CN207829601U - Protection board wall for construction site - Google Patents
Protection board wall for construction site Download PDFInfo
- Publication number
- CN207829601U CN207829601U CN201820152877.6U CN201820152877U CN207829601U CN 207829601 U CN207829601 U CN 207829601U CN 201820152877 U CN201820152877 U CN 201820152877U CN 207829601 U CN207829601 U CN 207829601U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- construction site
- protection board
- acoustic barrier
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Building Environments (AREA)
Abstract
The utility model discloses a kind of protection board walls for construction site, it is intended to and more construction waste material will be will produce by solving the problem of when the later stage removes has influence waste of resource, its key points of the technical solution are that:A kind of protection board wall for construction site, including multiple support components and the Acoustic barrier plate being set between adjacent supports component, support component includes the foundation pit for being set to ground and the mating pedestal of foundation pit and the vertical column being fixed on pedestal;Column top is provided with horizontal clamp bar, and horizontal clamp bar section takes the shape of the letter U, and Open Side Down, and Acoustic barrier plate lower edge is provided with binding piece, and binding piece fits in pedestal, and binding piece is provided with fixing bolt, and pedestal is provided with the threaded hole with fixing bolt screw-thread fit.A kind of protection board wall for construction site of the utility model is used as the enclosure wall in construction site by the way that reusable protection board wall is arranged, to reduce the generation of construction waste material, and then reduces the waste of resource.
Description
Technical field
The utility model is related to rooms to build field, more specifically, it relates to a kind of protection board wall for construction site.
Background technology
In modern house construction, to reduce the drifting of dust from construction sites, the propagation of construction noise, need in construction site week
It encloses and sets up enclosure wall, inside and outside by enclosure wall separating building building site, while playing depositing dust, noise abatement, also block idler
Into construction site.
The enclosure wall of construction site surrounding is generally built by masonry in the prior art, and such enclosure wall will when removing in the later stage
More construction waste material is will produce, there are problems that influencing waste of resource;Therefore need to propose a kind of new technical solution to solve
The certainly above problem.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of protection for construction site
Board wall is used as the enclosure wall in construction site by the way that reusable protection board wall is arranged, to reduce the generation of construction waste material, into
And reduce the waste of resource.
The above-mentioned technical purpose of the utility model technical scheme is that:One kind being used for construction site
Protection board wall, including multiple support components and the Acoustic barrier plate that is set between adjacent supports component, the support component
Including be set to ground foundation pit, with the mating pedestal of foundation pit and the vertical column being fixed on pedestal;It is described
Column top is provided with horizontal clamp bar, and the horizontal clamp bar section takes the shape of the letter U, and Open Side Down, and the Acoustic barrier plate lower edge is set
It is equipped with binding piece, the binding piece fits in pedestal, and the binding piece is provided with fixing bolt, and the pedestal is provided with
With the threaded hole of fixing bolt screw-thread fit.
By using above-mentioned technical proposal, when construction site needs to start building, prefabricated pit is dug in each precalculated position, and
Prefabricated pit is reinforced by way of casting concrete, to form foundation pit, pedestal is embedded in foundation pit, and then complete column
Set up;After the completion of all columns is set up, it is directed at the upper edge of Acoustic barrier plate and horizontal clamp bar and is inserted into, rotation Acoustic barrier plate
To vertical state, binding piece fits in pedestal at this time, finally fixing bolt is screwed into the threaded hole of pedestal, at this time soundproof wall
Plate upper and lower ends are limited, and effectively ensure the installation strength of Acoustic barrier plate, to complete setting up for Acoustic barrier plate;When all
Acoustic barrier plate complete installation after, formed one surround construction site enclosure wall, to by the enclosure wall blocking noise propagation and
The diffusion of flue dust;When construction site completes to construct, and needs dismounting enclosure wall, by fixing bolt by back-outing in the threaded hole of pedestal,
Acoustic barrier plate rotation is pushed, and is extracted in the clamping opening by Acoustic barrier plate by horizontal clamp bar, to complete the dismounting of Acoustic barrier plate;When
All Acoustic barrier plates are completed after removing, by crane by pedestal by being extracted in foundation pit, to complete the dismounting of column;When all
Column is completed to fill foundation pit after removing, and forms complete ground;In conclusion waste material of constructing caused by whole dismounting process
The only material of foundation pit, and the construction waste material can form complete ground after landfill, to reduce the production of construction waste material
It is raw, reach the technique effect for reducing the wasting of resources.
The utility model is further arranged to:The pedestal upper surface is fixedly installed becket, and the column top is set
Becket is set, oblique pull cable wire is provided between two beckets.
By using above-mentioned technical proposal, oblique pull cable wire is added between column top and pedestal, to realize for vertical
The limitation of top end effectively prevent column to occur crooked.
The utility model is further arranged to:The column is horizontally disposed with pedestal linkage section has wing plate, the wing plate to bury
Set on base interior.
By using above-mentioned technical proposal, the wing plate being fixed on column is buried into base interior, to increase column
With the connection amount of pedestal, and then improve pedestal and column bonding strength.
The utility model is further arranged to:The column is provided with fitting edge, and the fitting edge fits in Acoustic barrier plate
Outer surface edge.
By using above-mentioned technical proposal sound insulation is on the one hand prevented by fitting along Acoustic barrier plate outer surface edge is fitted in
Wallboard rotation is excessive, provides facility to turn to vertical state for Acoustic barrier plate, on the other hand improves Acoustic barrier plate and column
Leakproofness, effectively prevent building site flue dust to be drifted away by the gap of the two.
The utility model is further arranged to:The Acoustic barrier plate both sides are respectively arranged with casting lug thereon in midpoint, described
Casting lug thereon screw-thread fit has reinforcing bolt, the column to offer the reinforcing threaded hole with reinforcing bolt thread cooperation.
By using above-mentioned technical proposal, the connection of Acoustic barrier plate midpoint and column is added, to realize for sound insulation
The limitation of three positions of wallboard upper, middle and lower, further increases the bonding strength of Acoustic barrier plate and column.
The utility model is further arranged to:The Acoustic barrier plate include deadening felt and be clamped two pieces of deadening felt it is stainless
Steel plate.
By using above-mentioned technical proposal, the function of noise is absorbed using deadening felt, is made an uproar to assign Acoustic barrier plate reduction
The function of sound;Using the hardness of stainless steel plate, so that it is guaranteed that the reliability of Acoustic barrier plate;It is sandwiched simultaneously by two pieces of stainless steel plates
Deadening felt effectively prevent deadening felt to be damaged to realize the protection for deadening felt.
The utility model is further arranged to:Two pieces of stainless steel plate opposite faces offer holding tank respectively, it is described every
Sound felt is in holding tank, and two pieces of stainless steel plate edges are fixed to each other.
By using above-mentioned technical proposal, deadening felt is limited in holding tank, is obtained to the edge of two pieces of stainless steel plates
With fitting, therefore the mode that welding can be used fixes two pieces and does not repair steel plate, and then ensures stainless steel plate, deadening felt, stainless steel plate,
The bonding strength of this three-decker.
The utility model is further arranged to:The Acoustic barrier plate upper edge is fixedly installed planting pot.
By using above-mentioned technical proposal, realize in Acoustic barrier plate upper edge planting plants, to using plant improve every
The humidity of sound wallboard upper edge, and then after dust is infected with steam, it will it drops, and then is reduced by enclosure wall because weight becomes weight
The dust that top is drifted away.
In conclusion the utility model has the advantages that:Replace masonry enclosure wall by using dismountable board wall,
To reduce the generation of construction waste material, and then reduce the waste of resource;Column top is limited by adding oblique pull cable wire, to anti-
Only column occurs crooked;The connection amount that column and pedestal are increased by wing plate, to improve the bonding strength of pedestal and column;It is logical
Cross fitting effectively prevent building site flue dust by two along fitting Acoustic barrier plate edge to improve the leakproofness of Acoustic barrier plate and column
It drifts away in the gap of person;By in Acoustic barrier plate upper edge planting plants, to improve Acoustic barrier plate upper edge using plant
Humidity, and then reduce the dust by drifting away above enclosure wall.
Description of the drawings
Fig. 1 is the state diagram being set on ground of the utility model;
Fig. 2 is the structural schematic diagram of the utility model two support components and one piece of Acoustic barrier plate, mainly indicates soundproof wall
The matching relationship of plate and support component;
Fig. 3 is the structural schematic diagram that the utility model column does not pour pedestal;
Fig. 4 is the portions the A enlarged diagram of Fig. 2, the main connection relation for indicating Acoustic barrier plate midpoint and column;
Fig. 5 is the exploded perspective view of the utility model Acoustic barrier plate, main to indicate that the cooperation of deadening felt and stainless steel plate is closed
System.
Description of the drawings:1, support component;11, foundation pit;12, pedestal;13, column;14, horizontal clamp bar;15, level board
Item;16, fixing bolt;17, threaded hole;18, becket;19, oblique pull cable wire;191, wing plate;192, it is bonded edge;2, soundproof wall
Plate;21, casting lug thereon;22, bolt is reinforced;23, threaded hole is reinforced;24, deadening felt;25, stainless steel plate;26, holding tank;27, it plants
Plant basin.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
For the protection board wall in construction site, as shown in Figure 1 and Figure 2, including multiple support components 1 and it is set to adjacent
Acoustic barrier plate 2 between support component 1, support component 1 include being set to the foundation pit 11, mating with foundation pit 11 on ground
Pedestal 12 and the vertical column 13 being fixed on pedestal 12;13 top both sides of column, which are respectively welded, is fixed with horizontal clamp bar
14, horizontal clamp bar 14 is the stainless steel that section takes the shape of the letter U, and Open Side Down, and 2 lower edge of Acoustic barrier plate is welded with binding piece
15,15 lower surface of binding piece fits in pedestal 12, and binding piece 15 is provided with fixing bolt 16, and pedestal 12 is offered and fixed
The threaded hole 17 of 16 screw-thread fit of bolt.
When construction site needs to start building, prefabricated pit is dug in each precalculated position, and by way of casting concrete
Prefabricated pit is reinforced, to form foundation pit 11, pedestal 12 is embedded in foundation pit 11, and then complete setting up for column 13;Work as institute
After thering is the completion of column 13 to set up, it is directed at clamping opening and insertion of the upper edge of Acoustic barrier plate 2 in horizontal clamp bar 15, rotates Acoustic barrier plate
2 fit in pedestal 12 to vertical state, at this time binding piece 15, and fixing bolt 16 is finally screwed into the threaded hole 17 of pedestal 12
Interior, 2 upper and lower ends of Acoustic barrier plate are limited at this time, effectively ensure the installation strength of Acoustic barrier plate 2, to complete soundproof wall
Plate 2 is set up;After all Acoustic barrier plates 2 are completed to install, a board wall for surrounding construction site is formed, to be hindered by the board wall
Keep off the propagation of noise and the diffusion of flue dust;When construction site completes to construct, and needs dismounting board wall, by fixing bolt 16 by base
Back-out in the threaded hole 17 of seat 12, push Acoustic barrier plate 2 to rotate, and extracted in the clamping opening by Acoustic barrier plate 2 by horizontal clamp bar 14,
To complete the dismounting of Acoustic barrier plate 2;After all Acoustic barrier plates 2 are completed to remove, by crane by pedestal 12 by foundation pit 11
Interior extraction, to complete the dismounting of column 13;Foundation pit 11 is filled after all columns 13 are completed to remove, is formed completely
Face;In conclusion construction waste material caused by whole dismounting process is only the material of foundation pit 11, and the construction waste material is filling
After can form complete ground, to reduce construction waste material generation, reach reduce the wasting of resources technique effect.
It is crooked to avoid column 13 from occurring, as shown in Fig. 2, 12 upper surface of pedestal, which pours, is fixed with becket 18, column 13
Top is welded and fixed becket 18, and oblique pull cable wire 19 is provided between two beckets 18, to be opposed by oblique pull cable wire 19
13 top of column is limited, and then it is crooked to prevent column 13 from occurring.
Pedestal 12 is formed by concreting in the utility model, to improve the bonding strength of pedestal 12 and column 13, such as
Shown in Fig. 2, Fig. 3, column 13 is welded with wing plate 191 with 12 linkage section level of pedestal, and wing plate 191, which pours, is fixed on pedestal 12
The bonding strength of the two to increase the connection amount of column 13 and pedestal 12, and then is improved in inside.
To improve the leakproofness of Acoustic barrier plate 2 and column 13, as shown in Figure 2 and Figure 3, column 13 is integrally formed with fitting edge
192, fitting fits in 2 outer surface edge of Acoustic barrier plate along 192, to which column 13 and the seam of Acoustic barrier plate 2 are L-shaped, compares
In the contact of a vertical plane formula, the leakproofness of Acoustic barrier plate 2 and column 13 is effectively improved, and then prevents construction dust by the two
Seam crossing drift away.
To improve the bonding strength of Acoustic barrier plate 2 and column 13, as shown in Figure 3, Figure 4,2 both sides of Acoustic barrier plate are in height side
To midpoint be respectively welded and be fixed with casting lug thereon 21,21 screw-thread fit of casting lug thereon, which has, reinforces bolt 22, column 13 offer with
The reinforcing threaded hole 23 for reinforcing 22 screw-thread fit of bolt, connect to increase Acoustic barrier plate 2 with the midpoint of column 13, in turn
The connection for realizing Acoustic barrier plate 2 and 13 upper, middle and lower of column, three position, effectively improves the bonding strength of Acoustic barrier plate 2 and column 13.
In the utility model, as shown in figure 5, Acoustic barrier plate 2 includes deadening felt 24 and is clamped two pieces of deadening felt 24 not
Become rusty steel plate 25, to absorb the performance of sound wave using deadening felt 24, assigns the function that Acoustic barrier plate 2 reduces noise, and using not
The hardness of rust steel plate 25, it is ensured that the reliability of Acoustic barrier plate 2, meanwhile, deadening felts 24 are sandwiched by two pieces of stainless steel plates 25, to
It realizes the protection for deadening felt 24, deadening felt 24 is effectively prevent to be damaged.
Two pieces of stainless steel plates 25 are connect in the following way with deadening felt 24, as shown in figure 5, two pieces of stainless steel plates 25 are opposite
Face offers holding tank 26 respectively, and deadening felt 24 is in holding tank 26, and the edge of two pieces of stainless steel plates 25 is welded to each other fixation.
To further increase the dust-proof effect of the utility model, as shown in figure 5,2 upper edge of Acoustic barrier plate is welded with
Planting pot 27, so as to which in the upper edge planting plants of Acoustic barrier plate 2, the wet of 2 upper edge of Acoustic barrier plate is improved using plant
Degree, and then after dust is infected with steam, it will it drops because weight becomes weight, effectively reduces the ash by being drifted away above enclosure wall
Dirt.
Specific embodiment is only the explanation to the utility model, is not limitations of the present invention, this field
Technical staff can as needed make the present embodiment the modification of not creative contribution after reading this specification, but only
It all to be protected by Patent Law in the right of the utility model.
Claims (8)
1. a kind of protection board wall for construction site, it is characterised in that:Including multiple support components(1)And it is set to adjacent
Support component(1)Between Acoustic barrier plate(2), the support component(1)Foundation pit including being set to ground(11)With ground
Hole(11)Mating pedestal(12)And it is fixed on pedestal vertically(12)On column(13);The column(13)Top is set
It is equipped with horizontal clamp bar(14), the horizontal clamp bar(14)Section takes the shape of the letter U, and Open Side Down, the Acoustic barrier plate(2)Lower edge is set
It is equipped with binding piece(15), the binding piece(15)Fit in pedestal(12), the binding piece(15)It is provided with fixed spiral shell
Bolt(16), the pedestal(12)It is provided with and fixing bolt(16)The threaded hole of screw-thread fit(17).
2. the protection board wall according to claim 1 for construction site, it is characterised in that:The pedestal(12)Upper surface
It is fixedly installed becket(18), the column(13)Becket is arranged in top(18), two beckets(18)Between set
It is equipped with oblique pull cable wire(19).
3. the protection board wall according to claim 1 for construction site, it is characterised in that:The column(13)With pedestal
(12)Linkage section is horizontally disposed wing plate(191), the wing plate(191)It is embedded in pedestal(12)It is internal.
4. the protection board wall according to claim 1 for construction site, it is characterised in that:The column(13)It is provided with
It is bonded edge(192), the fitting edge(192)Fit in Acoustic barrier plate(2)Outer surface edge.
5. the protection board wall according to claim 1 for construction site, it is characterised in that:The Acoustic barrier plate(2)Two
Side is respectively arranged with casting lug thereon in midpoint(21), the casting lug thereon(21)Screw-thread fit has reinforcing bolt(22), the column
(13)It offers and reinforces bolt(22)The reinforcing threaded hole of screw-thread fit(23).
6. the protection board wall according to claim 1 for construction site, it is characterised in that:The Acoustic barrier plate(2)Packet
Include deadening felt(24)And clamping deadening felt(24)Two pieces of stainless steel plates(25).
7. the protection board wall according to claim 6 for construction site, it is characterised in that:Two pieces of stainless steel plates
(25)Opposite face offers holding tank respectively(26), the deadening felt(24)In holding tank(26)It is interior, two blocks of stainless steels
Plate(25)Edge is fixed to each other.
8. the protection board wall according to claim 1 for construction site, it is characterised in that:The Acoustic barrier plate(2)On
Edge is fixedly installed planting pot(27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820152877.6U CN207829601U (en) | 2018-01-29 | 2018-01-29 | Protection board wall for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820152877.6U CN207829601U (en) | 2018-01-29 | 2018-01-29 | Protection board wall for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207829601U true CN207829601U (en) | 2018-09-07 |
Family
ID=63395458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820152877.6U Expired - Fee Related CN207829601U (en) | 2018-01-29 | 2018-01-29 | Protection board wall for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207829601U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537653A (en) * | 2018-11-26 | 2019-03-29 | 南通四建集团有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction and its construction method |
CN113417377A (en) * | 2021-07-01 | 2021-09-21 | 江苏声立方环保科技有限公司 | Flexible sound absorption and insulation barrier and mounting method thereof |
-
2018
- 2018-01-29 CN CN201820152877.6U patent/CN207829601U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537653A (en) * | 2018-11-26 | 2019-03-29 | 南通四建集团有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction and its construction method |
CN113417377A (en) * | 2021-07-01 | 2021-09-21 | 江苏声立方环保科技有限公司 | Flexible sound absorption and insulation barrier and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207829601U (en) | Protection board wall for construction site | |
CN102449247B (en) | Half precast floor plank, and slab construction method using same | |
CN214739251U (en) | Assembled combination tie-beam window opening component and connection structure thereof | |
CN109707091A (en) | A kind of assembled stealth beam laminated floor slab for the pipeline separation installed from up to down | |
CN205444254U (en) | Deformation joint structure | |
CN205576955U (en) | Raft foundation's reinforced structure is displaced into to strip footing | |
CN207405730U (en) | A kind of discharge structure of basement | |
CN211396691U (en) | Structure for protecting pre-buried pipeline during concrete pouring and vibrating of superposed wall | |
CN208777690U (en) | A kind of reserved floor sealing hole template component of drainage pipeline | |
CN205857048U (en) | A kind of new-type embankment sound barrier | |
CN209129230U (en) | A kind of ancient building roof supported beam | |
CN110130404B (en) | Basement bottom plate drainage plate and construction process thereof | |
CN102587418B (en) | Plastic power cable well | |
WO2022247015A1 (en) | Retaining wall structure using corrugated plates and construction method therefor | |
CN110206192B (en) | Rammed earth wall body entrance to a cave lintel | |
CN110593453A (en) | Rammed earth wall construction method and rammed earth wall | |
CN204590336U (en) | A kind of overlapped shear wall based on half prefabricated ultra-tough steel concrete | |
CN210563525U (en) | Concrete beam modified structure based on bolt positioning structure | |
CN110206311B (en) | Rammed earth wall construction method for adding steel bars to square steel pipe column | |
CN210529522U (en) | Integral groove base direct-buried inorganic non-metallic sound barrier | |
CN207062686U (en) | Precast assembly concrete saucer type gutter | |
CN205399676U (en) | Brickwork infilled wall and main body frame's flexible connection mean | |
CN105507350B (en) | Damping ditch and its construction method with light well point and shockproof plate | |
CN205224015U (en) | Precast underground continuous wall of pre -buried I -steel | |
KR200421823Y1 (en) | Prefabricate stone house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |