CN207866144U - A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank - Google Patents

A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank Download PDF

Info

Publication number
CN207866144U
CN207866144U CN201820308653.XU CN201820308653U CN207866144U CN 207866144 U CN207866144 U CN 207866144U CN 201820308653 U CN201820308653 U CN 201820308653U CN 207866144 U CN207866144 U CN 207866144U
Authority
CN
China
Prior art keywords
flange
fuel tank
oil pump
bull
connection surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820308653.XU
Other languages
Chinese (zh)
Inventor
陈全娣
欧金怀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAHM HEAVY-DUTY MACHINE Co Ltd
Original Assignee
SAHM HEAVY-DUTY MACHINE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAHM HEAVY-DUTY MACHINE Co Ltd filed Critical SAHM HEAVY-DUTY MACHINE Co Ltd
Priority to CN201820308653.XU priority Critical patent/CN207866144U/en
Application granted granted Critical
Publication of CN207866144U publication Critical patent/CN207866144U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Abstract

The utility model is related to bull-dozer mounting technology field, more particularly to the flange rigging position of a kind of bull-dozer work oil pump and fuel tank measures tooling;Including first flange, second flange and connecting rod;By being separately connected first flange and second flange at connecting rod both ends, make the position of the flange connection surface of first flange and angle of inclination is consistent with the flange connection surface of work oil pump oil inlet end and direction on the contrary, the flange connection surface of position and angle of inclination and the fuel tank oil outlet of the flange connection surface of second flange is unanimously and towards opposite;Before oil pipe assembly, the installation site of fuel tank and the oil pump that works can be measured by above-mentioned measurement tooling, only when the installation site of fuel tank and work oil pump is in rational error range, the assembly of oil pipe is just carried out, is done over again so as to avoid the assembly of oil pipe.

Description

A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank
Technical field
The utility model is related to bull-dozer mounting technology field, more particularly to a kind of method of bull-dozer work oil pump and fuel tank Blue rigging position measures tooling.
Background technology
Bull-dozer works generally uses hard pipeline to connect between oil pump and fuel tank, in bull-dozer assembling process, needs First installment work oil pump and fuel tank on pedestal, in the flange that the both ends of hard pipeline are connected to work oil pump and fuel tank Docking between work oil pump and fuel tank is realized in face;And the assembly precision of the flanged joint between oil pipe and fuel tank, work oil pump It is required that high;If there are errors for the rigging position of fuel tank or work oil pump on pedestal, the recurrence of oil pipe connecting pin and oil can be caused The flange face alignment of case or the oil pump that works is done over again to assembly during being linked and packed, often occur in bull-dozer oil pipe;It bulldozes In the assembly rejection and waste a large amount of working hours and cost of labor that oil pipe connects in machine assembling process, the production efficiency of bull-dozer is caused sternly The influence of weight, and existing painted surface can be destroyed in process of rework, the cleannes of oil pipe are influenced, to cause product quality Decline.
Utility model content
Technical problem to be solved in the utility model is:A kind of flange assembly of bull-dozer work oil pump and fuel tank is provided Position measures tooling, solves the problems, such as that often occurring assembly in traditional bull-dozer oil pipe assembling process does over again.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of bull-dozer working oil is provided The flange rigging position of pump and fuel tank measures tooling, including first flange, second flange and connecting rod;
Described connecting rod one end is connected to first flange, and the other end is connected to second flange, the flange of the first flange The position and angle of inclination of joint face are consistent with the work flange connection surface of oil pump oil inlet end and direction is on the contrary, the second flange Flange connection surface position and angle of inclination and the flange connection surface of fuel tank oil outlet it is consistent and towards opposite.
Further, the shape of the first flange is rectangle, and the corner of the first flange is equipped with chamfering.
Further, the shape of the second flange is rectangle, and the corner of the first flange is equipped with chamfering.
Further, the first flange is set there are four the first bolt hole, first bolt hole and work oil pump oil inlet The bolt hole of the flange connection surface at end corresponds.
Further, the second flange is set there are four the second bolt hole, second bolt hole and fuel tank oil outlet Flange connection surface bolt hole corresponds.
The beneficial effects of the utility model are:The utility model is related to bull-dozer work oil pump and fuel tank flange dress It is measured in tool structure with position, by being separately connected first flange and second flange at connecting rod both ends, makes first flange The position and angle of inclination of flange connection surface are consistent with the work flange connection surface of oil pump oil inlet end and direction is on the contrary, second flange Flange connection surface position and angle of inclination and the flange connection surface of fuel tank oil outlet it is consistent and towards opposite;It is assembled in oil pipe Before, the installation site of fuel tank and the oil pump that works can be measured by above-mentioned measurement tooling, only in fuel tank and working oil When the installation site of pump is in rational error range, the assembly of oil pipe is just carried out, does over again, keeps away so as to avoid the assembly of oil pipe Exempt to cause to paint the problem of destroying, influencing oil pipe cleannes because oil pipe is reprocessed, also avoid doing over again the cost of labor brought And the waste in working hour, effectively increase the efficiency of assembling of bull-dozer.
Description of the drawings
Fig. 1 is that a kind of bull-dozer work oil pump of specific embodiment of the present invention and the flange position of fuel tank measure work The front view of dress;
Fig. 2 is that a kind of bull-dozer work oil pump of specific embodiment of the present invention and the flange position of fuel tank measure work The vertical view of dress;
Fig. 3 is that a kind of bull-dozer work oil pump of specific embodiment of the present invention and the flange position of fuel tank measure work The right view of dress;
Fig. 4 is that a kind of bull-dozer work oil pump of specific embodiment of the present invention and the flange position of fuel tank measure work Load is connected to structural schematic diagram when bull-dozer work oil pump and fuel tank;
Label declaration:
1, first flange;2, second flange;3, connecting rod;4, fuel tank;5, work oil pump.
Specific implementation mode
For technology contents, the objects and the effects of the utility model are described in detail, below in conjunction with embodiment and match Attached drawing is closed to be explained.
The design of the utility model most critical is:By being separately connected first flange and the second method at connecting rod both ends Orchid makes the position of the flange connection surface of first flange and the flange connection surface of oil pump oil inlet end is consistent and court with work at angle of inclination To on the contrary, second flange flange connection surface position and angle of inclination with the flange connection surface of fuel tank oil outlet consistent and direction On the contrary;The installation site of fuel tank and the oil pump that works can be measured by above-mentioned measurement tooling, only in fuel tank and work When the installation site of oil pump is in rational error range, the assembly of oil pipe is just carried out.
Fig. 1 to Fig. 4 is please referred to, the utility model is related to the flange rigging position surveys of a kind of bull-dozer work oil pump and fuel tank Measure tooling, including first flange 1, second flange 2 and connecting rod 3;
3 one end of the connecting rod is connected to first flange 1, and the other end is connected to second flange 2, the first flange 1 The flange connection surface of 5 oil inlet end of oil pump is consistent and direction for the position and angle of inclination of flange connection surface and work on the contrary, described the The position and angle of inclination of the flange connection surface of two flanges 2 and the flange connection surface of 4 oil outlet of fuel tank are consistent and towards opposite.
The flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures the operation instruction of tooling:First by work oil pump 5 and fuel tank 4 be assemblied in respectively on the corresponding position of bull-dozer, the first flange 1 of above-mentioned measurement tooling is bolted to The flange connection surface of work oil pump 5, checks whether the flange connection surface of second flange 2 is bonded with the flange connection surface on fuel tank 4 And bolt hole is aligned, and if fitted and is aligned, and illustrates bull-dozer work oil pump 5 and installation site of the fuel tank 4 on bull-dozer pedestal Qualification enables the both ends of oil pipe to be connect respectively with work oil pump 5 and fuel tank 4, assembly is avoided to do over again.
The advantageous effect that the flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures tooling is:This practicality is new The bull-dozer work oil pump 5 and the flange rigging position of fuel tank 4 that type is related to measure in tool structure, by 3 both ends of connecting rod It is separately connected first flange 1 and second flange 2, makes position and angle of inclination and the working oil of the flange connection surface of first flange 1 Pump 5 oil inlet ends flange connection surface is consistent and direction on the contrary, the flange connection surface of second flange 2 position and angle of inclination and oil The flange connection surface of 4 oil outlet of case is consistent and towards opposite;Oil pipe assembly before, can by above-mentioned measurement tooling to fuel tank 4 with And the installation site of work oil pump 5 measures, only in the installation site of fuel tank 4 and work oil pump 5 in rational error model When enclosing interior, the assembly of oil pipe is just carried out, is done over again so as to avoid the assembly of oil pipe, avoided and cause paint broken because oil pipe is reprocessed Bad, the problem of influencing oil pipe cleannes, the waste of also avoid the doing over again cost of labor and working hour brought effectively increases soil-shifting The efficiency of assembling of machine.
Further, the flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures in tool structure, and described the The shape of one flange 1 is rectangle, and the corner of the first flange 1 is equipped with chamfering.
Further, the flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures in tool structure, and described the The shape of two flanges 2 is rectangle, and the corner of the first flange 1 is equipped with chamfering.
Further, the flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures in tool structure, and described the One flange 1 is set there are four the first bolt hole, the bolt hole of first bolt hole and the flange connection surface of work 5 oil inlet end of oil pump It corresponds.
Further, the flange rigging position of above-mentioned bull-dozer work oil pump and fuel tank measures in tool structure, and described the Two flanges 2 are set there are four the second bolt hole, and the flange connection surface bolt hole one of second bolt hole and 4 oil outlet of fuel tank is a pair of It answers.
Embodiment 1
A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank, including first flange 1, second flange 2 and connecting rod 3;3 one end of the connecting rod is connected to first flange 1, and the other end is connected to second flange 2, the first flange 1 Flange connection surface position and angle of inclination and the work flange connection surface of 5 oil inlet end of oil pump it is consistent and direction is on the contrary, described The position and angle of inclination of the flange connection surface of second flange 2 and the flange connection surface of 4 oil outlet of fuel tank are consistent and towards opposite; The shape of the first flange 1 is rectangle, and the corner of the first flange 1 is equipped with chamfering;The shape of the second flange 2 is square The corner of shape, the first flange 1 is equipped with chamfering;The first flange 1 is set there are four the first bolt hole, first bolt hole It is corresponded with the bolt hole of the flange connection surface of work 5 oil inlet end of oil pump;The second flange 2 is set there are four the second bolt The flange connection surface bolt hole in hole, second bolt hole and 4 oil outlet of fuel tank corresponds.
In conclusion the utility model is related to bull-dozer work oil pump and fuel tank flange rigging position measure tooling knot In structure, by being separately connected first flange and second flange at connecting rod both ends, make the position of the flange connection surface of first flange With angle of inclination and work the flange connection surface of oil pump oil inlet end is consistent and direction on the contrary, the flange connection surface of second flange position It sets consistent with the flange connection surface of fuel tank oil outlet with angle of inclination and towards opposite;Before oil pipe assembly, above-mentioned survey can be passed through Amount tooling measures the installation site of fuel tank and the oil pump that works, and is only being closed in the installation site of fuel tank and work oil pump When in the error range of reason, the assembly of oil pipe is just carried out, does over again, is avoided due to oil pipe is reprocessed so as to avoid the assembly of oil pipe Paint is caused to destroy, the problem of influencing oil pipe cleannes, the waste of also avoid the doing over again cost of labor and working hour brought, effectively Improve the efficiency of assembling of bull-dozer.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalents made based on the specification and figures of the utility model are applied directly or indirectly in relevant technology neck Domain is equally included in the patent within the scope of the utility model.

Claims (5)

1. the flange rigging position of a kind of bull-dozer work oil pump and fuel tank measures tooling, which is characterized in that including first flange, Second flange and connecting rod;
Described connecting rod one end is connected to first flange, and the other end is connected to second flange, the flanged joint of the first flange The position and angle of inclination in face and work the flange connection surface of oil pump oil inlet end is consistent and direction on the contrary, the second flange method The position and angle of inclination of blue joint face and the flange connection surface of fuel tank oil outlet are consistent and towards opposite.
2. the flange rigging position of bull-dozer work oil pump according to claim 1 and fuel tank measures tooling, feature exists In the shape of the first flange is rectangle, and the corner of the first flange is equipped with chamfering.
3. the flange rigging position of bull-dozer work oil pump according to claim 1 and fuel tank measures tooling, feature exists In the shape of the second flange is rectangle, and the corner of the first flange is equipped with chamfering.
4. the flange rigging position of bull-dozer work oil pump according to claim 1 and fuel tank measures tooling, feature exists Set that there are four the first bolt hole, the flange connection surfaces of first bolt hole and work oil pump oil inlet end in, the first flange Bolt hole correspond.
5. the flange rigging position of bull-dozer work oil pump according to claim 1 and fuel tank measures tooling, feature exists Set that there are four the second bolt hole, the flange connection surface bolts of second bolt hole and fuel tank oil outlet in, the second flange Hole corresponds.
CN201820308653.XU 2018-03-06 2018-03-06 A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank Active CN207866144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820308653.XU CN207866144U (en) 2018-03-06 2018-03-06 A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820308653.XU CN207866144U (en) 2018-03-06 2018-03-06 A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank

Publications (1)

Publication Number Publication Date
CN207866144U true CN207866144U (en) 2018-09-14

Family

ID=63455789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820308653.XU Active CN207866144U (en) 2018-03-06 2018-03-06 A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank

Country Status (1)

Country Link
CN (1) CN207866144U (en)

Similar Documents

Publication Publication Date Title
CN204332282U (en) LED display
CN207866144U (en) A kind of flange rigging position measurement tooling of bull-dozer work oil pump and fuel tank
CN109323073A (en) A kind of pipeline flexible threeway and installation method
CN209180535U (en) A kind of fluid pipeline steel flange component
CN213239742U (en) Flange pipe weld pressure testing device
CN208450918U (en) A kind of fixture for assembling and welding of the dog leg piping for both ends with flange
CN203500765U (en) Four-way plugging pipe connector
CN211289095U (en) Multi-sealing corrosion-resistant flange
CN201307029Y (en) A plug-type effusion meter adjusting apparatus
CN204785176U (en) Novel it is blue to take flat welding method of neck
CN208961373U (en) A kind of piping leans on die craft equipment
CN210293584U (en) Power station water system equipment flange seals and detects analogue means
CN202580467U (en) Pipe breakage rapid repair auxiliary device
CN208281670U (en) A kind of Ifold flange
CN103674153A (en) Combined gas meter box with fuel gas manifold
CN202644737U (en) Node structure for standpipes
CN205401875U (en) Integral earth -moving machinery warm braw electromagnetic valve body of system
CN205254422U (en) Locating platform is used in part welding
CN206694697U (en) A kind of twin fixed guide-vane taper connector
CN207777857U (en) A kind of supply air line of compressed gas
CN203657877U (en) Combined gas meter box with self-mounted gas gathering pipe
CN205424248U (en) Removable bellows safety cover
CN206018050U (en) Hem flange wallboard bolt connection welds airduct
CN205300431U (en) Utensil is examined to truck scute
CN206409780U (en) A kind of steel flange

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant