, Luoyang High-tech Zone, Henan Province

Patentee before: LUOYANG HUAXULIER ELECTRIC STOVE CO., LTD.

CP01 Change in the name or title of a patent holder
CP02 Change in the address of a patent holder

Address after: 471000 Aimin Road, Baiying Village, Luoyang High-tech Zone, Henan Province

Patentee after: Luoyang Shenhua Heating Technology Co., Ltd.

Address before: 471000 No. 18 Aimin Road, Baiying Village, Luoyang High-tech Zone, Henan Province

Patentee before: Luoyang Shenhua Heating Technology Co., Ltd.

CP02 Change in the address of a patent holder