CN207878742U - A kind of large span apleuria full glass curtain wall installation system - Google Patents

A kind of large span apleuria full glass curtain wall installation system Download PDF

Info

Publication number
CN207878742U
CN207878742U CN201820082832.6U CN201820082832U CN207878742U CN 207878742 U CN207878742 U CN 207878742U CN 201820082832 U CN201820082832 U CN 201820082832U CN 207878742 U CN207878742 U CN 207878742U
Authority
CN
China
Prior art keywords
square tube
curtain wall
steel
glass curtain
large span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820082832.6U
Other languages
Chinese (zh)
Inventor
黄子毅
肖强
颜建新
罗卫军
刘荣辉
谢杰
麦剑枫
陈小霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Century Construction Group Co Ltd
Original Assignee
Guangdong Century Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Century Construction Group Co Ltd filed Critical Guangdong Century Construction Group Co Ltd
Priority to CN201820082832.6U priority Critical patent/CN207878742U/en
Application granted granted Critical
Publication of CN207878742U publication Critical patent/CN207878742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of large span apleuria full glass curtain wall installation system, large-span glass curtain wall mounting system includes:Upper supporting arrangement, upper supporting arrangement include upper built-in fitting and upper square tube, and upper square tube is fixed on built-in fitting, and lateral square tube is equipped on upper square tube both sides, multiple upper steel fasteners are equipped with below lateral square tube;Lower supporting apparatus, lower supporting apparatus includes lower built-in fitting, channel steel and lower square tube, channel steel is mounted on lower built-in fitting, the side of channel steel is equipped with lower square tube, and the other side of channel steel is equipped with lower steel fastener, and glass installation groove is respectively formed between upper steel fastener, between lower square tube and lower steel fastener, glass to be fixed between upper supporting arrangement and lower supporting apparatus, in this way so that it is easy for installation, it is efficient.

Description

A kind of large span apleuria full glass curtain wall installation system
Technical field
The utility model is related to technical fields, and in particular to a kind of large span apleuria full glass curtain wall installation system.
Background technology
Full glass curtain wall in building glass curtain wall refers to the glass curtain wall formed for glass fin by panel support structure, Because its vision is penetrating, span is big, great modern sense, thus it is widely used to obtain building designers.But also there is disadvantage:Design Glass Rib occupies the interior space;Glass self-explosion influences safe to use;Use suspension type supporting structure, installation multiple in large span It is miscellaneous, efficiency is low.
Invention content
In view of the above technical problems, the utility model provides a kind of large span apleuria full glass curtain wall installation system, installation It is convenient, it is efficient.
In order to solve the above technical problems, the technical solution that the utility model uses is:A kind of large span apleuria is provided Full glass curtain wall installation system, the large span apleuria full glass curtain wall installation system include:Upper supporting arrangement, the upper bearing Device includes upper built-in fitting and upper square tube, and the upper square tube is fixed on the upper built-in fitting, is all provided on the upper square tube both sides There is lateral square tube, multiple upper steel fasteners are equipped with below the transverse direction square tube;Lower supporting apparatus, under the lower supporting apparatus includes Built-in fitting, channel steel and lower square tube, the channel steel are mounted on the lower built-in fitting, and the side of the channel steel is equipped with the lower section Pipe, the other side of the channel steel are equipped with steel fastener, between the upper steel fastener, the lower square tube and the steel fastener it Between be respectively formed glass installation groove, glass is fixed between the upper supporting arrangement and the lower supporting apparatus.
Wherein, the lateral square tube on the outside of the upper supporting arrangement be equipped with fixing bolt, the fixing bolt will be described on Steel fastener is detachably fixed in the square tube laterally outside.
Wherein, the large span apleuria full glass curtain wall installation system further includes deep floor, the deep floor difference Setting is between the upper square tube and the lateral square tube and between the channel steel and the lower steel fastener.
Wherein, the large span apleuria full glass curtain wall installation system further includes glass block, the glass block setting On the Glass base and both sides.
The utility model has the beneficial effects that:The case where being different from the prior art, the utility model embodiment provide this Kind large span apleuria full glass curtain wall installation system only needs first install upper lower support structure, then glass is installed to installation Installation can be realized in slot, solve the problems, such as background technology, this mounting structure simple installation, efficiency well Height meets the demand of modern architecture installation.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment large span apleuria full glass curtain wall installation system;
Fig. 2 is the lower supporting apparatus schematic diagram of the utility model embodiment large span apleuria full glass curtain wall installation system.
Figure label explanation:1, upper built-in fitting;2, upper square tube;3, lateral square tube;301, square tube laterally outside;4, upper steel connects Fitting;5, lower built-in fitting;6, channel steel;7, lower square tube;8, lower steel fastener;9, glass;10, fixing bolt;11, deep floor; 12, glass block.
Specific implementation mode
The utility model is more fully retouched below with reference to relevant drawings for the ease of understanding the utility model, It states.The preferred embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms It realizes, however it is not limited to embodiment described herein.Make to the utility model on the contrary, purpose of providing these embodiments is The understanding of disclosure is more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with the technology for belonging to the utility model The normally understood meaning of technical staff in domain is identical.Terminology used in the description of the utility model herein only be The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term " and or " used herein includes Any and all combinations of one or more relevant Listed Items, in addition, " first " used herein, " second " etc. Description be used for description purposes only, be not understood to indicate or imply its relative importance or implicitly indicate indicated technology The quantity of feature.
Referring to Fig. 1, as shown, the utility model embodiment provides a kind of large span apleuria full glass curtain wall installation system System, large span apleuria full glass curtain wall installation system include:Upper supporting arrangement, upper supporting arrangement include upper built-in fitting 1 and top Pipe 2, upper square tube 2 are fixed on built-in fitting 1, and lateral square tube 3 is equipped on 2 both sides of upper square tube, and 3 lower section of lateral square tube is equipped with more A upper steel fastener 4;Lower supporting apparatus, lower supporting apparatus include lower built-in fitting 5, channel steel 6 and lower square tube 7, and channel steel is mounted on On lower built-in fitting 5, the indoor of channel steel 6 is equipped with lower square tube 7, and the outside of channel steel 6 is equipped with lower steel fastener 8, upper steel fastener 4 Between, between lower square tube 7 and lower steel fastener 8 be respectively formed glass installation groove, glass 9 is fixed on upper supporting arrangement Between lower supporting apparatus.
Particularly, the square tube laterally outside 301 of upper supporting arrangement is equipped with fixing bolt 10, and fixing bolt 10 connects upper steel Fitting 4 is detachably fixed in square tube 301 laterally outside, and when installing glass, glass is first packed into upper and lower In glass installation groove, then upper steel fastener 4 is installed to by fixing bolt 10 in square tube 301 laterally outside, to realize glass The installation of glass is fixed, and dismountable upper steel fastener 4 greatly facilitates the installation of glass so that the installation process of entire glass It is simple and fast.
Wherein, in the present embodiment, the upper steel fastener 4 in square tube 301 is detachable by fixing bolt 10 laterally outside It is fixed, and the upper steel fastener 4 of inside is then on the inside of being fixed on by welding in lateral square tube, moreover, upper steel connects Part 4 arranges one in lateral square tube per 500mm.
Particularly, large span apleuria full glass curtain wall installation system further includes deep floor 11, and deep floor 11 is set respectively It sets between pipe 2 above and lateral square tube 3 and on lower steel fastener 8.
Particularly, large span apleuria full glass curtain wall installation system further includes glass block 12, and the setting of glass block 12 exists On 9 bottom of glass and both sides.
The utility model has the beneficial effects that:The case where being different from the prior art, the utility model embodiment provide this Kind large span apleuria full glass curtain wall installation system only needs first install upper lower support structure, then glass is installed to installation Installation can be realized in slot, solve the problems, such as background technology, this mounting structure simple installation, efficiency well Height meets the demand of modern architecture installation.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in Other related technical areas are equally included in the patent within the scope of the utility model.

Claims (4)

1. a kind of large span apleuria full glass curtain wall installation system, which is characterized in that the large-span glass curtain wall mounting system Including:
Upper supporting arrangement, the upper supporting arrangement include upper built-in fitting and upper square tube, and the upper square tube is fixed on described pre-buried On part, it is equipped with lateral square tube on the upper square tube both sides, multiple upper steel fasteners are equipped with below the transverse direction square tube;
Lower supporting apparatus, the lower supporting apparatus include lower built-in fitting, channel steel and lower square tube, the channel steel be mounted on it is described under On built-in fitting, the side of the channel steel is equipped with the lower square tube, and the other side of the channel steel is equipped with steel fastener, and the upper steel connects It is respectively formed glass installation groove between fitting, between the lower square tube and the steel fastener, glass is fixed on institute It states between supporting arrangement and the lower supporting apparatus.
2. large span apleuria full glass curtain wall installation system according to claim 1, which is characterized in that the upper branch installs The lateral square tube for setting outside is equipped with fixing screws, and the upper steel fastener is detachably fixed on institute by the fixing bolt It states in square tube laterally outside.
3. large span apleuria full glass curtain wall installation system according to claim 1, which is characterized in that the large span without Rib full glass curtain wall installation system further includes deep floor, and the deep floor is separately positioned on the upper square tube and the transverse direction Between square tube and between the channel steel and the lower steel fastener.
4. large span apleuria full glass curtain wall installation system according to claim 1, which is characterized in that the large span without Rib full glass curtain wall installation system further includes glass block, and the glass block is arranged on the Glass base and both sides.
CN201820082832.6U 2018-01-16 2018-01-16 A kind of large span apleuria full glass curtain wall installation system Active CN207878742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820082832.6U CN207878742U (en) 2018-01-16 2018-01-16 A kind of large span apleuria full glass curtain wall installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820082832.6U CN207878742U (en) 2018-01-16 2018-01-16 A kind of large span apleuria full glass curtain wall installation system

Publications (1)

Publication Number Publication Date
CN207878742U true CN207878742U (en) 2018-09-18

Family

ID=63507335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820082832.6U Active CN207878742U (en) 2018-01-16 2018-01-16 A kind of large span apleuria full glass curtain wall installation system

Country Status (1)

Country Link
CN (1) CN207878742U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680842A (en) * 2018-11-23 2019-04-26 北京江河幕墙系统工程有限公司 A kind of no floor transparent curtain wall system and its installation method
CN110670775A (en) * 2019-11-05 2020-01-10 深圳市中装建设集团股份有限公司 Ultra-wide and ultra-high rib-free full-glass curtain wall
CN114856048A (en) * 2022-05-25 2022-08-05 苏州金螳螂幕墙有限公司 Rib-free hanging type mounting structure of ultra-large-span full-glass curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680842A (en) * 2018-11-23 2019-04-26 北京江河幕墙系统工程有限公司 A kind of no floor transparent curtain wall system and its installation method
CN110670775A (en) * 2019-11-05 2020-01-10 深圳市中装建设集团股份有限公司 Ultra-wide and ultra-high rib-free full-glass curtain wall
CN114856048A (en) * 2022-05-25 2022-08-05 苏州金螳螂幕墙有限公司 Rib-free hanging type mounting structure of ultra-large-span full-glass curtain wall

Similar Documents

Publication Publication Date Title
CN207878742U (en) A kind of large span apleuria full glass curtain wall installation system
CN107435394B (en) Partition wall and connecting structure thereof
CN205534627U (en) A compound is hung structure and props up and hang subassembly for multi -channel connects
TWI679388B (en) Solar panel frame group
CN206737222U (en) Cell cube section curtain wall installing device
CN101316974A (en) Profile for a cladding frame
KR101205957B1 (en) Fixing apparatus for finishing pannel
CN216787565U (en) Curtain wall panel hook structure and curtain wall structure
KR101087607B1 (en) Assembly pipe tray
WO2020143222A1 (en) Fabricated suspended ceiling structure and installation method therefor
CN216195920U (en) Suspended ceiling hanging structure for interior decoration
CN203036218U (en) Camera multifunctional installation fixing device
CN105476343A (en) Novel carpet display rack
CN205840109U (en) A kind of flexible hanging piece suspended ceiling of tubulose
CN215069150U (en) Support base capable of adjusting angle of flagpole
JP3150922U (en) Drain-up piping for air conditioning indoor units
CN209511788U (en) Pendent lamp mounting structure
CN204676757U (en) Suspended-ceiling suspension device
CN112411808A (en) Aluminum plate installation device for light steel keel partition wall
KR20120119314A (en) Structure for fixing ceiling of building
CN205855691U (en) A kind of elevator guide shoe support
CN209339431U (en) A kind of furred ceiling sunpender fixed structure based on side wall bracket
CN212564717U (en) Piping lane support
CN220100730U (en) Wire hanging assembly and reference line vertical setting structure comprising same
CN211345588U (en) Assembled pendant mechanism for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant