CN207883114U - A kind of train rail information collection Transmission system of high-speed railway - Google Patents
A kind of train rail information collection Transmission system of high-speed railway Download PDFInfo
- Publication number
- CN207883114U CN207883114U CN201820246897.XU CN201820246897U CN207883114U CN 207883114 U CN207883114 U CN 207883114U CN 201820246897 U CN201820246897 U CN 201820246897U CN 207883114 U CN207883114 U CN 207883114U
- Authority
- CN
- China
- Prior art keywords
- information acquisition
- module
- orbit
- speed railway
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The utility model discloses a kind of train rail information collection Transmission systems of high-speed railway, including orbit information monitoring center and multiple orbit information acquisition nodes, each orbit information acquisition node is set to the different sections of highway of high-speed railway, and the output end of each orbit information acquisition node is connect with orbit information monitoring center.The utility model is by being arranged the orbit information acquisition node in different sections of highway, the train rail information of acquisition high-speed railway in real time, it is transferred to orbit information monitoring center, the information of acquisition includes vibration information, acoustic information, video information and environmental information, sufficient orbit analysis foundation is provided for orbit information monitoring center, is convenient to formulate maintenance strategy;Also, self-organized network communication can be carried out between each orbit information acquisition node, even if between one of orbit information acquisition node and monitoring center when network interruption, collected information can also be uploaded by other nodes, be conducive to the timely upload of information.
Description
Technical field
The utility model is related to railroad track detection, the train rail information collection more particularly to a kind of high-speed railway passes
Defeated system.
Background technology
Railway transportation has many advantages, such as that freight volume is big, travelling speed is fast, has been increasingly becoming the main traffic of today's society
One of means of transportation, from object of transport, railway transportation can be divided into two class of passenger transportation and freight shipments, for now,
The means of transportation of this two class has a wide range of applications in China;With the development of railway technology, high-speed railway gradually appears;Speed
For railway in process of construction, camber is small, and measures and use elevated bridge and tunnel, for traditional railway transportation, high speed
Faster, driving more smooth-going safety has the progress of expanding economy and social standard of living important railway transportation speed
Effect.
The train rail of high-speed railway with the increase of use time, it is possible that various problems, to ensure high speed
The train driving safety of railway, it is necessary to train rail be safeguarded, and to realize that train rail is effectively safeguarded, must just be slapped
Hold train rail real time status.Therefore, the train rail information for acquiring high-speed railway in real time, uploads to orbit information monitoring center
It is extremely important, it is extremely important for the train rail maintenance of high-speed railway, but if the orbit information acquisition section in some sections
There is the case where network interruption between point and monitoring center, it will cause train rail information not upload in time, be unfavorable for arranging
The monitoring and maintenance of vehicle orbit information, increase the security risk of train operation on high-speed railway.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of train rail information of high-speed railway
Acquiring and transmission system acquires the train rail of high-speed railway in real time by the way that the orbit information acquisition node in different sections of highway is arranged
Information is transferred to orbit information monitoring center, and the information of acquisition includes vibration information, acoustic information, video information and environment letter
Breath provides sufficient orbit analysis foundation for orbit information monitoring center, is convenient to formulate maintenance strategy;Also, each rail
Self-organized network communication can be carried out between road information collection node, though one of orbit information acquisition node and monitoring center it
Between network interruption when, collected information can also be uploaded by other nodes, be conducive to the timely upload of information.
The purpose of this utility model is achieved through the following technical solutions:A kind of train rail letter of high-speed railway
Cease acquiring and transmission system, including orbit information monitoring center and multiple orbit information acquisition nodes, each orbit information acquisition section
During point is set to the different sections of highway of high-speed railway, and the output end of each orbit information acquisition node is monitored with orbit information
The heart connects;
The orbit information acquisition node includes that vibration information acquisition module, acoustic information acquisition module, video information are adopted
Collect module, environment information acquisition module, microprocessor, locating module and wireless sending module;The vibration information acquisition module,
Acoustic information acquisition module, video information acquisition module, environment information acquisition module and locating module output end with micro- place
Device connection is managed, the output end of microprocessor is connect by wireless sending module with orbit information monitoring center;
The orbit information acquisition node further includes group-net communication module, and the group-net communication module connects with microprocessor
It connects, self-organized network communication is carried out by group-net communication module between each orbit information acquisition node.
Wherein, the vibration information acquisition module includes the vibrating sensor being set on high speed railway track, vibration
The output end of sensor is connect with microprocessor;The acoustic information acquisition module includes the record being set to by high speed railway track
The output end of mixer, the recording device is connect with microprocessor;The video information acquisition module includes being set to high speed
The output end of camera by railroad track, the camera is connect with microprocessor;The environment information acquisition module includes
Temperature sensor, humidity sensor, air velocity transducer, wind transducer and baroceptor, the temperature sensor, humidity pass
Sensor, air velocity transducer, wind transducer and baroceptor output end connect with microprocessor;The locating module is
GPS positioning module or Beidou positioning module;The group-net communication module is Zigbee communication module.
The orbit information monitoring center includes wireless receiving module, central processing unit, display module and memory module, institute
It states wireless receiving module and communicates interconnection with the foundation of the wireless sending module of each orbit information acquisition node, receive and believe from track
Cease the information of acquisition node, the output end of wireless receiving module connect with central processing unit, central processing unit respectively with show mould
Block is connected with memory module.
The utility model has the beneficial effects that:By the way that the orbit information acquisition node in different sections of highway is arranged, acquire in real time
The train rail information of high-speed railway is transferred to orbit information monitoring center, and the information of acquisition includes vibration information, sound letter
Breath, video information and environmental information provide sufficient orbit analysis foundation for orbit information monitoring center, are convenient to formulate dimension
Shield strategy;Also, self-organized network communication can be carried out between each orbit information acquisition node, even if one of orbit information is adopted
When collecting network interruption between node and monitoring center, collected information can also be uploaded by other nodes, be conducive to information
Timely upload.
Description of the drawings
Fig. 1 is the system principle diagram of the present invention;
Fig. 2 is the functional block diagram of orbit information acquisition node;
Fig. 3 is the functional block diagram of orbit information monitoring center.
Specific implementation mode
The technical solution of the utility model, but the scope of protection of the utility model are described in further detail below in conjunction with the accompanying drawings
It is not limited to as described below.
As shown in Figure 1, a kind of train rail information collection Transmission system of high-speed railway, including orbit information monitoring center
With multiple orbit information acquisition nodes, each orbit information acquisition node is set to the different sections of highway of high-speed railway, and each
The output end of orbit information acquisition node is connect with orbit information monitoring center;
As shown in Fig. 2, the orbit information acquisition node include vibration information acquisition module, acoustic information acquisition module,
Video information acquisition module, environment information acquisition module, microprocessor, locating module and wireless sending module;The vibration letter
Cease the output of acquisition module, acoustic information acquisition module, video information acquisition module, environment information acquisition module and locating module
End is connect with microprocessor, and the output end of microprocessor is connect by wireless sending module with orbit information monitoring center;
The orbit information acquisition node further includes group-net communication module, and the group-net communication module connects with microprocessor
It connects, self-organized network communication is carried out by group-net communication module between each orbit information acquisition node.
Wherein, the vibration information acquisition module includes the vibrating sensor being set on high speed railway track, vibration
The output end of sensor is connect with microprocessor;The acoustic information acquisition module includes the record being set to by high speed railway track
The output end of mixer, the recording device is connect with microprocessor;The video information acquisition module includes being set to high speed
The output end of camera by railroad track, the camera is connect with microprocessor;The environment information acquisition module includes
Temperature sensor, humidity sensor, air velocity transducer, wind transducer and baroceptor, the temperature sensor, humidity pass
Sensor, air velocity transducer, wind transducer and baroceptor output end connect with microprocessor;The locating module is
GPS positioning module or Beidou positioning module;The group-net communication module is Zigbee communication module.
As shown in figure 3, the orbit information monitoring center include wireless receiving module, central processing unit, display module and
Memory module, the wireless receiving module communicate interconnection with the foundation of the wireless sending module of each orbit information acquisition node, connect
The information from orbit information acquisition node is received, the output end of wireless receiving module is connect with central processing unit, central processing unit
It is connect respectively with display module and memory module.
The operation principle of the utility model is as follows:Orbit information acquisition node in different sections of highway is set, acquires phase in real time
Answer track vibration information, video monitoring information and the management for environment monitor information in section(Temperature, humidity, wind speed, wind direction and air pressure), pass
It is defeated by orbit information monitoring center, especially the utility model and is provided with recording device, Ke Yilu in track information collection node
Train processed passes through sound, can be more accurate, comprehensive in conjunction with track vibration information, video monitoring information and management for environment monitor information
Ground reflects track condition, and sufficient orbit analysis foundation is provided for orbit information monitoring center.Orbit information monitoring center will
The information received is preserved by memory module, and is shown in display module, is convenient to staff and is carried out directly
It checks with seeing, and then is convenient to formulate maintenance strategy;When uploading the train rail information of fast railway, locating module is provided
Information is carried out at the same time upload, in order to when finding failure, can positioning failure section, formulate maintenance strategy, reduce train fortune
Capable security risk;Since orbit information acquisition node further includes group-net communication module, group-net communication module connects with microprocessor
It connects, therefore self-organized network communication can be carried out by group-net communication module between each orbit information acquisition node, even if one of them
Between orbit information acquisition node and monitoring center when network interruption, collected information can also be uploaded by other nodes,
Be conducive to the timely upload of information, and then be conducive to the timely discovery of failure and safeguard in time, further reduces high-speed railway
The security risk of upper train operation.
Claims (8)
1. a kind of train rail information collection Transmission system of high-speed railway, it is characterised in that:Including orbit information monitoring center
With multiple orbit information acquisition nodes, each orbit information acquisition node is set to the different sections of highway of high-speed railway, and each
The output end of orbit information acquisition node is connect with orbit information monitoring center;
The orbit information acquisition node includes vibration information acquisition module, acoustic information acquisition module, video information acquisition mould
Block, environment information acquisition module, microprocessor, locating module and wireless sending module;The vibration information acquisition module, sound
Information acquisition module, video information acquisition module, environment information acquisition module and locating module output end and microprocessor
Connection, the output end of microprocessor are connect by wireless sending module with orbit information monitoring center;
The orbit information acquisition node further includes group-net communication module, and the group-net communication module is connect with microprocessor, respectively
Self-organized network communication is carried out by group-net communication module between a orbit information acquisition node.
2. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
The vibration information acquisition module stated includes the vibrating sensor being set on high speed railway track, the output end of vibrating sensor with
Microprocessor connects.
3. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It includes the recording device being set to by high speed railway track to state acoustic information acquisition module, the output end of the recording device with it is micro-
Processor connects.
4. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It includes the camera being set to by high speed railway track, the output end and microprocessor of the camera to state video information acquisition module
Device connects.
5. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It includes temperature sensor, humidity sensor, air velocity transducer, wind transducer and air pressure sensing to state environment information acquisition module
Device, the temperature sensor, humidity sensor, air velocity transducer, wind transducer and baroceptor output end with it is micro-
Processor connects.
6. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It is GPS positioning module or Beidou positioning module to state locating module.
7. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It is Zigbee communication module to state group-net communication module.
8. a kind of train rail information collection Transmission system of high-speed railway according to claim 1, it is characterised in that:Institute
It includes wireless receiving module, central processing unit, display module and memory module, the wireless receiving to state orbit information monitoring center
Module communicates interconnection with the foundation of the wireless sending module of each orbit information acquisition node, receives and comes from orbit information acquisition node
Information, the output end of wireless receiving module connect with central processing unit, central processing unit respectively with display module and storage mould
Block connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820246897.XU CN207883114U (en) | 2018-02-11 | 2018-02-11 | A kind of train rail information collection Transmission system of high-speed railway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820246897.XU CN207883114U (en) | 2018-02-11 | 2018-02-11 | A kind of train rail information collection Transmission system of high-speed railway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207883114U true CN207883114U (en) | 2018-09-18 |
Family
ID=63498170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820246897.XU Expired - Fee Related CN207883114U (en) | 2018-02-11 | 2018-02-11 | A kind of train rail information collection Transmission system of high-speed railway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207883114U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108280980A (en) * | 2018-02-11 | 2018-07-13 | 成都兴联宜科技有限公司 | A kind of train rail information collection Transmission system of high-speed railway |
CN109068290A (en) * | 2018-10-24 | 2018-12-21 | 成都旸谷信息技术有限公司 | A kind of rail traffic equipment information collection terminal |
CN110470736A (en) * | 2019-08-20 | 2019-11-19 | 深圳科安达电子科技股份有限公司 | A kind of rail monitoring system and its control method based on wireless network |
CN112799402A (en) * | 2020-12-28 | 2021-05-14 | 广东电网有限责任公司 | Detection method and system for operation track of cable tunnel robot |
CN112799402B (en) * | 2020-12-28 | 2024-07-09 | 广东电网有限责任公司 | Detection method and system for cable tunnel robot running track |
-
2018
- 2018-02-11 CN CN201820246897.XU patent/CN207883114U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108280980A (en) * | 2018-02-11 | 2018-07-13 | 成都兴联宜科技有限公司 | A kind of train rail information collection Transmission system of high-speed railway |
CN109068290A (en) * | 2018-10-24 | 2018-12-21 | 成都旸谷信息技术有限公司 | A kind of rail traffic equipment information collection terminal |
CN110470736A (en) * | 2019-08-20 | 2019-11-19 | 深圳科安达电子科技股份有限公司 | A kind of rail monitoring system and its control method based on wireless network |
CN112799402A (en) * | 2020-12-28 | 2021-05-14 | 广东电网有限责任公司 | Detection method and system for operation track of cable tunnel robot |
CN112799402B (en) * | 2020-12-28 | 2024-07-09 | 广东电网有限责任公司 | Detection method and system for cable tunnel robot running track |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107380202B (en) | Based on NB-IoT net rail vehicle Spindle Status monitoring method and system | |
CN207883114U (en) | A kind of train rail information collection Transmission system of high-speed railway | |
CN107972695A (en) | A kind of Internet of Things rail vehicle axle health status intellectual monitoring administrative system apparatus | |
CN203283258U (en) | Integrated running train security monitoring system | |
CN108466635A (en) | A kind of train driving monitoring early-warning system of high-speed railway | |
CN208014168U (en) | A kind of Vehicle Orientation, Monitoring & Control System in vcehicular tunnel | |
CN107705234A (en) | A kind of system supervised using vehicle road pavement quality and its monitoring and managing method | |
CN206255021U (en) | A kind of lorry intelligent online monitoring device | |
CN101138983A (en) | Railway sliding vehicle automatic monitoring and alarm control system of the wireless sensor network | |
CN107380201A (en) | Based on wide area network and LAN axletree health status monitoring method and monitoring system | |
CN202120326U (en) | Monitoring system for transportation management of city slag vehicles | |
CN105115605A (en) | Track train infrared detection system and detection method | |
CN105702032B (en) | A kind of monitoring of roadside accident and alarm system | |
CN201917321U (en) | Device for automatically detecting length, width and height of high-speed dynamic state highway transport vehicle | |
CN108090661A (en) | Rolling stock intelligent vehicle scheduling management method and system and device | |
CN105000033B (en) | A kind of check and evaluation system of track geometry irregularities | |
CN101308152A (en) | Alcohol test method and system based on wireless network | |
CN108280980A (en) | A kind of train rail information collection Transmission system of high-speed railway | |
CN108717788A (en) | A kind of integrated information processing system of intelligent traffic light and transit equipment | |
CN108667138A (en) | Intelligence system for power station inspection | |
CN107021116A (en) | A kind of monitoring system of the track vehicle based on technology of Internet of things | |
CN205787842U (en) | A kind of intelligence environmental sanitation transhipment website long distance control system | |
CN208091718U (en) | A kind of rail traffic vehicles Collection transmitting device | |
CN207180769U (en) | A kind of underground coal mine environment monitoring device based on various topological structures | |
CN105988460B (en) | Vehicle runway dynamic testing method, device and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180918 Termination date: 20210211 |