CN207829166U - Piping lane is built - Google Patents

Piping lane is built Download PDF

Info

Publication number
CN207829166U
CN207829166U CN201721867391.2U CN201721867391U CN207829166U CN 207829166 U CN207829166 U CN 207829166U CN 201721867391 U CN201721867391 U CN 201721867391U CN 207829166 U CN207829166 U CN 207829166U
Authority
CN
China
Prior art keywords
piping lane
piping
annular ring
tube body
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721867391.2U
Other languages
Chinese (zh)
Inventor
于建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721867391.2U priority Critical patent/CN207829166U/en
Application granted granted Critical
Publication of CN207829166U publication Critical patent/CN207829166U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of piping lane building, belong to building field, its scheme be include load-bearing plate, be fixed on horizontally disposed multiple piping lanes one with prefabricated doors and windows on load-bearing plate, multiple piping lanes one surround a built-in space, adjacent piping lane one at least partly abuts, and horizontal positioned piping lane two is arranged on the piping lane one, the piping lane two completely encloses or the top end opening of partially enclosed built-in space, by rivet interlacement, the piping lane one is connect with load-bearing plate by L-type steel for piping lane two and piping lane one.Piping lane one and piping lane two are bamboo winding piping lane, light-weight, and lifting this programme is facilitated to realize quickly connection by L-type steel and rivet.And built-in space is formed in the case of opposite saving material, which is closed by piping lane two, further increases Building dimension.

Description

Piping lane is built
Technical field
The utility model is related to building field, more particularly to piping lane is built.
Background technology
Current building construction mostly uses concreting or uses brick structure.Concrete construction or brick and tile building The disadvantage is that weight is big, the production cycle is long.
To improve aforesaid way, has light steel house at present, structure such as notification number is similar disclosed in CN2599094Y.
The utility model proposes a kind of new schemes to realize fast construction.
Utility model content
The purpose of this utility model is to provide a kind of piping lane building, it can be achieved that fast construction.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of piping lane building, packet Load-bearing plate is included, horizontally disposed multiple piping lanes one with prefabricated doors and windows, multiple piping lanes one on load-bearing plate is fixed on and surrounds in one Between emptying, adjacent piping lane one at least partly abuts, and horizontal positioned piping lane two is arranged on the piping lane one, and the piping lane two is complete The top end opening of totally-enclosed or partially enclosed built-in space, piping lane two and piping lane one by rivet interlacement, the piping lane one with hold Disk is connected by L-type steel again.
Piping lane one and piping lane two are bamboo winding piping lane, light-weight, and lifting this programme is facilitated to pass through L-type steel and rivet Realize quickly connection.Adjacent piping lane one at least partly abuts, which installs for rivet.And in the feelings of opposite saving material Built-in space is formed under condition, which is closed by piping lane two, further increases Building dimension.
Further, the piping lane one includes tube body, the sealing plate positioned at tube body both ends, and the tube body both ends fix one Annular ring, annular ring and sealing plate are fixed and are provided with sealing ring between annular ring and sealing plate.
By the fixed seal ring between annular ring and sealing plate, the sealing at one both ends of piping lane is realized.
Further, annular ring is fixed by screw and piping lane one.
Annular ring can be removed when so transport, the different piping lane one of diameter can be mutually socketed, and be readily transported, and such as This piping lane one is more readily processed.
Further, the piping lane two includes tube body, the sealing plate positioned at tube body both ends, and the tube body both ends fix one Annular ring, annular ring and sealing plate are fixed and are provided with sealing ring between annular ring and sealing plate.
By the fixed seal ring between annular ring and sealing plate, the sealing at two both ends of piping lane is realized.
Further, annular ring is fixed by screw and piping lane two.
Annular ring can be removed when so transport, the different piping lane two of diameter can be mutually socketed, and be readily transported, and such as This piping lane two is more readily processed.
Further, the tube body is made of multiple pipeline sections, and adjacent pipeline section is sealed by seal assembly.
In this way, the convenient length for adjusting piping lane one according to demand.
Further, seal assembly include both ends extend respectively to two neighboring pipeline section connection sheet, pass through connection sheet with The connection bolt of corresponding pipeline section connection.
Connection sheet abuts outer wall at the docking of two pipeline sections, and connection bolt connects with corresponding pipeline section across connection sheet, passes through Connection sheet realizes the connection of two pipeline sections.
Due to having opened up seal groove, its strength reduction, junction is caused to be easy to happen destruction.
Further, the load-bearing pan bottom is fixed with support column.
The setting of support column is adapted to different landform, does not change original landforms.
In conclusion the utility model has the advantages that:1)The piping lane building of this programme design is suitable for various Landform is built quickly, convenience in transport;2)It is assembled using produced piping lane, increases living space, increased space is mainly used as Hall and garden;3)Using high-order ground(3.5 meters -5 meters)Mode is built, and can not change former land status, or be suitable for it His complicated landform;4)Solar power generation and hot water apparatus can be installed at the top of second cover board;5)Bamboo trunk corridor building meets green ring It protects, it is economical and practical, convenient requirement is built, it can be with standardized set at construction.
Description of the drawings
Fig. 1 is the structural schematic diagram of embodiment 1;
Fig. 2 is the vertical view omitted after piping lane two;
Fig. 3 is the longitudinal sectional view of piping lane one;
Fig. 4 is the portions the A enlarged drawing of Fig. 3;
Fig. 5 is the portions the B enlarged drawing of Fig. 3;
Fig. 6 is the structural schematic diagram of embodiment 2;
Fig. 7 is the distribution map of piping lane one in embodiment 4, piping lane two.
Reference numeral:1, load-bearing plate;2, piping lane one;3, built-in space;4, piping lane two;5, L-type steel;6, tube body;61, it manages Section;62, connection sheet;63, bolt is connected;71, sealing plate;72, annular ring;73, mounting portion;74, sealing ring;8, support column;9、 Column.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.
Embodiment 1:A kind of piping lane building, such as Fig. 1, including load-bearing plate 1, horizontally disposed four are fixed on load-bearing plate 1 Piping lane 1 with prefabricated doors and windows (nothing is shown in figure).Length direction such as Fig. 2, four piping lanes 1 is consistent, four piping lanes One 2 surround a built-in space 3, which is rectangular-shape, and adjacent one 2 part of piping lane abuts.
Such as Fig. 1, horizontal positioned piping lane 24 is set, and the interval of piping lane 24 setting two is to partially enclosed on piping lane 1 The top end opening of built-in space 3, piping lane 24 and piping lane 1 are connected with load-bearing plate 1 by L-type steel 5 by rivet interlacement, piping lane 1 It connects, at least two screws on L-shaped steel, one of screw connection L-type steel 5 and load-bearing plate 1, another screw connect L-type steel 5 With piping lane 1.For the bonding strength for promoting between piping lane 1 and piping lane 24, piping lane 1 and piping lane 24 are also connected by L-type steel 5 It connects.
Such as Fig. 3, piping lane 1 includes tube body 6, the sealing plate 71 positioned at 6 both ends of tube body.Tube body 6 is made of multiple pipeline sections 61, Adjacent pipeline section 61 is sealed by seal assembly.Seal assembly includes the connection sheet that both ends extend respectively to two neighboring pipeline section 61 62, the connection bolt 63 connected with corresponding pipeline section 61 across connection sheet 62.Connection sheet 62 abuts outside at the docking of two pipeline sections 61 Wall, connection bolt 63 pass through connection sheet 62 to be connected with corresponding pipeline section 61, the connection of two pipeline sections 61 are realized by connection sheet 62.
Such as Fig. 5,6 both ends of middle tube body(That is the pipeline section 61 at outermost both ends)Fix an annular ring 72,72 shape of annular ring At one along the axially extending mounting portion 73 of pipeline section 61, screw is connect radially across mounting portion 73 with pipeline section 61 along pipeline section 61.
The outside of annular ring 72 opens up annular groove, and one thickness of installation is more than the sealing ring of annular groove depth in the annular groove 74,71 crush seal circle 74 of sealing plate is abutted and is bolted with annular ring 72.
Piping lane 24 can be made of with piping lane 1 multistage pipeline section 61, can also be an entirety.
To adapt to different terrain, support column 8 is fixed in 1 bottom of load-bearing plate.The periphery of load-bearing plate 1 can install guardrail.
Embodiment 2:A kind of piping lane building, such as Fig. 6, as different from Example 1, the length direction of piping lane 1 is circumferentially The top end opening of built-in space 3 is fully sealed in setting, piping lane 24.
Embodiment 3:A kind of piping lane building, as different from Example 1, seal assembly includes being located in one of pipeline section end First seal groove in face, the first magnetic part for being fixed on the first seal groove, the second seal groove on another pipeline section end face, Sealing ring in the second seal groove is fixed on the second magnetic part that sealing ring one end attracts each other with the first magnetic part, phase The first magnetic part and the second magnetic part attract each other after adjacent pipeline section docking slides into part positioned at the first sealing with rotary packing ring In slot(Another part is also in the second seal groove), the first seal groove and the second seal groove are annular groove, the first magnetic part tool Body is anode magnet, and the second magnetic part is cathode magnet, and bonding or hot-melt adhesive paste may be used with sealing ring in the second magnetic part.It is logical It crosses the first magnetic part and the second magnetic part attracts each other and slides the rapid abutting joint, it can be achieved that the two, and because pipe with rotary packing ring Corridor one is horizontal, and when the gravity of piping lane two is in the entire surface of piping lane one, the junction stress of pipeline section is smaller and seals The setting of ring allows have a certain amount of vertical displacement, and if it is the piping lane placed vertically, and due to having opened up seal groove, cause Its strength reduction, junction are easy to happen destruction.
Embodiment 4:A kind of piping lane building, as different from Example 1:Such as Fig. 6, piping lane 1 and piping lane 24 are respectively provided with four A, piping lane 24 is located at one 2 top of piping lane and is staggered, and column 9 is located at support piping lane 24 on load-bearing plate 1.

Claims (8)

1. a kind of piping lane building, it is characterised in that:Including load-bearing plate (1), it is fixed on horizontally disposed multiple bands on load-bearing plate (1) There are the piping lane one (2) of prefabricated doors and windows, multiple piping lanes one (2) to surround a built-in space (3), adjacent piping lane one (2) is at least partly It abuts, horizontal positioned piping lane two (4) is set on the piping lane one (2), the piping lane two (4) is completely enclosed or partially enclosed interior The top end opening of (3) between emptying, piping lane two (4) and piping lane one (2) pass through rivet interlacement, the piping lane one (2) and load-bearing plate (1) It is connected by L-type steel (5).
2. piping lane building according to claim 1, it is characterized in that:The piping lane one (2) includes tube body (6), is located at tube body (6) annular ring (72), annular ring (72) and sealing plate are fixed in the sealing plate (71) at both ends, tube body (6) both ends (71) it fixes and is provided with sealing ring (74) between annular ring (72) and sealing plate (71).
3. piping lane building according to claim 2, it is characterized in that:Annular ring (72) passes through screw and piping lane one (2) It is fixed.
4. piping lane building according to claim 1, it is characterized in that:The piping lane two (4) includes tube body (6), is located at tube body (6) annular ring (72), annular ring (72) and sealing plate are fixed in the sealing plate (71) at both ends, tube body (6) both ends (71) it fixes and is provided with sealing ring (74) between annular ring (72) and sealing plate (71).
5. piping lane building according to claim 4, it is characterized in that:Annular ring (72) passes through screw and piping lane two (4) It is fixed.
6. piping lane building according to claim 4, it is characterized in that:The tube body (6) is made of multiple pipeline sections (61), adjacent Pipeline section (61) sealed by seal assembly.
7. piping lane building according to claim 6, it is characterized in that:Seal assembly include both ends extend respectively to it is two neighboring The connection sheet (62) of pipeline section (61), the connection bolt (63) for passing through connection sheet (62) to be connected with corresponding pipeline section (61).
8. piping lane building according to claim 1, it is characterized in that:Load-bearing plate (1) bottom is fixed with support column (8).
CN201721867391.2U 2017-12-27 2017-12-27 Piping lane is built Expired - Fee Related CN207829166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721867391.2U CN207829166U (en) 2017-12-27 2017-12-27 Piping lane is built

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721867391.2U CN207829166U (en) 2017-12-27 2017-12-27 Piping lane is built

Publications (1)

Publication Number Publication Date
CN207829166U true CN207829166U (en) 2018-09-07

Family

ID=63389831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721867391.2U Expired - Fee Related CN207829166U (en) 2017-12-27 2017-12-27 Piping lane is built

Country Status (1)

Country Link
CN (1) CN207829166U (en)

Similar Documents

Publication Publication Date Title
US9803331B2 (en) Tower support structure
US20120260583A1 (en) Hybrid geodesic structure
US20160258152A1 (en) Geodesic Dome using pre-casted panels of Magnesium-Phosphate ceramic cement connected with a plurality of hubs.
CN104303895B (en) There is heliogreenhouse and the building method thereof of heat storing and heat preserving body of wall
CN205716040U (en) A kind of assembled corrugated steel composite steel-concrete piping lane
CN110144963A (en) Variable storehouse assembled underground pipe gallery
CN207829166U (en) Piping lane is built
CN204080859U (en) High-strength resistance to compression centripetal-stress Urban Underground pipe gallery
CN206204979U (en) Pipe-shape base structure
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN204919989U (en) Collect steel - concrete combination special -shaped post of heat preservation bearing in an organic whole
CN203498234U (en) Top-and-bottom combined type plastic septic tank
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
JP2003273616A (en) Communication tower
CN207714509U (en) Fast construction piping lane is built
CN102691311A (en) Precast assembled comprehensive pipe gallery fan house
CN208792371U (en) A kind of combined inspection shaft prefabricated component
CN203213150U (en) Glass reinforced plastic inspection well
CN207392523U (en) A kind of lightweight steel construction assembles the metope modular system of decoration integrated building
CN206784867U (en) A kind of civil construction support frame
CN202068784U (en) Economic, practical and multi-purpose greenhouse shed
CN219794255U (en) Waterproof construction between prefabricated wall body
CN105003101A (en) Dehumidifying method of underground moisture-proof structure, equipment, and underground moisture-proof structure
US20230220647A1 (en) Foundation structural design with cells configured to redirect and distribute stress loads
CN216892741U (en) Prefabricated electric power octagonal inspection well of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907