CN203454608U - Containerized ice chest - Google Patents

Containerized ice chest Download PDF

Info

Publication number
CN203454608U
CN203454608U CN201320374052.6U CN201320374052U CN203454608U CN 203454608 U CN203454608 U CN 203454608U CN 201320374052 U CN201320374052 U CN 201320374052U CN 203454608 U CN203454608 U CN 203454608U
Authority
CN
China
Prior art keywords
container
ice chest
valve
subcooler
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320374052.6U
Other languages
Chinese (zh)
Inventor
洪艳红
向云华
李丰明
朱枭
何卉伦
李林香
余晓烨
韩领先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Fortune Cryogenic Equipment Co ltd
Original Assignee
HANGZHOU FORTUNE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU FORTUNE GROUP CO Ltd filed Critical HANGZHOU FORTUNE GROUP CO Ltd
Priority to CN201320374052.6U priority Critical patent/CN203454608U/en
Application granted granted Critical
Publication of CN203454608U publication Critical patent/CN203454608U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a containerized ice chest. The ice chest comprises a container and a pipeline system. The pipeline system comprises a rectifying tower disposed inside the container, a master heat exchanger, a subcooler, a valve and pipelines connecting all the above-mentioned parts. The ice chest is simple in structure, safe and convenient in transportation, and overcomes problems of complex on-site pipe collocation and high cost. The design of the container increases integrity and stability of the ice chest structure, plays a good role to protect the inner parts. Breakage rate of the parts in a transportation process is reduced, and fine components are effectively prevented from losing in the transportation process. Integral lifting brings convenience to on-site positioning and assembly. On-site workload is reduced, working period is greatly reduced, and product quality and safety are ensured in the premise of efficiency improvement.

Description

Container-type ice chest
Technical field
The utility model is specifically related to container-type ice chest.
Background technology
Conventionally in, it is by aluminum unit equipment that small size air divides ice chest, valve and connected pipeline reasonable Arrangement are in an airtight steel casing, casing is mainly made by steel structure frame and carbon steel sheet, framework is conventionally durable, outside is sealed carbon steel sheet again, and must guarantee the flatness of surfaces externally and internally, casing and each aluminum unit equipment, being assembled in manufactory of valve and connected pipeline etc. carried out, generally Bu manufactory is filling for heat-insulating material pearlife, treat that ice chest reaches the spot in place, after dismounting inside transport supports, carry out again filling, to reach the object of cold insulation, in addition, also must examine ice chest axle ear, hanger, hanger hole and weld seam etc., guarantee that these part dimensions are suitable, even to check weld seam by dye penetrating and magnetic particle inspection mode, see and whether have crackle, this class ice chest complex structure, manufacture loaded down with trivial details, cost is high, some air separation plant distillation system even, only each aluminum unit equipment and casing complete in manufactory, then at user scene, by installation unit, carry out casing assembling, equipment is installed and the pipeline of equipment room connects, this requires professional designer to arrive on-the-spot guidance installation, installation period is long, expense is high, and, site operation carries out outdoor substantially, environment is not good, difficulty of construction is large, work high above the ground is many, construction equipment is incomplete again, be difficult to guarantee safety and quality.For external project, do like this cost higher undoubtedly.
Summary of the invention
Technical problem to be solved in the utility model is to provide container-type ice chest, simple in structure, and transportation safety, convenience can solve again the problems such as on-the-spot pipe arrangement is complicated, expense is high.
For solving above-mentioned existing technical problem, the utility model adopts following scheme: container-type ice chest, comprise container and pipe-line system, described pipe-line system comprises rectifying column, main heat exchanger, subcooler, the valve being located in container and the pipeline that connects all parts.
As preferably, described rectifying column is vertically located at the centre position of container, main heat exchanger is vertically located at rectifying column sidepiece, subcooler is located at rectifying column lower end, valve is located at subcooler lower end, between described rectifying column, main heat exchanger, subcooler, valve, all by pipeline, connect, between this structure rectifying column, main heat exchanger, subcooler, valve, keep rational distance, simple to operate, maintenance convenience.
As preferably, in described container, be positioned at main heat exchanger bottom and be also provided with gauge valve, in this structure container, be provided with gauge valve, convenient operation, safe and reliable.
As preferably, in described container, be provided with the external interface that adopts flange to connect, in this structure container, be provided with the external interface that adopts flange to connect, operate more convenient, stable connection.
As preferably, each angle of described container is provided with corner fittings, and this structure container is provided with the corner fittings of standard, loads and unloads and transport also standardization, does not need to change the outfit, and be applicable to multiple means of transportation in transportation, convenient quick, increases work efficiency.
Beneficial effect:
The utility model adopts technique scheme that container-type ice chest is provided, simple in structure, transportation safety, convenient, can solve again on-the-spot pipe arrangement complicated, the problems such as expense height, the design of container has strengthened globality and the stability of ice chest structure, internal part is played a very good protection, also reduced the breakage rate to parts in transit, effectively avoided tiny parts to lose in transit, and that integral lifting is convenient to is on-the-spot in place, install, reduce work on the spot amount, greatly shorten the work period, raising the efficiency, quality and the safety of product have been guaranteed simultaneously.
Accompanying drawing explanation
Fig. 1 is structural perspective of the present utility model;
Fig. 2 is structural representation of the present utility model;
Fig. 3 is the structural representation of container in the utility model embodiment.
The specific embodiment
As Figure 1-3, container-type ice chest, comprise container 9 and pipe-line system, described pipe-line system comprises the rectifying column 1 being located in container 9, main heat exchanger 2, subcooler 3, valve 4 and the pipeline 5 that connects all parts, described rectifying column 1 is vertically located at the centre position of container 9, main heat exchanger 2 is vertically located at rectifying column 1 sidepiece, subcooler 3 is located at rectifying column 1 lower end, valve 4 is located at subcooler 3 lower ends, described rectifying column 1, main heat exchanger 2, subcooler 3, between valve 4, all by pipeline 5, connect, in described container 9, be positioned at main heat exchanger 2 bottoms and be also provided with gauge valve 6, in described container 9, be provided with the external interface 7 that adopts flange to connect, described container 9 each angles are provided with corner fittings 8.
During real work, container 9 is mainly used in fixing its inner each part, and hold the parts such as lower its inner all devices, valve 4, pipeline 5, strengthen globality and the stability of ice chest structure, convenient lifting, transportation can also effectively not protect inner each part contaminated and damage, before transportation in transportation and installation process, reserved external interface 7 all needs to take the measure of reasonably sealing, and common companion flange takes therebetween to be more than or equal to the rubber of 3mm with thickness or the mode of plastic plate seals, threaded end (TE) is available plastics or metal cap sealing, in addition, the corner fittings 8 that container itself is provided with, Button Block, convenient lifting, also be beneficial to fixedly ice chest on transport vehicle or ship, avoid destroying paint, external interface 7 must seal before delivery, in order to avoid there is pollutant to enter in transportation, some pollutant may be corrosive, rodent, abrasiveness, this structure rectifying column 1, main heat exchanger 2, subcooler 3, between valve 4, keep rational distance, simple to operate, maintenance is convenient, in this structure container 9, be provided with gauge valve 6, convenient operation, safe and reliable, in this structure container 9, be provided with the external interface 7 that adopts flange to connect, operate more convenient, stable connection, this structure container 9 is provided with the corner fittings 8 of standard, load and unload and transport also standardization, in transportation, do not need to change the outfit, and be applicable to multiple means of transportation, convenient quick, increase work efficiency, the utility model is simple in structure, transportation safety, convenient, can solve again on-the-spot pipe arrangement complicated, the problems such as expense height, the design of container has strengthened globality and the stability of ice chest structure, internal part is played a very good protection, also reduced the breakage rate to parts in transit, effectively avoided tiny parts to lose in transit, and that integral lifting is convenient to is on-the-spot in place, install, reduce work on the spot amount, greatly shorten the work period, raising the efficiency, quality and the safety of product have been guaranteed simultaneously.
Specific embodiment described herein is only to the explanation for example of the utility model spirit, the utility model person of ordinary skill in the field can make various modifications or supplements or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present utility model or surmount the defined scope of appended claims.

Claims (5)

1. container-type ice chest, it is characterized in that: comprise container (9) and pipe-line system, described pipe-line system comprises rectifying column (1), main heat exchanger (2), subcooler (3), the valve (4) being located in container (9) and the pipeline (5) that connects all parts.
2. container-type ice chest according to claim 1, it is characterized in that: described rectifying column (1) is vertically located at the centre position of container (9), main heat exchanger (2) is vertically located at rectifying column (1) sidepiece, subcooler (3) is located at rectifying column (1) lower end, valve (4) is located at subcooler (3) lower end, between described rectifying column (1), main heat exchanger (2), subcooler (3), valve (4), all by pipeline (5), connects.
3. container-type ice chest according to claim 1, is characterized in that: in described container (9), be positioned at main heat exchanger (2) bottom and be also provided with gauge valve (6).
4. container-type ice chest according to claim 1, is characterized in that: in described container (9), be provided with the external interface (7) that adopts flange to connect.
5. container-type ice chest according to claim 1, is characterized in that: each angle of described container (9) is provided with corner fittings (8).
CN201320374052.6U 2013-06-26 2013-06-26 Containerized ice chest Expired - Lifetime CN203454608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320374052.6U CN203454608U (en) 2013-06-26 2013-06-26 Containerized ice chest

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320374052.6U CN203454608U (en) 2013-06-26 2013-06-26 Containerized ice chest

Publications (1)

Publication Number Publication Date
CN203454608U true CN203454608U (en) 2014-02-26

Family

ID=50134475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320374052.6U Expired - Lifetime CN203454608U (en) 2013-06-26 2013-06-26 Containerized ice chest

Country Status (1)

Country Link
CN (1) CN203454608U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109954367A (en) * 2017-12-14 2019-07-02 乔治洛德方法研究和开发液化空气有限公司 It is separated by distillation the sealing cover of the equipment of gaseous mixture and the equipment including sealing cover
CN114087155A (en) * 2021-08-02 2022-02-25 杭州制氧机集团股份有限公司 Detachable cryogenic liquid pump box top cover of air separation equipment
CN115371358A (en) * 2022-07-21 2022-11-22 杭州福斯达深冷装备股份有限公司 Air separation plant and cold box subassembly thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109954367A (en) * 2017-12-14 2019-07-02 乔治洛德方法研究和开发液化空气有限公司 It is separated by distillation the sealing cover of the equipment of gaseous mixture and the equipment including sealing cover
CN114087155A (en) * 2021-08-02 2022-02-25 杭州制氧机集团股份有限公司 Detachable cryogenic liquid pump box top cover of air separation equipment
CN115371358A (en) * 2022-07-21 2022-11-22 杭州福斯达深冷装备股份有限公司 Air separation plant and cold box subassembly thereof

Similar Documents

Publication Publication Date Title
CN203454608U (en) Containerized ice chest
CN204629116U (en) Oil transport pipeline accident warning device
CN104439819B (en) The double-deck liquid ammonia storage tank construction technology of a kind of low temperature
CN205293802U (en) Oil storage tank with sealing performance
CN207526785U (en) A kind of sanitation cart hydraulic oil container
CN204280354U (en) A kind of aero-engine anti-corrosion type packing chest
CN104329562B (en) A kind of movable hydraulic substation car
CN205221613U (en) Antiseep double -layer oil tank
CN205606085U (en) Need not artifical oil pipeline anti -theft oil device of touing
CN204750164U (en) Rail is handed over and is hung power supply box under vehicle
CN204187267U (en) A kind of hydraulic pressure aerating type bundled tube shipping container
CN201391660Y (en) Liquid sealer
CN207624502U (en) The inner oil type metal bellow oil conservator with micro-positive pressure characteristic with check valve
CN208278714U (en) A kind of chondroitin sulfate production alcohol storage system
CN203006178U (en) Bottom unloading system and tank container
CN201740343U (en) Integral transportation thermal sledge
CN204528214U (en) A kind of casing of dock container
CN201023833Y (en) Multifunctional passive gas pressure balance voltage stabilizer
CN206370452U (en) A kind of sealing structure and automobile of electrokinetic cell casing and connector
CN202864112U (en) Tool for transporting advanced site assembly (ASA) structure transformer body
CN206377077U (en) A kind of fuel tank
CN206537776U (en) A kind of novel container
CN203486368U (en) Tube bundle container
CN205911114U (en) 35kV station is with transformer vacuum oil injection device
CN206329915U (en) Bundled tube container and gas transport car

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311199, No. 159 North East Lake Road, East Lake street, Yuhang District, Zhejiang, Hangzhou

Patentee after: HANGZHOU FORTUNE CRYOGENIC EQUIPMENT CO.,LTD.

Address before: 311425, No. 159 North East Lake Road, East Lake street, Yuhang District, Zhejiang, Hangzhou

Patentee before: Hangzhou Fortune Industry Group Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140226