CN207891902U - A kind of interface percolator of earth rock cofferdam and concrete cofferdam - Google Patents
A kind of interface percolator of earth rock cofferdam and concrete cofferdam Download PDFInfo
- Publication number
- CN207891902U CN207891902U CN201820177649.4U CN201820177649U CN207891902U CN 207891902 U CN207891902 U CN 207891902U CN 201820177649 U CN201820177649 U CN 201820177649U CN 207891902 U CN207891902 U CN 207891902U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- cofferdam
- interface
- geomembrane
- earth rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses the interface percolators of a kind of earth rock cofferdam and concrete cofferdam, including junction steel plate, geomembrane and compress steel plate, the junction steel plate is embedded in advance in the interface, on the geomembrane is layed in the longitudinal section of earth rock cofferdam, and geomembrane extends to the covering junction steel plate close to one end bending of the interface, geomembrane is pressed on junction steel plate and is locked by fastening bolt by the compression steel plate.The utility model has the advantages that low construction cost, good seepage-proof property, construction speed are fast.
Description
Technical field
The utility model is related to construction of hydro project technical field more particularly to a kind of earth rock cofferdams and concrete cofferdam
Interface percolator.
Background technology
The connection type of geomembrane between former vertical concrete cofferdam and lateral earth rock cofferdam, using in concrete cofferdam
Interior reserved tooth socket, geomembrane go deep into slot, the connection type of backfill clay in slot.But construction has the following problems:(1) preformed groove
Connection needs that a large amount of anchor poles are arranged;(2) preformed groove needs to use plank sheathing, speed of application very slow comprehensively;(3) longitudinal cofferdam
It rolls needs inside storehouse surface to transfer in reserved groove location, there is also superpressure, leakage pressure problems;(4) clay is rolled, is compacted in preformed groove
Difficulty is big, and compacting strength protection rate is low.Therefore, the leakage preventing structure of earth rock cofferdam and concrete cofferdam uses geomembrane+preformed groove
The rapid increase, construction cost height, quality assurance rate for backfilling the unfavorable grinding coagulation soil of form of construction work of clay are low.
Utility model content
The technical problems to be solved in the utility model is that overcome the deficiencies of the prior art and provide a kind of construction cost low, anti-
Ooze the interface percolator of effect is good, construction speed is fast earth rock cofferdam and concrete cofferdam.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of interface percolator of earth rock cofferdam and concrete cofferdam, including junction steel plate, geomembrane and compression steel
Plate, the junction steel plate are embedded in advance in the interface, on the geomembrane is layed in the longitudinal section of earth rock cofferdam, and geotechnique
Film extends to the covering junction steel plate close to one end bending of the interface, and geomembrane is pressed on company by the compression steel plate
It connects on steel plate and is locked by fastening bolt.
As a further improvement of the above technical scheme:
The compression steel plate is made of multiple including multiple steel plate strips, vertical side of the multiple steel plate strip in interface
It is arranged at zigzag.
The structure of the junction steel plate is identical as the structure of steel plate is compressed.
It is equipped with gasket between compression steel plate and the geomembrane, sealing is also provided between the junction steel plate and geomembrane
Pad.
The gasket is neoprene gasket.
The junction steel plate is equipped with the bolt hole coordinated with fastening bolt, and the compression steel plate is equipped with for fastening bolt
The through-hole passed through.
Geomembrane in the earth rock cofferdam is laid in vertical direction waviness.
Compared with prior art, the utility model has the advantage of:
The earth rock cofferdam of the utility model and the interface percolator of concrete cofferdam, junction steel plate are embedded in entire soil
On the interface of stone cofferdam and concrete cofferdam, it is between the geomembrane on geomembrane and interface being embedded in earth rock cofferdam
Seamless connection, the geomembrane on interface are pressed on by compressing steel plate on pre-buried junction steel plate, form Sandwich biscuit type
Antiseepage, this structure reserve tooth socket in the prior art in concrete cofferdam, and geomembrane gos deep into tooth socket, backfill in tooth socket
The connection type of clay carries out antiseepage mode and compares, and eliminates reserved tooth socket, reduces the erection amount of plank sheathing, accelerate coagulation
Earth cofferdam is for storehouse progress;The turnover for reducing rolling apparatus reduces the super risk ground, leak stone roller;Reduce clay backfilling, roll
Process, accelerate construction progress, have the advantages that low construction cost, good seepage-proof property, construction speed are fast.
Description of the drawings
Fig. 1 is the utility model percolator overlooking structure diagram.
Fig. 2 is the structural schematic diagram of the utility model interface upper steel plate item.
Fig. 3 is junction steel plate in the utility model, position relationship schematic diagram between geomembrane and steel plate strip.
Fig. 4 is entire projection view of the geomembrane in interface in the utility model.
Fig. 5 is the dimensional structure diagram of entire geomembrane in the utility model.
Each label indicates in figure:
1, junction steel plate;2, geomembrane;3, steel plate is compressed;4, interface;5, fastening bolt;6, gasket;7, native stone encloses
Weir;8, concrete cofferdam.
Specific implementation mode
The utility model is described in further detail below in conjunction with Figure of description and specific embodiment.
As shown in Figures 1 to 5, the interface percolator of the earth rock cofferdam of the present embodiment and concrete cofferdam, including even
It connects steel plate 1, geomembrane 2 and compresses steel plate 3, junction steel plate 1 is embedded in advance in interface 4, and geomembrane 2 is layed in earth rock cofferdam 7
On in longitudinal section, and geomembrane 2 extends to covering junction steel plate 1 close to one end bending of interface 4, and compressing steel plate 3 will be geotechnological
Film 2 is pressed on junction steel plate 1 and is locked by fastening bolt 5.
In Fig. 1, junction steel plate 1 is embedded on the interface 4 of earth rock cofferdam 7 and concrete cofferdam 8.Native stone is embedded in enclose
It is seamless connection, the soil on interface 4 between geomembrane 2 (thick lines in Fig. 1) on geomembrane 2 in weir 7 and interface 4
Work film 2 is pressed on by compressing steel plate 3 on pre-buried junction steel plate 1, forms Sandwich biscuit type antiseepage, as shown in Figure 3.This knot
Structure reserves tooth socket in the prior art in concrete cofferdam 8, and geomembrane 2 gos deep into tooth socket, the company of backfill clay in tooth socket
The mode of connecing carries out antiseepage mode and compares, and the present embodiment Sandwich biscuit type percolator eliminates reserved tooth socket, reduces plank sheathing
Erection amount, accelerate concrete cofferdam for storehouse progress;The turnover for reducing rolling apparatus reduces the super risk ground, leak stone roller;
The process for reducing clay backfilling, rolling, accelerates construction progress, with construction cost is low, good seepage-proof property, construction speed be fast
Advantage.
In the present embodiment, as shown in Figures 4 and 5, geomembrane 2 is by the parts b in interface 4 and a in earth rock cofferdam 7
Partly (thick lines) are constituted.The parts a of geomembrane 2 in earth rock cofferdam 7 are laid in vertical direction waviness, are improved native stone and are enclosed
The anti-seepage effect on weir 7.Geomembrane 2 in earth rock cofferdam 7 extends to form the parts b to interface 4, and the parts b are fitted in junction steel plate 1
On, therefore geomembrane 2 is seamless connection in interface 4 and in earth rock cofferdam 7, the antiseepage of the interface 4 further increased is imitated
Fruit.
In the present embodiment, it is made of multiple steel plate strips as shown in Fig. 2, compressing steel plate 3, multiple steel plate strips are in interface 4
Vertical direction arranged at zigzag.The structure of junction steel plate 1 is identical as the structure of steel plate 3 is compressed, and by multiple steel plate strip structures
At.It compresses and is equipped with gasket 6 between steel plate 3 and geomembrane 2, gasket 6 is also provided between junction steel plate 1 and geomembrane 2.Specifically
, gasket 6 is neoprene gasket.Multiple steel plate strip head and the tail connect, and form Z-shaped distribution, effectively lengthen in a vertical direction
Length between steel plate strip and geomembrane 2 so that the part that geomembrane 2 fastens lengthens, and increases interface 4 anti-seepage effect.Value
It is noted that Fig. 2 is on the basis of Fig. 4, the parts b of geomembrane 2 are cut according to the size of steel plate strip,
I.e. in interface 4, junction steel plate 1, geomembrane 2 and steel plate strip are to overlap, and size is identical.
When concrete cofferdam 8 pours, junction steel plate 1 is fixed on concrete mould plate surface, when earth rock cofferdam 7 is constructed,
One layer of gasket 6 is first pasted on junction steel plate 1, is then covered with geomembrane 2, then pastes one layer of gasket 6 again, outermost adds steel plate
Item is attached with junction steel plate 1 through steel plate strip, geomembrane 2 using fastening bolt 5, forms Sandwich biscuit type and fix geotechnique
The mode of film 2, to improve 2 fixed stability of geomembrane and improve anti-seepage effect.Finally, before geomembrane 2 is finally fixed,
Geomembrane 2 reserves the fold amount of 20cm to adapt to the sink deformation of earth rock cofferdam 7 in vertical direction in earth rock cofferdam 7.Reserved
Fold amount is in 10cm to 30cm.
Although the utility model has been disclosed with preferred embodiment as above, it is not limited to the utility model.It is any
Those skilled in the art, in the case where not departing from technical solutions of the utility model range, all using the disclosure above
Technology contents many possible changes and modifications are made to technical solutions of the utility model, or be revised as the equivalent of equivalent variations
Embodiment.Therefore, every content without departing from technical solutions of the utility model, according to the utility model technical spirit to above real
Any simple modifications, equivalents, and modifications that example is done are applied, should all be fallen in the range of technical solutions of the utility model are protected.
Claims (7)
1. the interface percolator of a kind of earth rock cofferdam and concrete cofferdam, it is characterised in that:Including junction steel plate (1), soil
Work film (2) and compression steel plate (3), the junction steel plate (1) are embedded in advance in the interface (4), and the geomembrane (2) is layed in
On in the longitudinal section of earth rock cofferdam (7), and geomembrane (2) is extended to close to one end bending of the interface (4) described in covering
Geomembrane (2) is pressed on junction steel plate (1) and is locked by fastening bolt (5) by junction steel plate (1), the compression steel plate (3)
Tightly.
2. the interface percolator of earth rock cofferdam according to claim 1 and concrete cofferdam, it is characterised in that:It is described
It compresses steel plate (3) to be made of multiple steel plate strips, vertical direction of the multiple steel plate strip in interface (4) is arranged at zigzag.
3. the interface percolator of earth rock cofferdam according to claim 2 and concrete cofferdam, it is characterised in that:It is described
The structure of junction steel plate (1) is identical as the structure for compressing steel plate (3).
4. the interface percolator of earth rock cofferdam according to claim 3 and concrete cofferdam, it is characterised in that:It is described
It compresses and is equipped with gasket (6) between steel plate (3) and geomembrane (2), be also provided between the junction steel plate (1) and geomembrane (2)
Gasket (6).
5. the interface percolator of earth rock cofferdam according to claim 4 and concrete cofferdam, it is characterised in that:It is described
Gasket (6) is neoprene gasket.
6. the interface percolator of the earth rock cofferdam and concrete cofferdam according to claim 1 to 5 any one, special
Sign is:The junction steel plate (1) is equipped with the bolt hole that coordinate with fastening bolt (5), the compression steel plate (3) equipped with for
The through-hole that fastening bolt (5) passes through.
7. the interface percolator of the earth rock cofferdam and concrete cofferdam according to claim 1 to 5 any one, special
Sign is:Geomembrane (2) in the earth rock cofferdam (7) is laid in vertical direction waviness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820177649.4U CN207891902U (en) | 2018-02-01 | 2018-02-01 | A kind of interface percolator of earth rock cofferdam and concrete cofferdam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820177649.4U CN207891902U (en) | 2018-02-01 | 2018-02-01 | A kind of interface percolator of earth rock cofferdam and concrete cofferdam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207891902U true CN207891902U (en) | 2018-09-21 |
Family
ID=63543444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820177649.4U Active CN207891902U (en) | 2018-02-01 | 2018-02-01 | A kind of interface percolator of earth rock cofferdam and concrete cofferdam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207891902U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109723442A (en) * | 2018-12-20 | 2019-05-07 | 中国矿业大学(北京) | Open coal mine water-bearing layer reservoir waterproof control device |
CN114855840A (en) * | 2022-06-01 | 2022-08-05 | 中国水利水电第八工程局有限公司 | Earth-rock cofferdam and concrete cofferdam connecting structure and construction method thereof |
-
2018
- 2018-02-01 CN CN201820177649.4U patent/CN207891902U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109723442A (en) * | 2018-12-20 | 2019-05-07 | 中国矿业大学(北京) | Open coal mine water-bearing layer reservoir waterproof control device |
CN114855840A (en) * | 2022-06-01 | 2022-08-05 | 中国水利水电第八工程局有限公司 | Earth-rock cofferdam and concrete cofferdam connecting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108412542B (en) | A kind of wide lane digging gangue paste body filling of high seam is at lane method | |
CN105464048A (en) | Composite geomembrane anti-seepage structure capable of automatically adapting to weir body deformation and construction method | |
CN207891902U (en) | A kind of interface percolator of earth rock cofferdam and concrete cofferdam | |
CN103225267B (en) | Construction method of deep and thick soft soil foundation bed bridge abutment | |
CN110374060A (en) | A kind of the reservoir seepage-proofing structure and construction method of rock-fill dams dam facing and earth and stone material backfill bottom storehouse | |
CN106836176A (en) | Sand soil and the method for improveing its engineering characteristic are reinforced using vacuum pumping technology | |
CN207348074U (en) | A kind of leakage preventing structure suitable for side slope surface | |
CN104060580B (en) | Compensate for displacement eliminates the method for high facial mask loose rock dam antiseepage film anchoring place chucking effect | |
CN107503370B (en) | The high barricade of one seed sand well combined type reinforced earth and production method | |
CN200946276Y (en) | Opencut tunnel for adapting to large uneven precipitation or stagger of stratum | |
CN203247838U (en) | Fully-buried basement side wall post-pouring belt advance water stop formwork | |
CN203113335U (en) | Counterfort type U-type groove retaining structure | |
CN205444109U (en) | Can automatic adapt to composite geomembrane seepage prevention structure that weir body warp | |
CN210151660U (en) | Embedded concrete antiskid tenon grout stone retaining wall | |
CN203741782U (en) | Multi-section face plate structure of high concrete faced rockfill dam | |
CN104746506A (en) | Soft soil combined preloading structure and construction method | |
CN103628406B (en) | Frame bridge butted part Construction for waterproofing treatment method | |
CN206015619U (en) | A kind of rock for reducing panel stress strain level | |
CN206457737U (en) | Conveyance Box Culvert bottom plate waterstop reinforces stopping means | |
CN108521097A (en) | A kind of prefabricated tunnel of electric power and its installation method | |
CN208748686U (en) | A kind of upper font retaining wall structure | |
CN209082426U (en) | Seepage-proofing structure combining reservoir bottom reverse seepage and core wall seepage proofing | |
CN103883336A (en) | Adjustable gob-side entry retaining wall with initial active and later buffering support and implementing method thereof | |
CN204456151U (en) | Bamboo raft dowel super large cofferdam | |
CN210562331U (en) | Anti-floating structure combined with underground continuous wall and provided with capping beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |