CN207872190U - Mobile Laboratory Module - Google Patents
Mobile Laboratory Module Download PDFInfo
- Publication number
- CN207872190U CN207872190U CN201721777909.3U CN201721777909U CN207872190U CN 207872190 U CN207872190 U CN 207872190U CN 201721777909 U CN201721777909 U CN 201721777909U CN 207872190 U CN207872190 U CN 207872190U
- Authority
- CN
- China
- Prior art keywords
- air
- nacelle
- experiment
- wall
- buffering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ventilation (AREA)
Abstract
The utility model is mobile Laboratory Module, including nacelle and air conditioner ventilating system, it is characterized in that, the nacelle passes through steel plate and square steel skeleton welding fabrication, the vertical direction of the internal maintenance structure is divided into mechanical floor and experiment room floor from top to bottom, the horizontal direction of the experiment room floor is divided between preparation room, buffering between main experiment, and the sewage collecting bucket position is arranged in the bottom of the fixed experimental bench.The structure design of the utility model is reasonable, safe operation, conveniently moving, by the way that the air conditioner ventilating system of new bellows, air exhaust box and purification air-conditioning unit composition is arranged, effectively the pressure inside Laboratory Module is adjusted, and then ensured further spreading out for disaster relief programs, in addition, by the way that sewage collecting bucket is arranged, the waste water that experiment generates is collected and is disinfected, pollution and bio-safety hidden danger caused by experiment wastewater discharge are avoided.
Description
Technical field
The utility model is related to biocontainment laboratory equipment technical fields, more particularly to mobile Laboratory Module.
Background technology
China's national territorial area is 9,600,000 square kilometres, and soil vast in territory is but also China is that a natural calamity is more
The country of hair.Disaster occurs, and Prevention and cure of epidemic situation also needs to mention first while organizing the disaster relief, some natural calamities mostly occur
It has inconvenient traffic area in mountain area etc..Some important viral, bacterium samples can not be sent to self-contained laboratory nearby in time,
So mobile experiment porch just seems particularly significant as bio-safety experimental facilities.China's mobile Laboratory Module used now
The problems such as single non-adjustable, mobile inconvenient there are Laboratory Module internal pressure environment.
Invention content
The utility model aims to solve the problem that the deficiencies in the prior art, and provides a kind of mobile Laboratory Module.
The utility model to achieve the above object, using following technical scheme:
Mobile Laboratory Module, including nacelle and air conditioner ventilating system, which is characterized in that the nacelle passes through steel plate and square steel bone
Frame welding fabrication is arranged with several wheels below the nacelle, and the inside of the nacelle is equipped with internal maintenance structure, institute
It states and is equipped with interlayer between internal maintenance structure and the nacelle, be filled with rock wool inside the interlayer, one outside the nacelle
Side is equipped with external door, and the external door is the closed steel door of four frames, and the internal maintenance structure includes wall and furred ceiling, described to hang
Top is arranged positioned at the top of the wall, the wall and the furred ceiling be plasterboard aluminum honeycomb color steel sandwich plate make and
At the wall is equipped with several sealed doors, and the wall bottom is equipped with the floor parallel with the furred ceiling, the internal maintenance
The vertical direction of structure is divided into mechanical floor and experiment room floor from top to bottom, and the air conditioner ventilating system peace turns in the mechanical floor
Interior, the air conditioner ventilating system includes new bellows, air exhaust box and purification air-conditioning unit, and the new bellows are mounted on the nacelle top
End outside, the new bellows are connected by fresh air pipeline with the air return pipeline of the purification air-conditioning unit, the purification air-conditioning machine
The outdoor machine of air-conditioner of group is mounted on the nacelle apical lateral, and the purification air-conditioning unit passes through air supply pipeline and the experiment room floor
Air outlet be connected, the air exhaust box is mounted on the nacelle apical lateral and the air exhaust box and is located at the one of the new bellows
Side is arranged, and the air exhaust box is connected by exhaust pipeline with the exhaust outlet of the mechanical floor, in the air supply pipeline, the fresh air
Electric control air valve, check-valves and airtight valve, the laboratory are respectively mounted on pipeline, in the exhaust pipeline and on the air return pipeline
The horizontal direction of layer is divided between preparation room, buffering between main experiment, and the main reality is located between the preparation room and the buffering
One end setting between testing, the external door are connected with the preparation room, the other side of the preparation room opposite with the external door
It is connected by steel door between the buffering, by being connected between steel door and the main experiment between the buffering, the preparation
Wall between room and the main experiment is equipped with pass-through box, the purification air-conditioning unit by air return pipeline respectively with it is described
It is connected between the buffering between main experiment, the bottom of the return air sandwich wall between return air sandwich wall and the buffering between the main experiment is equal
Equipped with return air inlet, the top of the return air sandwich wall between return air sandwich wall and the buffering between the main experiment with the air return pipeline
It is connected, connector is reserved between the buffering equipped with control electronic box, the power supply of the control electronic box in the sandwich wall between the buffering
Sandwich wall connect with external power supply, the control electronic box by conducting wire respectively with the new bellows, the air exhaust box and described net
To change air-conditioner set to be connected, fixed experimental bench is equipped in the main experiment, the fixed experimental bench is welded on inside the nacelle,
The side of the fixed experimental bench is equipped with washing equipment, and side wall of the washing equipment by connecting tube through the nacelle is connected with
Quick water source connector is provided with sewage collecting bucket below the washing equipment, and the sewage collecting bucket position is in described fixed real
Test the bottom setting of platform.
The nacelle is arranged in rectangular parallelepiped structure.
The bottom outside of the nacelle is arranged with Level tune wheel, and the Level tune wheel includes vertical screw rod and is located at
The handwheel at the screw rod both ends, the screw rod are vertically installed on the outside of the surrounding of the nacelle bottom.
The wheel uses self-locking universal wheel.
The sealed door is color steel sealed door.
The utility model has the beneficial effects that:The structure design of the utility model is reasonable, safe operation, and conveniently moving passes through
The air conditioner ventilating system of new bellows, air exhaust box and purification air-conditioning unit composition is set, effectively the pressure inside Laboratory Module is carried out
It adjusts, and then has ensured further spreading out for disaster relief programs, in addition, by the way that sewage collecting bucket is arranged, to the waste water of experiment generation
It is collected and is disinfected, avoid pollution and bio-safety hidden danger caused by experiment wastewater discharge.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the A-A sectional views of Fig. 1;
In figure:1- nacelles;11- preparation rooms;Between 12- bufferings;Between the main experiments of 13-;14- mechanical floors;15- tests room floor;2-
External door;3- air conditioner ventilating systems;The new bellows of 31-;32- air exhaust boxes;33- purification air-conditioning units;4- walls;5- furred ceilings;6- wheels;
7- Level tune wheels;8- pass-through boxes;9- controls electronic box;10- fixes experimental bench;
It is described in detail with reference to attached drawing below with reference to the embodiments of the present invention.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown, mobile Laboratory Module, including nacelle 1 and air conditioner ventilating system 3, which is characterized in that the nacelle 1 passes through
The lower section of steel plate and square steel skeleton welding fabrication, the nacelle 1 is arranged with several wheels 6, and the inside of the nacelle 1 is equipped with
Internal maintenance structure is equipped with interlayer, rock wool is filled with inside the interlayer between the internal maintenance structure and the nacelle 1,
Side outside the nacelle 1 is equipped with external door 2, and the external door 2 is the closed steel door of four frames, the internal maintenance structure packet
Wall 4 and furred ceiling 5 are included, the furred ceiling 5 is located at the top setting of the wall 4, and the wall 4 and the furred ceiling 5 are gypsum
Plate aluminum honeycomb color steel sandwich plate is made, the wall 4 be equipped with several sealed doors, 4 bottom of the wall be equipped with it is described
The vertical direction on the parallel floor of furred ceiling 5, the internal maintenance structure is divided into mechanical floor 14 and experiment room floor 15 from top to bottom,
The peace of the air conditioner ventilating system 3 turns in the mechanical floor 14, and the air conditioner ventilating system 3 includes new bellows 31, air exhaust box 32
With purification air-conditioning unit 33, the new bellows 31 are mounted on 1 apical lateral of the nacelle, and the new bellows 31 pass through fresh air pipeline
It is connected with the air return pipeline of the purification air-conditioning unit 33, the outdoor machine of air-conditioner of the purification air-conditioning unit 33 is mounted on the nacelle
1 apical lateral, the purification air-conditioning unit 33 are connected by air supply pipeline with the air outlet of the experiment room floor 15, the air draft
Case 32 is mounted on 1 apical lateral of the nacelle and the air exhaust box 32 is located at the side setting of the new bellows 31, the row
Bellows 32 are connected by exhaust pipeline with the exhaust outlet of the mechanical floor 14, in the air supply pipeline, on the fresh air pipeline, institute
State in exhaust pipeline and be respectively mounted on the air return pipeline electric control air valve, check-valves and airtight valve, the water of the experiment room floor 15
Square to being divided between preparation room 11, buffering 13 between 12 and main experiment, between the preparation room 11 and the buffering 12 be located at it is described
13 one end setting, the external door 2 are connected with the preparation room 11 between main experiment, the preparation opposite with the external door 2
12 are connected by steel door between the other side of room 11 and the buffering, and 12 by between steel door and the main experiment between the buffering
13 are connected, 13 between the preparation room 11 and the main experiment between wall be equipped with pass-through box 8, the purification air-conditioning unit
33 12 are connected between the main experiment between 13 and the buffering respectively by air return pipeline, 13 return air sandwich wall between the main experiment
The bottom of 12 return air sandwich wall is equipped with return air inlet, 13 return air sandwich wall and the buffering between the main experiment between the buffering
Between 12 top of return air sandwich wall be connected with the air return pipeline, equipped with control electronic box 9, institute in 12 sandwich wall between the buffering
The reserved connector of power supply 12 sandwich wall between the buffering for stating control electronic box 9 is connect with external power supply, and the control electronic box 9 is logical
It crosses conducting wire to be respectively connected with the new bellows 31, the air exhaust box 32 and the purification air-conditioning unit 33,13 between the main experiment
Interior to be equipped with fixed experimental bench 10, the fixed experimental bench 10 is welded on inside the nacelle 1, the side of the fixed experimental bench 10
Equipped with washing equipment, side wall of the washing equipment by connecting tube through the nacelle 1 is connected with quick water source connector, described to wash
Sewage collecting bucket is provided with below water installations, the sewage collecting bucket position is arranged in the bottom of the fixed experimental bench 10.
The nacelle 1 is arranged in rectangular parallelepiped structure.
The bottom outside of the nacelle 1 is arranged with Level tune wheel 7, the Level tune wheel 7 include vertical screw rod and
Handwheel positioned at the screw rod both ends, the screw rod are vertically installed on the outside of the surrounding of 1 bottom of the nacelle.
The wheel 6 uses self-locking universal wheel.
The sealed door is color steel sealed door.
When the utility model is used, connector is reserved into the power supply for controlling electronic box 9 and connects external power supply, control electronic box 9 is powered
Afterwards, air conditioner ventilating system 3 brings into operation, when experimental situation needs negative pressure, by opening in fresh air pipeline and exhaust pipeline
Electric control air valve and airtight valve, the airtight valve closed on air return pipeline or the open degree for turning the electric control air valve on air return pipeline down, make
The air output of air conditioner ventilating system 3 is less than exhaust air rate, and the experimental situation in the utility model is become negative pressure;When experimental situation needs
When wanting positive pressure, by opening electric control air valve and airtight valve in fresh air pipeline and exhaust pipeline, open closed on air return pipeline
Valve or the open degree for tuning up the electric control air valve on air return pipeline make the air output of air conditioner ventilating system 3 be more than exhaust air rate, by this reality
Become positive pressure with novel interior experimental situation;Effectively the pressure inside Laboratory Module is adjusted, and then has ensured disaster relief programs
Further spread out, experimenter is prepared process into preparation room 11 from outside by external door 2, is entered by steel door slow
12 between punching, being entered 13 between main experiment by steel door by between buffering 12, laboratory sample enters main laboratory 13 by pass-through box 8,
Realize the differentiation of the stream of people and logistics, in addition, 13 it is connected into water source from the quick water source connector of 1 lateral wall of nacelle between main experiment, it is fixed
The waste water that the sewage collecting bucket of 10 bottom of experimental bench generates experiment is collected and disinfects, and avoids experiment wastewater
Pollution and bio-safety hidden danger caused by discharge, the structure design of the utility model is reasonable, safe operation, conveniently moving.
The utility model is exemplarily described above in conjunction with attached drawing, it is clear that the utility model specific implementation not by
The limitation of aforesaid way, if the various improvement of the methodology and technical solution progress of the utility model are used, or without
Improvement directly applies to other occasions, both is within the protection scope of the present invention.
Claims (5)
1. moving Laboratory Module, including nacelle (1) and air conditioner ventilating system (3), which is characterized in that the nacelle (1) passes through steel plate
With square steel skeleton welding fabrication, several wheels (6), the inside installation of the nacelle (1) are arranged with below the nacelle (1)
There is internal maintenance structure, interlayer is equipped between the internal maintenance structure and the nacelle (1), rock is filled with inside the interlayer
Cotton, the external side of the nacelle (1) are equipped with external door (2), and the external door (2) is the closed steel door of four frames, the inside
Enclosed structure includes wall (4) and furred ceiling (5), and the furred ceiling (5) is located at the top setting of the wall (4), the wall (4)
It is that plasterboard aluminum honeycomb color steel sandwich plate is made with the furred ceiling (5), the wall (4) is equipped with several sealed doors,
Wall (4) bottom is equipped with the floor parallel with the furred ceiling (5), and the vertical direction of the internal maintenance structure is from top to bottom
It is divided into mechanical floor (14) and experiment room floor (15), air conditioner ventilating system (3) peace turns in the mechanical floor (14), described
Air conditioner ventilating system (3) includes new bellows (31), air exhaust box (32) and purification air-conditioning unit (33), new bellows (31) installation
In the return air that the nacelle (1) apical lateral, the new bellows (31) pass through fresh air pipeline and the purification air-conditioning unit (33)
Pipeline is connected, and the outdoor machine of air-conditioner of the purification air-conditioning unit (33) is mounted on the nacelle (1) apical lateral, the purification air-conditioning
Unit (33) is connected by air supply pipeline with the air outlet of the experiment room floor (15), and the air exhaust box (32) is mounted on the cabin
Body (1) apical lateral and the air exhaust box (32) are located at the side setting of the new bellows (31), and the air exhaust box (32) is logical
Exhaust pipeline is crossed with the exhaust outlet of the mechanical floor (14) to be connected, in the air supply pipeline, on the fresh air pipeline, the air draft
Electric control air valve, check-valves and airtight valve, the level side of the experiment room floor (15) are respectively mounted on pipeline and on the air return pipeline
To between being divided into preparation room (11), buffer between (12) and main experiment (13), (12) position between the preparation room (11) and the buffering
One end setting of (13) between the main experiment, the external door (2) is connected with the preparation room (11), with the external door (2)
The other side of the opposite preparation room (11) is connected with (12) between the buffering by steel door, and (12) pass through between the buffering
(13) are connected between steel door and the main experiment, are set on the wall between the preparation room (11) and the main experiment between (13)
There is a pass-through box (8), the purification air-conditioning unit (33) passes through air return pipeline (13) and the buffering between the main experiment respectively
Between (12) be connected, the bottom of the return air sandwich wall of (12) is equipped with back between the return air sandwich wall and the buffering of (13) between the main experiment
Air port, between the main experiment between the return air sandwich wall and the buffering of (13) top of the return air sandwich wall of (12) with the backwind tube
Road is connected, is passed through equipped with control electronic box (9), the reserved connector of power supply of the control electronic box (9) in the sandwich wall of (12) between the buffering
The sandwich wall for wearing (12) between the buffering is connect with external power supply, the control electronic box (9) by conducting wire respectively with the new bellows
(31), the air exhaust box (32) is connected with the purification air-conditioning unit (33), is equipped with fixed experiment between the main experiment in (13)
Platform (10), the fixed experimental bench (10) are welded on the nacelle (1) inside, and the side of the fixed experimental bench (10), which is equipped with, to be washed
Water installations, the washing equipment are connected with quick water source connector, the wash water dress by connecting tube through the side wall of the nacelle (1)
The lower section set is provided with sewage collecting bucket, and the sewage collecting bucket position is arranged in the bottom of the fixed experimental bench (10).
2. mobile Laboratory Module according to claim 1, which is characterized in that the nacelle (1) is arranged in rectangular parallelepiped structure.
3. mobile Laboratory Module according to claim 1, which is characterized in that the bottom outside of the nacelle (1) is arranged with
Level tune wheel (7), the Level tune wheel (7) include vertical screw rod and the handwheel positioned at the screw rod both ends, the screw rod
It is vertically installed on the outside of the surrounding of the nacelle (1) bottom.
4. mobile Laboratory Module according to claim 1, which is characterized in that the wheel (6) uses self-locking universal wheel.
5. mobile Laboratory Module according to claim 1, which is characterized in that the sealed door is color steel sealed door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721777909.3U CN207872190U (en) | 2017-12-19 | 2017-12-19 | Mobile Laboratory Module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721777909.3U CN207872190U (en) | 2017-12-19 | 2017-12-19 | Mobile Laboratory Module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207872190U true CN207872190U (en) | 2018-09-18 |
Family
ID=63502862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721777909.3U Active CN207872190U (en) | 2017-12-19 | 2017-12-19 | Mobile Laboratory Module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207872190U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112774740A (en) * | 2020-12-24 | 2021-05-11 | 珠海格力电器股份有限公司 | Mobile biochemical laboratory and air conditioning method thereof |
CN112814485A (en) * | 2020-12-31 | 2021-05-18 | 深圳市万维空调净化工程有限公司 | Air lock control system for controlling lock body of air lock chamber |
-
2017
- 2017-12-19 CN CN201721777909.3U patent/CN207872190U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112774740A (en) * | 2020-12-24 | 2021-05-11 | 珠海格力电器股份有限公司 | Mobile biochemical laboratory and air conditioning method thereof |
CN112814485A (en) * | 2020-12-31 | 2021-05-18 | 深圳市万维空调净化工程有限公司 | Air lock control system for controlling lock body of air lock chamber |
CN112814485B (en) * | 2020-12-31 | 2022-05-27 | 深圳市万维空调净化工程有限公司 | Air lock control system for controlling lock body of air lock chamber |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100361747C (en) | Movable safety biological laboratory | |
CN101294451B (en) | Multifunctional microenvironment laboratory | |
CN207872190U (en) | Mobile Laboratory Module | |
CN202847523U (en) | Movable type biological test laboratory | |
CN104879839B (en) | Night shift room modular air cleaning system and method in a kind of Extra-long Highway Tunnel hole | |
CN205878543U (en) | New trend return air filter unit | |
CN201672605U (en) | Air cleaner system | |
CN102814207A (en) | Movable biological examination laboratory | |
CN104456777A (en) | Air-purifying and fresh-air system of building door window | |
CN107882370A (en) | A kind of removable toilet | |
CN103344009B (en) | The integrated indoor static adsorption air cleaner of a kind of modularization | |
CN203285297U (en) | Omni-directional city air purifying system | |
CN106930663B (en) | A kind of energy-saving and environment-friendly intelligent building removes haze window system | |
CN203587373U (en) | Environment test cabin | |
CN106403088A (en) | Automatic low-energy-consumption indoor constant-temperature constant-humidity constant-oxygen positive pressure supply device | |
CN206176599U (en) | Permanent oxygen malleation automatic feeding device of indoor constant temperature and humidity of low energy consumption | |
CN103363593B (en) | A kind of modularization strengthens integrated indoor air-purification device | |
CN204460460U (en) | A kind of Multifunctional hanging window water-filtering air-purifying apparatus | |
CN204404448U (en) | The clean wind device of power wall- | |
CN204534824U (en) | A kind of edible fungi inoculation chamber system | |
CN208458189U (en) | The vertical parallel fresh air system of teaching building | |
CN208936419U (en) | A kind of chemical experiment chamber system | |
CN202719698U (en) | Simple special PM2.5 air purification treatment device | |
CN203147929U (en) | Air purifier | |
CN207350471U (en) | A kind of wall-mounted fresh air purifying air-conditioning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |