CN207891858U - The vibrations of earth rock placement are rammed - Google Patents

The vibrations of earth rock placement are rammed Download PDF

Info

Publication number
CN207891858U
CN207891858U CN201721715966.9U CN201721715966U CN207891858U CN 207891858 U CN207891858 U CN 207891858U CN 201721715966 U CN201721715966 U CN 201721715966U CN 207891858 U CN207891858 U CN 207891858U
Authority
CN
China
Prior art keywords
vibrations
rammed
bottom plate
plate
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721715966.9U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721715966.9U priority Critical patent/CN207891858U/en
Application granted granted Critical
Publication of CN207891858U publication Critical patent/CN207891858U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The vibrations that the utility model provides earth rock placement are rammed, including vibrating bottom plate front apron, hopper, material spilling hole, dust protection rubber plate and cushion collar;Run through by way of bolt on the vibrating bottom plate front apron for the front end face that main body is rammed in the vibrations and hopper at one is installed;The partition board of one director's square platy structure is also installed by vertical mode, and partition board is located at the right positions of vibrating bottom plate front apron and hopper on the left side top surface of the vibrating bottom plate of the underrun vibrational structure connection of the vibrations rammer main body;As vibrations are rammed during vibrations together, the sandstone in funnel is set to carry out backfill processing in the pit pressed through as vibrating effect is fallen on down together, make falling rocks effect evenly, vibrations are recycled to ram to applying again herein, pit is flattened, instead of traditional when encountering such case, by way of manually directly backfilling sand material to pit, using this structure in vibration processes blanking, keep blanking more uniform.

Description

The vibrations of earth rock placement are rammed
Technical field
The utility model belongs to Architectural Equipment technical field more particularly to the vibrations of earth rock placement are rammed.
Background technology
Vibrations on lifting equipment are rammed in vibration processes, the location of earth's surface in the cubic metre of earth and stone, Mei Yiduan When soil layer apart from earth's surface intensity and different, therefore in the vibrating bottom plate and the cubic metre of earth and stone of its bottom occurs pressure and pounds, it can make The more loose soil section of quality is recessed, and causes the entire earth's surface pounded uneven, traditional processing mode is, by artificial It is at the heel to backfill sandstone to these recess, then this device is made to pound again, artificial back-filling way makes the sand being backfilling into pit Stone is scattered and uneven, cause some backfill sandstones again back pressure when, insufficient pressure influences subsequent to pound effect again.
Then, it in view of this, being studied improvement for existing structure and missing, provides with the uniformly distributed sandstone leakage of backfill The vibrations of bucket structure are rammed, to achieve the purpose that with more more practical value.
Utility model content
The purpose and effect that the vibrations of the utility model earth rock placement are rammed, are reached by technological means in detail below:
The vibrations of earth rock placement are rammed, including main body, vibrating bottom plate, partition board, dust excluding plate, vibrating bottom plate front are rammed in vibrations Plate, hopper, material spilling hole, dust protection rubber plate and cushion collar;Lead on the vibrating bottom plate front apron for the front end face that main body is rammed in the vibrations The mode of bolt is crossed through being equipped with hopper at one;The vibrating bottom plate of the underrun vibrational structure connection of main body is rammed in the vibrations Left side top surface on the partition board of director's square platy structure is also installed by vertical mode, and partition board is located at vibrating bottom plate front The right positions of plate and hopper;The bottom surface of the vibrating bottom plate is also equipped with cushion collar at one, and the bottom side of cushion collar is connected with Dust protection rubber plate at one.
Further, before the inner chamber bottom surface of the hopper and ontology bottom surface are arc-shaped structure, and its inner chamber bottom surface is pressed Mode of inclining offers one layer of material spilling hole.
Further, the dust protection rubber plate is located at the bottom side position of vibrating bottom plate, and the outer profile ruler of dust protection rubber plate The very little outer profile size more than vibrating bottom plate, and dust protection rubber plate is substantially preventing rubber cover structure, and height dimension is less than The height dimension of vibrating bottom plate.
Further, it is set as ten centimetres between the left side overall size of the dust protection rubber plate and the right end face of hopper Positional distance.
Further, the top surface of the partition board offers threaded hole, and is equipped with Curved structure at one by threaded hole Dust excluding plate, and the bending range of dust excluding plate reaches the top side of hopper, and is also hinged on this dust excluding plate and is connected to and can beat Push And Release The filler plate door of closed state.
Compared with prior art, the utility model has the advantages that:
The vibrating bottom plate front apron that left side is rammed in original vibrations similar to this structure is lengthened, and through peace on the inside of it Hopper at one is filled, this hopper inner chamber bottom surface and ontology bottom surface are arc-shaped structure, and its inner chamber bottom surface is by the mode of leaning forward The one layer of material spilling hole opened up can fill using the funnel of this structure and take filling sand material, can be good at solving, and dress is rammed in vibrations It sets and presses with ground carry out level when flattening, due to landing stiffness difference, the problem of being formed by first mate's degree pit, specially: When vibrations are rammed to geology softer earth's surface application pressure generation dell, a certain amount of sandstone can will be packed into funnel, with vibrations It rams during shaking together, the sandstone in funnel is made to be carried out at backfill as vibrating effect is fallen on down in the pit pressed through together Reason, makes falling rocks effect evenly, recycles vibrations to ram to applying again herein, pit is flattened, is encountering this instead of traditional When kind of situation, by way of manually directly backfilling sand material to pit, using this structure in vibration processes blanking, make blanking More uniformly.
A circle dust protection rubber plate, i.e. dust cover structure, and this dust protection rubber are also equipped on the vibrating bottom plate of bottom surface Plate is connected on the bottom surface of vibrating bottom plate by the cushion collar of rubber material ripple struction so that vibrating bottom plate is sent out with ground The sandstone dust of raw pressure contact institute output, can be stopped by downward buckle-type by a certain percentage, and dust-proof on funnel structure Plate function is the same, exactly stops to the dust of sandstone output, to improve the reasonability for being directed to this structure.
Description of the drawings
Fig. 1 is the structural schematic diagram (when removing dust excluding plate) of the utility model.
Fig. 2 is the bottom substance schematic diagram of the utility model.
Fig. 3 is the main view planar structure schematic diagram of the utility model.
Fig. 4 is the utility model only hopper internal structure schematic diagram.
In figure:Vibrations rammer main body -1, vibrating bottom plate -2, partition board -3, dust excluding plate -301, vibrating bottom plate front apron -4, Hopper -5, material spilling hole -501, dust protection rubber plate -6, cushion collar -7.
Specific implementation mode
The utility model is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 4:
The vibrations that the utility model provides earth rock placement are rammed, including main body 1, vibrating bottom plate 2 are rammed in vibrations, and partition board 3 is prevented Dirt plate 301, vibrating bottom plate front apron 4, hopper 5, material spilling hole 501, dust protection rubber plate 6 and cushion collar 7;Main body 1 is rammed in the vibrations Front end face vibrating bottom plate front apron 4 on by way of bolt through being equipped with hopper 5 at one;Main body 1 is rammed in the vibrations Underrun vibrational structure connection vibrating bottom plate 2 left side top surface on rectangle tabular at one also is installed by vertical mode The partition board 3 of structure, and partition board 3 is located at the right positions of vibrating bottom plate front apron 4 and hopper 5;The bottom surface of the vibrating bottom plate 2 is also Cushion collar 7 at one are installed, and the bottom side of cushion collar 7 is connected with dust protection rubber plate 6 at one
Wherein, the inner chamber bottom surface of the hopper 5 and ontology bottom surface are arc-shaped structure, and its inner chamber bottom surface is by the side of leaning forward Formula offers one layer of material spilling hole 501 so that the sandstone in artificial filling hopper 5, during capable of being vibrated with whole device, Material spilling hole 501 in the way of leaning forward constructed stay dimpled landscape position forwards, more uniform blanking, instead of It is traditional when encountering such case, by way of manually directly backfilling sand material to pit, using this structure vibrated Blanking in journey keeps blanking more uniform.
Wherein, the dust protection rubber plate 6 is located at the bottom side position of vibrating bottom plate 2, and the outer profile size of dust protection rubber plate 6 More than the outer profile size of vibrating bottom plate 2, and dust protection rubber plate 6 is substantially preventing rubber cover structure, and height dimension is less than The height dimension of vibrating bottom plate 2 so that when vibrating bottom plate 2 is depressed on the ground being compacted, dust protection rubber plate 6 is in corrugated knot Under the action of the cushion collar 7 of structure, snubber contact occurs with ground, meanwhile, vibrating bottom plate 2 and ground application are acted on, institute's output Dust smog be blocked, reduce the ratio that a large amount of dusts are flown upward upwards.
Wherein, it is set as ten centimetres between the left side overall size of the dust protection rubber plate 6 and the right end face of hopper 5 Positional distance so that when hopper 5 drops out downwards sandstone, will not be influenced by 6 outer profile of dust protection rubber plate.
Wherein, the top surface of the partition board 3 offers threaded hole, and is equipped with the anti-of Curved structure at one by threaded hole Dirt plate 301, and the bending range of dust excluding plate 301 reaches the top side of hopper 5, and be also hinged on this dust excluding plate 301 and be connected to and can beat The filler plate door of Push And Release closed state, using dust excluding plate 301 to the dust of output in the sandstone vibration processes in hopper 5 into The certain blocking of row reduces dust to the winged ratio that raises up.
The specifically used mode of the present embodiment and effect:
In the utility model, this device is in vibration processes, if earth's surface surface layer is inconsistent, in the section that one section pounded When upper generation pit, artificially periphery sandstone can be inserted in hopper 5, as the vibrating effect of 1 prior art of main body is rammed in vibrations, with And lifting equipment makes vibrations rammer main body 1 come back to pit top side, makes the sandstone in hopper 5 since vibrating effect is uniformly shaken Dynamic distribution, and more uniformly passed through under these uniformly distributed material spilling holes 501 and fallen in pit using vibrating effect, main body is rammed in vibrations 1 when continuing vibration, the vibrating bottom plate 2 of its bottom surface is recycled to be pounded again with sandstone is backfilled, meanwhile, during this, shake The dust protection rubber plate 6 that dynamic 2 bottom side of bottom plate is connected by cushion collar 7, acts on vibrating bottom plate 2 and ground application, the ash of institute's output Cloud of dust mist is blocked, and reduces the ratio that a large amount of dusts are flown upward upwards.
It should be noted that the vibrations of this structure ram main body is how to realize vibration, essence has been the existing skill of maturation Art, this structure, which is not done, separately to be stated, this structure is the design of left side and bottom surface structure have been done on the basis of its mature technology, therefore close In the project of its prior art, this structure no longer does hello prolixity explanation.
The opening in technical solutions of the utility model using technical solution described in the utility model or those skilled in the art It gives, designs similar technical solution, and reach above-mentioned technique effect, be to fall into the scope of protection of the utility model.

Claims (5)

1. the vibrations of earth rock placement are rammed, it is characterised in that:The vibrations of the earth rock placement are rammed, including main body is rammed in vibrations (1), vibrating bottom plate (2), partition board (3), dust excluding plate (301), vibrating bottom plate front apron (4), hopper (5), material spilling hole (501) are prevented Dirt rubber slab (6) and cushion collar (7);Pass through bolt on the vibrating bottom plate front apron (4) for the front end face that main body (1) is rammed in the vibrations Mode through being equipped with hopper at one (5);The vibrating bottom plate of the underrun vibrational structure connection of main body (1) is rammed in the vibrations (2) partition board (3) of director's square platy structure is also installed by vertical mode, and partition board (3) is located at and shakes on left side top surface The right positions of dynamic bottom plate front apron (4) and hopper (5);The bottom surface of the vibrating bottom plate (2) is also equipped with cushion collar at one (7), and the bottom side of cushion collar (7) is connected with dust protection rubber plate (6) at one.
2. the vibrations of earth rock placement as described in claim 1 are rammed, it is characterised in that:The inner chamber bottom surface of the hopper (5) and Ontology bottom surface is arc-shaped structure, and its inner chamber bottom surface offers one layer of material spilling hole (501) by the mode of leaning forward.
3. the vibrations of earth rock placement as described in claim 1 are rammed, it is characterised in that:The dust protection rubber plate (6), which is located at, to be shaken The bottom side position of dynamic bottom plate (2), and the outer profile size of dust protection rubber plate (6) is more than the outer profile size of vibrating bottom plate (2), and And dust protection rubber plate (6) is substantially preventing rubber cover structure, height dimension is less than the height dimension of vibrating bottom plate (2).
4. the vibrations of earth rock placement as claimed in claim 1 or 2 are rammed, it is characterised in that:A left side for the dust protection rubber plate (6) It is set as ten centimetres of positional distance between side profile size and the right end face of hopper (5).
5. the vibrations of earth rock placement as described in claim 1 are rammed, it is characterised in that:The top surface of the partition board (3) offers Threaded hole, and the dust excluding plate (301) of Curved structure at one is installed by threaded hole, and the bending range of dust excluding plate (301) Reach hopper (5) top side, and on this dust excluding plate (301) also be hinged be connected to can open and close status filler plate door knot Structure.
CN201721715966.9U 2017-12-09 2017-12-09 The vibrations of earth rock placement are rammed Expired - Fee Related CN207891858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721715966.9U CN207891858U (en) 2017-12-09 2017-12-09 The vibrations of earth rock placement are rammed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721715966.9U CN207891858U (en) 2017-12-09 2017-12-09 The vibrations of earth rock placement are rammed

Publications (1)

Publication Number Publication Date
CN207891858U true CN207891858U (en) 2018-09-21

Family

ID=63548679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721715966.9U Expired - Fee Related CN207891858U (en) 2017-12-09 2017-12-09 The vibrations of earth rock placement are rammed

Country Status (1)

Country Link
CN (1) CN207891858U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842015A (en) * 2017-12-09 2018-03-27 惠州市梦芭迪工业产品设计中心(普通合伙) The vibrations of earth rock placement are rammed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842015A (en) * 2017-12-09 2018-03-27 惠州市梦芭迪工业产品设计中心(普通合伙) The vibrations of earth rock placement are rammed

Similar Documents

Publication Publication Date Title
CN106884676B (en) A kind of well work subsidence area administering method of neighbouring opencut
CN206174997U (en) It moves towards subregion and keeps apart slip casting and fill structure to adopt overlying strata
CN207891858U (en) The vibrations of earth rock placement are rammed
CN106869171B (en) Pipe gallery sand cushion isolating damping device and its method of construction
CN102135006A (en) Automatic tamper type waste filling hydraulic support
CN104047214A (en) Roadbed construction method adopting aeolian sand filling
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN106320318A (en) Novel kidney discharging vibration impact device and pile manufacturing method thereof
CN107842015A (en) The vibrations of earth rock placement are rammed
CN110080198A (en) A kind of energy saving and environment friendly building hammer ram
CN105133568A (en) Improved dynamic compaction hammer
CN205046546U (en) Strong ram of improved generation
KR101694502B1 (en) Gabion adjustable the angle of inclination and construction method
CN208583582U (en) A kind of screening plant of the coal mining convenient for adjusting
CN106812118A (en) One kind is for mixing gravel earth material Gradation Control method
CN207154113U (en) A kind of vibratory sieve of dregs processing system
CN107190724A (en) A kind of automatic dynamic compaction machinery feed bin welding body
CN103240789B (en) Mounting and delivering pin mechanism of biomass scrimber pressing device
CN206205027U (en) Supervise irrigation canals and ditches excavating gear in a kind of soil
CN208603067U (en) Highway construction scene anti-clogging transports tank without fugitive dust formula cement
KR101597519B1 (en) Continuous soil solidification processing method and apparatus for preventing yellow dust and constructing meadow in desertificated area
CN209397642U (en) A kind of exploration of Novel water conservancy is with filling out hole equipment
JP7170266B2 (en) Drainage forming device
CN207348047U (en) Automatic sealing package gate-type sand compaction pile
CN206011417U (en) A kind of pre- material pressing device of plug-in type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180921

Termination date: 20191209