CN207847074U - Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue - Google Patents

Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue Download PDF

Info

Publication number
CN207847074U
CN207847074U CN201820050620.XU CN201820050620U CN207847074U CN 207847074 U CN207847074 U CN 207847074U CN 201820050620 U CN201820050620 U CN 201820050620U CN 207847074 U CN207847074 U CN 207847074U
Authority
CN
China
Prior art keywords
plate
reserved opening
shear wall
outrigger
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820050620.XU
Other languages
Chinese (zh)
Inventor
韩鹏
孔繁聪
唐群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Original Assignee
YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANKUANG DONGHUA CONSTRUCTION CO Ltd filed Critical YANKUANG DONGHUA CONSTRUCTION CO Ltd
Priority to CN201820050620.XU priority Critical patent/CN207847074U/en
Application granted granted Critical
Publication of CN207847074U publication Critical patent/CN207847074U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to a kind of outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprues.Existing outrigger is easy falling object from high altitude with shear wall reserved opening blocking technology, this outrigger shear wall reserved opening forming composition template, including inner template, exterior sheathing, two perpendicular side plates, top plate and support plate, inner template, opposite square breach are provided on exterior sheathing, the horizontal width of the square breach of inner template is more than the horizontal width of the square breach of exterior sheathing, each perpendicular side plate is by foreboard, middle plate and back plate composition, front and rear panels are parallel, intersect with back plate leading vertical on the outside of middle plate, it intersects vertically with foreboard rear on the inside of middle plate, it is in convex shape that the top plate projects in the horizontal plane.The utility model also relates to corresponding shear wall, reserved opening sprue, and the utility model has the advantages of easy to use, to prevent falling object from high altitude, and the builder's jack of various buildings is suitble to use.

Description

Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue
Technical field
The utility model is related to a kind of outrigger shear wall reserved opening forming composition template, shear wall, reserved opening are stifled Block.
Background technology
Brace foundation of the builder's jack of Tall Shear Wall Structures generally using overhanging I-steel as scaffold, outstanding Overhanging I-steel hole is reserved when choosing the construction of story shear wall, after scaffold, I-steel are removed, hole needs again formwork to pour Concrete is built, outboard template installation is very troublesome, it is easy to lead to falling object from high altitude.
Utility model content
The technical problems to be solved in the utility model is how to overcome the drawbacks described above of the prior art, provides a kind of outrigger use Shear wall reserved opening forming composition template, shear wall, reserved opening sprue.
In order to solve the above technical problems, this outrigger shear wall reserved opening forming composition template, including inner template, external mold Plate, two perpendicular side plates, top plate and support plate are provided with opposite square breach, the top plate rear and front end in inner template, exterior sheathing Upper surface is attached to respectively in the upper edge of two square breach, is pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, two On the side wall for the square breach that recline respectively before and after a perpendicular side plate, support plate is parallel to top plate, and left and right ends are against two respectively On the medial surface of perpendicular side plate, it is characterised in that:The horizontal width of the square breach of inner template is more than the square breach of exterior sheathing Horizontal width each erects side plate and is made of foreboard, middle plate and back plate, and front and rear panels are parallel, middle plate outside and marginal lappet before back plate Straight intersection, middle plate inside intersect vertically with foreboard rear, and it is in convex shape that the top plate projects in the horizontal plane.Its application method is such as Under:
A. first inner template and exterior sheathing are fixed, keeps its square breach opposite, then will distinguished before and after two perpendicular side plates On the side wall for the square breach that recline, it will be pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, by support plate or so two End is against respectively on the medial surface of two perpendicular side plates, and keeps horizontal, makes one protuberance of formation between inner template and exterior sheathing Babinet.
B. it applies concrete isolation agent on cabinet exterior obtained by then first being walked in inner template, exterior sheathing inner wall and a. or encloses Concrete isolation film, then injects concrete into babinet;
C. after concrete setting, then bolt of first dismantling removes support plate, two perpendicular side plates and top plate successively, so that it may Form corresponding outrigger shear wall reserved opening, then can outrigger with shear wall reserved opening install mating outrigger and The builder's jack of outrigger support.
As an optimization, each there are one horizontal braces, described support plates or so for weldering on the medial surface of the back plate of perpendicular side plate Both ends lower edge rides in the horizontal braces of both sides respectively.So design, convenient for placing support plate.
As an optimization, between the angle between middle plate lateral surface and foreboard lateral surface, middle plate lateral surface and back plate lateral surface Angle make chamfering or fillet processing.So design, structural strength is big, and is easy demoulding.
As an optimization, the top plate rear and front end, perpendicular side plate rear and front end protrude from inner template, exterior sheathing respectively.So Design when form removal, can use rubber hammer to tap protrusion, be detached with concrete convenient for template.
The shear wall poured with shear wall reserved opening forming composition template using aforementioned outrigger, shear wall are equipped with multiple Outrigger shear wall reserved opening, cross section are square, it is characterised in that:The outside hole of outrigger shear wall reserved opening Horizontal width is less than the inside hole horizontal width of outrigger shear wall reserved opening, the level of outrigger shear wall reserved opening Section is in convex shape.It so designs, big outer small in reserved opening, the reserved opening sprue of installation is not easily to fall off, has prevented high-altitude Fall object.
Block the reserved opening sprue of aforementioned novel outrigger shear wall reserved opening, it is characterised in that:The reserved opening Horizontal cross-section when sprue uses is in convex shape.So design, advantage are same as above.
The Combined Forming Die of aforementioned reserved opening sprue includes two side plates, two end plates and one piece of bottom plate, wherein side Plate is made of upper vertical plate, middle plate and lower riser, and upper vertical plate and lower riser are mutually parallel, vertical with upper vertical plate lower edge on the outside of middle plate Intersection, middle plate inside intersect vertically with lower riser upper limb, and two end plate main bodys are in convex shape, and both sides, which are respectively equipped with, vertically to be turned over The corresponding position of the vertical flange of side, two side plate both sides and end plate both sides has a through-hole, two side plates, two end plates from Four sides surrounds a babinet, and the bolt by being threaded through in respective through hole is fixed, and the bottom of box, each end plate is arranged in the bottom plate Lower edge be pressed in the upper surface of bottom plate, bottom plate both ends protrude from end plate respectively.Specifically used method is as follows:
A. by two side plates, two end plates from surrounding a babinet on four sides, and the bolt by being threaded through in respective through hole is consolidated Fixed, the bottom of box is arranged in the bottom plate;
B. then first the cabinet wall obtained by a steps applies concrete isolation agent or encloses concrete isolation film, then to case Body injects concrete;
C. after concrete setting, then bolt of first dismantling removes bottom plate, two side plates, two end plates successively, obtain phase The reserved opening sprue answered.So design, it is easy to use.
As an optimization, the angle between middle plate lateral surface and upper vertical plate lateral surface, middle plate lateral surface and lower riser lateral surface Between angle make chamfering or fillet processing, and with there are one pressing plate.So design when casting concrete, can use pressing plate pressure Real concrete.
The method for the shear wall that the utility model outrigger is poured with shear wall reserved opening forming composition template, including it is following Step:
1. the Combined Forming Dies of aforementioned reserved opening sprue, pour into a mould reserved opening sprue above-mentioned, specific method is such as Under:
A. by two side plates, two end plates from surrounding a babinet on four sides, and the bolt by being threaded through in respective through hole is consolidated Fixed, the bottom of box is arranged in the bottom plate;
B. then first the cabinet wall obtained by a steps applies concrete isolation agent or encloses concrete isolation film, then to case Body injects concrete, and pressing plate is used in combination to be compacted;
C. after concrete setting, then bolt of first dismantling removes bottom plate, two side plates, two end plates successively, obtain phase The reserved opening sprue answered;
2. sets up aforementioned outrigger shear wall reserved opening forming composition template, concrete is used in combination to pour into a mould aforementioned shear wall, The specific method is as follows:
A. first inner template and exterior sheathing are fixed, keeps its square breach opposite, then will distinguished before and after two perpendicular side plates On the side wall for the square breach that recline, it will be pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, by support plate or so two End is against respectively on the medial surface of two perpendicular side plates, and keeps horizontal, makes one protuberance of formation between inner template and exterior sheathing Babinet,
B. it applies concrete isolation agent on cabinet exterior obtained by then first being walked in inner template, exterior sheathing inner wall and a. or encloses Concrete isolation film, then to injecting concrete between inner template, exterior sheathing;
C. after concrete setting, then bolt of first dismantling removes support plate, two perpendicular side plates and top plate successively, so that it may Form corresponding outrigger shear wall reserved opening, then can outrigger with shear wall reserved opening install mating outrigger and The builder's jack of outrigger support.
3. waits for builder's jack and outrigger with finishing, and after removing, take the 1. step gained reserved opening sprue, with side plate, The face of end plate contact applies foam concrete cream, then makes it outside with the bottom plate phase-contact surface, from inside to outside, gets lodged in the 2. gained The corresponding outrigger of shear wall smears concrete on shear wall reserved opening on reserved opening sprue up and down each face Two sides inside and outside outrigger shear wall reserved opening is used coagulation soil cream to smooth out by cream.So design blocks reserved opening side Just, laborsaving and not easily to fall off, prevent falling object from high altitude.
The utility model outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue have make The advantages of with conveniently, falling object from high altitude is prevented, is suitble to the builder's jack of various buildings to use.
Description of the drawings
Below in conjunction with the accompanying drawings to this practicality outrigger shear wall reserved opening forming composition template, shear wall, reserved opening Sprue is described further:
Fig. 1 is the decomposition diagram of the reserved opening forming composition template of outrigger shear wall shown in Fig. 2;
Fig. 2 is dimensional structure diagram of this outrigger with shear wall reserved opening forming composition template;
Fig. 3 is that outrigger shown in Fig. 2 is cast in shear wall sectional perspective structure with shear wall reserved opening forming composition template Schematic diagram;
Fig. 4 is the stereoscopic schematic diagram that reserved opening sprue is poured using the Combined Forming Die of reserved opening sprue;
Fig. 5 is the decomposition diagram of Fig. 4;
Fig. 6 is the decomposition diagram of the Combined Forming Die of reserved opening sprue in Fig. 4;
Fig. 7 be using reserved opening sprue block outrigger shear wall reserved opening stereoscopic schematic diagram (to clearly show that, Wall and reserved opening sprue make overturning processing).
In figure:1 it is inner template, 2 be exterior sheathing, 3 be perpendicular side plate, 31 be foreboard, 32 be middle plate, 33 be back plate, 4 is top Plate, 5 be support plate, 6 be square breach, 7 be horizontal braces, 8 be shear wall, 9 be outrigger shear wall reserved opening, 10 be Reserved opening sprue, 11 be side plate, 111 be upper vertical plate, 112 be middle plate, 113 be lower riser, 12 be end plate, 13 be bottom plate, 14 It is through-hole for vertical flange, 15,16 is pressing plate.
Specific implementation mode
Embodiment one:As shown in Figs. 1-2, this outrigger shear wall reserved opening forming composition template, including inner template 1,2, two perpendicular side plates 3 of exterior sheathing, top plate 4 and support plate 5 are provided with opposite square breach 6, institute in inner template 1, exterior sheathing 2 It states 4 rear and front end upper surface of top plate to be attached to respectively in the upper edge of two square breach 6,4 left and right sides of top plate is pressed respectively against two In the upper edge of perpendicular side plate 3, on the side wall for the square breach 6 that recline respectively before and after two perpendicular side plates 3, support plate 5 is parallel to top plate 4, Its left and right ends is against respectively on the medial surface of two perpendicular side plates 3.The horizontal width of the square breach 6 of inner template 1 is more than external mold The horizontal width of the square breach 6 of plate 2 each erects side plate 3 and is made of foreboard 31, middle plate 32 and back plate 33, foreboard 31 and back plate 33 is parallel, and 32 outside of middle plate is intersected with 33 leading vertical of back plate, and 32 inside of middle plate intersects vertically with 31 rear of foreboard, the top plate 4 project in the horizontal plane in convex shape.
There are one horizontal braces 7,5 left and right ends of the support plate for weldering on the medial surface of the back plate 33 of each perpendicular side plate 3 Lower edge is ridden over respectively in the horizontal braces 7 of both sides.
Between 33 lateral surface of angle, 32 lateral surface of middle plate and back plate between 31 lateral surface of 32 lateral surface of middle plate and foreboard Angle makees chamfering or fillet processing.
As shown in Fig. 2, 4 rear and front end of the top plate, perpendicular 3 rear and front end of side plate protrude from inner template 1, exterior sheathing 2 respectively.
As shown in figure 3, the utility model shear wall 8, which is equipped with multiple outriggers shear wall reserved opening 9, Its cross section is square, it is characterised in that:Outrigger shear wall reserved opening 9 on the shear wall 8 is using aforementioned outrigger with cutting Power wall reserved opening forming composition template pours, and the outside hole horizontal width of outrigger shear wall reserved opening 9 is small In the inside hole horizontal width of outrigger shear wall reserved opening 9, the horizontal cross-section of outrigger shear wall reserved opening 9 is in convex Font.
As shown in Fig. 4,7, the utility model blocks the reserved opening sprue of aforementioned novel outrigger shear wall reserved opening 10, horizontal cross-section when which uses is in convex shape.
As Figure 4-Figure 6, the Combined Forming Die of aforementioned reserved opening sprue includes two side plates, 11, two 12 and of end plate One piece of bottom plate 13, latus inframedium are made of upper vertical plate 111, middle plate 112 and lower riser 113,111 times risers of upper vertical plate, 113 phase Mutually parallel, 112 outside of middle plate intersects vertically with 111 lower edge of upper vertical plate, and 112 inside of middle plate intersects vertically with lower 113 upper limb of riser, Two 12 main bodys of end plate are in convex shape, and both sides are respectively equipped with vertical flange 14, two 11 both sides of side plate and 12 both sides of end plate The corresponding position of vertical flange 14 has a through-hole 15, two side plates, 11, two end plates 12 from surrounding a babinet on four sides, and It is fixed by the bolt (not shown) being threaded through in respective through hole 15, the bottom of box, each end plate 12 is arranged in the bottom plate 13 Lower edge be pressed in the upper surface of bottom plate 13,13 both ends of bottom plate protrude from end plate 12 respectively.
As Figure 4-Figure 6, the angle between 111 lateral surface of 112 lateral surface of middle plate and upper vertical plate, 112 lateral surface of middle plate with Angle between lower 113 lateral surface of riser makees chamfering or fillet processing, and with there are one pressing plate 16,16 main body of pressing plate is one Square plate, square plate upper surface are equipped with a handle.
The method for the shear wall that the utility model outrigger is poured with shear wall reserved opening forming composition template, including it is following Step:
1. the Combined Forming Dies of aforementioned reserved opening sprue 10, pour into a mould reserved opening sprue 10 above-mentioned, specific side Method is as follows:
A. by two side plates, 11, two end plates 12 from surrounding a babinet on four sides, and by being threaded through in respective through hole 15 Bolt (not shown) is fixed, and the bottom of box is arranged in the bottom plate 13, as seen in figs. 5-6.
B. then first the cabinet wall obtained by a steps applies concrete isolation agent or encloses concrete isolation film, then to case Injection concrete in vivo is used in combination pressing plate 16 to be compacted;As illustrated in figures 4-5.
C. after concrete setting, then bolt of first dismantling removes the end plate 12 of side plate 11, two of bottom plate 13, two successively, Corresponding reserved opening sprue 10 is obtained, as shown in Figure 4.
2. sets up aforementioned outrigger shear wall reserved opening forming composition template, concrete is used in combination to pour into a mould aforementioned shear wall 8, as shown in Figs. 1-3, the specific method is as follows:
A. first inner template 1 and exterior sheathing 2 are fixed, keeps its square breach opposite, then by before and after two perpendicular side plates 3 points On the side wall of the square breach that do not recline 6,4 left and right sides of top plate is pressed respectively against in the upper edge of two perpendicular side plates 3, by support plate 5 Left and right ends are against respectively on the medial surface of two perpendicular side plates 3, and keep horizontal, make to form one between inner template 1 and exterior sheathing 2 The babinet of a protuberance, as shown in Figs. 1-2.(inner template 1 and exterior sheathing 2 only depict part, actually answer bigger, inner template 1 and outer Casting area both ends between template 2 should be closed, and figure omits)
B. then first applied on cabinet exterior obtained by inner template 1, the inner wall of exterior sheathing 2 and a step concrete isolation agent or Concrete isolation film is enclosed, then injects concrete between inner template 1, exterior sheathing 2;
C. after concrete setting, then bolt of first dismantling removes 5, two perpendicular side plates 3 of support plate and top plate 4 successively, Corresponding outrigger shear wall reserved opening 9 can be formed, then can be installed in outrigger shear wall reserved opening 9 mating Outrigger (not shown) and the builder's jack (not shown) of outrigger support.
3. waits for builder's jack and outrigger with finishing, and after removing, take the 1. step gained reserved opening sprue 10, with side The face that plate 11, end plate 12 contact applies foam concrete cream, then makes it outside with 13 phase-contact surface of the bottom plate, from inside to outside, blocks up The the 2. gained shear wall 8 corresponding outrigger on shear wall reserved opening 9, and in each face up and down of reserved opening sprue 10 Two sides inside and outside outrigger shear wall reserved opening 9 is used coagulation soil cream to smooth out, as shown in Figure 7 by upper smearing coagulation soil cream.

Claims (8)

1. a kind of outrigger shear wall reserved opening forming composition template, including inner template, exterior sheathing, two perpendicular side plates, top plates And support plate, opposite square breach are provided in inner template, exterior sheathing, and top plate rear and front end upper surface is attached to two respectively In the upper edge of square breach, it is pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, is pasted respectively before and after two perpendicular side plates On the side wall of square breach, support plate is parallel to top plate, and left and right ends are against respectively on the medial surface of two perpendicular side plates, It is characterized in that:The horizontal width of the square breach of inner template is more than the horizontal width of the square breach of exterior sheathing, each erects side plate It is made of foreboard, middle plate and back plate, front and rear panels are parallel, intersect with back plate leading vertical on the outside of middle plate, on the inside of middle plate with before Plate rear intersects vertically, and it is in convex shape that the top plate projects in the horizontal plane.
2. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:Each perpendicular side There are one horizontal braces, support plate left and right ends lower edge to ride over the level of both sides respectively for weldering on the medial surface of the back plate of plate On support bar.
3. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:On the outside of middle plate Angle, middle plate lateral surface between face and foreboard lateral surface and the angle between back plate lateral surface make chamfering or fillet processing.
4. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:The top plate Rear and front end, perpendicular side plate rear and front end protrude from inner template, exterior sheathing respectively.
5. a kind of shearing poured with shear wall reserved opening forming composition template using any outrigger of Claims 1-4 4 Wall, shear wall are equipped with multiple outriggers shear wall reserved opening, and cross section is square, it is characterised in that:Outrigger shears The outside hole horizontal width of wall reserved opening is less than the inside hole horizontal width of outrigger shear wall reserved opening, and outrigger is used The horizontal cross-section of shear wall reserved opening is in convex shape.
6. a kind of reserved opening sprue blocking novel outrigger shear wall reserved opening described in claim 5, it is characterised in that: Horizontal cross-section when the reserved opening sprue uses is in convex shape.
7. a kind of Combined Forming Die of the reserved opening sprue described in claim 6, it is characterised in that:Including two side plates, Two end plates and one piece of bottom plate, latus inframedium are made of upper vertical plate, middle plate and lower riser, and upper vertical plate and lower riser are mutually flat Row, middle plate outside intersect vertically with upper vertical plate lower edge, intersect vertically with lower riser upper limb on the inside of middle plate, two end plate main bodys are in convex Font, both sides are respectively equipped with vertical flange, and the corresponding position of the vertical flange of two side plate both sides and end plate both sides is opened respectively There is a through-hole, two side plates, two end plates from surrounding a babinet on four sides, and the bolt by being threaded through in respective through hole is fixed, institute The bottom plate setting bottom of box is stated, the lower edge of each end plate is pressed in the upper surface of bottom plate, and bottom plate both ends protrude from end plate respectively.
8. the Combined Forming Die of reserved opening sprue according to claim 7, it is characterised in that:Middle plate lateral surface with it is upper Angle, middle plate lateral surface between riser lateral surface and the angle between lower riser lateral surface make chamfering or fillet processing, and With there are one pressing plates.
CN201820050620.XU 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue Expired - Fee Related CN207847074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820050620.XU CN207847074U (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820050620.XU CN207847074U (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue

Publications (1)

Publication Number Publication Date
CN207847074U true CN207847074U (en) 2018-09-11

Family

ID=63418228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820050620.XU Expired - Fee Related CN207847074U (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue

Country Status (1)

Country Link
CN (1) CN207847074U (en)

Similar Documents

Publication Publication Date Title
CN108240110A (en) Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method
CN208701708U (en) A kind of anchor lattice beam protective slope structure
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN207847074U (en) Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue
CN215471884U (en) Cast concrete superimposed sheet preparation mould with location structure
CN207813019U (en) A kind of UHPC non-dismantling formworks of casting concrete column
CN212224625U (en) Structural column casting mold
CN206319404U (en) A kind of building precast exterior sheathing
CN213774492U (en) Laminated floor slab site construction hole reservation tool and laminated floor slab
CN109235709B (en) Full cast-in-place outer wall structure of building
CN209224259U (en) Turnover type concrete precast block makes mold
CN205908016U (en) Heavy grade cast in situ concrete inclined roof board formwork system
CN208323721U (en) A kind of cross saddle mold and cross saddle
CN208502251U (en) A kind of assembly type step type pump line mouth can formwork
CN206987373U (en) Core column concrete pours mouth mold tool
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN219006435U (en) Prefabricated shear wall die with grooves on side surfaces
CN217268355U (en) Constructional column non-disassembly pouring mold
CN209429519U (en) A kind of inner wall of building formwork for placing
CN220840740U (en) Precast column pouring die
CN205876346U (en) Integral template of pouring of tunnel invert and short side wall
CN213674670U (en) Indent mould
CN210032567U (en) Modular pouring template structure for building construction
CN205777500U (en) A kind of for secondary structure constructional column stigma concrete shaping mould plate
CN108501188B (en) A kind of concrete prefabricated element battery mould process units and its working method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911

Termination date: 20200111