CN207828969U - A kind of steel-pipe pile is outstanding to beat constructing device - Google Patents
A kind of steel-pipe pile is outstanding to beat constructing device Download PDFInfo
- Publication number
- CN207828969U CN207828969U CN201820206989.5U CN201820206989U CN207828969U CN 207828969 U CN207828969 U CN 207828969U CN 201820206989 U CN201820206989 U CN 201820206989U CN 207828969 U CN207828969 U CN 207828969U
- Authority
- CN
- China
- Prior art keywords
- crossbar
- outstanding
- montant
- beat
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model belongs to that steel-pipe pile is outstanding to beat constructing device technical field, constructing device is beaten more particularly to a kind of steel-pipe pile is outstanding, rack is beaten including outstanding, outstanding rack of beating includes two first crossbars, two first crossbars are fixedly connected by metal mesh, the outstanding lower face for beating rack is fixedly connected with several positioning devices, the positioning device includes two L-type framves, L-type frame includes second crossbar and montant, one end of second crossbar and the connection of the upper end of montant and the vertical length direction with montant of the length direction of second crossbar, it is connected by several third cross bars between the montant of two L-type framves, the utility model safety, it is convenient, construction efficiency is high.
Description
Technical field
The utility model belongs to that steel-pipe pile is outstanding to beat constructing device technical field, and in particular to a kind of steel-pipe pile is outstanding to be beaten to construct and fill
It sets.
Background technology
In recent years, China's highway, high-speed rail construction were fast-developing, and bridge spanning the sea, river-spanning bridge are more and more, are building
It is faced with big wind when needing to build construction bridge temporarily when bridge, however building temporary construction trestle, wave height, the depth of water, gushes anxious, tide
The complicated problems such as nighttide is apparent, naked rock cause accurately to carry out inserting piling to steel-pipe pile, and it is accurate also to be carried out to steel-pipe pile
Positioning, for the inserting piling of steel-pipe pile using " halieutics ", this method is to carry vibration hammer using crawler belt in construction to carry out inserting piling at present,
For this method during inserting piling, precision is not high, meets and easily leads to steel-pipe pile displacement in high wind;And it can not also be protected using this method
Verticality when steel-pipe pile inserting piling, low construction efficiency are demonstrate,proved, if meeting rough swell wave easily causes steel-pipe pile shaking, security risk is big,
Therefore further improve is needed.
Invention content
The purpose of this utility model is to provide one kind conveniently, safely, and the high steel-pipe pile of construction efficiency is outstanding to beat constructing device.
Based on above-mentioned purpose, the utility model adopts the following technical scheme that:
A kind of steel-pipe pile is outstanding to beat constructing device, including it is outstanding beat rack, hang that beat rack include two first crossbars, two first
Cross bar is fixedly connected by metal mesh, and outstanding beat is equipped with several positioning devices below rack, which includes two L-type framves, L
Type frame includes second crossbar and montant, and one end of second crossbar is vertical with the connection of the upper end of montant and the length direction of second crossbar
With the length direction of montant, pass through the connection of several third cross bars between the montant of two L-type framves, the lower end connection of montant is oriented to
Frame, leading truck include rectangle frame, are fixed with jack on four angles of rectangle frame, and the head cover of jack is towards in rectangle frame
Heart position, the second crossbar are parallel to leading truck, and second crossbar is located at third cross bar with leading truck and is enclosed with montant
The both sides of the plane of synthesis, second crossbar are located above first crossbar, the length direction of second crossbar and the length of first crossbar
Direction is vertical in the same plane, is additionally provided with several beret slices between positioning device two-by-two, the rectangle of beret slice it is unilateral vertically with
The outstanding lower face for beating rack, first crossbar lower section are also horizontal with the use of the 4th cross bar of connection, the 4th by several screw bolt and nut
Bar runs through several beret slices, forms structure of the top of beret slice between first crossbar and the 4th cross bar.
Further, also it is fixedly connected with reinforcing rib between the montant and rectangle frame.
The utility model is simple in structure, and steel-pipe pile can be fixed, and can also use jack pair steel-pipe pile
It is finely adjusted, and steel-pipe pile can be stably fixed in rectangle frame, while it is also ensured that inserting piling steel-pipe pile is vertical inserts
It is with good stability to steel-pipe pile good to beat fixed plate.
Description of the drawings
Fig. 1 is that the connection diagram for beating rack and positioning device is hanged in the utility model;
Fig. 2 is the structural schematic diagram of positioning device in the utility model;
Fig. 3 is that the structural schematic diagram for beating rack is hanged in the utility model.
Specific implementation mode
Constructing device is beaten as a kind of steel-pipe pile of Fig. 1-3 is outstanding, including hangs and beats rack 1, outstanding rack 1 of beating includes two first horizontal
Bar 101, two first crossbars 101 are fixedly connected by metal mesh 102, and the outstanding lower section for beating rack 1 is set there are two positioning device 2,
The positioning device 2 includes two L-type framves 201, and L-type frame 201 includes second crossbar 2011 and montant 2012, second crossbar 2011
One end is connect with the upper end of montant 2012 and the vertical length direction with montant 2012 of the length direction of second crossbar 2011, two
It is connected by three third cross bars 2013 between the montant 2012 of L-type frame 201, the lower end of montant 2012 connects leading truck 202, leads
Include rectangle frame 2021 to frame 202, be fixed with jack 3 on four angles of rectangle frame 2021, the head cover of jack 3 is towards square
The center location of shape frame 2021, the second crossbar 2011 are parallel to leading truck 202, second crossbar 2011 and leading truck 202
It is located at the both sides for the plane that third cross bar 2013 and montant 2012 are enclosed, the length direction of second crossbar 2011 and the
The length direction of one cross bar 101 is vertical in the same plane, is additionally provided with two beret slices 5, beret slice between positioning device 2 two-by-two
5 rectangle is unilateral vertically with the outstanding lower face for beating rack 1, and 101 lower section of first crossbar is also coordinated by two bolts 6 and nut 7
Using connection the 4th cross bar 4, the 4th cross bar 4 run through two beret slices 5, formed beret slice 5 top be located at first crossbar 101 and
Structure between 4th cross bar 4, the second crossbar 2011 are located at 101 top of first crossbar, the montant 2012 and square
It is also fixedly connected with reinforcing rib between shape frame 2021.
In use, building construction bridge and being fixedly connected beret slice 5 with interim, steel-pipe pile is put into rectangle frame 2021,
It drives piles.
Claims (2)
1. a kind of steel-pipe pile is outstanding to beat constructing device, which is characterized in that beat rack including outstanding, outstanding rack of beating includes two first horizontal
Bar, two first crossbars are fixedly connected by metal mesh, and outstanding beat is equipped with several positioning devices below rack, which includes
Two L-type framves, L-type frame include second crossbar and montant, one end of second crossbar and the upper end connection of montant and second crossbar
Length direction vertically with the length direction of montant, is connected between the montant of two L-type framves by several third cross bars, under montant
End connection leading truck, leading truck includes rectangle frame, and jack, the head cover direction of jack are fixed on four angles of rectangle frame
The center of rectangle frame, the second crossbar are parallel to leading truck, and second crossbar is located at third cross bar with leading truck
The both sides of the plane enclosed with montant, second crossbar are located above first crossbar, the length direction of second crossbar and first
The length direction of cross bar is vertical in the same plane, is additionally provided with several beret slices, the rectangle of beret slice between positioning device two-by-two
It is unilateral vertically with the outstanding lower face for beating rack, also by several screw bolt and nut with the use of the 4th cross of connection below first crossbar
Bar, the 4th cross bar run through several beret slices, form structure of the top of beret slice between first crossbar and the 4th cross bar.
2. a kind of steel-pipe pile according to claim 1 is outstanding to beat constructing device, which is characterized in that the montant and rectangle frame
Between be also fixedly connected with reinforcing rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820206989.5U CN207828969U (en) | 2018-02-06 | 2018-02-06 | A kind of steel-pipe pile is outstanding to beat constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820206989.5U CN207828969U (en) | 2018-02-06 | 2018-02-06 | A kind of steel-pipe pile is outstanding to beat constructing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207828969U true CN207828969U (en) | 2018-09-07 |
Family
ID=63397322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820206989.5U Expired - Fee Related CN207828969U (en) | 2018-02-06 | 2018-02-06 | A kind of steel-pipe pile is outstanding to beat constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207828969U (en) |
-
2018
- 2018-02-06 CN CN201820206989.5U patent/CN207828969U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207828969U (en) | A kind of steel-pipe pile is outstanding to beat constructing device | |
CN107227741B (en) | Basement supporting construction | |
CN109423982A (en) | From the interim breakwater structure of steady floating type | |
CN206635801U (en) | A kind of deep water waters bridge construction tower-crane foundation structure | |
CN201176597Y (en) | Sinking well structure | |
CN212670485U (en) | Stagnant water template is strutted to breast wall | |
CN107059641B (en) | Goods shelf type pier body outer scaffold | |
CN212001179U (en) | Goaf collapses prosthetic side slope supporting construction | |
CN213948717U (en) | Floating offshore wind power operation platform | |
CN210421061U (en) | Vibroflotation device with fixing device | |
CN213061745U (en) | Basket protective structure is hung to continuous beam bridge construction template | |
CN214545887U (en) | Float ecological bank protection of planting formula | |
CN210368583U (en) | Bridge frame with lifting device | |
CN212026246U (en) | Quick pile driving equipment for constructional engineering | |
CN107182877A (en) | A kind of Largesize deepwater net cage of use longitudinal framing main truss | |
CN207812355U (en) | A kind of urban road and traffic engineering protective fence | |
CN206529788U (en) | Offshore wind turbine foundation single-column adheres to assembled berthing structure | |
CN206887976U (en) | A kind of caisset for being suitable for big wave | |
CN216739280U (en) | Safety protection shed for construction of overpass bridge | |
CN205444101U (en) | I -shaped armor block is turned round to strenghthened type | |
CN213329085U (en) | Novel combined platform is in pile foundation construction auxiliary assembly on water | |
CN214690099U (en) | Underwater purse seine facility for fishing | |
CN216038519U (en) | Hydraulic engineering construction auxiliary device that ascends a height | |
CN2451632Y (en) | Metal structure for laying shallow water zone road | |
CN211923790U (en) | Novel road green belt maintenance device for municipal engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180907 Termination date: 20190206 |
|
CF01 | Termination of patent right due to non-payment of annual fee |