CN207820511U - A kind of tree planting five-axle linkage brill pit device - Google Patents
A kind of tree planting five-axle linkage brill pit device Download PDFInfo
- Publication number
- CN207820511U CN207820511U CN201820043114.8U CN201820043114U CN207820511U CN 207820511 U CN207820511 U CN 207820511U CN 201820043114 U CN201820043114 U CN 201820043114U CN 207820511 U CN207820511 U CN 207820511U
- Authority
- CN
- China
- Prior art keywords
- fixed
- auger spindle
- plate
- hole
- brill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of tree planting five-axle linkages to bore pit device, including bottom plate, the lower section of bottom plate is equipped with several wheels, four slide bars are fixed on bottom plate, one piece of top plate is fixed at the top of slide bar, it is fixed on top plate that there are one oil cylinders, oil cylinder is equipped with a mandril, the bottom end of mandril is fixed with one slide-plate, slide plate is socketed on slide bar, it is fixed on the bottom surface of slide plate that there are one motors, motor is equipped with a main shaft, it is fixed with the first of a brill hole on main shaft and bores hole auger spindle, it is additionally provided with four second on slide plate and bores hole auger spindle, pit hole is bored there are one being set on bottom plate, it is fixed on main shaft that there are one drive gear, it is fixed on every second brill hole auger spindle that there are one transmission gears, each transmission gear is meshed with driving gear, the rear end of bottom plate is fixed with a push rod, there are one handles for the top fixation of push rod.The utility model obtain advantageous effect be:(1) simple in structure;(2) brill pit area is big in the unit interval, and work efficiency is high.
Description
Technical field
The utility model is related to a kind of brill pit device, especially a kind of tree planting bores pit device with five-axle linkage.
Background technology
Currently, people are when planting trees, usually manually mode is digged pit, but the mode manually digged pit is worked by force
Degree is big, and working efficiency is low, in order to increase the working efficiency digged pit, can sometimes be digged pit using excavator, although excavator
Can greatly improve the working efficiency digged pit, but it is costly, oil consumption is big, while also significantly increasing the expense planted trees and digged pit
With, thus there is unreasonable place in existing two kinds modes of digging pit, cannot be satisfied the demand planted trees with digging pit.
Invention content
Problem to be solved in the utility model is:A kind of tree planting use simple in structure, easy to operate, brill hole is efficient is provided
Pit device is bored in five-axle linkage.
To solve the above-mentioned problems, the tree planting of the utility model bores pit device, including bottom plate, the bottom plate with five-axle linkage
Lower section be equipped with several wheels, be fixed with four slide bars on the bottom plate, one piece of top plate, institute be fixed at the top of the slide bar
It states top plate and is parallel to horizontal plane, fixed on the top plate there are one oil cylinder, the oil cylinder is equipped with a mandril, the mandril
Bottom end is fixed with one slide-plate, and the slide plate is socketed on slide bar, and fixed on the bottom surface of the slide plate there are one motor, the electricity
Machine is equipped with a main shaft, and the first of a brill hole is fixed on the main shaft and bores hole auger spindle, four are additionally provided on the slide plate
Root second bores hole auger spindle, and described second, which bores hole auger spindle, bores that cheat auger spindle parallel with first, and described second bores and cheat auger spindle and be distributed in the
One bores the surrounding of hole auger spindle, is set on the bottom plate there are one pit hole is bored, the first brill hole auger spindle and second bore hole auger spindle and insert
Enter to bore in pit hole and be stretched out from the bottom for boring pit hole, fixed there are one gear is driven on the main shaft, every second is bored hole and bored
Fixed there are one transmission gear on axis, each transmission gear is meshed with driving gear, and a liquid is additionally provided on the bottom plate
Work station and an accumulator are pressed, is equipped with oil inlet pipe and flowline between the hydraulic workstation and oil cylinder, after the bottom plate
End is fixed with a push rod, and the top of the push rod is fixed there are one handle, sets that there are one what motor opened and closed to open on the handle
Close button, the declines button that the rising button that a control cylinder rises and a control cylinder decline, the motor, accumulator
It is in series with switch button.
Good support is carried out in order to bore hole auger spindle to second, while ensuring that the second brill hole auger spindle can be rotated smoothly,
The tree planting of the utility model bores pit device with five-axle linkage, and one piece of support plate is fixed with below the slide plate, and described second bores
Hole auger spindle is inserted in the stretching of the lower section in support plate and from support plate, between the slide plate and the second brill hole auger spindle and supports
It is equipped with rolling bearing between plate and the second brill hole auger spindle.
In order to which main shaft and first are bored hole, auger spindle is firm is fixedly connected, and the tree planting of the utility model is bored with five-axle linkage
Pit device is connected between the main shaft and the first brill hole auger spindle by shaft coupling.
The utility model obtain advantageous effect be:(1) simple in structure;(2) when specifically used, staff is first
It holds with a firm grip handle, whole device is moved to hole place to be drilled, the first brill hole auger spindle and second is made to bore hole auger spindle with being located at hole to be drilled
The surface of point, then presses switch button, starts motor, and after electric motor starting, main shaft will drive the first brill hole auger spindle and drive
Moving gear rotates, and driving gear can also bore hole auger spindle rotation, first bores while rotation with nutating gear and four second
It cheats auger spindle and four second is bored hole auger spindle while rotation, staff starts declines button, at this point, the mandril on oil cylinder is just
Slide plate, motor, the first brill hole auger spindle and four second brill hole auger spindles can be driven constantly to be moved down along slide bar, wherein first
It bores hole auger spindle and second and bores hole auger spindle during the decline, rotated since it is continuous, thus will constantly thereunder
Soil drills out the hole that plants trees, and compared with existing mode of digging pit, the tree planting of the utility model bores pit device with five-axle linkage, bores
During hole, since the first brill hole auger spindle and four second bore hole auger spindles and work at the same time, and first bores the rotation side for cheating auger spindle
To the rotation direction for boring hole auger spindle with four second on the contrary, therefore brill pit area is big in the unit interval, a side can be quickly drilled out
The tree planting of shape is cheated, and work efficiency is high;After the brill for completing the hole that plants trees cheats work, staff presses rising button, sliding
Plate, motor, first, which bore hole auger spindle and the second brill hole auger spindle, to automatically reset under the drive of mandril, for next hole that plants trees
Hole work is bored to be ready;(3) one piece of support plate is fixed with below slide plate, second, which bores hole auger spindle, is inserted in support plate simultaneously
It is stretched out from the lower section of support plate, is equipped between slide plate and the second brill hole auger spindle and between support plate and the second brill hole auger spindle and turns
Dynamic bearing, therefore hole auger spindle can be bored to four second and carry out good support, while also ensuring that four second brill hole auger spindles are suitable
Smooth rotation bores hole work to quickly finish;(4) it is connected by shaft coupling between main shaft and the first brill hole auger spindle, because
And main shaft and first can be bored hole auger spindle is firm is fixed together.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the sectional view in the faces A-A in Fig. 1.
In figure:1, wheel, 2, hole of digging pit, 3, second bores hole auger spindle, and 4, bottom plate, 5, driving gear,
6, hydraulic workstation, 7, transmission gear, 8, handle, 9, oil inlet pipe, 10, flowline, 11, main shaft,
12, oil cylinder, 13, mandril, 14, top plate, 15, rolling bearing, 16, slide bar, 17, slide plate,
18, support plate, 19, shaft coupling, 20, accumulator, 21, push rod, 22, declines button, 23, rising button,
24, switch button, 25, motor, 26, first bores hole auger spindle.
Specific implementation mode
As depicted in figs. 1 and 2, the tree planting of the utility model bores pit device, including bottom plate 4, the bottom plate 4 with five-axle linkage
Lower section be equipped with several wheels 1, be fixed with four slide bars 16 on the bottom plate 4, the top of the slide bar 16 is fixed with one piece
Top plate 14, the top plate 14 are parallel to horizontal plane, are fixed on the top plate 14 there are one oil cylinder 12, the oil cylinder 12 is equipped with one
The bottom end of root mandril 13, the mandril 13 is fixed with one slide-plate 17, and the slide plate 17 is socketed on slide bar 16, the slide plate
Fixed there are one motor 25 on 17 bottom surface, the motor 25 is equipped with a main shaft 11, and one is fixed on the main shaft 11
First to dig pit bores hole auger spindle 26, and four second are additionally provided on the slide plate 17 and bores hole auger spindle 3, described second bores hole auger spindle 3
Parallel with the first brill hole auger spindle 26, described second bores the surrounding that hole auger spindle 3 is distributed in the first brill hole auger spindle 26, the bottom plate 4
On set there are one digging pit hole 2, described first bore hole auger spindle 26 and second bore hole auger spindle 3 be inserted in dig pit hole 2 in and from digging pit
The bottom in hole 2 is stretched out, fixed there are one driving gear 5 on the main shaft 11, and every second is bored that fixed on the auger spindle 3 of hole there are one pass
Moving gear 7, each transmission gear 7 are meshed with driving gear 5, and 6 He of hydraulic workstation is additionally provided on the bottom plate 4
One accumulator 20 is equipped with oil inlet pipe 9 and flowline 10, the rear end of the bottom plate 4 between the hydraulic workstation 6 and oil cylinder 12
It is fixed with a push rod 21, the top of the push rod 21 is fixed there are one handle 8, is set on the handle 8 and is opened there are one motor 25
The declines button that the rising button 23 and a control cylinder 12 that 24, control cylinders 12 of the switch button closed rise decline
22, the motor 25, accumulator 20 and switch button 24 are in series;The lower section of the slide plate 17 is fixed with one piece of support plate 18,
Described second, which bores hole auger spindle 3, is inserted in support plate 18 and is stretched out from the lower section of support plate 18, and the slide plate 17 and second bores
Between the auger spindle 3 of hole and support plate 18 and second bores between cheating auger spindle 3 and is equipped with rolling bearing 15;The main shaft 11 and first bores
It is connected by shaft coupling 19 between the auger spindle 26 of hole.
The tree planting of the utility model bores pit device with five-axle linkage, simple in structure, and when specifically used, staff is first
It first holds with a firm grip handle 8, whole device is moved to hole place to be drilled, so that the first brill hole auger spindle 26 and second is bored hole auger spindle 3 and is located at and wait for
The surface for boring hole place, then presses switch button 24, starts motor 25, and after motor 25 starts, main shaft 11 will drive the
One bores hole auger spindle 26 and the driving rotation of gear 5, and driving gear 5, can also be with nutating gear 7 and four second while rotation
It bores hole auger spindle 3 to rotate, the first brill cheats auger spindle 26 and four second are bored hole auger spindle 3 while rotation, staff's startup decline
Button 22, at this point, the mandril 13 on oil cylinder 12 will drive slide plate 17, motor 25, first to bore hole auger spindle 26 and four second brills
Hole auger spindle 3 is constantly moved down along slide bar 16, wherein first, which bores hole auger spindle 26 and second, bores the process for cheating auger spindle 3 in decline
In, it is rotated since it is continuous, thus soil that will constantly thereunder drills out the hole that plants trees, with existing mode of digging pit
It compares, the tree planting of the utility model bores pit device with five-axle linkage, during boring hole, due to the first brill hole auger spindle 26 and four
Second, which bores hole auger spindle 3, works at the same time, and the first rotation direction for boring hole auger spindle 26 bores the rotation direction for cheating auger spindle 3 with four second
On the contrary, therefore being bored in the unit interval, pit area is big, can quickly drill out a rectangular tree planting hole, work efficiency is high;When completion one
After the brill hole work in a hole that plants trees, staff presses rising button 23, and slide plate 17, motor 25, first bore hole 26 and of auger spindle
Second, which bores hole auger spindle 3, to automatically reset under the drive of mandril 13, cheat work for next brill cheated of planting trees and be ready.
The tree planting of the utility model bores pit device with five-axle linkage, and the lower section of slide plate 17 is fixed with one piece of support plate 18, the
Two, which bore hole auger spindle 3, is inserted in support plate 18 and is stretched out from the lower section of support plate 18, and slide plate 17 and second bores between the auger spindle 3 of hole
And support plate 18 and second bores and is equipped with rolling bearing 15 between cheating auger spindle 3, therefore hole auger spindles 3 can be bored to four second and carried out
Good support, while also ensuring that four second brill hole auger spindles 3 smoothly rotate, bore hole work to quickly finish.
The tree planting of the utility model bores pit device with five-axle linkage, and main shaft 11 and first passes through shaft coupling between boring hole auger spindle 26
Device 19 is connected, thus can main shaft 11 and first be bored hole auger spindle 26 is firm is fixed together.
Claims (3)
1. a kind of tree planting bores pit device with five-axle linkage, it is characterised in that:Including bottom plate (4), the lower section of the bottom plate (4) is equipped with
Several wheels (1) are fixed with four slide bars (16) on the bottom plate (4), one piece of top are fixed at the top of the slide bar (16)
Plate (14), the top plate (14) are parallel to horizontal plane, and fixed on the top plate (14) there are one oil cylinder (12), the oil cylinders (12)
It is equipped with a mandril (13), the bottom end of the mandril (13) is fixed with one slide-plate (17), and the slide plate (17) is socketed on cunning
On bar (16), fixed there are one motor (25) on the bottom surface of the slide plate (17), the motor (25) is equipped with a main shaft
(11), it is fixed with a first brill hole auger spindle (26) digged pit on the main shaft (11), four are additionally provided on the slide plate (17)
Root second, which bores, cheats auger spindle (3), and the second brill hole auger spindle (3) is parallel with the first brill hole auger spindle (26), and second brill, which is cheated, to be bored
Axis (3) is distributed in the surrounding of the first brill hole auger spindle (26), is set on the bottom plate (4) there are one hole (2) of digging pit, first brill is cheated
Auger spindle (26) and the second brill hole auger spindle (3) are inserted in hole of digging pit (2) and are stretched out from the bottom of hole of digging pit (2), the main shaft
(11) fixed there are one driving gear (5) on, every second is bored that fixed on hole auger spindle (3) there are one transmission gear (7), Mei Gechuan
Moving gear (7) is meshed with driving gear (5), and a hydraulic workstation (6) and an electric power storage are additionally provided on the bottom plate (4)
Pond (20) is equipped with oil inlet pipe (9) and flowline (10) between the hydraulic workstation (6) and oil cylinder (12), the bottom plate (4)
Rear end is fixed with a push rod (21), and the top of the push rod (21) is fixed there are one handle (8), and the handle (8) is equipped with
The rising button (23) and a control oil that the switch button (24) of one motor (25) keying, a control cylinder (12) rise
The declines button (22) that cylinder (12) declines, the motor (25), accumulator (20) and switch button (24) are in series.
2. tree planting according to claim 1 bores pit device with five-axle linkage, it is characterised in that:The lower section of the slide plate (17)
It is fixed with one piece of support plate (18), described second, which bores hole auger spindle (3), is inserted in support plate (18) and from support plate (18)
Lower section is stretched out, between the slide plate (17) and the second brill hole auger spindle (3) and between support plate (18) and the second brill hole auger spindle (3)
It is equipped with rolling bearing (15).
3. tree planting according to claim 2 bores pit device with five-axle linkage, it is characterised in that:The main shaft (11) and first
It bores and is connected by shaft coupling (19) between cheating auger spindle (26).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820043114.8U CN207820511U (en) | 2018-01-10 | 2018-01-10 | A kind of tree planting five-axle linkage brill pit device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820043114.8U CN207820511U (en) | 2018-01-10 | 2018-01-10 | A kind of tree planting five-axle linkage brill pit device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207820511U true CN207820511U (en) | 2018-09-07 |
Family
ID=63392568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820043114.8U Expired - Fee Related CN207820511U (en) | 2018-01-10 | 2018-01-10 | A kind of tree planting five-axle linkage brill pit device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207820511U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111512715A (en) * | 2020-04-29 | 2020-08-11 | 东阳伸狄建筑科技有限公司 | Main transmission soil loosening mechanism of automatic scarifier |
-
2018
- 2018-01-10 CN CN201820043114.8U patent/CN207820511U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111512715A (en) * | 2020-04-29 | 2020-08-11 | 东阳伸狄建筑科技有限公司 | Main transmission soil loosening mechanism of automatic scarifier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213245623U (en) | Garden construction plants integrative equipment of tree with digging pit | |
CN208317348U (en) | A kind of swing offset punching variable-rate fertilization | |
CN211931216U (en) | Farming that work efficiency is high is with device that loosens soil | |
CN207820511U (en) | A kind of tree planting five-axle linkage brill pit device | |
CN208754849U (en) | A kind of quick Tree planting vehicle | |
CN213022418U (en) | A soil sampling device for saline and alkaline land afforestation | |
CN220441294U (en) | Fertilizing device | |
CN205491753U (en) | Fruit tree fertilizer injection unit | |
CN2794129Y (en) | Tree pit digger | |
CN212306088U (en) | Afforestation plants with digging device | |
CN208999121U (en) | A kind of garden soil sampling apparatus | |
CN209861540U (en) | Gardens are with device of digging pit | |
CN209594242U (en) | A kind of agricultural open hole device | |
CN207099619U (en) | Tree planting pit-picker | |
CN214070589U (en) | A device of digging pit for gardens are planted | |
CN213960683U (en) | Gardens are transplanted device that digs soil and loosens soil with flowers and trees | |
CN112219641B (en) | Edible fungus is planted and uses artifical device that digs | |
CN115250865B (en) | Container seedling planter suitable for desert areas | |
CN110500030A (en) | Power construction drilling machine | |
CN217315106U (en) | Liquid-phase medicament permeation injection device for contaminated soil remediation | |
CN219228355U (en) | Ditching device for vegetable core planting | |
CN219803030U (en) | Auxiliary pit digging device for seedling cultivation | |
CN215735711U (en) | Vegetable planting is with device of digging pit | |
CN213245621U (en) | Irrigation type walnut planting device | |
CN211931276U (en) | Hole digging machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180907 Termination date: 20200110 |