CN207847560U - A kind of bridge construction mud conditioning device - Google Patents
A kind of bridge construction mud conditioning device Download PDFInfo
- Publication number
- CN207847560U CN207847560U CN201820199802.3U CN201820199802U CN207847560U CN 207847560 U CN207847560 U CN 207847560U CN 201820199802 U CN201820199802 U CN 201820199802U CN 207847560 U CN207847560 U CN 207847560U
- Authority
- CN
- China
- Prior art keywords
- mud
- tank
- separator
- adjusts
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of bridge construction mud conditioning devices, including:Mud separator, the slurry outlet end of the mud separator adjusts tank with mud by connecting pipe and connect, the mud adjusts pot bottom and is equipped with Sand pump, described Sand pump one end is equipped with sediment outflow pipe, sediment outflow pipe outlet end adjusts tank through mud and extends to outside, agitating paddle is equipped with above the Sand pump, the mud adjusts tank upper end and is equipped with stirring motor, and the stirring motor is sequentially connected with agitating paddle.The utility model by mud adjust tank by mud separator it is separated go out mud carry out the more characteristics of proportion, viscosity, silt content etc. and adjust, mud is set to recycle, simultaneously pond is dug without manpower, reduce working feature, improve production efficiency, mud separator is equipped with generating set simultaneously, and electricity energizes caused by generating set, reduces the input cost of enterprise.
Description
Technical field
The utility model is related to technical field of bridge engineering more particularly to a kind of bridge construction mud conditioning devices.
Background technology
Mud separator using more, mainly detaches mud with the sediment taken out of when recycling in metro project,
General is stationary separator, has bad luck mud and is detached, in bridge drilling pile driving construction, mostly uses percussive drilling at this stage and apply
Work technique to ensure punching speed needs that slush pump is used to carry out borehole cleaning for a long time during percussive drilling, so equal per bench drill machine
It needs that individual mud pit and sedimentation basin is arranged, such as uses stationary separator, need to fall the mud at scene using mud of technological requirement
It is transported at separator, Slurry Storage system then is set in mud separation place, it again will be fresh after separation after the completion of separation
Mud is had bad luck to the mud pit in drilled pile construction place and is used for drilling machine normal circulation, using stationary separator, needs auxiliary
There is bigger input in terms of helping facility(Place, Slurry Storage, separation), and mud is had bad luck repeatedly, also improves at mud
Reason expense.
Through retrieval, grant number is the Chinese patent of 204266960 U of CN, discloses a kind of bridge construction mud conditioning
Device, including mud separator, described mud separator one end connect Sand pump through outlet, and the mud separator other end is through going out
It starches pipe and connects pile foundation slurry supply reservoir, slush pump is equipped in pile foundation slurry supply reservoir, slush pump output is connected through connecting tube
Hole position and pile foundation slurry discharge pond, and pile foundation slurry discharges pond and connects Sand pump, pile foundation slurry discharge pond setting through inlet tube
In pile foundation slurry supply reservoir side, the mud separator, Sand pump, generating set are mounted on flat car.This is novel to bridge
Mud carries out separating treatment in beam pile foundation mud pit, reduces sand content in mud, improves mud and takes sediment ability, reduces pulping number
Amount, has the characteristics that simple in structure, environmentally friendly, economical;But there is also following disadvantages:Mud in supply reservoir after separation of solid and liquid
Proportion, viscosity, silt content etc. change, but regulating device without mixing in supply reservoir, make mud property that can not adjust, to
Cause mud that can not recycle, practicality could be recycled after need to being manually adjusted, improves cost of labor, it is negative to increase enterprise
Load.
Utility model content
The utility model is intended to solve at least some of the technical problems in related technologies.For this purpose, this reality
It is to propose a kind of bridge construction mud conditioning device with a novel purpose, tank is adjusted by mud separator by mud
It is separated go out mud carry out the more characteristics of proportion, viscosity, silt content etc. and adjust, so that mud is recycled, while being not necessarily to people
Power digs pond, reduces working feature, improves production efficiency, while mud separator is equipped with generating set, generating set institute
The electricity energy supply of generation can reduce the input cost of enterprise.
In order to achieve the above objectives, the utility model adopts the following technical solution.
A kind of bridge construction mud conditioning device, including:Mud separator, the slurry outlet end of the mud separator
Tank is adjusted by connecting pipe with mud to connect, the mud adjusts pot bottom and is equipped with Sand pump, and described Sand pump one end is equipped with
Sediment outflow pipe, sediment outflow pipe outlet end adjust tank through mud and extend to outside, and agitating paddle, institute are equipped with above the Sand pump
It states mud and adjusts tank upper end equipped with stirring motor, the stirring motor is sequentially connected with agitating paddle;The mud adjusts tank side
It is connect with the first slush pump by connecting pipe equipped with outlet end, first slush pump is connect with pile foundation hole position pipeline, described
Pile foundation hole position is connect with discharge pond pipeline, and the discharge bottom of pond portion is equipped with the second slush pump, and second slush pump passes through connection
The input end pipeline of pipeline and mud separator connects.
Further, the side of the mud separator is equipped with generating set, and the rotary head of the generating set, which is equipped with, to be turned
Paddle.
Further, the lower end both sides of the mud adjusting tank are equipped with holder.
Further, the input end of the mud adjusting tank is equipped with solenoid valve on outlet end and sediment outflow pipe.
Further, the mud adjusts the top side of tank equipped with charge door.
Advantageous effect in the utility model is:Mud separator it is separated go out mud pass through connecting pipe, be delivered to
Mud is adjusted in tank, and it is canned supply reservoir that mud, which adjusts tank, but is not necessarily to hand excavation, while mud adjusts and is equipped with stirring in tank
Paddle can adjust the uniformity of mud;The Sand pump of bottom simultaneously can extract the little particles such as sandstone in mud out, through sediment outflow
Pipe is discharged mud and adjusts tank;Simultaneously solenoid valve can disconnect supply and addition, charge door can additive, to the proportion of mud,
Viscosity, silt content etc. are adjusted comprehensively, are adjusted to and form can be recycled, then open the solenoid valve of outlet end, through the first mud
Stock pump acts on, and mud is adjusted in the slurry transportation to pile foundation hole position in tank and is used, the mud after extra or use is again
It flows into discharge pond, the second slush pump will carry out solid-liquid separation in slurry transportation to mud separator, facilitate mud again
It uses, is not necessarily to manual adjustment characteristics of mud, mud is enable to recycle, reduce enterprise and launch cost.The utility model is logical
Cross mud adjust tank by mud separator it is separated go out mud carry out the more characteristics of proportion, viscosity, silt content etc. and adjust, make mud
It can recycle, while pond is dug without manpower, reduce working feature, improve production efficiency, while on mud separator
Equipped with generating set, electricity energizes caused by generating set, can reduce the input cost of enterprise.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality
Novel embodiment for explaining the utility model, does not constitute limitations of the present invention together.In the accompanying drawings:
Fig. 1 be the utility model proposes a kind of bridge construction mud conditioning device structural schematic diagram.
In figure:1- mud separators, 2- connecting pipes, 3- mud adjust tank, 4- stirring motors, 5- agitating paddles, 6- and inhale sand
Pump, the first slush pumps of 7-, 8- pile foundation holes position, 9- discharges pond, the second slush pumps of 10-, 11- generating sets, 12- sediment outflow pipes.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Examples of the embodiments are shown in the accompanying drawings, and in which the same or similar labels are throughly indicated identical or classes
As element or element with the same or similar functions.The embodiments described below with reference to the accompanying drawings are exemplary, purport
For explaining the utility model, and should not be understood as limiting the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be
Mechanical connection can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two
The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Referring to Fig.1, a kind of bridge construction mud conditioning device, including:Mud separator 1, the mud of mud separator 1
Outlet end adjusts tank 3 with mud by connecting pipe 2 and connect, and mud adjusts 3 bottom of tank and is equipped with Sand pump 6, and 6 one end of Sand pump is set
There are sediment outflow pipe 12,12 outlet end of sediment outflow pipe to adjust tank 3 through mud and extend to outside, 12 top of Sand pump is equipped with agitating paddle 5,
Mud adjusts 3 upper end of tank and is equipped with stirring motor 4, and stirring motor 4 is sequentially connected with agitating paddle 5;Mud adjusts 3 side of tank and is equipped with out
Mouthful end is connect by connecting pipe 2 with the first slush pump 7, and the first slush pump 7 is connect with 8 pipeline of pile foundation hole position, pile foundation hole position 8 and
The connection of 9 pipeline of pond is discharged, discharge 9 bottom of pond is equipped with the second slush pump 10, and the second connection pump 10 passes through connecting pipe 2 and mud point
Input end pipeline connection from device 1;The side of mud separator 1 is equipped with generating set 11, and the rotary head of generating set 11 is equipped with
Turn paddle, band turn paddle rotates when mud moves, to produce electricl energy;The lower end both sides that mud adjusts tank 3 are equipped with holder;Mud
The input end that slurry adjusts tank 3 is equipped with solenoid valve on outlet end and sediment outflow pipe 12;The top side that mud adjusts tank 3 is equipped with
Charge door.
The utility model is simple in structure, easy to use.Mud separator 1 it is separated go out mud by connecting pipe 2 it is defeated
It send to mud and adjusts in tank 3, it is canned supply reservoir that mud, which adjusts tank 3, but is not necessarily to hand excavation, while mud is adjusted in tank 3
Equipped with agitating paddle 5, the uniformity of mud can be adjusted;The Sand pump 6 of bottom simultaneously can take out the little particles such as sandstone in mud
Go out, mud, which is discharged, through sediment outflow pipe 12 adjusts tank 3;Simultaneously solenoid valve can disconnect supply and addition, charge door can additive, it is right
Proportion, viscosity, silt content of mud etc. are adjusted comprehensively, are adjusted to and form can be recycled, then open the electromagnetism of outlet end
Valve is acted on through the first slush pump 7, and mud is adjusted the slurry transportation in tank 3 to be used in pile foundation hole position 8, extra or make
Mud after again flows into discharge pond 9;Second slush pump 10 will carry out solid-liquid point in slurry transportation to mud separator 1
From, facilitate reusing for mud, be not necessarily to manual adjustment characteristics of mud, so that mud is recycled, reduce enterprise dispensing
Cost.
The utility model by mud adjust tank 3 by mud separator 1 it is separated go out mud carry out proportion, viscosity, contain
More characteristics such as sand amount are adjusted, and mud is allow to recycle, while digging pond without manpower, are reduced working feature, are improved life
Efficiency is produced, while mud separator is equipped with generating set 11, electricity energizes caused by generating set, reduces the throwing of enterprise
Enter cost.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not
Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of bridge construction mud conditioning device, which is characterized in that including:
Mud separator, the slurry outlet end of the mud separator adjust tank with mud by connecting pipe and connect, the mud
Slurry adjusts pot bottom and is equipped with Sand pump, and described Sand pump one end is equipped with sediment outflow pipe, and sediment outflow pipe outlet end is adjusted through mud
Tank simultaneously extends to outside, agitating paddle is equipped with above the Sand pump, the mud adjusts tank upper end and is equipped with stirring motor, described to stir
Motor is mixed to be sequentially connected with agitating paddle;
The mud adjusts tank side and is equipped with outlet end and is connect with the first slush pump by connecting pipe, first slush pump
It being connect with pile foundation hole position pipeline, the pile foundation hole position is connect with discharge pond pipeline, and the discharge bottom of pond portion is equipped with the second slush pump,
Second slush pump is connected by the input end pipeline of connecting pipe and mud separator.
2. a kind of bridge construction mud conditioning device according to claim 1, it is characterised in that:The mud separator
Side be equipped with generating set, the rotary head of the generating set, which is equipped with, turns paddle.
3. a kind of bridge construction mud conditioning device according to claim 1, it is characterised in that:The mud adjusts tank
Lower end both sides be equipped with holder.
4. a kind of bridge construction mud conditioning device according to claim 1, it is characterised in that:The mud adjusts tank
Input end and outlet end and sediment outflow pipe on be equipped with solenoid valve.
5. a kind of bridge construction mud conditioning device according to claim 1, it is characterised in that:The mud adjusts tank
Top side be equipped with charge door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820199802.3U CN207847560U (en) | 2018-02-06 | 2018-02-06 | A kind of bridge construction mud conditioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820199802.3U CN207847560U (en) | 2018-02-06 | 2018-02-06 | A kind of bridge construction mud conditioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207847560U true CN207847560U (en) | 2018-09-11 |
Family
ID=63410943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820199802.3U Expired - Fee Related CN207847560U (en) | 2018-02-06 | 2018-02-06 | A kind of bridge construction mud conditioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207847560U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114632375A (en) * | 2022-04-19 | 2022-06-17 | 江西省欧陶科技有限公司 | Device for reducing water content of ceramic slurry and operation method |
-
2018
- 2018-02-06 CN CN201820199802.3U patent/CN207847560U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114632375A (en) * | 2022-04-19 | 2022-06-17 | 江西省欧陶科技有限公司 | Device for reducing water content of ceramic slurry and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155511A (en) | Rotating drum type swirl curing and stirring device and dredged sludge hydraulic reclamation method | |
CN103951104B (en) | Pile foundation construction mud treatment system and mud treatment process | |
CN109488238B (en) | Multifunctional integrated drilling fluid comprehensive treatment system and method for geological drilling | |
CN103603339A (en) | Method for long spiral drilling machine grouting retaining wall hole forming and system thereof | |
CN207847560U (en) | A kind of bridge construction mud conditioning device | |
CN206858385U (en) | It is a kind of that fuel-displaced separator is separated from oil-cut mud | |
CN206972179U (en) | A kind of pile foundation construction hole cleaning device | |
CN203625895U (en) | Rapid pile-forming mixing pile machine | |
CN203603145U (en) | Long spiral drilling machine grouting retaining wall hole forming system | |
CN201111446Y (en) | Novel stirring type mud-iron separator | |
CN210457925U (en) | Bored concrete pile pore-forming mud is handled and is removed charge device | |
KR100720821B1 (en) | Instillation matter Agitator for supplementing the ground and stagnant water | |
CN102432147A (en) | Wet-type anaerobic digestion degritting device for sludge | |
CN1059180A (en) | Solidification control system for well drilling liguid | |
CN201376317Y (en) | Sand pulp stirring machine | |
CN206589141U (en) | Grouting mixer and hybrid power stirring system | |
CN217169042U (en) | Municipal construction cement pouring device | |
CN104358545A (en) | Method and device for discharging sand and pulverized coal and producing gas | |
CN201321418Y (en) | Oil-sludge sand recycling treatment device | |
CN209742781U (en) | double-barrelled height of unipolar spouts stirring composite pile drilling system | |
CN210585352U (en) | Spiral fine sand recovery plant | |
CN208975307U (en) | Underground coal mine black water automatic separating apparatus | |
CN211246293U (en) | Hydraulic engineering construction is with high-efficient mixing stirring device | |
CN208777896U (en) | A kind of bored concrete pile auger machine | |
CN207667806U (en) | A kind of concrete gravel separator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180911 Termination date: 20200206 |