CN207879362U - A kind of mine laneway maintenance tool - Google Patents
A kind of mine laneway maintenance tool Download PDFInfo
- Publication number
- CN207879362U CN207879362U CN201820302702.9U CN201820302702U CN207879362U CN 207879362 U CN207879362 U CN 207879362U CN 201820302702 U CN201820302702 U CN 201820302702U CN 207879362 U CN207879362 U CN 207879362U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- catch basin
- anchor
- maintenance tool
- mine laneway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model is related to temporary support device technical fields,And disclose a kind of mine laneway maintenance tool,Including anchor net,The both sides on the anchor surface off the net have been fixedly connected with link block,The middle part of the link block, which is run through, anchor pole,The anchor net is fixedly connected with catch basin close to the lower surface of link block one end,The catch basin is fixedly connected with fixed block close to the side of anchor surface,The lower surface of the catch basin is fixedly connected with support plate,The lower surface of the support plate is fixedly connected with telescopic rod,The mine laneway maintenance tool,By the way that catch basin and drainage sponge is arranged,Make the water oozed out in rock when construction,Catch basin is flowed by draining sponge,So that environmental quality of the maintenance personnel in construction is improved,By the way that connecting hoop is arranged,So that anchor net length arbitrarily can be increased and reduce by connecting hoop,So that the device greatly improves the adaptability of construction environment,Save human and material resources simultaneously.
Description
Technical field
The utility model is related to temporary support device technical field, specially a kind of mine laneway maintenance tool.
Background technology
China's coal-mine is mainly underground mining, needs to dig a large amount of tunnels in underground, tunnel is kept using roadway support
Unimpeded and adjoining rock stability is of great significance to construction of coal mine and production, to tunnel carry out supporting basic object be mitigate and
The movement for reducing country rock, makes drift section that will not excessively reduce, while preventing from having dissipated the country rock inbreak from destruction, roadway support
Effect but depend not only on the supporting force of holder itself, (supporting force and can also be contracted by rock property, holder mechanical property
Property), support setting density, the morning and evening for installing the holder time, support setting quality and the way of contact (point contact or face with country rock
Contact) etc. series of factors influence, in general, in order to make excavation support adjust with deformation controlling for rock surrounding gateways during play actively
Effect, holder should be installed before country rock occurs to loosen and destroy, so that holder is in the case where country rock is still maintained from load
Play carrying jointly with country rock, rather than wait country rocks occurred it is loose, destroy, almost lose in the case of the load again
Go to undertake the weight of inbreak sillar with holder, that is to say, that holder and country rock should be made in mutual constraint and complementary
Under the conditions of realize common carrying.
Suspension device is fallen when safeguarding in lane, need to use provisional suspension device, but existing temporary support device, exist
, complicated installation is inconvenient time-consuming and laborious, while also lacking, in construction to rock in institute's water seepage collection device, lead
The construction environment of maintenance personnel is caused to deteriorate.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of mine laneway maintenance tool, have it is simple in structure,
Easy for installation time saving and energy saving, institute's water seepage can be collected effectively in rock when to construction, improve maintenance personnel in construction
Environmental quality the advantages that, it is inconvenient time-consuming and laborious to solve complicated installation, while institute in also lacking in construction to rock
The collection device of water seepage, cause maintenance personnel's construction environment deteriorate the problem of.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of mine laneway maintenance tool, including anchor
The both sides of net, the anchor surface off the net have been fixedly connected with link block, and the middle part of the link block, which is run through, anchor pole, the anchor net
Lower surface close to link block one end is fixedly connected with catch basin, and the catch basin is fixedly connected with close to the side of anchor surface
The lower surface of fixed block, the catch basin is fixedly connected with support plate, and the lower surface of the support plate is fixedly connected with telescopic rod,
Fixing bolt is fixedly connected in the middle part of the telescopic rod, the outer surface of the telescopic rod is set with protective shell, the protective shell
Lower surface be fixedly connected with support base, the lower surface of the support base is fixedly connected with pressure-proof spring, the pressure-proof spring
Lower surface is fixedly connected with pedestal.
Preferably, the anchor pole runs through the middle part of fixed block and link block.
Preferably, it is connected with connecting hoop in the middle part of the anchor net.
Preferably, the lower surface of the catch basin offers water outlet, and the lower surface of the water outlet is fixedly connected with
Outlet valve.
Preferably, the protective shell is stainless steel.
Preferably, the upper surface of anchor net is provided with drainage sponge inside the catch basin.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of mine laneway maintenance tool, has following advantageous effect:
1, the mine laneway maintenance tool makes to be oozed out in rock when construction by the way that catch basin and drainage sponge is arranged
Water flows into catch basin by draining sponge so that environmental quality of the maintenance personnel in construction is improved.
2, the mine laneway maintenance tool, by be arranged connecting hoop, make anchor net length can arbitrarily be increased by connecting hoop with
It reduces so that the device greatly improves the adaptability of construction environment, while saving human and material resources.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure catch basin schematic diagram.
In figure:1 anchor net, 2 link blocks, 3 anchor poles, 4 catch basins, 5 fixed blocks, 6 support plates, 7 telescopic rods, 8 fixing bolts, 9
Protective shell, 10 support bases, 11 pressure-proof springs, 12 pedestals, 13 connecting hoops, 14 water outlets, 15 outlet valves, 16 drainage sponges.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 to Fig. 2, the utility model provides a kind of technical solution:A kind of mine laneway maintenance tool, including anchor
The middle part of net 1, anchor net 1 is connected with connecting hoop 13, so that 1 length of anchor net arbitrarily can be increased and reduce by connecting hoop 13, makes
It obtains the device to greatly improve the adaptability of construction environment, while saving human and material resources, the both sides of 1 lower surface of anchor net are equal
It is fixedly connected with link block 2, through there is anchor pole 3, anchor net 1 is fixed close to the lower surface of 2 one end of link block to be connected at the middle part of link block 2
It is connected to catch basin 4,4 inside of catch basin is provided with drainage sponge 16 close to the upper surface of anchor net 1, makes to be oozed out in rock when construction
Water, pass through drain sponge 16 flow into catch basin 4 so that maintenance personnel construction when environmental quality be improved, catchment
The lower surface of slot 4 offers water outlet 14, and the lower surface of water outlet 14 is fixedly connected with outlet valve 15, and catch basin 4 is close to anchor
The side on 3 surface of bar is fixedly connected with fixed block 5, and anchor pole 3 runs through the middle part of fixed block 5 and link block 2, the following table of catch basin 4
Face is fixedly connected with support plate 6, and the lower surface of support plate 6 is fixedly connected with telescopic rod 7, and the middle part of telescopic rod 7 is fixedly connected with
The outer surface of fixing bolt 8, telescopic rod 7 is set with protective shell 9, and protective shell 9 is stainless steel, and the lower surface of protective shell 9 is solid
Surely it is connected with support base 10, the lower surface of support base 10 is fixedly connected with pressure-proof spring 11, and the lower surface of pressure-proof spring 11 is fixed
It is connected with pedestal 12.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
In conclusion the mine laneway maintenance tool, by the way that catch basin 4 and drainage sponge 16 is arranged, rock when making construction
Middle oozed out water flows into catch basin 4 by draining sponge 16 so that environmental quality of the maintenance personnel in construction is carried
Height makes 1 length of anchor net arbitrarily can increase and reduce by connecting hoop 13 so that the device is to construction by the way that connecting hoop 13 is arranged
The adaptability of environment greatly improves, while saving human and material resources.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of mine laneway maintenance tool, including anchor net (1), it is characterised in that:The both sides of anchor net (1) lower surface are solid
Surely it is connected with link block (2), the middle part of the link block (2) is through there is anchor pole (3), and the anchor net (1) is close to link block (2) one
The lower surface at end is fixedly connected with catch basin (4), and the catch basin (4) is fixedly connected with close to the side on anchor pole (3) surface
Determine block (5), the lower surface of the catch basin (4) is fixedly connected with support plate (6), and the lower surface of the support plate (6), which is fixed, to be connected
It is connected to telescopic rod (7), fixing bolt (8), the outer surface of the telescopic rod (7) are fixedly connected in the middle part of the telescopic rod (7)
It is set with protective shell (9), the lower surface of the protective shell (9) is fixedly connected with support base (10), under the support base (10)
Surface is fixedly connected with pressure-proof spring (11), and the lower surface of the pressure-proof spring (11) is fixedly connected with pedestal (12).
2. a kind of mine laneway maintenance tool according to claim 1, it is characterised in that:The anchor pole (3) is through fixation
The middle part of block (5) and link block (2).
3. a kind of mine laneway maintenance tool according to claim 1, it is characterised in that:It lives at the middle part of the anchor net (1)
It is dynamic to be connected with connecting hoop (13).
4. a kind of mine laneway maintenance tool according to claim 1, it is characterised in that:The following table of the catch basin (4)
Face offers water outlet (14), and the lower surface of the water outlet (14) is fixedly connected with outlet valve (15).
5. a kind of mine laneway maintenance tool according to claim 1, it is characterised in that:The protective shell (9) is stainless
Steel material.
6. a kind of mine laneway maintenance tool according to claim 1, it is characterised in that:It is leaned on inside the catch basin (4)
The upper surface of nearly anchor net (1) is provided with drainage sponge (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820302702.9U CN207879362U (en) | 2018-03-05 | 2018-03-05 | A kind of mine laneway maintenance tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820302702.9U CN207879362U (en) | 2018-03-05 | 2018-03-05 | A kind of mine laneway maintenance tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207879362U true CN207879362U (en) | 2018-09-18 |
Family
ID=63495986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820302702.9U Expired - Fee Related CN207879362U (en) | 2018-03-05 | 2018-03-05 | A kind of mine laneway maintenance tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207879362U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110486085A (en) * | 2019-03-12 | 2019-11-22 | 浙江交工宏途交通建设有限公司 | A kind of Karst Geological Landscape constructing tunnel drainage arrangement |
WO2024113545A1 (en) * | 2022-11-28 | 2024-06-06 | 中铁北京工程局集团(天津)工程有限公司 | Drainage apparatus for karst formation tunnel construction |
-
2018
- 2018-03-05 CN CN201820302702.9U patent/CN207879362U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110486085A (en) * | 2019-03-12 | 2019-11-22 | 浙江交工宏途交通建设有限公司 | A kind of Karst Geological Landscape constructing tunnel drainage arrangement |
CN110486085B (en) * | 2019-03-12 | 2020-12-11 | 浙江交工宏途交通建设有限公司 | Karst geology tunnel construction drainage device |
WO2024113545A1 (en) * | 2022-11-28 | 2024-06-06 | 中铁北京工程局集团(天津)工程有限公司 | Drainage apparatus for karst formation tunnel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207879362U (en) | A kind of mine laneway maintenance tool | |
CN207143708U (en) | A kind of across foundation ditch synthesis steel trestle of lift-on/lift-off type | |
CN204385984U (en) | Back of the body bolt suspension member group formula shaped steel keel stone curtain wall | |
CN113107524B (en) | Supporting method for roadway specially used for treating rock burst and application | |
CN106677806B (en) | A kind of tubular type canopy frame support structure for underworkings, tunnel | |
CN209482338U (en) | A kind of plug-in type prefabricated pile basis | |
CN208038953U (en) | Novel pavement structure in subsidence area | |
CN207277630U (en) | A kind of stone curtain wall that can be mounted and dismounted from outside | |
CN210238433U (en) | Slope protection net for hydraulic engineering | |
CN201606995U (en) | High-efficient air filter seal installation system equipped with flume | |
CN209227552U (en) | A kind of band is conducive to the pattern foundation pit supporting structure of discharge structure | |
CN208363125U (en) | A kind of mounting structure of centrifuge ground | |
CN110158655B (en) | Comprehensive pipe gallery system based on BIM technology | |
CN208123629U (en) | Outdoor overhead lifting pipeline equipment | |
CN207807693U (en) | A kind of adjustable pipe rack of civil engineering | |
CN209144964U (en) | A kind of efficient rainwater isolation collection device | |
CN203783050U (en) | Special-shaped stone point hanging structure | |
CN209585098U (en) | A kind of substation equipment bracket novel steel tube short column pile foundation | |
CN102974179B (en) | Anti-dust water curtain system and its making method | |
CN208220810U (en) | A kind of U-shaped frame colliery tunnel support structure | |
CN202893126U (en) | Raise dust preventing water curtain system | |
CN214738643U (en) | Rainwater well cover | |
CN213978833U (en) | Ecological bank protection of water conservancy building | |
CN208153038U (en) | A kind of supporting construction on excacation arm | |
CN220248111U (en) | Supporting template for fault crushing belt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180918 Termination date: 20190305 |