CN215568604U - Pipeline connecting piece for building of factory building - Google Patents
Pipeline connecting piece for building of factory building Download PDFInfo
- Publication number
- CN215568604U CN215568604U CN202122109048.4U CN202122109048U CN215568604U CN 215568604 U CN215568604 U CN 215568604U CN 202122109048 U CN202122109048 U CN 202122109048U CN 215568604 U CN215568604 U CN 215568604U
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipeline body
- screw thread
- thread
- construction according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline connecting piece for factory building, and particularly relates to the field of pipeline connection. The pipe sleeve is provided with the pentagonal blocks and the connecting ports, so that the pipe can be conveniently connected, the pipe sleeve is stable, when the pipe body is fixed with the pentagonal blocks, the pentagonal blocks are directly sleeved on the outer surface of the pipe sleeve, one end of the pipe sleeve is plugged into the mounting groove to be screwed, and then the connecting pipe is inserted into the connecting ports to be connected.
Description
Technical Field
The utility model relates to the technical field of pipeline connection, in particular to a pipeline connecting piece for factory building.
Background
The pipe connection refers to connecting the prefabricated pipe sections into a complete system according to the requirements of a design drawing, different connection methods are selected according to the materials of the used pipes in the construction, and common steel pipes are in threaded connection, flange connection, welding connection, socket connection, pipe bonding connection and the like.
However, in practical use, the two pipelines are directly connected by the connecting piece in a threaded manner by the conventional pipeline connecting method, and the two pipelines are difficult to be quickly screwed under the condition of narrow installation space, so that the working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned drawbacks of the prior art, embodiments of the present invention provide a pipe connector for building a factory building, so as to solve the above-mentioned problems in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a pipeline connecting piece is used in factory building construction, includes the pipeline body, the both ends of pipeline body all overlap and are equipped with the pipe box, the surface of pipe box closes five arriss pieces soon, the connector that is linked together with the pipeline body is seted up to the one end of five arriss pieces, the fixed surface of five arriss pieces installs the installation piece, the mounting groove that closes soon mutually with the pipe box is seted up to the other end of five arriss pieces.
Preferably, a side of the pentagonal prism block, which is far away from the pipeline body, is provided with a mounting ring, two supporting rods are fixedly mounted on the outer surface of the mounting ring, and two rotating grooves which are tightly attached to one ends of the supporting rods are formed in one side of the pentagonal prism block.
Preferably, the inside of mounting groove is equipped with the second screw thread, the surface of pipe box is equipped with first screw thread, first screw thread and second screw thread are closed mutually.
Preferably, a fourth thread is arranged on the outer surface of one end of the connecting port, and a third thread screwed with the fourth thread is arranged on the inner wall of the pipe sleeve.
Preferably, the thickness of the mounting groove is greater than the wall thickness of the pipe sleeve, and one end of the pipe sleeve is located inside the mounting groove.
Preferably, the diameter of the connecting port is larger than that of the pipeline body, and a rubber pad is laid on the inner wall of the connecting port.
Preferably, the supporting rod is located the inside one end fixedly connected with block rubber of swivelling chute, and the block rubber closely laminates with the inner wall of swivelling chute.
The utility model has the technical effects and advantages that:
1. compared with the prior art, connecting tube through setting up five arriss pieces and connector can be convenient for to have stability, when fixed with pipeline body and five arriss pieces, directly overlap five arriss pieces at the surface of pipe box, let the one end of pipe box fill in the mounting groove and carry out the spin-on, inject the inside of connector with the connecting pipe after that and connect.
2. Compared with the prior art, can be convenient for fixed five arriss pieces on the pipe box surface through setting up the collar, at first inject rotatory inslot portion with the bracing piece on collar surface, rotatory five arriss pieces after that, fix the surface at the pipe box with five arriss pieces to another section connecting pipe of installation.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a front sectional view of the present invention.
Fig. 3 is an enlarged schematic view of the structure at a in fig. 2 according to the present invention.
The reference signs are: 1. a pipe body; 2. pipe sleeve; 3. a pentagonal prism block; 301. mounting grooves; 4. a connecting port; 5. mounting blocks; 6. a first thread; 7. a second thread; 8. a third thread; 9. a fourth thread; 10. a mounting ring; 11. a support bar; 12. a rotating tank; 13. a rubber block.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
The pipeline connecting piece for factory building shown in the attached figures 1-3 comprises a pipeline body 1, pipe sleeves 2 are sleeved at two ends of the pipeline body 1, five-edge blocks 3 are screwed on the outer surfaces of the pipe sleeves 2, connectors 4 communicated with the pipeline body 1 are arranged at one ends of the five-edge blocks 3, installation blocks 5 are fixedly installed on the outer surfaces of the five-edge blocks 3, installation grooves 301 screwed with the pipe sleeves 2 are formed in the other ends of the five-edge blocks 3, pipeline connection can be facilitated by the arrangement of the five-edge blocks 3 and the connectors 4, stability is achieved, when the pipeline body 1 is fixed with the five-edge blocks 3, the five-edge blocks 3 are directly sleeved on the outer surfaces of the pipe sleeves 2, one ends of the pipe sleeves 2 are plugged into the installation grooves 301 to be screwed, and then connecting pipes are plugged into the connectors 4 to be connected.
A side of keeping away from pipeline body 1 through setting up five arriss pieces 3 is equipped with collar 10, and two bracing pieces 11 are installed to collar 10's fixed surface, and two swivelling chute 12 that closely laminate with the one end of bracing piece 11 are seted up to one side of five arriss pieces 3, can be convenient for fix five arriss pieces 3 on pipe box 2 surfaces.
Through the inside that sets up mounting groove 301 being equipped with second screw thread 7, the surface of pipe box 2 is equipped with first screw thread 6, and first screw thread 6 closes with second screw thread 7 is revolved mutually, and when can be convenient for revolve five arriss piece 3, fix with first screw thread 6 and second screw thread 7.
The outer surface of one end provided with the connecting port 4 is provided with a fourth thread 9, the inner wall of the pipe sleeve 2 is provided with a third thread 8 screwed with the fourth thread 9, and double-layer screwing fixation can be realized.
Thickness through setting up mounting groove 301 is greater than the wall thickness of pipe box 2, and the one end of pipe box 2 is located the inside of mounting groove 301, can have the leakproofness when pentagon piece 3 is fixed at pipeline body 1 both ends.
The diameter through setting up connector 4 is greater than the diameter of pipeline body 1, and the rubber pad has been laid to the inner wall of connector 4, is convenient for inject another connecting pipe into the inside of connector 4, and reaches sealed effect.
Through setting up one end fixedly connected with block rubber 13 that bracing piece 11 is located the inside of swivelling chute 12, and block rubber 13 closely laminates with the inner wall of swivelling chute 12, has anti-skidding effect when can making collar 10 rotate.
The working principle of the utility model is as follows: when the device need be installed, at first fix pipeline body 1 and five arriss piece 3, then insert another section pipeline into connector 4 and connect and communicate with pipeline body 1, when fixing pipeline body 1 with five arriss piece 3, directly overlap five arriss piece 3 at the surface of pipe box 2, let the one end of pipe box 2 fill in mounting groove 301, then insert the bracing piece 11 on mounting ring 10 surface inside rotatory groove 12, rotatory five arriss piece 3 lets third screw thread 8 and fourth screw thread 9 close each other soon afterwards, first screw thread 6 and second screw thread 7 close each other soon, it can to insert another pipeline into connector 4 at five arriss piece 3 centers afterwards.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a pipe connection spare for factory building construction, includes pipeline body (1), its characterized in that: the pipeline comprises a pipeline body (1), wherein pipe sleeves (2) are sleeved at two ends of the pipeline body (1), five-edge blocks (3) are screwed on the outer surfaces of the pipe sleeves (2), a connecting port (4) communicated with the pipeline body (1) is formed in one end of each five-edge block (3), installation blocks (5) are fixedly installed on the outer surfaces of the five-edge blocks (3), and installation grooves (301) screwed with the pipe sleeves (2) are formed in the other ends of the five-edge blocks (3).
2. The pipe joint for plant construction according to claim 1, wherein: a side of the five-edge block (3) far away from the pipeline body (1) is provided with a mounting ring (10), two supporting rods (11) are fixedly mounted on the outer surface of the mounting ring (10), and two rotating grooves (12) tightly attached to one ends of the supporting rods (11) are formed in one side of the five-edge block (3).
3. The pipe joint for plant construction according to claim 1, wherein: the inside of mounting groove (301) is equipped with second screw thread (7), the surface of pipe box (2) is equipped with first screw thread (6), first screw thread (6) and second screw thread (7) are closed mutually soon.
4. The pipe joint for plant construction according to claim 1, wherein: the outer surface of one end of the connecting port (4) is provided with a fourth thread (9), and the inner wall of the pipe sleeve (2) is provided with a third thread (8) screwed with the fourth thread (9).
5. The pipe joint for plant construction according to claim 1, wherein: the thickness of the mounting groove (301) is larger than the wall thickness of the pipe sleeve (2), and one end of the pipe sleeve (2) is located inside the mounting groove (301).
6. The pipe joint for plant construction according to claim 1, wherein: the diameter of the connecting port (4) is larger than that of the pipeline body (1), and a rubber pad is laid on the inner wall of the connecting port (4).
7. The pipe joint for plant construction according to claim 2, wherein: the supporting rod (11) is located one end fixedly connected with rubber block (13) inside the rotating groove (12), and the rubber block (13) is tightly attached to the inner wall of the rotating groove (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122109048.4U CN215568604U (en) | 2021-09-02 | 2021-09-02 | Pipeline connecting piece for building of factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122109048.4U CN215568604U (en) | 2021-09-02 | 2021-09-02 | Pipeline connecting piece for building of factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215568604U true CN215568604U (en) | 2022-01-18 |
Family
ID=79846244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122109048.4U Expired - Fee Related CN215568604U (en) | 2021-09-02 | 2021-09-02 | Pipeline connecting piece for building of factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215568604U (en) |
-
2021
- 2021-09-02 CN CN202122109048.4U patent/CN215568604U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207701989U (en) | A kind of water tubular union easy to use | |
CN215568604U (en) | Pipeline connecting piece for building of factory building | |
CN208703345U (en) | A kind of connected drainpipe with connector | |
CN207812623U (en) | A kind of drainage pipeline being easily installed | |
CN207246639U (en) | A kind of PE pipelines of convenient maintenance | |
CN205371938U (en) | Pipeline rush -repair joint | |
CN202577554U (en) | Polypropylene mute drainpipe fitting provided with double buckle type threaded connection head | |
CN212203556U (en) | Butt joint device for PE water supply pipe | |
CN210165032U (en) | Building drainage pipe connection structure | |
CN203375052U (en) | Device for fast connection of PE pipes | |
CN208750289U (en) | A kind of municipal administration water supply and drainage construction tubing | |
CN219673576U (en) | Natural gas pipeline connecting device | |
CN216590273U (en) | Water supply and drainage pipeline convenient to construction | |
CN211821170U (en) | Sewage PVC composite pipe for home decoration | |
CN207569399U (en) | A kind of water inlet pipe of dismantled and assembled attaching nut | |
CN216666750U (en) | Novel high polymer material pipeline | |
CN218671031U (en) | Water supply and drainage pipeline connecting structure | |
CN212107331U (en) | Connecting piece for metal pipeline | |
CN217583633U (en) | Modular sewage intercepting device arranged along river surge | |
CN216952146U (en) | High-sealing connecting device for water supply and drainage pipeline | |
CN221880454U (en) | Railing claw for fixedly connecting adjacent pipelines | |
CN221402135U (en) | Metal corrugated pipe | |
CN220706696U (en) | Sewage pipeline convenient to connect | |
CN217208121U (en) | SMC glass steel mould pressing converges dish | |
CN112959049B (en) | Pre-buried plastic-coated steel pipe connection auxiliary device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220118 |