CN207829889U - A kind of structure for administering three-soft seam - Google Patents

A kind of structure for administering three-soft seam Download PDF

Info

Publication number
CN207829889U
CN207829889U CN201721464643.7U CN201721464643U CN207829889U CN 207829889 U CN207829889 U CN 207829889U CN 201721464643 U CN201721464643 U CN 201721464643U CN 207829889 U CN207829889 U CN 207829889U
Authority
CN
China
Prior art keywords
liquid nitrogen
administering
soft seam
seat earth
steel skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721464643.7U
Other languages
Chinese (zh)
Inventor
张春旺
李绍泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University
Original Assignee
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University filed Critical Guizhou University
Priority to CN201721464643.7U priority Critical patent/CN207829889U/en
Application granted granted Critical
Publication of CN207829889U publication Critical patent/CN207829889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a kind of structures for administering three-soft seam, it includes seat earth(12), in seat earth(12)On be equipped with a meter font steel skeleton(11), seat earth(12)On be evenly arranged with liquid nitrogen filling drilling(13);It solves the existing backwardness for administering three-soft seam technology and regulation effect is poor, man power and material puts into the problem of larger construction period length;On the other hand economic benefit is also taken into account, construction period is shortened, reduces drilling hole amount, aperture and material consumption, is developed skill using compatibility.

Description

A kind of structure for administering three-soft seam
Technical field
The utility model belongs to coal seam Treatment process more particularly to a kind of structure for administering three-soft seam.
Background technology
During coal production, three-soft seam exploitation is always a very difficult thing, especially in three-soft seam Which type of production technique to be most difficult something using when working face designs.Because selected production technique is not only wanted Meet exploitation needs, and to meet national corresponding safety code and relevant industries standard;And the regulation and standard of the latter The link that considers first in the design of three-soft seam working face, using which type of a kind of technology, not only can guarantee safety but also It is the thinking core that the utility model solves the problems, such as not interfere production.Currently, home and abroad colliery is in three-soft seam recovery process one As using anchoring support technology, metallic framework support technology etc., these support technologies are to use metal material, material sheet mostly The dead weight of body can bring many troubles to worker in mining process again very much, such as:The very heavy inconvenient faceman of steel skeleton Construction, that is, influence construction period again in the presence of some security risks.The material used in these support technologies be mostly it is disposable, It is a large amount of to use the financial burden that also increase coal mining enterprise.
Utility model content:
The technical problems to be solved in the utility model:A kind of structure for administering three-soft seam is provided, to solve the prior art Three-soft seam recovery process using anchoring support technology, metallic framework support technology etc., these support technologies are to use mostly The dead weight of metal material, material itself can bring many troubles, the very heavy not side of steel skeleton to worker in mining process again very much Just the construction of faceman influences construction period and there are some security risks again.The material used in these support technologies It is disposable mostly, a large amount of use can also increase the technical problems such as the financial burden of coal mining enterprise.
Technical solutions of the utility model:
A kind of structure for administering three-soft seam, it includes seat earth, and a meter font steel skeleton is equipped on seat earth, Liquid nitrogen filling drilling is evenly arranged on seat earth.
The rice font steel skeleton is light steel skeleton.
Rice font steel skeleton upper berth is equipped with steel plate.
Liquid nitrogen filling drilling is connect with liquid nitrogen loading system.
The liquid nitrogen loading system includes fluid reservoir, and fluid reservoir is by pipeline and liquid nitrogen filling drilling connection, in fluid reservoir Pipeline(9)On be disposed with level-one solenoid valve, gas-liquid phase separation mechanism, two-stage supercharging mechanism, two-stage electromagnetic valve, sealing dress It sets and liquid nitrogen filling head;Sealing device is sleeved on liquid nitrogen filling head.
Pipeline innermost layer is aluminium film internal layer, and aluminium film inner layer outer surface is provided with steel wire floor, and steel wire floor is wrapped up by rubber layer.
A kind of administering method of the structure of improvement three-soft seam, is drilled with using drilling equipment by design requirement first Liquid nitrogen filling drilling, then places rice font steel skeleton;After rice font steel skeleton is placed on seat earth, in rice font reinforcing bar The steel plate of 10 millimeters thicks is laid with above frame as bed course;The pipeline of fluid injection nitrogen is put into liquid nitrogen filling drilling, closing liquid nitrogen adds It is filled again to liquid nitrogen after note drilling and persistently injects liquefaction nitrogen in drilling, observation and measurement seat earth variation, until coal seam hair Life terminates injection nitrogen after freezing.
The beneficial effects of the utility model:
The utility model is injected by nitrogen and is bored using the intensity of rice font light steel frame structure enhancing coal body compression face Hole absorbs big calorimetric when gasifying as liquefied nitrogen, to freeze, and because nitrogen boiling point is very low, coal body can be made all It encloses temperature and drops to very low, improve coal body and bear the ability of upper load;Its feature have easy construction, cost is less, effect is good And loaded area range is big, the excellent novel improvement three-soft seam technology of bearing load ability, wherein mining liquid nitrogen pipeline uses Novel steel mesh rubber+aluminum film compounded forms, and has stretching resistance, resistance to compression, anti-aging, impermeable, waterproof, fire-retardant, insulation, acidproof The features such as alkali, long service life.On the one hand the utility model enhances holding for coal body by using the shape of M shape light steel skeleton Power is carried, effectively uniformly passes on by upper load;The pressure resistance of three cherry coal body of another aspect liquid nitrogen freezing technological transformation Degree is mainly using temperature difference between coal body and liquid nitrogen, and liquid nitrogen, which is filled in drilling, causes coal body to freeze rapidly, to improve coal body Compression strength.It solves the existing backwardness for administering three-soft seam technology and regulation effect is poor, man power and material's input is larger, applies Work problem long in time limit;On the other hand economic benefit is also taken into account, construction period is shortened, drilling hole amount, aperture and material is reduced and disappears Consumption develops skill using compatibility.
Description of the drawings:
Fig. 1 the utility model structure diagrams;
Fig. 2 is the utility model liquid nitrogen loading system structural schematic diagram;
Fig. 3 is the utility model pipeline structure schematic diagram.
Specific implementation mode:
A kind of structure for administering three-soft seam, it includes seat earth 12, and a meter shaped steel is equipped on seat earth 12 Skeleton 11 is evenly arranged with liquid nitrogen filling drilling 13 on seat earth 12.
The rice font steel skeleton 11 is light steel skeleton.Rice font light steel skeleton is the structure for supporting upper load.
It is equipped with steel plate on rice font steel skeleton 11.Its purpose is exactly that upper support load is made uniformly to transmit downwards.
Liquid nitrogen filling drilling 13 is connect with liquid nitrogen loading system.
The pipeline of liquid nitrogen loading system is put into liquid nitrogen filling drilling 13, again to brill after first closing liquid nitrogen filling drilling 13 Persistently injection liquefaction nitrogen, observation and measurement seat earth change in hole, terminate injection nitrogen after coal seam is freezed.
The liquid nitrogen loading system includes fluid reservoir 1, and fluid reservoir 1 is connect with liquid nitrogen filling drilling 13 by pipeline 9, stored up Level-one solenoid valve 2, gas-liquid phase separation mechanism 3, two-stage supercharging mechanism 4, two-stage electromagnetic valve are disposed on the pipeline 9 of flow container 1 5, sealing device 7 and liquid nitrogen filling head 6;Sealing device 7 is sleeved on liquid nitrogen filling head 6;Sealing device 7 is fixed on liquid nitrogen filling and bores On hole 13, by 13 sealing of liquid nitrogen filling drilling, to prevent helium leak.
The effect of gas-liquid phase separation mechanism 3 be by nitrogen liquid and impurity and gas separate, avoid the liquid in nitrogen Body or impurity corruption channel interior or blocking pipeline, improve the service life of pipeline.
Two-stage supercharging mechanism 4 use pressue device, it is therefore an objective to the pressure for increasing nitrogen, with improve filling nitrogen efficiency and Improve coal seam freeze and resistance to compression.Nitrogen is injected under normal pressure, and nitrogen cannot go deep into liquid nitrogen filling drilling, and expand in drilling It is scattered shallow, it is unfavorable for the compression strength that coal body freezes and improve coal body.
Sealing device 7, in order to prevent into drilling when fluid injection nitrogen, smooth base is damaged to the body of human body and is carried out Safeguard measure;Sealing device 7 is made of materials such as rubber rings.
9 innermost layer of pipeline is aluminium film internal layer 22, and aluminium film inner layer outer surface is provided with steel wire floor 23, and steel wire floor 23 passes through rubber Layer 21 wraps up.
Pipeline is formed using steel mesh rubber+aluminum film compounded, and aluminium film material thickness is at 1.2-1.5 millimeters.With stretching resistance, resist The features such as pressure, anti-aging, impermeable, waterproof, fire-retardant, insulation, acid and alkali-resistance, long service life.In addition aluminium film plasticity itself and The characteristics of toughness, can improve liquid nitrogen charging line service efficiency.
A kind of administering method of structure that administering three-soft seam, is drilled with liquid nitrogen by design requirement using drilling equipment first and adds Note drilling, then places rice font steel skeleton;After rice font steel skeleton is placed on seat earth, above rice font steel skeleton The steel plate of 10 millimeters thicks is laid with as bed course;The pipeline of fluid injection nitrogen is put into liquid nitrogen filling drilling, closing liquid nitrogen filling drilling Liquefaction nitrogen is persistently injected into liquid nitrogen filling drilling again afterwards, seat earth variation is observed and measure, until coal seam is freezed After terminate inject nitrogen.

Claims (6)

1. a kind of structure for administering three-soft seam, it includes seat earth(12), it is characterised in that:In seat earth(12)Upper berth Equipped with rice font steel skeleton(11), seat earth(12)On be evenly arranged with liquid nitrogen filling drilling(13).
2. a kind of structure for administering three-soft seam according to claim 1, it is characterised in that:Rice font steel skeleton(11)On It is equipped with steel plate.
3. a kind of structure for administering three-soft seam according to claim 1, it is characterised in that:The rice font steel skeleton (11)For light steel skeleton.
4. a kind of structure for administering three-soft seam according to claim 1, it is characterised in that:Liquid nitrogen filling drilling(13)With Liquid nitrogen loading system connects.
5. a kind of structure for administering three-soft seam according to claim 4, it is characterised in that:The liquid nitrogen loading system packet Include fluid reservoir(1), fluid reservoir(1)Pass through pipeline(9)It fills and drills with liquid nitrogen(13)Connection, in fluid reservoir(1)Pipeline(9)On It is disposed with level-one solenoid valve(2), gas-liquid phase separation mechanism(3), two-stage supercharging mechanism(4), two-stage electromagnetic valve(5), sealing Device(7)With liquid nitrogen filling head(6);Sealing device(7)It is sleeved on liquid nitrogen filling head(6)On.
6. a kind of structure for administering three-soft seam according to claim 5, it is characterised in that:Pipeline(9)Innermost layer is aluminium Film inner layer(22), aluminium film inner layer outer surface is provided with steel wire floor(23), steel wire floor(23)It is wrapped up by rubber layer.
CN201721464643.7U 2017-11-06 2017-11-06 A kind of structure for administering three-soft seam Active CN207829889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721464643.7U CN207829889U (en) 2017-11-06 2017-11-06 A kind of structure for administering three-soft seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721464643.7U CN207829889U (en) 2017-11-06 2017-11-06 A kind of structure for administering three-soft seam

Publications (1)

Publication Number Publication Date
CN207829889U true CN207829889U (en) 2018-09-07

Family

ID=63384528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721464643.7U Active CN207829889U (en) 2017-11-06 2017-11-06 A kind of structure for administering three-soft seam

Country Status (1)

Country Link
CN (1) CN207829889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605495A (en) * 2017-11-06 2018-01-19 贵州大学 A kind of structure and administering method for administering three-soft seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605495A (en) * 2017-11-06 2018-01-19 贵州大学 A kind of structure and administering method for administering three-soft seam

Similar Documents

Publication Publication Date Title
CN112414882B (en) High-temperature crystalline rock cold impact cracking experiment system and method
AU2015271890B2 (en) Ground cold exchange injection system and coal reservoir phase change reconstructing method
CN207829889U (en) A kind of structure for administering three-soft seam
CN102562124B (en) Underground liquid nitrogen direct injection type fire preventing and extinguishing device
CN106677756A (en) Active fracturing device for coal rock softening and coal rock fracturing construction process
CN105107429B (en) Semi-continuous piston type hydrate cake generating device
CN203257442U (en) Anchor rod/anchor rope with leakproof plug of rubber for anchoring
CN205532657U (en) Blow and compress anchor rod grout device
CN107605495A (en) A kind of structure and administering method for administering three-soft seam
CN202370549U (en) Rapid injection prop lifting boosting device for single hydraulic prop
CN207830973U (en) A kind of vertical low temperature basin Anti-overflow device
CN202250190U (en) Escape way device for landslide during tunnel construction
CN207778887U (en) A kind of mining liquid nitrogen filling apparatus
CN213875286U (en) High-temperature crystalline rock cold shock cracking experiment system
CN105484723B (en) The continuous pipe device of built-in cable and its application
CN212270903U (en) Vertical shaft freezing pipe
CN207298229U (en) A kind of prefabricated thermal insulation pipe fitting
CN107934260A (en) A kind of permanent protective property LNG cryogenic tank cases easy to remove
CN108193720B (en) A kind of high-speed rail roof truss without columns hydraulic shock-absorbing device
CN205505878U (en) A inflation plug for high temperature big gun hole
CN2828318Y (en) Coal mine salvor
CN201032050Y (en) Low-temperature liquefied petroleum gas underground gas storage well
CN206988808U (en) A kind of vertical low temperature container and its supporting construction
CN205137076U (en) Spherical tank pillar is connected with double -deck U -shaped layer board structure with spherical shell
CN219974538U (en) Grouting anchor rod tail end plugging device capable of improving grouting effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant