CN207863119U - A kind of construction drainage piping shaft - Google Patents

A kind of construction drainage piping shaft Download PDF

Info

Publication number
CN207863119U
CN207863119U CN201820069983.8U CN201820069983U CN207863119U CN 207863119 U CN207863119 U CN 207863119U CN 201820069983 U CN201820069983 U CN 201820069983U CN 207863119 U CN207863119 U CN 207863119U
Authority
CN
China
Prior art keywords
upper cover
block
spring
mandril
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820069983.8U
Other languages
Chinese (zh)
Inventor
向少春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Supreme Construction Group Ltd
Original Assignee
Supreme Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Supreme Construction Group Ltd filed Critical Supreme Construction Group Ltd
Priority to CN201820069983.8U priority Critical patent/CN207863119U/en
Application granted granted Critical
Publication of CN207863119U publication Critical patent/CN207863119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction drainage piping shafts, including well body and upper cover, upper cover is installed at the top of the well body, the sliding block is connected with the inner wall of upper cover, and the top exterior walls left and right ends of the upper cover are mounted on spring groove, and the inner cavity of the spring groove is equipped with second spring, the front end of the second spring is equipped with jacking block, the jacking block sequentially passes through spring groove and mandril, and the top of the jacking block is equipped with pull rod, and the pull rod runs through spring groove.The construction drainage piping shaft, by turning the first stubborn bar, having reached makes the bolt of its bottom start to rotate, and nut is made to push pressing plate, it is moved down along guide post, having reached makes fixture block take in slotting purpose in the block under the promotion of the first spring, so that inserted block is no longer mutually clamped with upper cover, you can to pull up upper cover, it is set to be removed from well body, achieve the purpose that open well body, the construction drainage piping shaft can be used, brought convenience for people.

Description

A kind of construction drainage piping shaft
Technical field
The utility model is related to architecture technical field, specially a kind of construction drainage piping shaft.
Background technology
Drainpipe Dow Jones index collects the system formed with the pipe duct of sewage effluent, waste water and rainwater and its affiliated facility.Packet Include main pipe, branch pipe and the pipeline towards treatment plant, no matter be built on street or it is other Anywhere, as long as rise draining make Pipeline all should be used as drainage pipeline statistics.
Therefore construction drainage piping shaft has obtained the extensive use of people, such as application No. is the realities of CN 204876482U With new patent, including piping shaft drainpipe, surroundings wall and conduit pipe, although the structure of the utility model patent is simple, But it due to its poor sealing, sheds usually having peculiar smell, makes troubles to people’s lives.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of construction drainage piping shaft Problem.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction drainage piping shaft, including well body And upper cover, upper cover is installed at the top of the well body, the first stubborn bar is installed, the first stubborn bar runs through at the top of the upper cover The bottom end of upper cover, the first stubborn bar is equipped with bolt, and the bottom outer wall of the bolt is equipped with nut, the bottom of the nut Outer wall is equipped with fore-set, and the bottom end of the fore-set is equipped with pressing plate, and the bottom of the pressing plate is equipped with rubber ring, the well body Bottom interior wall is equipped with baffle ring, and the rubber ring is connected with baffle ring overlap joint, is mounted at left and right sides of the upper surface of the baffle ring Guide post, the guide post run through pressing plate, inserted block, the top inner cavity of the inserted block are mounted at left and right sides of the upper surface of the well body The left and right sides is mounted on fixture block, and the fixture block sequentially passes through inserted block and upper cover, and the fixture block passes through first rotating shaft and connecting rod phase Even, the connecting rod is connected by the second shaft with inserted block, and the outer wall of the connecting rod is equipped with the first spring, first spring Rear end is connected with the inner wall of inserted block, mandril is mounted at left and right sides of the top of the upper cover, the mandril is through upper cover and inserts The left and right sides of block, the mandril is connected with fixture block overlap joint, and the inner wall of the mandril is equipped with slideway, the inner cavity of the slideway Sliding block is installed, the sliding block is connected with the inner wall of upper cover, and the top exterior walls left and right ends of the upper cover are mounted on spring groove, The inner cavity of the spring groove is equipped with second spring, and the front end of the second spring is equipped with jacking block, and the jacking block sequentially passes through The top of spring groove and mandril, the jacking block is equipped with pull rod, and the pull rod runs through spring groove.
Preferably, the right side inner cavity of the upper cover is equipped with rack, and the right hand top outer wall of the upper cover is equipped with second Bar is twisted, the second stubborn bar runs through upper cover, and the bottom end of the second stubborn bar is equipped with gear, and the wheel and rack engages phase Even, the rack sequentially passes through upper cover and the first stubborn bar.
Preferably, the top of the described first stubborn bar is equipped with silica gel sheath.
Preferably, strut, the bottom end of the strut and the upper surface phase of pressing plate are mounted at left and right sides of the fore-set Even.
Preferably, the top of the mandril is equipped with handle.
Compared with prior art, the utility model has the beneficial effects that:The construction drainage piping shaft is twisted by turning first Bar, having reached makes the bolt of its bottom start to rotate, and nut is made to push pressing plate, is moved down along guide post, having reached makes pressing plate pressure Firmly baffle ring, the purpose for making rubber ring tightly be pushed down with baffle ring, plays the effect of sealing, and by pulling pull rod, having reached makes top Block exits the purpose in mandril, after pull up mandril, so that it is exited between fixture block and fixture block, having reached makes fixture block in the first bullet Take in slotting purpose in the block under the promotion of spring, inserted block made no longer mutually to be clamped with upper cover, you can pull up upper cover, make its by from It is removed in well body, has achieved the purpose that open well body, the construction drainage piping shaft can be used, brought convenience for people.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is bolt, nut and fore-set connection relation structural schematic diagram in Fig. 1;
Fig. 3 is the connection relation structural schematic diagram of handle and mandril in Fig. 1;
Fig. 4 be Fig. 1 in gear, the second stubborn bar and rack connection relation structural schematic diagram.
In figure:1, well body, 2, upper cover, the 3, first stubborn bar, 4, bolt, 5, nut, 6, fore-set, 7, guide post, 8, rubber ring, 9, Pressing plate, 10, baffle ring, 11, inserted block, 12, fixture block, 13, first rotating shaft, the 14, first spring, the 15, second shaft, 16, connecting rod, 17, Sliding block, 18, slideway, 19, mandril, 20, pull rod, 21, jacking block, 22, spring groove, 23, second spring, 24, gear, 25, second twists Bar, 26, rack, 27, silica gel sheath, 28, strut, 29, handle.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction drainage piping shaft, including 1 He of well body The top of upper cover 2, well body 1 is equipped with upper cover 2, and upper cover 2 seals the top of well body 1, and the top of upper cover 2 is equipped with the first stubborn bar 3, the first stubborn bar 3 runs through upper cover 2, and the bottom end of the first stubborn bar 3 is equipped with bolt 4, and the bottom outer wall of bolt 4 is equipped with nut 5, spiral shell Mother 5 matches with bolt 4, and the bottom outer wall of nut 5 is equipped with fore-set 6, and the bottom end of fore-set 6 is equipped with pressing plate 9, the bottom of pressing plate 9 Portion is equipped with rubber ring 8, and the leakproofness of well body 1 is made to greatly promote, and the bottom interior wall of well body 1 is equipped with baffle ring 10, rubber ring 8 with The overlap joint of baffle ring 10 is connected, and guide post 7 is mounted at left and right sides of the upper surface of baffle ring 10, and guide post 7 runs through pressing plate 9, makes pressing plate 9 can be with It is moved up and down along it, inserted block 11 is mounted at left and right sides of the upper surface of well body 1, is pacified at left and right sides of the top inner cavity of inserted block 11 Equipped with fixture block 12, fixture block 12 sequentially passes through inserted block 11 and upper cover 2, and fixture block 12 is connected by first rotating shaft 13 with connecting rod 16, and company is made Bar 16 can be pulled, and prevent its stuck, and connecting rod 16 is connected by the second shaft 15 with inserted block 11, and the outer wall of connecting rod 16 is equipped with The rear end of first spring 14, the first spring 14 is connected with the inner wall of inserted block 11, and after mandril 19 exits, fixture block 12 is taken in inserted block 11 In, mandril 19 is mounted at left and right sides of the top of upper cover 2, mandril 19 runs through upper cover 2 and inserted block 11, the left and right sides of mandril 19 It is connected with the overlap joint of fixture block 12, the inner wall of mandril 19 is equipped with slideway 18, and the inner cavity of slideway 18 is equipped with sliding block 17, prevents mandril 19 displacements, sliding block 17 are connected with the inner wall of upper cover 2, and the top exterior walls left and right ends of upper cover 2 are mounted on spring groove 22, spring groove 22 inner cavity is equipped with second spring 23, and the front end of second spring 23 is equipped with jacking block 21, and jacking block 21 sequentially passes through spring groove 22 With mandril 19, mandril 19 to be fixed, prevents it from falling off, the top of jacking block 21 is equipped with pull rod 20, and pull rod 20 runs through spring groove 22, Jacking block 21 can be reached, the right side inner cavity of upper cover 2 is equipped with rack 26, and the right hand top outer wall of upper cover 2 is equipped with the second stubborn bar 25, the second stubborn bar 25 runs through upper cover 2, and the bottom end of the second stubborn bar 25 is equipped with gear 24, turns the second stubborn bar 25, make rack 26 can To move left and right, being inserted into the first mandril 3 prevents its loosening, affects leakproofness, and gear 24 is engaged with rack 26 to be connected, rack 26 sequentially pass through upper cover 2 and the first stubborn bar 3, and the top of the first stubborn bar 3 is equipped with silica gel sheath 27, make to turn more comfortably, fore-set 6 The left and right sides is mounted on strut 28, and the bottom end of strut 28 is connected with the upper surface of pressing plate 9, and the top of mandril 19 is equipped with handle 29。
When needing to seal well body 1, the first stubborn bar 3 is turned first, makes the bolt 4 of its bottom start to rotate, due to spiral shell The pressing plate 9 that mother 5 is connected has the limitation of guide post 7, so preventing nut 9 from rotating, and is sent out with it during bolt 4 rotates It is raw to relatively rotate, generate displacement, and move down, push fore-set 6 and pressing plate 9, pressing plate 9 is made to push down baffle ring 10, make rubber ring 8 with Baffle ring 10 is tightly pushed down, and the effect of sealing is played, and when needing to open well body 1, pulls pull rod 20 first, jacking block 21 is made to move back Go out in mandril 19, after pull up mandril 19, so that it is exited between fixture block 12 and fixture block 12, lose the fixture block 12 of support It is taken in inserted block 11 under the promotion of one spring 14, makes inserted block 11 and the no longer mutually clamping of upper cover 2, you can pull up upper cover 2, make It is removed from well body 1, and pressing plate 9 is made to be separated with baffle ring 10, has been achieved the purpose that open well body 1, can have been built using this Drainpipe well is built, is brought convenience for people.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ", " in The orientation of the instructions such as portion ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than Indicate or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot It is construed as a limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, can also be electrical connection;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction drainage piping shaft, including well body (1) and upper cover (2), upper cover (2) is installed at the top of the well body (1), It is characterized in that:First stubborn bar (3) is installed, the first stubborn bar (3) runs through upper cover (2), described at the top of the upper cover (2) The bottom end of first stubborn bar (3) is equipped with bolt (4), and the bottom outer wall of the bolt (4) is equipped with nut (5), the nut (5) Bottom outer wall fore-set (6) is installed, the bottom end of the fore-set (6) is equipped with pressing plate (9), the bottom installation of the pressing plate (9) There are rubber ring (8), the bottom interior wall of the well body (1) that baffle ring (10) is installed, the rubber ring (8) overlaps phase with baffle ring (10) Even, guide post (7) is mounted at left and right sides of the upper surface of the baffle ring (10), the guide post (7) runs through pressing plate (9), the well It is mounted on inserted block (11) at left and right sides of the upper surface of body (1), is mounted at left and right sides of the top inner cavity of the inserted block (11) Fixture block (12), the fixture block (12) sequentially pass through inserted block (11) and upper cover (2), the fixture block (12) by first rotating shaft (13) with Connecting rod (16) is connected, and the connecting rod (16) is connected by the second shaft (15) with inserted block (11), the outer wall peace of the connecting rod (16) Equipped with the first spring (14), the rear end of first spring (14) is connected with the inner wall of inserted block (11), the top of the upper cover (2) The left and right sides is mounted on mandril (19), and the mandril (19) runs through upper cover (2) and inserted block (11), the left and right of the mandril (19) Both sides are connected with fixture block (12) overlap joint, and the inner wall of the mandril (19) is equipped with slideway (18), the inner cavity of the slideway (18) Sliding block (17) is installed, the sliding block (17) is connected with the inner wall of upper cover (2), the top exterior walls left and right ends of the upper cover (2) It is mounted on spring groove (22), the inner cavity of the spring groove (22) is equipped with second spring (23), the second spring (23) Front end is equipped with jacking block (21), and the jacking block (21) sequentially passes through spring groove (22) and mandril (19), the jacking block (21) it is upper Portion is equipped with pull rod (20), and the pull rod (20) runs through spring groove (22).
2. a kind of construction drainage piping shaft according to claim 1, it is characterised in that:The right side inner cavity of the upper cover (2) Rack (26) is installed, the right hand top outer wall of the upper cover (2) is equipped with the second stubborn bar (25), and the second stubborn bar (25) is passed through Lid (2) is put on, the bottom end of the second stubborn bar (25) is equipped with gear (24), and the gear (24) engages phase with rack (26) Even, the rack (26) sequentially passes through upper cover (2) and the first stubborn bar (3).
3. a kind of construction drainage piping shaft according to claim 1, it is characterised in that:The top of the first stubborn bar (3) Silica gel sheath (27) is installed.
4. a kind of construction drainage piping shaft according to claim 1, it is characterised in that:The left and right sides of the fore-set (6) It is mounted on strut (28), the bottom end of the strut (28) is connected with the upper surface of pressing plate (9).
5. a kind of construction drainage piping shaft according to claim 1, it is characterised in that:It installs on the top of the mandril (19) There is handle (29).
CN201820069983.8U 2018-01-16 2018-01-16 A kind of construction drainage piping shaft Expired - Fee Related CN207863119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820069983.8U CN207863119U (en) 2018-01-16 2018-01-16 A kind of construction drainage piping shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820069983.8U CN207863119U (en) 2018-01-16 2018-01-16 A kind of construction drainage piping shaft

Publications (1)

Publication Number Publication Date
CN207863119U true CN207863119U (en) 2018-09-14

Family

ID=63461751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820069983.8U Expired - Fee Related CN207863119U (en) 2018-01-16 2018-01-16 A kind of construction drainage piping shaft

Country Status (1)

Country Link
CN (1) CN207863119U (en)

Similar Documents

Publication Publication Date Title
CN207863119U (en) A kind of construction drainage piping shaft
CN201817874U (en) Sewer elbow connector with rotation cutter blade
CN208586717U (en) A kind of municipal works drainage pipeline
CN204876561U (en) Device is reserved at entrance to a cave
CN208381522U (en) A kind of novel double-layer composite pipe
CN206257385U (en) A kind of flexible pipe fitting
CN208152194U (en) A kind of construction drainage pipe connections
CN204608942U (en) A kind of multi-functional lobby water assembly
CN210917640U (en) Engineering filtering drainage pipeline
CN209250147U (en) A kind of cable distribution box being easily installed disassembly
CN207211283U (en) A kind of cistern of convenient installation
CN202972311U (en) Direct-pushing-type fastening nut
CN207575940U (en) Water purifier
CN203361263U (en) Basin capable of facilitating installation of water faucet
CN215891563U (en) Rigid sleeve plugging device for sewage pool
CN205026138U (en) Water heater water valve lead water piping connection structure
CN216045975U (en) Connecting device for building water supply and drainage pipeline
CN215928818U (en) Building water supply and drainage pipeline
CN219491221U (en) Urban and rural planning municipal drainage pipeline structure
CN216273168U (en) Sewage purification device for environmental protection engineering
CN109399350A (en) A kind of wrap-up of raw silk rings pipe
CN216041346U (en) Municipal works road surface inspection shaft well head
CN213997078U (en) Air pipe cleaning machine for gas control cabinet
CN215568604U (en) Pipeline connecting piece for building of factory building
CN211118134U (en) Building water supply and drainage pipeline over-building guide pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180914