CN207847557U - Wellhead dust removal device for drilling equipment - Google Patents

Wellhead dust removal device for drilling equipment Download PDF

Info

Publication number
CN207847557U
CN207847557U CN201820199285.XU CN201820199285U CN207847557U CN 207847557 U CN207847557 U CN 207847557U CN 201820199285 U CN201820199285 U CN 201820199285U CN 207847557 U CN207847557 U CN 207847557U
Authority
CN
China
Prior art keywords
dust
guide cylinder
drilling
gathering arrester
deduster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820199285.XU
Other languages
Chinese (zh)
Inventor
邝光升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Original Assignee
Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute) filed Critical Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Priority to CN201820199285.XU priority Critical patent/CN207847557U/en
Application granted granted Critical
Publication of CN207847557U publication Critical patent/CN207847557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a well head dust collector for drilling equipment, including tubaeform dust cage, the guide cylinder, dust remover and sealed gasbag, the upper end of guide cylinder is sealed and is provided with rubber seal and realizes the movive seal on the drilling rod via hole, the dust remover is vertical to be installed under the guide cylinder and to communicate with each other with the inner chamber of guide cylinder, the dust remover is the coaxial circular nozzle stub of bilayer, the cyclic annular intermediate layer both ends that the interior outer tube formed are sealed, it has a large amount of hole for water spraying to distribute on the inner tube, be provided with high pressure water on the outer tube and insert the pipe, when the air current that carries the dust in the drilling passes through the dust remover, the water under high pressure that feeds into with the water access pipe and through the inside spun water smoke of dust remover inner tube hole for water spraying abundant contact, become wet ball or. The anchor rod and anchor cable drilling machine is simple in structure, low in manufacturing cost, light in weight and small in occupied space, can be flexibly used for anchor rod and anchor cable drilling of scaffold operation such as high slope, deep foundation pit and dangerous rock management, and achieves green drilling.

Description

Drilling equipment well head dust-extraction unit
Technical field
The utility model belongs to geological drilling field of engineering technology, is suitable for various using air as the dust of circulatory mediator brill Into dedusting.
Background technology
Traditional large-scale advanced drilling equipment, is sent to cyclone separator dedusting, advantage is to remove after the dust of aperture by pipeline Dirt effect is preferable, but since volume, weight are big, can not be applied on the landing stage of scaffold of anchoring engineering.Small-sized probing is set It is standby, it is generally not provided with dust-extraction unit, proofing dust and protecting measure only is taken to worker and combines well head covering plus water spray dust, although It is at low cost, but dust removing effects are bad, pollute environment, influence workers ' health, dust is big to equipment damage.
Utility model content
In view of the above technical problems, the utility model is intended to provide that a kind of manufacturing cost is low, probing of good dedusting effect is set Spare well head dust-extraction unit, is particularly suitable for some drilling site conditions harshnesses, and large scale equipment cannot go up the occasion of scaffold operation It uses, can flexibly be used for anchor shaft anchor cable drilling of the scaffolds operation such as high slope, deep basal pit and Unstable Rock Treatment etc., it is especially small-sized Drilling equipment air drilling well head dedusting effectively solves environmental pollution and protection worker's health.
For this purpose, technical solution used by the utility model is:A kind of drilling equipment well head dust-extraction unit, including loudspeaker Shape dust gathering arrester, guide cylinder and deduster, the tubaeform dust gathering arrester and guide cylinder be co-axially mounted rear enclosure drilling equipment drilling rod On, the big opening end of the tubaeform dust gathering arrester covers in well head, and the pressure bladder by being close to well head prevents dust from leaking, described The upper end closed of guide cylinder is simultaneously provided with rubber seal realization dynamic sealing on drilling rod via, and the drilling rod is horizontal by folder Angle α, and 0 ° of 90 ° of < α <, deduster are vertically installed at the underface of guide cylinder and are communicated with the inner cavity of guide cylinder, and deduster is Double-layer coaxial circular short tube, the cyclic annular interlayer that inner and outer pipes are formed is closed at both ends, is distributed with a large amount of hole for water spraying in inner tube, on outer tube It is provided with high pressure water access tube, when the air stream for carrying dust in drilling passes through deduster, is sent into high pressure water access tube The high pressure water and water mist inwardly sprayed through deduster inner tube hole for water spraying comes into full contact with, becomes wet bulb or mud, under the effect of gravity, It is discharged through deduster bottom.
The osculum end of the tubaeform dust gathering arrester is perpendicular to drilling rod as a preferred embodiment of the above solution, tubaeform dust gathering arrester Big opening end is obliquely installed with respect to drilling rod, the inclined hole drilling well for different angle, it is only necessary to replace tubaeform dust gathering arrester, it is ensured that loudspeaker The big opening end diameter of shape dust gathering arrester is consistent, you can realizes the general of pressure bladder.
Further, the tubaeform dust gathering arrester is welded and fixed with guide cylinder, and deduster is welded and fixed with guide cylinder, welding peace The sealing effect of dress is more preferable.
The utility model has the beneficial effects that:It is simple in structure, manufacturing cost is low, it is light-weight, occupy little space, can flexibly use It drills in the anchor shaft anchor cable of the scaffolds operation such as high slope, deep basal pit and Unstable Rock Treatment;Made using totally enclosed type high pressure water veil Dust becomes wet bulb or mud, and is automatically drained out using gravity, to realize green probing, effectively solves environmental pollution and guarantor Nurse's human body health, the well head dedusting being adapted under all devices and execution conditions have been filled up in addition to large scale equipment operation Air drilling dedusting blank.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the deduster perspective view with high pressure water access tube.
Specific implementation mode
By way of example and in conjunction with the accompanying drawings, the utility model is described in further detail:
As shown in Figure 1, a kind of drilling equipment well head dust-extraction unit, mainly by tubaeform dust gathering arrester 1, guide cylinder 2, dedusting Device 3, pressure bladder 4, high pressure water access tube 5 form.
Tubaeform dust gathering arrester 1 is co-axially mounted rear enclosure on the drilling rod 6 of drilling equipment with guide cylinder 2, it is preferable that tubaeform collection Dust hood 1 is welded and fixed with guide cylinder 2.
Tubaeform dust gathering arrester 1 divides big opening end and osculum end, the big opening end of tubaeform dust gathering arrester 1 to cover in well head, and by tight The pressure bladder 4 of patch well head prevents dust from leaking, and the osculum end of tubaeform dust gathering arrester 1 is welded with the lower end of guide cylinder 2.
The upper end closed of guide cylinder 2 is simultaneously provided with rubber seal realization dynamic sealing on drilling rod via, and drilling rod 6 was crept into Cheng Zhong, tubaeform dust gathering arrester 1, guide cylinder 2, deduster 3, pressure bladder 4, high pressure water access tube 5 are fixed not as a whole It is dynamic.
Drilling rod 6 is horizontal by angle α, and 0 ° of 90 ° of < α <, deduster 3 are vertically installed at the underface of guide cylinder 2, and It is communicated with the inner cavity of guide cylinder 2, deduster 3 is welded and fixed with guide cylinder 2.
As shown in Figure 1, Figure 2, deduster 3 is double-layer coaxial circular short tube, two end seal of cyclic annular interlayer that inner and outer pipes are formed It closes, a large amount of hole for water spraying 3a is distributed in inner tube, high pressure water access tube 5 is provided on outer tube.
When carrying the air stream of dust by deduster 3 in drilling, the high pressure water and warp be sent into high pressure water access tube 5 The water mist that 3 inner tube hole for water spraying 3a of deduster inwardly sprays comes into full contact with, and becomes wet bulb or mud, under the effect of gravity, through dedusting 3 bottom of device is discharged.
The osculum end of tubaeform dust gathering arrester 1 is set perpendicular to drilling rod 6, the big opening end of tubaeform dust gathering arrester 1 with respect to the inclination of drilling rod 6 It sets, the inclined hole drilling well for different angle, it is only necessary to replace tubaeform dust gathering arrester 1, it is ensured that the big opening end of tubaeform dust gathering arrester 1 is straight Diameter is consistent, you can realizes the general of pressure bladder 4.
Gap of the dust generated in drilling process between drilling and hole wall is blown out using high pressure gas in drilling rod, is led to The big opening end for crossing tubaeform dust gathering arrester 1 covers in well head, can preferably collect dust, and dust is finally blown to guide cylinder 2, deduster 3 connect pressure water by high pressure water access tube 5 forms interior spray high pressure water veil, contacts to form wet bulb or mud with dust, through dedusting 3 bottom of device is discharged.Since deduster 3 is arranged in the underface of guide cylinder 2, dust, which is once contacted with high-pressure water mist, just becomes wet bulb Or mud, dust removing effects are very good.

Claims (3)

1. a kind of drilling equipment well head dust-extraction unit, it is characterised in that:Including tubaeform dust gathering arrester (1), guide cylinder (2) and remove Dirt device (3), the tubaeform dust gathering arrester (1) is co-axially mounted rear enclosure on the drilling rod (6) of drilling equipment with guide cylinder (2), described The big opening end of tubaeform dust gathering arrester (1) covers in well head, and the pressure bladder (4) by being close to well head prevents dust from leaking, described The upper end closed of guide cylinder (2) is simultaneously provided with rubber seal realization dynamic sealing, the drilling rod (6) and level on drilling rod via Face makes an angle alpha, and 0 ° of 90 ° of < α <, and deduster (3) is vertically installed at the underface of guide cylinder (2) and interior with guide cylinder (2) Chamber communicates, and deduster (3) is double-layer coaxial circular short tube, and the cyclic annular interlayer that inner and outer pipes are formed is closed at both ends, is distributed in inner tube A large amount of hole for water spraying (3a) is provided with high pressure water access tube (5) on outer tube, when the air stream for carrying dust in drilling passes through dedusting When device (3), the high pressure water being sent into high pressure water access tube (5) and the water inwardly sprayed through deduster (3) inner tube hole for water spraying (3a) Mist comes into full contact with, and becomes wet bulb or mud, under the effect of gravity, is discharged through deduster (3) bottom.
2. drilling equipment according to claim 1 well head dust-extraction unit, it is characterised in that:The tubaeform dust gathering arrester (1) osculum end is obliquely installed perpendicular to drilling rod (6), the big opening end of tubaeform dust gathering arrester (1) with respect to drilling rod (6).
3. drilling equipment according to claim 1 well head dust-extraction unit, it is characterised in that:The tubaeform dust gathering arrester (1) it is welded and fixed with guide cylinder (2), deduster (3) is welded and fixed with guide cylinder (2).
CN201820199285.XU 2018-02-05 2018-02-05 Wellhead dust removal device for drilling equipment Expired - Fee Related CN207847557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820199285.XU CN207847557U (en) 2018-02-05 2018-02-05 Wellhead dust removal device for drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820199285.XU CN207847557U (en) 2018-02-05 2018-02-05 Wellhead dust removal device for drilling equipment

Publications (1)

Publication Number Publication Date
CN207847557U true CN207847557U (en) 2018-09-11

Family

ID=63411236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820199285.XU Expired - Fee Related CN207847557U (en) 2018-02-05 2018-02-05 Wellhead dust removal device for drilling equipment

Country Status (1)

Country Link
CN (1) CN207847557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086931A (en) * 2018-02-05 2018-05-29 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Well head dust collector for drilling equipment
CN109469455A (en) * 2018-12-25 2019-03-15 明达海洋工程有限公司 Drilling dust-removing apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086931A (en) * 2018-02-05 2018-05-29 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Well head dust collector for drilling equipment
CN109469455A (en) * 2018-12-25 2019-03-15 明达海洋工程有限公司 Drilling dust-removing apparatus
CN109469455B (en) * 2018-12-25 2021-07-27 明达海洋工程有限公司 Drilling dust removal device

Similar Documents

Publication Publication Date Title
CN203879428U (en) Dry-type drilling and dust removing device
CN207847557U (en) Wellhead dust removal device for drilling equipment
CN108086931A (en) Well head dust collector for drilling equipment
CN203090686U (en) Spraying system of tower crane
CN206376771U (en) Geophysical drilling machine dust guard
CN201531270U (en) Water spray surrounded dust collector of excavating machine
CN203097768U (en) Dust removal device of dry-type drilling hole
CN208236411U (en) A kind of mine fully mechanized workface negative pressure suspension dust-extraction unit
CN109779561A (en) A kind of coal mine down-hole drilling blowout prevention dust-extraction unit
CN201474637U (en) Mine drilling orifice dust catcher
CN206608126U (en) Pneumatic type down-hole hammer drilling dust-removing apparatus
CN209687526U (en) A kind of dust removing down-hole of coal mine device
CN209687489U (en) A kind of boom-type roadheader dust falling system
CN202544900U (en) Drilling orifice deduster for gas drainage
CN202970548U (en) Gas jet flow dust collector for mine drilling
CN212642642U (en) Spraying dust fall drilling rod
CN204312048U (en) A kind of well head Quick gas-liquid disjoint set apparatus for converting
CN212716440U (en) Dust removal and blowout prevention hole system used in underground coal seam crossing drilling
CN208564473U (en) A kind of fortune envelope pumping integration dust-removing device for wind power slag-discharging drilling machine
CN103362465A (en) Mine compressed air self-negative-pressure orifice dust removing device
CN210105912U (en) Dust settling system for underground gas extraction drill hole orifice
CN210113381U (en) Tunnel dust removal trolley
CN213510714U (en) Dust collection and removal device in extremely soft rock tunnel dry drilling environment
CN208984293U (en) A kind of hydrostatic test outside measurement tower that can dry gas cylinder
CN209539396U (en) A kind of cleaner for constructing tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911