CN205534627U - A compound is hung structure and props up and hang subassembly for multi -channel connects - Google Patents

A compound is hung structure and props up and hang subassembly for multi -channel connects Download PDF

Info

Publication number
CN205534627U
CN205534627U CN201620243903.7U CN201620243903U CN205534627U CN 205534627 U CN205534627 U CN 205534627U CN 201620243903 U CN201620243903 U CN 201620243903U CN 205534627 U CN205534627 U CN 205534627U
Authority
CN
China
Prior art keywords
pipeline
wall
fixture
pipe clamp
type steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620243903.7U
Other languages
Chinese (zh)
Inventor
麦卫通
王欢欢
麦小锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guoli Science And Technology Co ltd
Original Assignee
Shenzhen Guoli Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guoli Science And Technology Co ltd filed Critical Shenzhen Guoli Science And Technology Co ltd
Priority to CN201620243903.7U priority Critical patent/CN205534627U/en
Application granted granted Critical
Publication of CN205534627U publication Critical patent/CN205534627U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a compound is hung structure and props up and hang subassembly for multi -channel connects, its medium counts hang the structure and include bracing piece, mounting and pipe clamp, and the mounting is two departments at least, and the length direction that can follow the bracing piece on the bracing piece that concatenates that it was parallel to each other slides to form big or small adjustable centre gripping clearance between adjacent mounting, the pipe clamp is installed on the mounting. The utility model discloses can a plurality of rectangular pipes of the integrated installation and pipe on a department gallows, reduced the use amount of a pipeline gallows, the pipeline of also being convenient for is put and is arranged, both dismouting alone of pipeline simultaneously also can be regarded as and hang that the structure is whole carries out the dismouting, and the operation more has the flexibility, simple structure, easily realization.

Description

A kind of composite support connected for multi-pipeline hangs structure and hangs assembly with propping up
Technical field
This utility model relates to Pipe installing field, especially relate to a kind of hang structure and application this hang structure hang assembly.
Background technology
For meeting the demand of the aspects such as building structure ventilation, water flowing and cabling, it will usually be provided with multi units tube road.For the consideration making full use of space, pipeline majority is ceiling mounted, for avoiding pipeline to fall threat personal safety, people carry out the fixing of pipeline by suspension and support, but the pipeline in building has various shape, such as rectangular tube, round tube etc., prior art is usually the most fixing for difform pipeline, but this mode can increase the usage quantity of suspension and support, also it is unfavorable for the arrangement of pipeline enclosure simultaneously.
Utility model content
In order to overcome the deficiencies in the prior art, this utility model provides a kind of composite support connected for multi-pipeline to hang structure, can decrease the usage amount of pipe-hanger support with the multiple rectangular tube of integrated installation and pipe, also allow for pipeline and put and arrange at one on suspension and support;Pipeline both can individually dismount simultaneously, it is also possible to dismounts as hanging structure entirety, and operation has more motility, simple in construction, it is easy to accomplish.
This utility model also provides for a kind of and hangs assembly.
This utility model solves its technical problem and be the technical scheme is that
A kind of composite support connected for multi-pipeline hangs structure, including support bar, fixture and pipe clamp, fixture is at least at two, what it was parallel to each other is serially connected on support bar and can slide along the length direction of support bar, to form size adjustable clamping gap between adjacent fixture, pipe clamp is arranged on fixture.
As the further improved procedure of such scheme, support bar is screw rod, and screw rod is bolted with nut in the top and bottom of any fixture.
As the further improved procedure of such scheme, fixture is C-type steel, is provided with through hole on diapire relative with its opening in C-type steel, and screw rod passes in opening and through hole.
As the further improved procedure of such scheme, including U-shaped connector, connector is provided with the through hole passed through for screw rod, and it is connected in the open side of C-type steel, and its vertical edge is coated on the outside of C-type steel.
As the further improved procedure of such scheme, pipe clamp is arranged on the upper end of described fixture, lower end or side.
Further improved procedure as such scheme, pipe clamp includes a semicircular arc sections, and the two ends of arc sections are tangentially extended with the first wall, and the tail end of the first wall is provided with the second perpendicular wall, second wall is provided with through hole, and it is locked in C-type steel by screw and nut.
Further improved procedure as such scheme, pipe clamp includes an arc sections, the two ends of arc sections are extended with the 3rd wall and the 4th wall respectively, wherein the tail end of the 3rd wall is provided with groove, it is connected on the medial wall of C-type steel opening by groove and can slide along the length direction of C-type steel, 4th wall is provided with through hole, and the pipe clamp at two docks so that arc sections forms a semicircular structure, by screw and nut locking between the 4th wall.
A kind of is hung assembly, and the combination for rectangular tube with pipe is fixed, and hangs structure including above-mentioned composite support, and rectangular tube is located between adjacent fixture and is clamped by it, and pipe is fixed by pipe clamp.
As the further improved procedure of such scheme, including being located at the L-type banking stop of the rectangular tube left and right sides, banking stop is fixed on fixture by one side, and its another side supports with rectangular tube.
The beneficial effects of the utility model are:
At one, the usage amount of pipe-hanger support can be decreased with the multiple rectangular tube of integrated installation and pipe on suspension and support, also allow for pipeline and put and arrange;Pipeline both can individually dismount simultaneously, it is also possible to dismounts as hanging structure entirety, and operation has more motility, simple in construction, it is easy to accomplish.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is the front view of one embodiment of this utility model;
Fig. 2 is the side view in Fig. 1;
Fig. 3 is the axonometric chart in Fig. 1;
Fig. 4 is the schematic diagram of this utility model pipe clamp first embodiment;
Fig. 5 is the schematic diagram of this utility model pipe clamp the second embodiment.
Detailed description of the invention
Below with reference to embodiment and accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is carried out clear, complete description, to be completely understood by the purpose of this utility model, scheme and effect.It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutually combined.
It should be noted that if no special instructions, when a certain feature is referred to as " fixing ", " connection " in another feature, and it can directly be fixed, be connected in another feature, it is also possible to indirectly fixes, be connected in another feature.Additionally, the upper and lower, left and right etc. used in this utility model describe and are only for the mutual alignment relation of each ingredient of this utility model in accompanying drawing.
Additionally, unless otherwise defined, all of technology used herein is identical with the implication that scientific terminology is generally understood that with those skilled in the art.Term the most used in the description is intended merely to describe specific embodiment rather than in order to limit the present invention.Term as used herein " and/or " include that the arbitrary of one or more relevant Listed Items combines.
Referring to figs. 1 through Fig. 3, it is shown that the accompanying drawings of one embodiment of this utility model, including support bar 1, fixture 2 and pipe clamp 3.
At fixture 2 at least two, what it was parallel to each other is serially connected on support bar 1 and can slide along the length direction of support bar 1, to form size adjustable clamping gap between adjacent fixture 2, it can be fixed by the way of the two ends up and down of clamping rectangular tube by this fixture 2, it is understandable that, multiple fixture 2 can be set along support bar 1, thus fix multiple rectangular tubes.
Preferably, as a kind of preferred implementation of support bar, it is screw rod.
Further, fixture preferably employs C-type steel, the one side of C-type steel has opening, and shaped steel is provided with through hole relative to the diapire of opening, screw rod passes to realize the section bar slip relative to screw rod with through hole from opening, in addition, screw rod is bolted with nut 41 in the top and bottom of arbitrary profile, this nut 41 1 aspect can promote shaped steel to slide by the turn of relative screw rod, thus regulate the size clamping gap between adjacent shaped steel, on the other hand the most again can when static locking shaped steel, the spacing in fixed clamp gap.
Further, because the one side of section bar has opening, therefore its two side that may result in opening part when bearing bigger external force is expanded laterally, for improving this problem, the present embodiment is preferably also provided with U-shaped connector 42, connector 42 includes a base plate, and the both sides that base plate is relative are provided with perpendicular vertical edge, and base plate is additionally provided with the through hole passed through for screw rod.Connector 42 is connected in the open side of C-type steel, and its base plate covers opening, and vertical edge is coated on the outside of C-type steel, such that it is able to limit the deformation of shaped steel, additionally, connector 42 is also used as installing the pad of nut 41, it is simple to shaped steel is exerted a force by nut.
Pipe clamp 3 is as the structure of fixing pipe, and it is arranged on fixture, preferably, in the present embodiment, only lower end at lower section fixture is provided with pipe clamp, it is understood that pipe clamp 3 can also be arranged on upper end or other side of fixture 2, it is also possible to be to be both provided with pipe clamp on each fixture.
With reference to Fig. 4, as a kind of preferred implementation of pipe clamp, it includes a semicircular arc sections 31, and the two ends of arc sections 31 are tangentially extended with the first wall 32, and the tail end of the first wall 32 is provided with the second perpendicular wall 33, and the second wall 33 is provided with through hole.During installation, pipe clamp being placed on shaped steel and has the side of opening, then the inside at shaped steel arranges a nut, and this nut is spacing and can not directly deviate from from opening part by opening, is locked on shaped steel by pipe clamp by screw the most again, and arc sections 31 just can be with fixed-piping.
With reference to Fig. 5, another kind of preferred implementation as pipe clamp, it is split type structure, pipe clamp includes an arc sections 34, arc sections 34 is approximately quarter circular arc, and its two ends are extended with the 3rd wall 35 and the 4th wall 36 respectively, and wherein the tail end of the 3rd wall 35 is provided with groove 351, it is connected on the medial wall of C-type steel opening by groove and can slide along the length direction of C-type steel, and the 4th wall 36 is provided with through hole.During use, the pipe clamp docking at two, so that arc sections 34 forms a semicircular structure, then carries out locking by screw and nut to the 4th wall, and now pipe just can be fixed between semicircular structure.
The invention also discloses a kind of and hang assembly, it includes that above-mentioned composite support hangs structure, and the combination being mainly used in rectangular tube and pipe is fixed.Rectangular tube 5 is located between adjacent fixture and is clamped by it, and pipe 6 is fixed by pipe clamp 3.By arranging multiple fixture 2 and multiple pipe clamps 3, the combinative structure of multiple rectangular tube and pipe can be formed, as arranged multiple fixture to realize the installation of multiple rectangular tube along the length direction of support bar 1, multiple pipe clamp can be set again on the most each fixture, significantly increase the installation quantity of pipeline, pipeline both can individually dismount simultaneously, it is also possible to hanging structure as overall propping up and dismount, operation has more motility.
Preferably, in order to avoid rectangular tube occurs the displacement along fastener length direction, also including the L-type banking stop 7 being located at rectangular tube 5 left and right sides, banking stop 7 is fixed on fixture by one side, and its another side supports with rectangular tube.
Additionally, in order to promote an intensity hanging structure, be additionally provided with main brace 8 and diagonal brace 9, wherein main brace 8 is connected with fixture 1 with one end of diagonal brace 9, and the other end is connected with building body respectively.
It is above preferable enforcement of the present utility model is illustrated, but the invention is not limited to described embodiment, those of ordinary skill in the art it may also be made that all equivalent variations or replacement on the premise of this utility model spirit, and deformation or the replacement of these equivalents are all contained in the application claim limited range.

Claims (9)

1. the composite support connected for multi-pipeline hangs structure, it is characterized in that: include support bar, fixture and pipe clamp, described fixture is at least at two, what it was parallel to each other is serially connected on described support bar and can slide along the length direction of support bar, to form size adjustable clamping gap between adjacent fixture, described pipe clamp is arranged on described fixture.
The composite support connected for multi-pipeline the most according to claim 1 hangs structure, it is characterised in that: described support bar is screw rod, and described screw rod is bolted with nut in the top and bottom of any described fixture.
The composite support connected for multi-pipeline the most according to claim 2 hangs structure, it is characterised in that: described fixture is C-type steel, is provided with through hole on diapire relative with its opening in described C-type steel, and described screw rod passes in described opening and through hole.
The composite support connected for multi-pipeline the most according to claim 3 hangs structure, it is characterized in that: include U-shaped connector, described connector is provided with the through hole passed through for screw rod, and it is connected in the open side of described C-type steel, and its vertical edge is coated on the outside of described C-type steel.
The composite support connected for multi-pipeline the most according to claim 3 hangs structure, it is characterised in that: described pipe clamp is arranged on the upper end of described fixture, lower end or side.
The composite support connected for multi-pipeline the most according to claim 5 hangs structure, it is characterized in that: described pipe clamp includes a semicircular arc sections, the two ends of described arc sections are tangentially extended with the first wall, the tail end of described first wall is provided with the second perpendicular wall, described second wall is provided with through hole, and it is locked in described C-type steel by screw and nut.
The composite support connected for multi-pipeline the most according to claim 5 hangs structure, it is characterized in that: described pipe clamp includes an arc sections, the two ends of described arc sections are extended with the 3rd wall and the 4th wall respectively, wherein the tail end of the 3rd wall is provided with groove, it is connected on the medial wall of described C-type steel opening by described groove and can slide along the length direction of C-type steel, described 4th wall is provided with through hole, described pipe clamp at two docks so that described arc sections forms a semicircular structure, by screw and nut locking between described 4th wall.
8. one kind is hung assembly, combination for rectangular tube with pipe is fixed, it is characterized in that: include that the composite support according to any one of claim 1 to 7 hangs structure, described rectangular tube is located between adjacent described fixture and is clamped by it, and described pipe is fixed by described pipe clamp.
The most according to claim 8 hang assembly for what multi-pipeline connected, it is characterized in that: include being located at the L-type banking stop of the described rectangular tube left and right sides, described banking stop is fixed on described fixture by one side, and its another side supports with described rectangular tube.
CN201620243903.7U 2016-03-28 2016-03-28 A compound is hung structure and props up and hang subassembly for multi -channel connects Active CN205534627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620243903.7U CN205534627U (en) 2016-03-28 2016-03-28 A compound is hung structure and props up and hang subassembly for multi -channel connects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620243903.7U CN205534627U (en) 2016-03-28 2016-03-28 A compound is hung structure and props up and hang subassembly for multi -channel connects

Publications (1)

Publication Number Publication Date
CN205534627U true CN205534627U (en) 2016-08-31

Family

ID=56786150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620243903.7U Active CN205534627U (en) 2016-03-28 2016-03-28 A compound is hung structure and props up and hang subassembly for multi -channel connects

Country Status (1)

Country Link
CN (1) CN205534627U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107120480A (en) * 2017-06-28 2017-09-01 安徽奥睿德科技发展有限公司 A kind of anti-rock para-seismic support for being easy to adjust pipeline setting height(from bottom)
CN107143700A (en) * 2017-06-02 2017-09-08 安徽奥睿德科技发展有限公司 A kind of para-seismic support for being used to fix utilidor and non-utilidor
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN107339514A (en) * 2017-06-02 2017-11-10 安徽奥睿德科技发展有限公司 A kind of flame retardant type assembled anti-knock support of multilayer water pipe
CN108361254A (en) * 2018-02-28 2018-08-03 成都新力紧科技有限公司 A kind of electromechanical installation hanger system of building
CN108736418A (en) * 2018-07-12 2018-11-02 江苏雄海智能电气有限公司 A kind of bus duct mounting bracket
CN108825882A (en) * 2018-06-01 2018-11-16 广东邦达机电科技有限公司 A kind of manifold road antidetonation branch crane system
CN109488005A (en) * 2018-09-12 2019-03-19 深圳市建艺装饰集团股份有限公司 Horizontal pipe mounting structure and construction method
CN112647643A (en) * 2021-01-20 2021-04-13 上海建工二建集团有限公司 Pipeline fixing device and method for masonry structure wall
CN112762233A (en) * 2019-10-21 2021-05-07 江苏固泰建筑材料科技有限公司 Pipeline spring support and hanger
CN114427986A (en) * 2022-04-06 2022-05-03 南京庆瑞水泥有限公司 Cement powder sampling and detecting system in concrete production

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143700A (en) * 2017-06-02 2017-09-08 安徽奥睿德科技发展有限公司 A kind of para-seismic support for being used to fix utilidor and non-utilidor
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN107339514A (en) * 2017-06-02 2017-11-10 安徽奥睿德科技发展有限公司 A kind of flame retardant type assembled anti-knock support of multilayer water pipe
CN107120480A (en) * 2017-06-28 2017-09-01 安徽奥睿德科技发展有限公司 A kind of anti-rock para-seismic support for being easy to adjust pipeline setting height(from bottom)
CN108361254A (en) * 2018-02-28 2018-08-03 成都新力紧科技有限公司 A kind of electromechanical installation hanger system of building
CN108825882A (en) * 2018-06-01 2018-11-16 广东邦达机电科技有限公司 A kind of manifold road antidetonation branch crane system
CN108736418A (en) * 2018-07-12 2018-11-02 江苏雄海智能电气有限公司 A kind of bus duct mounting bracket
CN108736418B (en) * 2018-07-12 2020-08-11 江苏雄海智能电气有限公司 Bus duct installing support
CN109488005A (en) * 2018-09-12 2019-03-19 深圳市建艺装饰集团股份有限公司 Horizontal pipe mounting structure and construction method
CN109488005B (en) * 2018-09-12 2020-09-15 深圳市建艺装饰集团股份有限公司 Horizontal pipeline installation structure and construction method
CN112762233A (en) * 2019-10-21 2021-05-07 江苏固泰建筑材料科技有限公司 Pipeline spring support and hanger
CN112647643A (en) * 2021-01-20 2021-04-13 上海建工二建集团有限公司 Pipeline fixing device and method for masonry structure wall
CN114427986A (en) * 2022-04-06 2022-05-03 南京庆瑞水泥有限公司 Cement powder sampling and detecting system in concrete production

Similar Documents

Publication Publication Date Title
CN205534627U (en) A compound is hung structure and props up and hang subassembly for multi -channel connects
CN104315255B (en) Anti-seismic connecting support combined structure
US9360136B2 (en) Double hangar
KR101205957B1 (en) Fixing apparatus for finishing pannel
CN204005124U (en) Mounting bracket and LED display
CN204176142U (en) A kind of antidetonation connects substrate and antidetonation connection bracket composite structure
CN203454040U (en) Lamp mounting structure
CN207878742U (en) A kind of large span apleuria full glass curtain wall installation system
CN208934232U (en) Indoor suspended ceiling structure
CN202274266U (en) Flat television rack
CN206377128U (en) Keyhole connector, shock-resistant slant bar assembly and the antidetonation suspension bracket of brace are shaken for bilateral monoclonal antibody
CN212643749U (en) Water pipe hanger
CN215721273U (en) A assembled component for piping lane construction
CN209169914U (en) It broadens the cable suspension and support of section for pipe gallery
CN209325704U (en) A kind of moveable hanging column
CN206888312U (en) Assembled open-type builds the general erection support and mounting assembly of bottom plate
CN218843504U (en) Suspended ceiling system
CN208267184U (en) A kind of staggered form tapered end connection otic placode and the glass curtain wall support construction comprising it
CN207714580U (en) A kind of installation system of no crossbeam stone curtain wall
CN213575924U (en) Be applied to hanging sign indicating number of air conditioner installation
CN203068447U (en) Multifunctional aluminum alloy lantern support
CN104563358A (en) Parallel keel ceiling
CN214034332U (en) Suspended ceiling structure convenient to installation
CN218064139U (en) Wall-hung mounting structure
CN218441032U (en) Multi-angle adjustable type anti-seismic support hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 518000, 202, 203, 204, Building 3, Taiyu Business Building, Industrial Zone B, Wulian Team, Shangcun Community, Gongming Street, Guangming District, Shenzhen City, Guangdong Province

Patentee after: SHENZHEN GUOLI SCIENCE AND TECHNOLOGY Co.,Ltd.

Country or region after: China

Address before: 518100 Room 1006, Jiayu Building, Hongxing Community, Songgang Street, Bao'an District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN GUOLI SCIENCE AND TECHNOLOGY Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address