CN207814657U - A kind of pipeline hold-down support bearing 500t axial forces - Google Patents
A kind of pipeline hold-down support bearing 500t axial forces Download PDFInfo
- Publication number
- CN207814657U CN207814657U CN201721905828.7U CN201721905828U CN207814657U CN 207814657 U CN207814657 U CN 207814657U CN 201721905828 U CN201721905828 U CN 201721905828U CN 207814657 U CN207814657 U CN 207814657U
- Authority
- CN
- China
- Prior art keywords
- web
- pipeline
- ribs
- bottom plate
- lantern ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
A kind of pipeline hold-down support bearing 500t axial forces of the utility model, including with pipeline, bottom plate, cover board, deep floor, girt lantern ring, web;Lantern ring is set on the outside of pipeline, and lantern ring connect with web, ribs, girt, is connected with each other between web, ribs, girt respectively, and abdomen and ribs are connect with bottom plate, and bottom plate position of opening places cover board, and cover board is connect with outer concrete basis rod iron.The utility model hold-down support can efficiently solve the problems, such as the following axial force power transmissions of pipeline 500t.
Description
Technical field
The utility model is related to a kind of pipeline hold-down supports bearing 500t axial forces.
Background technology
Pipeline hold-down support is the pipe support for not allowing pipeline and supporting structure to have relative displacement.It is mainly used for manage
Road is divided into several compensation pipeline sections, carries out thermal compensation respectively, to ensure the normal work of compensator, in addition for big generation
The equipment of axial force, hold-down support are also essential.
The most commonly used is the hold-down supports of metal structure, there is snap ring-type, welding angle steel hold-down support, curved surface slot hold-down support
With baffle-type hold-down support etc..
The most commonly used is the hold-down supports of metal structure, have snap ring-type, welding angle steel hold-down support, curved surface slot to fix branch
Seat and baffle-type hold-down support etc..
The axial thrust that first three is born is smaller, typically not greater than 50kN, and the standard baffles formula hold-down support load limit is about
1000kN or so.Yet there are no can bear the hold-down support of 5000kN axial forces.
Utility model content
The technology of the utility model solves the problems, such as:Overcome the deficiencies in the prior art proposes that one kind can bear 500t axial directions
The pipeline hold-down support of power solves the problems, such as that larger axial force pipeline fixes support within axial force 500t (5000kN), makes to set
Standby zero shift.
The technical solution of the utility model is:A kind of pipeline hold-down support bearing t axial forces, including with pipe
Road, bottom plate, cover board, ribs, girt lantern ring, web;Lantern ring is set on the outside of pipeline, lantern ring respectively with web, ribs, cross
Lacing wire connects, and is connected with each other between web, ribs, girt, abdomen and ribs are connect with bottom plate, bottom plate position of opening
Cover board is placed, cover board is connect with outer concrete basis rod iron.
The bore of pipeline is greater than or equal to 1m.
Bottom plate is a monoblock steel plate, round hole quantity is arranged according to concrete foundation rod iron quantity, opening diameter compares steel
Big 20mm~the 50mm of stick diameter, the circle setting anchor (bolt) hole of bottom edge one.
Cover board is circular steel plate or square plate, middle part trepanning, the big 5mm of aperture ratio rod iron diameter, on the outside of cover board welding with
On bottom plate, inside is welded with rod iron.
Ribs, lantern ring, web weld together, and ribs and web are welded with bottom plate, according to the axial force born
It needs, one or more sets can be arranged in ribs, lantern ring, web, and when being arranged two sets or more, girt, girt connection is arranged
Cover strong floor, lantern ring, web more.
The advantageous effect of the utility model compared with prior art is:
1) pipeline, reinforcement, basic connection type integrated design scheme are used, keeps pipeline hold-down support structure more firm
It leans on, solves the problems, such as that the too big and existing conventional pipeline hold-down support of special occasions pipeline axial force can not use, be big axial
Hydraulic piping equipment load provides new solution route.
2) the utility model is applied to pipe diameter 1m or more, and larger axial force pipeline is solid within axial force 500t (5000kN)
Surely the problem of supporting makes equipment zero shift.
Description of the drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model side view.
Specific implementation mode
The utility model is described in detail below in conjunction with the drawings and specific embodiments.
A kind of pipeline hold-down support bearing 500t axial forces, including with pipeline 1, bottom plate 2, cover board 3, ribs 4, horizontal
5 lantern ring 6 of lacing wire, web 7;Lantern ring 6 is arranged in 1 outside of pipeline, and lantern ring 6 is connect with web 7, ribs 4, girt 5 respectively, web
7, it is connected with each other between ribs 4, girt 5, web 7 and ribs 4 are connect with bottom plate 2, and 2 position of opening of bottom plate places lid
Plate 3, cover board 3 are connect with outer concrete basis rod iron.
The bore of pipeline 1 is greater than or equal to 1m.Bottom plate 2 is a monoblock steel plate, is arranged according to concrete foundation rod iron quantity
Round hole quantity, opening diameter is bigger 20mm~50mm than rod iron diameter, 2 edge one of bottom plate circle setting anchor (bolt) hole.Cover board 3
For circular steel plate or square plate, middle part trepanning, the big 5mm of aperture ratio rod iron diameter, 3 outside welding of cover board on bottom plate 2, inside
It is welded with rod iron.Ribs 4, lantern ring 6, web 7 weld together, and ribs 4 and web 7 are welded with bottom plate 2, according to bearing
Axial force need, one or more sets can be arranged in ribs 4, lantern ring 6, web 7, when being arranged two sets or more, setting girt
5, girt 5 connects the strong rib 4 of more sets, lantern ring 6, web 7.
6 both ends of lantern ring are welded on the outside of pipeline, ensure that pipeline stress can be transmitted on casing.Ribs 4, girt version
5, web 6 is power transmission strengthening part.When pipeline axial force is smaller, the combination of web can be added with a secondary lantern ring, coordinates ribs
It will be in axial force transmission to bottom plate.When pipeline axial force is larger, the combination of web can be added with two sets or two sets or more lantern rings, is used
Girt plate links into an integrated entity web, and cooperation ribs will be in axial force transmission to bottom plate.
Bottom plate 2 is used to support weight, and the movement on restriction conduit vertical direction, and bottom plate makes of monoblock steel plate, works as branch
When seat load is smaller, light holes can be suitably reduced, to reduce the weight of bearing itself.
Cover board 3 is main force transferring part, can be made as rectangular, can also be made as circle, and outside is welded with bottom plate,
Inner ring is connect with basic steel column, after axial force suffered by bearing passes to bottom plate by other component, bottom plate, cover board and basic steel column
By cut mode by axial force transmission to Equipment Foundations.The welding of bottom plate, cover board and basic steel column three can certain journey simultaneously
Restriction conduit vertical motion on degree.Bottom plate passes through the trepanning of basic steel column that need to be slightly larger than steel column diameter, cover board trepanning and basic steel
Column diameter is identical, it is therefore an objective to position adjustment is convenient for when installing hold-down support.
What is be not described in detail in the utility model specification partly belongs to common sense well known to those skilled in the art.
Claims (5)
1. a kind of pipeline hold-down support bearing 500t axial forces, it is characterised in that:Including with pipeline (1), bottom plate (2), lid
Plate (3), ribs (4), girt (5) lantern ring (6), web (7);Setting lantern ring (6) on the outside of pipeline (1), lantern ring (6) respectively with
Web (7), ribs (4), girt (5) connection, web (7), ribs (4), girt are connected with each other between (5), web
(7) it is connect with bottom plate (2) with ribs (4), bottom plate (2) position of opening places cover board (3), cover board (3) and outer concrete
Basic rod iron connection.
2. a kind of pipeline hold-down support bearing 500t axial forces according to claim 1, it is characterised in that:Pipeline
(1) bore is greater than or equal to 1m.
3. a kind of pipeline hold-down support bearing 500t axial forces according to claim 1, it is characterised in that:Bottom plate
(2) it is a monoblock steel plate, round hole quantity is arranged according to concrete foundation rod iron quantity, opening diameter is bigger than rod iron diameter
20mm~50mm, the circle setting anchor (bolt) hole of bottom plate (2) edge one.
4. a kind of pipeline hold-down support bearing 500t axial forces according to claim 1, it is characterised in that:Cover board
(3) it is circular steel plate or square plate, middle part trepanning, the big 5mm of aperture ratio rod iron diameter, cover board (3) outside is welded and bottom plate (2)
On, inside is welded with rod iron.
5. a kind of pipeline hold-down support bearing 500t axial forces according to claim 1 or 2 or 3 or 4, feature exist
In:Ribs (4), lantern ring (6), web (7) weld together, and ribs (4) and web (7) are welded with bottom plate (2), according to
One or more sets can be arranged in the axial force needs born, ribs (4), lantern ring (6), web (7), when being arranged two sets or more,
Girt (5), the strong floor (4) of the more sets of girt (5) connection, lantern ring (6), web (7) are set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721905828.7U CN207814657U (en) | 2017-12-29 | 2017-12-29 | A kind of pipeline hold-down support bearing 500t axial forces |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721905828.7U CN207814657U (en) | 2017-12-29 | 2017-12-29 | A kind of pipeline hold-down support bearing 500t axial forces |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207814657U true CN207814657U (en) | 2018-09-04 |
Family
ID=63328563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721905828.7U Active CN207814657U (en) | 2017-12-29 | 2017-12-29 | A kind of pipeline hold-down support bearing 500t axial forces |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207814657U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108087631A (en) * | 2017-12-29 | 2018-05-29 | 中国航天空气动力技术研究院 | A kind of pipeline hold-down support for bearing 500t axial forces |
-
2017
- 2017-12-29 CN CN201721905828.7U patent/CN207814657U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108087631A (en) * | 2017-12-29 | 2018-05-29 | 中国航天空气动力技术研究院 | A kind of pipeline hold-down support for bearing 500t axial forces |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015147681A1 (en) | Movable pipeline-support and support assembly thereof | |
RU2572743C2 (en) | Pipeline movable support and its support unit | |
CN102359683A (en) | Plunger-type double-safety pipeline compensator | |
CN207814657U (en) | A kind of pipeline hold-down support bearing 500t axial forces | |
CN111218998A (en) | Metal and composite material laminated damper | |
CN108087631A (en) | A kind of pipeline hold-down support for bearing 500t axial forces | |
CN201074705Y (en) | Fixed bracket for super high-rise indoor gas vertical type pipe | |
CN106151759B (en) | External pressure lateral type expansion joint | |
CN202182284U (en) | Novel dual-gland precision type pipeline compensator | |
CN108533052B (en) | Adjustable power transmission supporting structure for continuous large deformation area of foundation | |
CN104197099B (en) | Middle pressure-bearing vertical duct integration segmental timbering | |
CN214839193U (en) | Corner supporting structure of pressure pipeline and corner structure of high-drop pressure pipeline | |
CN204825835U (en) | From jacket platform that restores to throne | |
CN202484511U (en) | Plunger type multifunctional pipeline compensator | |
CN113882343A (en) | Upper block connecting device of offshore converter station in butt joint with LMU (local mean square u) | |
CN208997471U (en) | A kind of sliding saddle support | |
CN111650035A (en) | Vertical bending loading test device | |
CN213117722U (en) | Low temperature ball valve bearing support | |
CN104912047A (en) | Self-returning offshore jacket platform and manufacturing method thereof | |
CN206637121U (en) | Sway in both directions support | |
CN205147131U (en) | Anchor clamps are used in quick propelling movement of bellows installation | |
CN216643467U (en) | Novel HDPE double-wall corrugated pipe coupling head | |
CN204083515U (en) | A kind of high/low temperature pipeline extension bearing | |
CN215759595U (en) | Connecting device for steel structural member | |
CN219510293U (en) | Liquid couple spoon pipe clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |