CN207891677U - A kind of cement pavement structure - Google Patents
A kind of cement pavement structure Download PDFInfo
- Publication number
- CN207891677U CN207891677U CN201721566492.6U CN201721566492U CN207891677U CN 207891677 U CN207891677 U CN 207891677U CN 201721566492 U CN201721566492 U CN 201721566492U CN 207891677 U CN207891677 U CN 207891677U
- Authority
- CN
- China
- Prior art keywords
- cement
- cement pavement
- concrete
- bituminous concrete
- base course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of cement pavement structure, solves cement pavement and a degree of crack occur in the road surfaces of bituminous paving stitching portion, the problem of reducing the flatness on road surface, influence the traveling of vehicle, its key points of the technical solution are that:It is equipped with crushed rock base course immediately below the cement concrete, crushed rock base course is filled in the skewed slot, being horizontally disposed in the crushed rock base course has bearing plate, and the bearing plate is located at the stitching portion of cement pavement and bituminous paving, the cement pavement and the upper surface of bituminous paving stitching portion are provided with buffer stopper, a kind of cement pavement structure of the utility model improves the flatness of cement concrete pavement and bituminous paving stitching portion, reduces the influence to driving vehicle.
Description
Technical field
The utility model is related to a kind of pavement structure, more particularly to a kind of cement pavement structure.
Background technology
In highways and streets and airport roadway, use to be most widely the ordinary cement of cast in situs mixed at present
Solidifying soil surface, this kind of cement concrete pavement remove seaming zone and subrange(Edge or corner)Outside, not configuration reinforcement, it is also known as plain
Concrete road surface.
In the building of road, generally in old Cement Concrete Pavement asphalt concrete pavement, since cement is mixed
Solidifying soil surface is in rigidity, and intensity is high, stability is good, and bituminous paving has certain elasticity, plastic deformation ability in flexibility,
Therefore easily there is pit slot in the stitching portion of cement concrete pavement and bituminous paving, it is easy to occur to jump vehicle situation.
A changeover portion is set in the stitching portion of cement concrete pavement and bituminous paving at present, but in cement concrete pavement
It still will appear a degree of crack with the road surfaces of bituminous paving stitching portion, reduce the flatness on road surface, influence the row of vehicle
It sails, there is room for improvement.
Utility model content
The purpose of this utility model is to provide a kind of cement pavement structure, improves cement pavement and bituminous paving stitching portion
Flatness reduces the influence to driving vehicle.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of cement pavement structure, including the horizontal cement concrete being laid with, with cement concrete splicing and be located at same
Horizontal particulate formula bituminous concrete, the skewed slot being opened in below particulate formula bituminous concrete, the cement concrete just under
Side is equipped with crushed rock base course, crushed rock base course is filled in the skewed slot, being horizontally disposed in the crushed rock base course has bearing plate, and institute
The stitching portion that bearing plate is located at cement pavement and bituminous paving is stated, the cement pavement and the upper surface of bituminous paving stitching portion are set
It is equipped with buffer stopper.
Using the above scheme, changeover portion of the skewed slot as cement pavement and bituminous paving so that rigid cement pavement with
The connection of bituminous paving flexible is more harmonious;The setting of bearing plate, when vehicle passes through the connection of cement pavement and bituminous paving
Place, bearing plate to be layed in the crushed rock base course stress equalization in cement pavement and bituminous paving, and then weaken vehicle to connection
The destructive power at place;The setting of buffer stopper improves the survivability of junction upper surface, so that junction is kept centainly
Flatness.
Preferably, the buffer stopper is arranged in Z-shaped, the first filling slot and the second filling are provided on the buffer stopper
Slot.
Using the above scheme, buffer stopper is arranged in Z-shaped, has higher intensity, is not easy to be destroyed after vehicle warp,
The stability for improving junction, so that junction keeps certain flatness.
Preferably, being filled with crushed rock base course in first filling slot, particulate formula is filled in second filling slot
Bituminous concrete.
Using the above scheme, the filling of crushed rock base course and bituminous concrete so that buffer stopper preferably with bituminous paving and
Cement pavement splices and combines together, improves the flatness and stability on entire road surface.
Preferably, issuing for the particulate formula bituminous concrete is equipped with middle grain formula bituminous concrete, the middle grain formula
Side of the bituminous concrete far from particulate formula bituminous concrete and the crushed rock base course being filled in skewed slot contradict.
Using the above scheme, the laying of particulate formula bituminous concrete and middle grain formula bituminous concrete different size improves drip
The strength and stability on green road surface.
Preferably, being equipped with Coarse Graded Bituminous Concrete, the coarse grain formula below the middle grain formula bituminous concrete
Side of the bituminous concrete far from middle grain formula bituminous concrete and the crushed rock base course being filled in skewed slot contradict.
Using the above scheme, the bituminous concrete of different gradation type makes bituminous paving form closely knit, stable, roughness and fit
Preferably, long-lived road surface.
Preferably, the middle grain formula bituminous concrete is laid with the trapezoidal shape of Coarse Graded Bituminous Concrete.
Using the above scheme, the laying of trapezoidal shape so that the crushed rock base course from cement pavement to bituminous paving and coarse grain formula
The trapezoidal shape setting of splicing of bituminous concrete so that the road surface of stitching portion has certain changeover portion, and then prevents in stitching portion
Generate pit slot.
Preferably, being provided with drainpipe in the crushed rock base course that the cement pavement is laid with.
Using the above scheme, on the surface of cement pavement there are when certain ponding, the setting of drainpipe, convenient for by rainwater into
Row is collected and then is drained into blowoff basin, reduces the amount of ponding on cement pavement to a certain extent.
Preferably, being provided with drainpipe in the skewed slot.
Using the above scheme, in skewed slot drainpipe setting, the rainwater convenient for being oozed out from bituminous concrete is quickly discharged into
To stormwater tank, and then influence of the rainwater to bituminous paving is reduced to a certain extent.
In conclusion the utility model has the advantages that:The setting of bearing plate, buffer stopper so that from cement road
The upper surface of face to bituminous paving stitching portion has certain buffering, transition, and then improves the stability and flatness of stitching portion,
Reduce the influence to driving vehicle.
Description of the drawings
Fig. 1 is the sectional view of bituminous paving and cement pavement stitching section;
Fig. 2 is the enlarged diagram in the portions A in Fig. 1.
In figure:1, cement concrete;2, particulate formula bituminous concrete;3, skewed slot;4, crushed rock base course;5, bearing plate;6, delay
Rush block;7, the first filling slot;8, the second filling slot;9, middle grain formula bituminous concrete;10, Coarse Graded Bituminous Concrete;11, it drains
Pipe;12, element soil;13, cushion lime;14, cement pavement;15, bituminous paving.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
As shown in Figure 1, a kind of cement pavement structure disclosed in the present embodiment, including cement pavement 14 and cement pavement 14
Positioned at same horizontal line bituminous paving 15, be layed in cement pavement 14 and 15 bottommost of bituminous paving and in the horizontal element being laid with
Soil 12, the cushion lime 13 being layed on plain soil 12.
As shown in Figure 1, the most surface of cement pavement 14 is equipped with cement concrete 1, the most surface of bituminous paving 15 is laid with
Have has particulate formula bituminous concrete 2 compared with less friction to vehicle, and particulate formula bituminous concrete 2 is located at cement concrete 1
Same level.
As shown in Figure 1, side of the cement concrete 1 far from road surfaces is equipped with crushed rock base course 4, and crushed rock base course 4 is separate
The side of cement concrete 1 is contradicted with cushion lime 13.The cushion lime 13 being layed in bituminous paving 15 is dripped close to particulate formula
The side of green concrete 2 offers skewed slot 3, and skewed slot 3 is inclined to set close to the bottom surface of 14 one end of cement pavement, is located at pitch
The skewed slot 3 on road surface 15 has one section of bottom surface being arranged in horizontal plane.Crushed rock base course 4 is filled in skewed slot 3.Bituminous paving 15 and cement
The bearing plate 5 for the setting that is square is provided in the crushed rock base course 4 of 14 stitching portion of road surface, and bearing plate 5 is parallel to particulate formula pitch
Concrete 2.
As shown in Figure 1, 2, the upper surface of cement pavement 14 and 15 stitching portion of bituminous paving is provided with buffer stopper 6, and buffers
The upper surface of block 6 and the upper surface of cement pavement 14 and bituminous paving 15 are located at same horizontal line, and buffer stopper 6 is arranged in Z-shaped.
It is provided with the first filling slot 7 and the second filling slot 8 on buffer stopper 6, the notch of the first filling slot 7 is towards cement pavement 14, and second
The notch of filling slot 8 is towards bituminous paving 15, and the first filling slot 7 and the second filling slot 8 are in that " ∠ " shape is arranged.First filling
It is filled with crushed rock base course 4 in slot 7, particulate formula bituminous concrete 2 is filled in the second filling slot 8.As shown in Figure 1, particulate formula drips
Side of the green concrete 2 far from road surfaces is equipped with middle grain formula bituminous concrete 9, and middle grain formula bituminous concrete 9 is far from particulate formula
The side of bituminous concrete 2 is equipped with Coarse Graded Bituminous Concrete 10, and middle grain formula bituminous concrete 9 and coarse grain formula pitch coagulation
Soil 10 is close to the trapezoidal shape setting in one end of cement pavement 14.Coarse Graded Bituminous Concrete 10 is close to cement pavement 14 and far from
The side of grain formula bituminous concrete 9 is contradicted with crushed rock base course 4.Coarse Graded Bituminous Concrete 10 is far from cement pavement 14 and far from
The side of grain formula bituminous concrete 9 is contradicted with cushion lime 13, and resistance surface is arranged in horizontal plane.
As shown in Figure 1, skewed slot 3 is in be provided with drainpipe 11, the crushed rock base course 4 of cement pavement 14 on horizontally disposed bottom surface
In be also equipped with drainpipe 11, drainpipe 11 is in horizontally disposed, and the circular in cross-section setting of drainpipe 11.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (8)
1. a kind of cement pavement structure, including the horizontal cement concrete (1) being laid with, with cement concrete (1) splicing and be located at
The particulate formula bituminous concrete (2) of same horizontal line, the skewed slot (3) being opened in below particulate formula bituminous concrete (2), feature
It is:It is equipped with crushed rock base course (4) immediately below the cement concrete (1), crushed rock base course (4), institute are filled in the skewed slot (3)
It states to be horizontally disposed in crushed rock base course (4) and has bearing plate (5), and the bearing plate (5) is located at the spelling of cement pavement and bituminous paving
Place is met, the cement pavement and the upper surface of bituminous paving stitching portion are provided with buffer stopper (6).
2. a kind of cement pavement structure according to claim 1, it is characterized in that:The buffer stopper (6) is arranged in Z-shaped,
It is provided with the first filling slot (7) and the second filling slot (8) on the buffer stopper (6).
3. a kind of cement pavement structure according to claim 2, it is characterized in that:It is filled in first filling slot (7)
Crushed rock base course (4) is filled with particulate formula bituminous concrete (2) in second filling slot (8).
4. a kind of cement pavement structure according to claim 1, it is characterized in that:The particulate formula bituminous concrete (2)
It issues and is equipped with middle grain formula bituminous concrete (9), the middle grain formula bituminous concrete (9) is far from particulate formula bituminous concrete (2)
Side and the crushed rock base course (4) that is filled in skewed slot (3) contradict.
5. a kind of cement pavement structure according to claim 4, it is characterized in that:The middle grain formula bituminous concrete (9)
Lower section is equipped with Coarse Graded Bituminous Concrete (10), and the Coarse Graded Bituminous Concrete (10) is far from middle grain formula bituminous concrete
(9) side is contradicted with the crushed rock base course (4) being filled in skewed slot (3).
6. a kind of cement pavement structure according to claim 5, it is characterized in that:The middle grain formula bituminous concrete (9) with
The trapezoidal shape of Coarse Graded Bituminous Concrete (10) is laid with.
7. a kind of cement pavement structure according to claim 1, it is characterized in that:The crushed rock base course that the cement pavement is laid with
(4) drainpipe (11) is provided in.
8. a kind of cement pavement structure according to claim 1, it is characterized in that:It is provided with drainpipe in the skewed slot (3)
(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721566492.6U CN207891677U (en) | 2017-11-21 | 2017-11-21 | A kind of cement pavement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721566492.6U CN207891677U (en) | 2017-11-21 | 2017-11-21 | A kind of cement pavement structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207891677U true CN207891677U (en) | 2018-09-21 |
Family
ID=63547794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721566492.6U Expired - Fee Related CN207891677U (en) | 2017-11-21 | 2017-11-21 | A kind of cement pavement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207891677U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455766A (en) * | 2020-04-14 | 2020-07-28 | 重庆义伦公路建设有限公司 | Regenerated asphalt concrete structure for road and construction process thereof |
-
2017
- 2017-11-21 CN CN201721566492.6U patent/CN207891677U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455766A (en) * | 2020-04-14 | 2020-07-28 | 重庆义伦公路建设有限公司 | Regenerated asphalt concrete structure for road and construction process thereof |
CN111455766B (en) * | 2020-04-14 | 2022-04-12 | 重庆义伦公路建设有限公司 | Regenerated asphalt concrete structure for road and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207699971U (en) | A kind of asphalt pavement structure | |
US20090180833A1 (en) | Pavedrain | |
CN205276099U (en) | Drainage formula brick that permeates water | |
CN109098064A (en) | The sponge urban road structure for avoiding rainwater on road surface from depositing | |
CN101985823A (en) | Sliding continuous reinforced concrete pavement, composite pavement and construction method thereof | |
CN201817761U (en) | Sliding type continuous reinforced concrete pavement and combined pavement | |
CN102051848B (en) | HMA/CC (Hot-Mix Asphalt)/(Cement Concrete) composite type pavement structure and constructing method thereof | |
CA2720230C (en) | Drainage system, apparatus, and method | |
CN207891677U (en) | A kind of cement pavement structure | |
CN107700299A (en) | A kind of elevated bridge lower floor road structure and its construction method | |
KR101043285B1 (en) | Settlement of the road surface to prevent the construction of drainage facilities, and he used to drain | |
CN209039963U (en) | A kind of platform back preventing car jump between high road bed and bridge | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
CN216551386U (en) | New old bituminous paving basic unit of environment-friendly links up structure | |
CN107268368A (en) | Latch gap water-permeable brick | |
CN211079810U (en) | Avoid pitch highway of ponding | |
CN201010988Y (en) | Conveniently draining shutter grate cover | |
CN203834313U (en) | Impound strap for highway pavement | |
CN207714483U (en) | One kind being used for the low-lying place's drainage system of city asphalt concrete pavement | |
CN105926407A (en) | Highway water seepage structure | |
CN203411895U (en) | Drainage facility for highway bridge floor | |
CN203498724U (en) | Routing table drainage system in construction period of expressway reconstruction and extension project | |
CN208395598U (en) | It is a kind of for improving the concrete precast block of easy ponding region | |
CN207435841U (en) | A kind of campus asphalt paving structure | |
CN208701457U (en) | Pavement bricks, the pavement using pavement bricks and engineering road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 Termination date: 20201121 |