CN207878287U - A kind of box culvert construct concrete placing installation - Google Patents

A kind of box culvert construct concrete placing installation Download PDF

Info

Publication number
CN207878287U
CN207878287U CN201820156028.8U CN201820156028U CN207878287U CN 207878287 U CN207878287 U CN 207878287U CN 201820156028 U CN201820156028 U CN 201820156028U CN 207878287 U CN207878287 U CN 207878287U
Authority
CN
China
Prior art keywords
fixedly connected
block
funnel
box culvert
concrete placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820156028.8U
Other languages
Chinese (zh)
Inventor
詹磊
王海君
吴居涛
麦剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU RAPID TRANSIT CONSTRUCTION CO Ltd
Original Assignee
GUANGZHOU RAPID TRANSIT CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU RAPID TRANSIT CONSTRUCTION CO Ltd filed Critical GUANGZHOU RAPID TRANSIT CONSTRUCTION CO Ltd
Priority to CN201820156028.8U priority Critical patent/CN207878287U/en
Application granted granted Critical
Publication of CN207878287U publication Critical patent/CN207878287U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a kind of box culvert construct concrete placing installation, is related to concrete placing installation field.The box culvert construct concrete placing installation, including prefabricated mould, it is fixedly connected with fixed block at the top of the prefabricated mould, it is fixedly connected with track at the top of the fixed block, it is provided with above the track and pours funnel, the output end for pouring funnel is communicated with discharge nozzle, and the outer surface for pouring funnel is fixedly connected with rectangular block, and the bottom of the rectangular block is fixedly connected with connecting rod.The box culvert construct concrete placing installation, by pouring the rectangular block that funnel outer surface is fixedly connected and the connecting rod that rectangular block bottom connects and U-shaped piece, on the track that placing installation can be placed at the top of prefabricated mould when pouring funnel in placement, it solves the problems, such as that sprue cup vacantly causes to pour funnel shaking on prefabricated mould, and improves and pour safety of the funnel in casting process.

Description

A kind of box culvert construct concrete placing installation
Technical field
The utility model is related to concrete placing installation technical field, specially a kind of box culvert construct is set with concreting It is standby.
Background technology
In concrete pouring construction, hopper is using very universal.
Box culvert construct used at present with concreting hopper generally by lifting equipment by hopper vacantly in prefabricated molds The top of tool is prefabricated to box culvert progress, since hopper vacantly easily shakes in the air, has some potential safety problems, and expect Bucket is also more inconvenient in mobile cast.
Implement new content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of box culvert construct concrete placing installation, solves Box culvert construct used at present with concreting hopper generally by lifting equipment by hopper vacantly in the upper of prefabricated mould Side is prefabricated to box culvert progress, since hopper vacantly easily shakes in the air, has some potential safety problems, and hopper is moving Also problem more inconvenient when dynamic casting.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of box culvert construct coagulation Native placing installation, including prefabricated mould, are fixedly connected with fixed block at the top of the prefabricated mould, fixed at the top of the fixed block It is connected with track, is provided with above the track and pours funnel, the output end for pouring funnel is communicated with discharge nozzle, described The outer surface for pouring funnel is fixedly connected with rectangular block, and the bottom of the rectangular block is fixedly connected with connecting rod, the connecting rod One end activity far from rectangular block is plugged with casing, and the internal activity of described sleeve pipe is connected with buffer spring, the buffer spring One end contacted with the inner wall of casing, the other end of the buffer spring is fixedly connected with limited block, and the limited block is far from slow The side for rushing spring is fixedly connected with the connecting rod, and inner wall and the limited block of described sleeve pipe are slidably connected, and described sleeve pipe is far from connection One end of bar is fixedly connected with U-shaped block, and the top of the track runs through U-shaped block and extends to the inside of U-shaped block, the U-shaped block Bottom be fixedly connected with idler wheel, the outer ring of the idler wheel is contacted with fixed block.
Preferably, reinforcing rib, the outer surface for pouring funnel and reinforcing rib are fixedly welded at the top of the rectangular block It is welded and fixed.
Preferably, the outer surface for pouring funnel and fixed ring is welded with above the reinforcing rib.
Preferably, Open Side Down for the U-shaped block, and outer surface and the U-shaped block of the track are slidably connected.
Preferably, the bottom of the U-shaped block is fixedly connected there are two idler wheel, and two idler wheels are symmetrical as central axes using U-shaped block Setting.
Preferably, the outer surface of the connecting rod is connect with cannula slide.
(3) advantageous effect
The utility model provides a kind of box culvert construct concrete placing installation.Has following advantageous effect:
1, box culvert construct concrete placing installation, by pouring the rectangular block and square that funnel outer surface is fixedly connected Shape block bottom connection connecting rod and U-shaped piece, when pour funnel place when placing installation can be placed at the top of prefabricated mould Track on, solve the problems, such as that sprue cup vacantly causes to pour on prefabricated mould funnel shaking, and improve and pour Safety of the funnel in casting process, and the buffer spring being flexibly connected by inside pipe casing, buffer spring pass through limited block Being fixedly connected with the connecting rod can make to pour funnel has the function of buffering during placement, effectively reduces and pours funnel and exist Directly to the impact of prefabricated mould in placement process.
2, the box culvert construct concrete placing installation, the idler wheel being fixedly connected by U-shaped block bottom, the outer ring of idler wheel with Fixed block be slidably connected can facilitate to pour funnel carry out movement pour, effectively increase the efficiency poured.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model sleeve structure sectional view.
Wherein, 1 prefabricated mould, 2 fixed blocks, 3 tracks, 4 pour funnel, 5 fixed rings, 6 discharge nozzles, 7 rectangular blocks, 8 reinforcements Muscle, 9 connecting rods, 10 casings, 11 buffer springs, 12 limited blocks, 13U shapes block, 14 idler wheels.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
The utility model embodiment provides a kind of box culvert construct concrete placing installation, as shown in Figs. 1-2, including it is prefabricated The top of mold 1, prefabricated mould 1 is fixedly connected with fixed block 2, and 2 top of fixed block is fixedly connected with track 3, the top of track 3 It is provided with and pours funnel 4, the output end for pouring funnel 4 is communicated with discharge nozzle 6, and the outer surface for pouring funnel 4 is fixedly connected with square The top of shape block 7, rectangular block 7 is fixedly welded with reinforcing rib 8, and the outer surface and reinforcing rib 8 for pouring funnel 4 are welded and fixed, and are poured The outer surface of funnel 4 is simultaneously welded with fixed ring 5 positioned at the top of reinforcing rib 8, and the bottom of rectangular block 7 is fixedly connected with connection Bar 9, one end activity of the connecting rod 9 far from rectangular block 7 are plugged with casing 10, and outer surface and the casing 10 of connecting rod 9 are slidably connected, The internal activity of casing 10 is connected with buffer spring 11, and one end of buffer spring 11 is contacted with the inner wall of casing 10, buffer spring 11 other end is fixedly connected with limited block 12, and side of the limited block 12 far from buffer spring 11 is fixedly connected with connecting rod 9, set The inner wall of pipe 10 is slidably connected with limited block 12, the buffer spring 11 connected by 10 internal activity of casing, and buffer spring 11 is logical Cross limited block 12 be fixedly connected with connecting rod 9 can make to pour funnel 4 have the function of during placement buffering, effectively reduce Impact of the funnel 4 directly to prefabricated mould 1 in placement process is poured, the one end of casing 10 far from connecting rod 9 is fixedly connected There are U-shaped block 13, the top of track 3 to run through U-shaped block 13 and extend to the inside of U-shaped block 13, Open Side Down for U-shaped block 13, track 3 Outer surface be slidably connected with U-shaped block 13, by pouring 7 bottom of rectangular block 7 and rectangular block that 4 outer surface of funnel is fixedly connected Placing installation can be placed on the rail at 1 top of prefabricated mould by the connecting rod 9 of connection and U-shaped piece 13 when pouring funnel 4 when placing On road 3, solve the problems, such as that sprue cup 4 vacantly causes to pour the shaking of funnel 4 on prefabricated mould 1, and improve and pour The bottom of safety of the funnel 4 in casting process, U-shaped block 13 is fixedly connected with idler wheel 14, outer ring and the fixed block 2 of idler wheel 14 The bottom of contact, U-shaped block 13 is fixedly connected there are two idler wheel 14, and two idler wheels 14 are symmetrical arranged with U-shaped block 13 for central axes, are led to The idler wheel 14 that 13 bottom of U-shaped block is fixedly connected is crossed, outer ring and the fixed block 2 of idler wheel 14 are slidably connected and can facilitate to pouring funnel 4 It carries out movement to pour, effectively increases the efficiency poured.
Operation principle:The box culvert construct concrete placing installation, the rectangle being fixedly connected by pouring 4 outer surface of funnel Block 7 and 7 bottom of rectangular block connection connecting rod 9 and U-shaped piece 13, when pour funnel 4 place when placing installation can be placed On the track 3 at 1 top of prefabricated mould, efficiently solves sprue cup 4 and vacantly cause to pour the rolling of funnel 4 on prefabricated mould 1 Dynamic problem, and the buffering elastic for improving and pouring safety of the funnel 4 in casting process, and connected by 10 internal activity of casing Spring 11, buffer spring 11, which is fixedly connected by limited block 12 with connecting rod 9, can make to pour funnel 4 during placement with slow The function of punching, the idler wheel 14 being fixedly connected by 13 bottom of U-shaped block, the outer ring of idler wheel 14 are slidably connected with fixed block 2 and can facilitate Mobile pour is carried out to pouring funnel 4.
In conclusion the box culvert construct concrete placing installation, the rectangle being fixedly connected by pouring 4 outer surface of funnel Block 7 and 7 bottom of rectangular block connection connecting rod 9 and U-shaped piece 13, when pour funnel 4 place when placing installation can be placed On the track 3 at 1 top of prefabricated mould, efficiently solves sprue cup 4 and vacantly cause to pour the rolling of funnel 4 on prefabricated mould 1 Dynamic problem, and the buffering elastic for improving and pouring safety of the funnel 4 in casting process, and connected by 10 internal activity of casing Spring 11, buffer spring 11, which is fixedly connected by limited block 12 with connecting rod 9, can make to pour funnel 4 during placement with slow The function of punching effectively reduces the impact for pouring funnel 4 directly to prefabricated mould 1 in placement process.
Also, the box culvert construct concrete placing installation, the idler wheel 14 being fixedly connected by 13 bottom of U-shaped block, idler wheel 14 outer ring be slidably connected with fixed block 2 can facilitate to pour funnel 4 carry out movement pour, effectively increase the efficiency poured.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of box culvert construct concrete placing installation, including prefabricated mould (1), it is characterised in that:The prefabricated mould (1) Top be fixedly connected with fixed block (2), be fixedly connected with track (3) at the top of the fixed block (2), the track (3) it is upper Side is provided with and pours funnel (4), the output end for pouring funnel (4) is communicated with discharge nozzle (6), the funnel (4) that pours Outer surface is fixedly connected with rectangular block (7), and the bottom of the rectangular block (7) is fixedly connected with connecting rod (9), the connecting rod (9) one end activity far from rectangular block (7) is plugged with casing (10), and the internal activity of described sleeve pipe (10) is connected with buffer spring (11), one end of the buffer spring (11) is contacted with the inner wall of casing (10), and the other end of the buffer spring (11) is fixed It is connected with limited block (12), side of the limited block (12) far from buffer spring (11) is fixedly connected with connecting rod (9), described The inner wall of casing (10) is slidably connected with limited block (12), and the one end of described sleeve pipe (10) far from connecting rod (9) is fixedly connected with U The top of shape block (13), the track (3) runs through U-shaped block (13) and extends to the inside of U-shaped block (13), the U-shaped block (13) Bottom be fixedly connected with idler wheel (14), the outer ring of the idler wheel (14) is contacted with fixed block (2).
2. a kind of box culvert construct concrete placing installation according to claim 1, it is characterised in that:The rectangular block (7) reinforcing rib (8) is fixedly welded at the top of, the outer surface for pouring funnel (4) is welded and fixed with reinforcing rib (8).
3. a kind of box culvert construct concrete placing installation according to claim 2, it is characterised in that:It is described to pour funnel (4) outer surface is simultaneously welded with fixed ring (5) above reinforcing rib (8).
4. a kind of box culvert construct concrete placing installation according to claim 1, it is characterised in that:The U-shaped block (13) Open Side Down, and outer surface and the U-shaped block (13) of the track (3) are slidably connected.
5. a kind of box culvert construct concrete placing installation according to claim 1, it is characterised in that:The U-shaped block (13) bottom is fixedly connected there are two idler wheel (14), and two idler wheels (14) are symmetrical arranged with U-shaped block (13) for central axes.
6. a kind of box culvert construct concrete placing installation according to claim 1, it is characterised in that:The connecting rod (9) outer surface is slidably connected with casing (10).
CN201820156028.8U 2018-01-30 2018-01-30 A kind of box culvert construct concrete placing installation Active CN207878287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820156028.8U CN207878287U (en) 2018-01-30 2018-01-30 A kind of box culvert construct concrete placing installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820156028.8U CN207878287U (en) 2018-01-30 2018-01-30 A kind of box culvert construct concrete placing installation

Publications (1)

Publication Number Publication Date
CN207878287U true CN207878287U (en) 2018-09-18

Family

ID=63509163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820156028.8U Active CN207878287U (en) 2018-01-30 2018-01-30 A kind of box culvert construct concrete placing installation

Country Status (1)

Country Link
CN (1) CN207878287U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537430A (en) * 2019-01-18 2019-03-29 中交四公局第十工程有限公司 Box beam concrete is poured with guiding device and box beam concrete casting method
CN111364769A (en) * 2020-04-20 2020-07-03 中国一冶集团有限公司 Assembled conveyer suitable for original narrow pavement pipeline is buried underground
CN112177338A (en) * 2020-09-30 2021-01-05 重庆飞强混凝土有限公司 Concrete production and processing is with mechanism of pouring fast

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537430A (en) * 2019-01-18 2019-03-29 中交四公局第十工程有限公司 Box beam concrete is poured with guiding device and box beam concrete casting method
CN109537430B (en) * 2019-01-18 2023-11-21 中交四公局第十工程有限公司 Guide device for box girder concrete pouring and box girder concrete pouring method
CN111364769A (en) * 2020-04-20 2020-07-03 中国一冶集团有限公司 Assembled conveyer suitable for original narrow pavement pipeline is buried underground
CN112177338A (en) * 2020-09-30 2021-01-05 重庆飞强混凝土有限公司 Concrete production and processing is with mechanism of pouring fast

Similar Documents

Publication Publication Date Title
CN207878287U (en) A kind of box culvert construct concrete placing installation
CN102635369B (en) Construction method for integrally pouring inverted arch concrete by matching trestle with top formwork
CN205935650U (en) Template is supported to post -cast strip
CN108130863A (en) Precast T-Beam hydraulic self-traveling integral mold plate and its construction method
CN203227804U (en) Casting flask
CN204492198U (en) Concrete slip cylinder
CN202946193U (en) Tunnel center gutterway formwork
CN210791388U (en) Cement product forming machine
CN207273501U (en) Kerbstone prefabricated steel-template
CN103203435A (en) Casting sand box
CN206840424U (en) A kind of concrete entirety irrigation device
CN205969414U (en) Block forming machine with shock -absorbing structure
CN205928986U (en) Utility tunnel casting mold
CN213388738U (en) Fashioned blast furnace mould is pour to integral type
CN202298565U (en) Template
CN207105209U (en) A kind of precast stair mould
CN208266905U (en) A kind of simple plate device in rim of a cup basis
CN207494514U (en) A kind of full-sized car mould cast moulding group case
CN209207737U (en) Removing device
CN202910254U (en) Filter type sprue cup
CN206765036U (en) It is a kind of applied to cement brick production from mold
CN209207733U (en) A kind of electric pole mold, which pours, uses support device
CN207228628U (en) A kind of hole cylinder mould for building that can continuously construct
CN207267027U (en) Motor casing has the evaporative pattern mold of accurate positioning
CN207387943U (en) A kind of quick detachable precast floor slab mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant