CN207828969U - A kind of steel-pipe pile is outstanding to beat constructing device - Google Patents

A kind of steel-pipe pile is outstanding to beat constructing device Download PDF

Info

Publication number
CN207828969U
CN207828969U CN201820206989.5U CN201820206989U CN207828969U CN 207828969 U CN207828969 U CN 207828969U CN 201820206989 U CN201820206989 U CN 201820206989U CN 207828969 U CN207828969 U CN 207828969U
Authority
CN
China
Prior art keywords
crossbar
outstanding
montant
beat
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820206989.5U
Other languages
Chinese (zh)
Inventor
叶派平
黄亮
熊子多
卢磊
李秋霜
邢轩
廖旭东
林联奇
向子鑫
王琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Xiamen Engineering Co Ltd
Priority to CN201820206989.5U priority Critical patent/CN207828969U/en
Application granted granted Critical
Publication of CN207828969U publication Critical patent/CN207828969U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to that steel-pipe pile is outstanding to beat constructing device technical field, constructing device is beaten more particularly to a kind of steel-pipe pile is outstanding, rack is beaten including outstanding, outstanding rack of beating includes two first crossbars, two first crossbars are fixedly connected by metal mesh, the outstanding lower face for beating rack is fixedly connected with several positioning devices, the positioning device includes two L-type framves, L-type frame includes second crossbar and montant, one end of second crossbar and the connection of the upper end of montant and the vertical length direction with montant of the length direction of second crossbar, it is connected by several third cross bars between the montant of two L-type framves, the utility model safety, it is convenient, construction efficiency is high.

Description

A kind of steel-pipe pile is outstanding to beat constructing device
Technical field
The utility model belongs to that steel-pipe pile is outstanding to beat constructing device technical field, and in particular to a kind of steel-pipe pile is outstanding to be beaten to construct and fill It sets.
Background technology
In recent years, China's highway, high-speed rail construction were fast-developing, and bridge spanning the sea, river-spanning bridge are more and more, are building It is faced with big wind when needing to build construction bridge temporarily when bridge, however building temporary construction trestle, wave height, the depth of water, gushes anxious, tide The complicated problems such as nighttide is apparent, naked rock cause accurately to carry out inserting piling to steel-pipe pile, and it is accurate also to be carried out to steel-pipe pile Positioning, for the inserting piling of steel-pipe pile using " halieutics ", this method is to carry vibration hammer using crawler belt in construction to carry out inserting piling at present, For this method during inserting piling, precision is not high, meets and easily leads to steel-pipe pile displacement in high wind;And it can not also be protected using this method Verticality when steel-pipe pile inserting piling, low construction efficiency are demonstrate,proved, if meeting rough swell wave easily causes steel-pipe pile shaking, security risk is big, Therefore further improve is needed.
Invention content
The purpose of this utility model is to provide one kind conveniently, safely, and the high steel-pipe pile of construction efficiency is outstanding to beat constructing device.
Based on above-mentioned purpose, the utility model adopts the following technical scheme that:
A kind of steel-pipe pile is outstanding to beat constructing device, including it is outstanding beat rack, hang that beat rack include two first crossbars, two first Cross bar is fixedly connected by metal mesh, and outstanding beat is equipped with several positioning devices below rack, which includes two L-type framves, L Type frame includes second crossbar and montant, and one end of second crossbar is vertical with the connection of the upper end of montant and the length direction of second crossbar With the length direction of montant, pass through the connection of several third cross bars between the montant of two L-type framves, the lower end connection of montant is oriented to Frame, leading truck include rectangle frame, are fixed with jack on four angles of rectangle frame, and the head cover of jack is towards in rectangle frame Heart position, the second crossbar are parallel to leading truck, and second crossbar is located at third cross bar with leading truck and is enclosed with montant The both sides of the plane of synthesis, second crossbar are located above first crossbar, the length direction of second crossbar and the length of first crossbar Direction is vertical in the same plane, is additionally provided with several beret slices between positioning device two-by-two, the rectangle of beret slice it is unilateral vertically with The outstanding lower face for beating rack, first crossbar lower section are also horizontal with the use of the 4th cross bar of connection, the 4th by several screw bolt and nut Bar runs through several beret slices, forms structure of the top of beret slice between first crossbar and the 4th cross bar.
Further, also it is fixedly connected with reinforcing rib between the montant and rectangle frame.
The utility model is simple in structure, and steel-pipe pile can be fixed, and can also use jack pair steel-pipe pile It is finely adjusted, and steel-pipe pile can be stably fixed in rectangle frame, while it is also ensured that inserting piling steel-pipe pile is vertical inserts It is with good stability to steel-pipe pile good to beat fixed plate.
Description of the drawings
Fig. 1 is that the connection diagram for beating rack and positioning device is hanged in the utility model;
Fig. 2 is the structural schematic diagram of positioning device in the utility model;
Fig. 3 is that the structural schematic diagram for beating rack is hanged in the utility model.
Specific implementation mode
Constructing device is beaten as a kind of steel-pipe pile of Fig. 1-3 is outstanding, including hangs and beats rack 1, outstanding rack 1 of beating includes two first horizontal Bar 101, two first crossbars 101 are fixedly connected by metal mesh 102, and the outstanding lower section for beating rack 1 is set there are two positioning device 2, The positioning device 2 includes two L-type framves 201, and L-type frame 201 includes second crossbar 2011 and montant 2012, second crossbar 2011 One end is connect with the upper end of montant 2012 and the vertical length direction with montant 2012 of the length direction of second crossbar 2011, two It is connected by three third cross bars 2013 between the montant 2012 of L-type frame 201, the lower end of montant 2012 connects leading truck 202, leads Include rectangle frame 2021 to frame 202, be fixed with jack 3 on four angles of rectangle frame 2021, the head cover of jack 3 is towards square The center location of shape frame 2021, the second crossbar 2011 are parallel to leading truck 202, second crossbar 2011 and leading truck 202 It is located at the both sides for the plane that third cross bar 2013 and montant 2012 are enclosed, the length direction of second crossbar 2011 and the The length direction of one cross bar 101 is vertical in the same plane, is additionally provided with two beret slices 5, beret slice between positioning device 2 two-by-two 5 rectangle is unilateral vertically with the outstanding lower face for beating rack 1, and 101 lower section of first crossbar is also coordinated by two bolts 6 and nut 7 Using connection the 4th cross bar 4, the 4th cross bar 4 run through two beret slices 5, formed beret slice 5 top be located at first crossbar 101 and Structure between 4th cross bar 4, the second crossbar 2011 are located at 101 top of first crossbar, the montant 2012 and square It is also fixedly connected with reinforcing rib between shape frame 2021.
In use, building construction bridge and being fixedly connected beret slice 5 with interim, steel-pipe pile is put into rectangle frame 2021, It drives piles.

Claims (2)

1. a kind of steel-pipe pile is outstanding to beat constructing device, which is characterized in that beat rack including outstanding, outstanding rack of beating includes two first horizontal Bar, two first crossbars are fixedly connected by metal mesh, and outstanding beat is equipped with several positioning devices below rack, which includes Two L-type framves, L-type frame include second crossbar and montant, one end of second crossbar and the upper end connection of montant and second crossbar Length direction vertically with the length direction of montant, is connected between the montant of two L-type framves by several third cross bars, under montant End connection leading truck, leading truck includes rectangle frame, and jack, the head cover direction of jack are fixed on four angles of rectangle frame The center of rectangle frame, the second crossbar are parallel to leading truck, and second crossbar is located at third cross bar with leading truck The both sides of the plane enclosed with montant, second crossbar are located above first crossbar, the length direction of second crossbar and first The length direction of cross bar is vertical in the same plane, is additionally provided with several beret slices, the rectangle of beret slice between positioning device two-by-two It is unilateral vertically with the outstanding lower face for beating rack, also by several screw bolt and nut with the use of the 4th cross of connection below first crossbar Bar, the 4th cross bar run through several beret slices, form structure of the top of beret slice between first crossbar and the 4th cross bar.
2. a kind of steel-pipe pile according to claim 1 is outstanding to beat constructing device, which is characterized in that the montant and rectangle frame Between be also fixedly connected with reinforcing rib.
CN201820206989.5U 2018-02-06 2018-02-06 A kind of steel-pipe pile is outstanding to beat constructing device Expired - Fee Related CN207828969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820206989.5U CN207828969U (en) 2018-02-06 2018-02-06 A kind of steel-pipe pile is outstanding to beat constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820206989.5U CN207828969U (en) 2018-02-06 2018-02-06 A kind of steel-pipe pile is outstanding to beat constructing device

Publications (1)

Publication Number Publication Date
CN207828969U true CN207828969U (en) 2018-09-07

Family

ID=63397322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820206989.5U Expired - Fee Related CN207828969U (en) 2018-02-06 2018-02-06 A kind of steel-pipe pile is outstanding to beat constructing device

Country Status (1)

Country Link
CN (1) CN207828969U (en)

Similar Documents

Publication Publication Date Title
CN207828969U (en) A kind of steel-pipe pile is outstanding to beat constructing device
CN107227741B (en) Basement supporting construction
CN109423982A (en) From the interim breakwater structure of steady floating type
CN206635801U (en) A kind of deep water waters bridge construction tower-crane foundation structure
CN201176597Y (en) Sinking well structure
CN212670485U (en) Stagnant water template is strutted to breast wall
CN107059641B (en) Goods shelf type pier body outer scaffold
CN212001179U (en) Goaf collapses prosthetic side slope supporting construction
CN213948717U (en) Floating offshore wind power operation platform
CN210421061U (en) Vibroflotation device with fixing device
CN213061745U (en) Basket protective structure is hung to continuous beam bridge construction template
CN214545887U (en) Float ecological bank protection of planting formula
CN210368583U (en) Bridge frame with lifting device
CN212026246U (en) Quick pile driving equipment for constructional engineering
CN107182877A (en) A kind of Largesize deepwater net cage of use longitudinal framing main truss
CN207812355U (en) A kind of urban road and traffic engineering protective fence
CN206529788U (en) Offshore wind turbine foundation single-column adheres to assembled berthing structure
CN206887976U (en) A kind of caisset for being suitable for big wave
CN216739280U (en) Safety protection shed for construction of overpass bridge
CN205444101U (en) I -shaped armor block is turned round to strenghthened type
CN213329085U (en) Novel combined platform is in pile foundation construction auxiliary assembly on water
CN214690099U (en) Underwater purse seine facility for fishing
CN216038519U (en) Hydraulic engineering construction auxiliary device that ascends a height
CN2451632Y (en) Metal structure for laying shallow water zone road
CN211923790U (en) Novel road green belt maintenance device for municipal engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20190206

CF01 Termination of patent right due to non-payment of annual fee