CN207813011U - The self-crawling type electrical lift shaft form of material distributing machine can be carried - Google Patents

The self-crawling type electrical lift shaft form of material distributing machine can be carried Download PDF

Info

Publication number
CN207813011U
CN207813011U CN201820081002.1U CN201820081002U CN207813011U CN 207813011 U CN207813011 U CN 207813011U CN 201820081002 U CN201820081002 U CN 201820081002U CN 207813011 U CN207813011 U CN 207813011U
Authority
CN
China
Prior art keywords
material distributing
girder steel
distributing machine
pawl
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820081002.1U
Other languages
Chinese (zh)
Inventor
陈财欢
李东
常湛成
潘保卫
蒋竞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Dayongcheng Building Technology Development Co Ltd
Original Assignee
Guangzhou Dayongcheng Building Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Dayongcheng Building Technology Development Co Ltd filed Critical Guangzhou Dayongcheng Building Technology Development Co Ltd
Priority to CN201820081002.1U priority Critical patent/CN207813011U/en
Application granted granted Critical
Publication of CN207813011U publication Critical patent/CN207813011U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of self-crawling type electrical lift shaft forms carrying material distributing machine, including the first girder steel, the second girder steel and actuating unit, first girder steel both ends are equipped with the first support portion, second girder steel both ends are equipped with the second support portion, first girder steel is located at immediately below the second girder steel and there is interval between two girder steels, it is fixed with guide rail and frame body on first girder steel, guide rail is slidably matched through the second girder steel and with the formation of the second girder steel, material distributing machine is equipped at the top of frame body, actuating unit is connected with the second girder steel, guide rail respectively.The self-crawling type electrical lift shaft form that material distributing machine can be carried can carry material distributing machine and realize automatic rising, easy for construction without opening up preformed hole in floor and being carried using tower crane, safe to use, improve construction efficiency, reduce construction cost.

Description

The self-crawling type electrical lift shaft form of material distributing machine can be carried
Technical field
The utility model is related to construction equipment fields, and in particular to a kind of self-crawling type elevator carrying material distributing machine Cylinder mould.
Background technology
In the construction of high-rise building elevator shaft, the major part that pours of concrete is applied using concrete spreader Work, with the raising of floor, material distributing machine, which also needs to be transported to corresponding floor, constructs, and conventional way is:In floor plate face The reserved opening for carrying material distributing machine is opened up, is then promoted to corresponding floor position by tower crane and is installed, constructed.
Since this mode needs to open up reserved opening in floor plate face in advance, and tower crane is needed to remove material distributing machine Fortune, therefore bring many drawbacks:Obstacle is caused to construction channel, brings construction inconvenient, and the later stage needs to carry out reserved opening Repairing, it is costly;Occupy the usage time of tower crane, it has not been convenient to;Floor plates face is also easy to produce cracking, brings security risk.
Invention content
The purpose of this utility model is to provide a kind of self-crawling type electrical lift shaft forms carrying material distributing machine, this can carry cloth The self-crawling type electrical lift shaft form of material machine can carry material distributing machine and realize automatic rising, without opening up preformed hole in floor and utilizing tower crane It is carried, it is easy for construction, it is safe to use, construction efficiency is improved, construction cost is reduced.
Its technical solution is as follows:
It can carry the self-crawling type electrical lift shaft form of material distributing machine, including elevator wall, it is detachable in the elevator wall It is connected with the first girder steel and the second girder steel, is fixed with frame body, guide rail and material distributing machine mounting bracket on first girder steel, described second Girder steel is equipped with actuating unit, and the actuating unit is connected with the guide rail, and cylinder mould is lifted on the frame body.
First girder steel both ends are equipped with flexible bracket, offer on the elevator wall and match with the flexible bracket To preformed hole;Second girder steel both ends are equipped with support bracket, and the elevator wall is equipped with and the support bracket phase The support base of pairing.
The cylinder mould includes four pieces of standard forms and back mode device, and four pieces of standard forms pass through described move back between any two Mold device is flexibly connected and forms rectangular closed circular.
The back mode device include the first connecting plate, the second connecting plate and adjusting rod, one piece of standard form with it is described First connecting plate is hinged, and another piece of adjoining standard form is hinged with second connecting plate;Described first connects Fishplate bar and second connecting plate are hinged and form angle, and the adjusting rod is located in the angle and respectively with described first Connecting plate, the second connecting plate are hinged.
The adjusting rod includes drive rod, connecting rod, the first screw rod and the second screw rod, and the drive rod and connecting rod are vertical Setting, first screw rod one end and the threaded one end of the connecting rod coordinate, and the other end is hinged with first connecting plate; The other end screw-thread fit of second screw rod one end and the connecting rod, the other end are hinged with second connecting plate.
The actuating unit includes hydraulic jack, and the hydraulic jack upper end is equipped with the first connector, and lower end is equipped with Second connector;First connector, the second connector are slidably connected with the guide rail, the guide rail vertically on It being evenly arranged with block, is equipped with the first pawl in first connector, second connector is equipped with the second pawl, and described the One pawl is in contact with the block on corresponding position, and second pawl is in contact with the block on corresponding position, First pawl, the second pawl are respectively connected with reversing handle.
The frame body is equipped with chain block, and the cylinder mould is lifted on by the chain block on the frame body.
The frame body is equipped with directive wheel.
The material distributing machine mounting bracket includes material distributing machine standard knot and supporting beam, and multiple material distributing machine standard knots are along vertical side Installation frame body is formed to superposition installation, the supporting beam is located at the bottom of the installation frame body, the installation frame body It is fixed on first girder steel by the supporting beam.
It should be noted that:
Aforementioned " first, second, " does not represent specific quantity and sequence, is only used for the differentiation to title.
The advantages of below to the utility model or principle illustrate:
1, play the role of off-load after the first girder steel, the second girder steel and elevator wall connecting, the cylinder being lifted on frame body Mould is used for the molding of elevator wall, and frame body, guide rail and material distributing machine mounting bracket are fixed on the first girder steel and are collectively formed one It is whole, material distributing machine is installed on to the top of material distributing machine mounting bracket when building;After completing this layer of construction, the first girder steel and elevator are released Then connection between well wall starts actuating unit, supported at this time using the second girder steel as stress, and off-load is provided to be whole, It is specified that actuating unit drives guide rail integrally to be risen to together with the first girder steel, frame body, cylinder mould, material distributing machine mounting bracket and material distributing machine Position;After rising to designated position, by the first girder steel and elevator wall connecting, the second girder steel and elevator wall are then released Between connection, be again started up actuating unit, supported at this time using the first girder steel as stress, off-load is provided for the second girder steel, it is dynamic Force mechanisms drive the second girder steel to rise to designated position, then by the second girder steel and elevator wall connecting, to provide next time Off-load is prepared, and finally carries out cloth, construction to superstructure using material distributing machine, this can carry the self-crawling type electricity of material distributing machine at this time Stair shaft cylinder mould has been returned to original state, and after the completion of waiting for superstructure construction, can move in circles action according to aforesaid operations;This can The automatic rising of material distributing machine realization can be carried by carrying the self-crawling type electrical lift shaft form of material distributing machine, without opening up preformed hole and profit in floor It is carried with tower crane, it is easy for construction, it is safe to use, construction efficiency is improved, construction cost is reduced.
2, after completing this layer of construction, flexible bracket can be detached from from preformed hole by the flexible bracket of contraction, when first When girder steel rises to designated position, flexible bracket, which is put in preformed hole, to be connected to elevator wall by the first girder steel again On, form is simple, convenient to carry out;The support bracket at the second girder steel both ends can be placed on support base, when the second girder steel rises, branch Support bracket can be detached directly with support base, when the second girder steel rises to designated position, in the elevator corresponding to support bracket Upper support seat is installed the second girder steel can be connected with elevator wall on wall, is prepared to provide off-load next time, shape Formula is simple, convenient to carry out.
3, elevator wall molding after, using back mode device drive four pieces of standard form inward movements, realize cylinder mould with The quick separating of elevator, the molding for upper layer elevator wall next time are prepared.
4, after the molding of elevator wall, the first connecting plate and the second connecting plate can be driven toward varus by operating adjusting rod Turn, angle tapers into, and four pieces of standard forms are gradually drawn close inside, realizes the quick separating of cylinder mould and elevator wall.
5, after the molding of elevator wall, rotation of drive rod, drive rod drive connecting rod to be rotated inside simultaneously inside, by Coordinate respectively with the first screw rod, the second screw flight in the both ends of connecting rod, when connecting rod is rotated inside, the first spiral shell Bar, the second screw rod are rotated toward connecting rod medium position, are shunk, then drive the first connecting plate and the second connecting plate inside into Row overturning, angle taper into, and four pieces of standard forms are gradually drawn close inside, to realize quick point of cylinder mould and elevator wall From mode is simple and reliable, convenient to carry out.
6, the first pawl and the second pawl have been debugged using reversing handle:Second pawl is withstood under the block of corresponding position On surface, supporting role is formed to guide rail, and the first pawl is close to the lower surface of the block of corresponding position, hydraulic jack at this time In condensed state;After completing this layer of construction, the connection between the first girder steel and elevator wall is released, at this time with the second girder steel It is supported as stress, provides off-load to be whole, hydraulic jack action extends upwards, and the first connector slides up along guide rail Dynamic, when the first pawl encounters the block of top, the first pawl applies active force to the block, and push rail rises, and works as hydraulic pressure When jack elongation finishes, on the lower surface for the block that the first pawl and the second pawl withstand on corresponding position, guide rail is formed Supporting role, subsequent hydraulic jack retracted downward, the first connector is along guide rail slide downward, when the first pawl encounters lower section Block when, first pawl of block pair apply active force and so that the first pawl is overturn, when hydraulic jack contraction finish When, the first pawl and the second pawl have returned to original state, and hydraulic jack acts again, start same cyclic process, Guide rail is driven integrally gradually to climb together with the first girder steel, frame body, cylinder mould, material distributing machine mounting bracket and material distributing machine, until specified Until position, then by the first girder steel and elevator wall connecting, the automatic climbing of the entirety is completed to this;
After completing whole climb, the first pawl and the second pawl have been debugged using reversing handle:First pawl withstands on phase On the upper surface for answering the block of position, the second girder steel of guide rail pair forms supporting role, and the second pawl leans against on block at this time, liquid Pressure jack is in extended state;The connection between the second girder steel and elevator wall is then released, is made at this time with the first girder steel It is supported for stress, provides off-load for the second girder steel, hydraulic jack action is shunk upwards, and the second connector is upward along guide rail Sliding, while the second girder steel being driven to rise, when hydraulic jack contraction finishes, the first pawl and the second pawl are withstood on accordingly On the upper surface of the block of position, the second girder steel of guide rail pair forms supporting role, and and then hydraulic jack extends upwards, and first Connector is along guide rail upward sliding, and when the first pawl encounters the block of top, which applies active force And the first pawl is made to be overturn, when hydraulic jack elongation finishes, the first pawl and the second pawl withstand on corresponding position Block upper surface on, hydraulic jack acts again, starts same cyclic process, and the second girder steel is driven gradually to climb, Until designated position, then it is to the automatic climbing of this second girder steel of completion by the second girder steel and elevator wall connecting The whole automatic climbing together of guide rail, the first girder steel, frame body, cylinder mould, material distributing machine mounting bracket and material distributing machine carries out offer next time The preparation of off-load;
The self-crawling type electrical lift shaft form that material distributing machine can be carried can carry material distributing machine and realize automatic climbing, without being opened in floor It is easy for construction if preformed hole and being carried using tower crane, it is safe to use, construction efficiency is improved, construction cost is reduced.
7, chain block has the characteristics that simple in structure, safe and reliable, and cylinder mould is lifted on frame body by chain block, Improve stability and the safety of construction.
8, during frame body rises, the directive wheel on frame body can be with the rising of frame body and along in elevator wall Wall scrolls up, and plays the role of guiding and anti-dumping.
9, installation frame body is vertically superimposed installation by multiple material distributing machine standard knots and is formed, and can be convenient in this way to cloth Material machine mounting bracket is dismounted and is transported, while according to actual condition of construction can determine the quantity of material distributing machine standard knot and clever The height of adjustment material distributing machine mounting bracket living, to neatly adjust the construction height of material distributing machine.
Description of the drawings
Fig. 1 be the present embodiment can carry material distributing machine self-crawling type electrical lift shaft form promoted before schematic view of facade structure;
Plan view from above when Fig. 2 is cylinder mould molding state in the present embodiment;
Fig. 3 is plan view from above when cylinder mould moves back mould state in the present embodiment;
Fig. 4 is the status diagram before the promotion of the first girder steel in the present embodiment;
Fig. 5 is that Fig. 4 is close-up schematic view;
Fig. 6 is the status diagram after the promotion of the first girder steel in the present embodiment;
Fig. 7 is the status diagram before the promotion of the second girder steel in the present embodiment;
Fig. 8 is that Fig. 7 is close-up schematic view;
Fig. 9 is the status diagram after the promotion of the second girder steel in the present embodiment;
Figure 10 be the present embodiment can carry material distributing machine self-crawling type electrical lift shaft form promoted after schematic view of facade structure;
Reference sign:
1, the first girder steel, 101, flexible bracket, the 2, second girder steel, 201, support bracket, 3, elevator wall, 4, frame body, 5, material distributing machine mounting bracket, 6, guide rail, 61, block, 7, actuating unit, 71, hydraulic jack, the 701, first pawl, 702, second Pawl, the 711, first connector, the 712, second connector, 8, cylinder mould, 81, standard form, 82, back mode device, 821, first connects Fishplate bar, the 822, second connecting plate, 823, drive rod, 824, connecting rod, the 825, first screw rod, the 826, second screw rod, 9, pull calabash Reed, 10, directive wheel, 11, support base, 12, reversing handle.
Specific implementation mode
The embodiments of the present invention are described in detail below.
As shown in Figure 1, Figure 10 shows, which includes elevator wall 3, described It is removably connected with the first girder steel 1 and the second girder steel 2 in elevator wall 3, frame body 4, guide rail are fixed on first girder steel 1 6 and material distributing machine mounting bracket 5, the material distributing machine mounting bracket 5 includes material distributing machine standard knot and supporting beam, multiple material distributing machine standards Section vertically superposition installs and forms installation frame body, and the supporting beam (not illustrated in figure) is located at the mounting bracket master The bottom of body, the installation frame body are fixed on by the supporting beam on first girder steel;Second girder steel 2 is equipped with Actuating unit 7, the actuating unit 7 are connected with the guide rail 6, and the frame body 4 is equipped with directive wheel 10, on the frame body 4 It is lifted with cylinder mould 8, the frame body 4 is equipped with chain block 9, and the cylinder mould 8 is lifted on the frame body by the chain block 9 On 4;It should be pointed out that in the present embodiment, the supporting beam, the first girder steel 1, the second girder steel 2, guide rail 6, actuating unit 7 It is arranged in pairs.
As shown in figure 4,1 both ends of the first girder steel are equipped with flexible bracket 101, offered on the elevator wall 3 with The preformed hole (not illustrated in figure) that the flexible bracket 101 matches;Second girder steel, 2 both ends are equipped with support bracket 201, The elevator wall 3 is equipped with the support base 11 to match with the support bracket 201.
As shown in Figure 2 and Figure 3, the cylinder mould 8 includes four pieces of standard forms 81 and back mode device 82, four pieces of master dies Plate 81 is flexibly connected by the back mode device 82 and forms rectangular closed circular between any two;The back mode device 82 includes the One connecting plate 821, the second connecting plate 822 and adjusting rod, one piece of template is hinged with first connecting plate 821, another The adjoining template of block is hinged with second connecting plate 822;First connecting plate 821 and second connecting plate 822 are hinged and form angle, and the adjusting rod is located in the angle and respectively with first connecting plate 821, second and connects Fishplate bar 822 is hinged;The adjusting rod includes drive rod 823, connecting rod 824, the first screw rod 825 and the second screw rod 826, described Drive rod 823 and connecting rod 824 are vertically arranged, and described first screw rod, 825 one end and the threaded one end of the connecting rod 824 are matched It closes, the other end is hinged with first connecting plate 821;The other end of described second screw rod 826 one end and the connecting rod 824 Screw-thread fit, the other end are hinged with second connecting plate 822.
As shown in Figure 5, Figure 8, the actuating unit 7 includes hydraulic jack 71, and 71 upper end of the hydraulic jack is equipped with First connector 711, lower end are equipped with the second connector 712;First connector 711, the second connector 712 are led with described Rail 6 is slidably connected, and the guide rail 6 is evenly arranged with block 61 on vertically, first is equipped in first connector 711 Pawl 701, second connector 712 are equipped with the second pawl 702, first pawl 701 and the gear on corresponding position Block 61 is in contact, and second pawl 702 is in contact with the block 61 on corresponding position, first pawl 701, second Pawl 702 is respectively connected with reversing handle 12.
This implementation has the following advantages:
1, in conjunction with Fig. 1 and Figure 10, the first girder steel 1, the second girder steel 2 play the role of off-load after being connect with elevator wall 3, It is lifted on the molding that cylinder mould 8 on frame body 4 is used for elevator wall 3, frame body 4, guide rail 6 and material distributing machine mounting bracket 5 are fixed on the An entirety is collectively formed on one girder steel 1, material distributing machine (not illustrated in figure) is installed on material distributing machine mounting bracket 5 when building Top;After completing this layer of construction, the connection between the first girder steel 1 and elevator wall 3 is released, then starts actuating unit 7, this When supported using the second girder steel 2 as stress, provide off-load to be whole, the drive guide rail 6 of actuating unit 7 is together with the first girder steel 1, frame body 4, cylinder mould 8, material distributing machine mounting bracket 5 and material distributing machine integrally rise to designated position together;After rising to designated position, by the first steel Beam 1 is connect with elevator wall 3, is then released the connection between the second girder steel 2 and elevator wall 3, is again started up engine Structure 7 is supported using the first girder steel 1 as stress at this time, provides off-load for the second girder steel 2, actuating unit 7 drives on the second girder steel 2 It is raised to designated position, then connect the second girder steel 2 with elevator wall 3, prepares to provide off-load next time, finally utilizes Material distributing machine carries out cloth, construction to superstructure, and the self-crawling type electrical lift shaft form 8 that can carry material distributing machine has been returned to just at this time Beginning state, after the completion of waiting for superstructure construction, can move in circles action according to aforesaid operations, it should be pointed out that in this implementation In example, actuating unit 7 is arranged in pairs, this is to the synchronous progress at work of actuating unit 7;This can carry the self-crawling type electricity of material distributing machine Stair shaft cylinder mould 8 can carry material distributing machine and realize automatic rising, without opening up preformed hole in floor and being carried using tower crane, construct It is convenient, it is safe to use, construction efficiency is improved, construction cost is reduced.
2, after completing this layer of construction, flexible bracket 101 can be detached from from preformed hole by shrinking the bracket 101 that stretches, When the first girder steel 1 rises to designated position, flexible bracket 101 is put in preformed hole and can again be connected the first girder steel 1 Onto elevator wall 3, form is simple, convenient to carry out;The support bracket 201 at 2 both ends of the second girder steel can be placed in support base 11 On, when the second girder steel 2 rises, support bracket 201 can be detached directly with support base 11, when the second girder steel 2 rises to designated position When, installation upper support seat 11 can be by the second girder steel 2 and elevator wall on the elevator wall 3 supported corresponding to bracket 201 Body 3 is connected, and prepares to provide off-load next time, form is simple, convenient to carry out.
3, after elevator wall 3 is molded, four pieces of 81 inward movements of standard form is driven using back mode device 82, realize cylinder The quick separating of mould 8 and elevator, the molding for upper layer elevator wall 3 next time are prepared.
4, after elevator wall 3 is molded, the first connecting plate 821 and the second connecting plate 822 can be driven by operating adjusting rod It overturns inside, angle tapers into, and four pieces of standard forms 81 are gradually drawn close inside, and realization cylinder mould 8 is quick with elevator wall 3 Separation.
5, after elevator wall 3 is molded, rotation of drive rod 823, drive rod 823 drive connecting rod 824 inside simultaneously inside Rotated, due to connecting rod 824 both ends respectively with the first screw rod 825,826 screw-thread fit of the second screw rod, when connecting rod 824 When being rotated inside, the first screw rod 825, the second screw rod 826 are rotated toward 824 medium position of connecting rod, are shunk, then band Dynamic first connecting plate 821 and the second connecting plate 822 are overturn inside, and angle tapers into, and four pieces of standard forms 81 are gradually past It inside draws close, to realize the quick separating of cylinder mould 8 and elevator wall 3, mode is simple and reliable, convenient to carry out.
6, in conjunction with Fig. 4 to Fig. 8, the first pawl 701 and the second pawl 702 are debugged using reversing handle 12:Second pawl 702 withstand on the lower surface of block 61 of corresponding position, and supporting role is formed to guide rail 6, and the first pawl 701 is close to phase at this time The lower surface of the block 61 of position, hydraulic jack 71 is answered to be in condensed state;After completing this layer of construction, the first girder steel 1 is released It with the connection between elevator wall 3, is supported at this time using the second girder steel 2 as stress, off-load, hydraulic jack is provided to be whole 71 actions, extend upwards, and the first connector 711 is along 6 upward sliding of guide rail, when the first pawl 701 encounters the block 61 of top When, the first pawl 701 applies active force to the block 61, and push rail 6 rises, when the elongation of hydraulic jack 71 finishes, the One pawl 701 and the second pawl 702 are withstood on the lower surface of block 61 of corresponding position, and supporting role is formed to guide rail 6, with 71 retracted downward of rear jack top, the first connector 711 is along 6 slide downward of guide rail, when the first pawl 701 encounters lower section When block 61, which applies active force to the first pawl 701 and the first pawl 701 is made to overturn, and works as hydraulic jack When 71 contractions finish, the first pawl 701 and the second pawl 702 have returned to original state, and hydraulic jack 71 acts again, opens Begin same cyclic process, drives guide rail 6 whole together with the first girder steel 1, frame body 4, cylinder mould 8, material distributing machine mounting bracket 5 and material distributing machine It gradually climbs together, until designated position, the first girder steel 1 is connect with elevator wall 3 then, the entirety is completed to this Automatic climbing;
After completing whole climb, reversing handle 12 is utilized to debug the first pawl 701 and the second pawl 702:First spine Pawl 701 is withstood on the upper surface of block 61 of corresponding position, and guide rail 6 forms supporting role, and the second spine at this time to the second girder steel 2 Pawl 702 leans against on block 61, and hydraulic jack 71 is in extended state;Then release between the second girder steel 2 and elevator wall 3 Connection, supported at this time using the first girder steel 1 as stress, provide off-load for the second girder steel 2, hydraulic jack 71 acts, upwards It shrinks, the second connector 712 drives the second girder steel 2 to rise along 6 upward sliding of guide rail, when hydraulic jack 71 is shunk When finishing, the first pawl 701 and the second pawl 702 are withstood on the upper surface of block 61 of corresponding position, and guide rail 6 is to the second steel Beam 2 forms supporting role, and and then hydraulic jack 71 extends upwards, the first connector 711 along 6 upward sliding of guide rail, when When first pawl 701 encounters the block 61 of top, which applies active force to the first pawl 701 and makes the first pawl 701 It is overturn, when the elongation of hydraulic jack 71 finishes, the first pawl 701 and the second pawl 702 withstand on the gear of corresponding position On the upper surface of block 61, hydraulic jack 71 acts again, starts same cyclic process, and the second girder steel 2 is driven gradually to climb, Until designated position, then the second girder steel 2 is connect with elevator wall 3, automatic to this second girder steel 2 of completion climbs It rises, for guide rail 6 next time, the first girder steel 1, frame body 4, cylinder mould 8, material distributing machine mounting bracket 5 and material distributing machine entirety climbing automatically together Rise the preparation carried out and off-load is provided;
The self-crawling type electrical lift shaft form 8 that material distributing machine can be carried can carry material distributing machine and realize automatic climbing, without in floor It opens up preformed hole and is carried using tower crane, it is easy for construction, it is safe to use, construction efficiency is improved, construction cost is reduced.
7, chain block 9 has the characteristics that simple in structure, safe and reliable, and cylinder mould 8 is lifted on frame body by chain block 9 On 4, stability and the safety of construction are improved.
8, during frame body 4 rises, the directive wheel 10 on frame body 4 can be with the rising of frame body 4 and along elevator 3 inner wall of wall scrolls up, and plays the role of guiding and anti-dumping.
9, installation frame body is vertically superimposed installation by multiple material distributing machine standard knots and is formed, and can be convenient in this way to cloth Material machine mounting bracket 5 is dismounted and is transported, at the same according to actual condition of construction can determine the quantity of material distributing machine standard knot and The height of material distributing machine mounting bracket 5 is adjusted flexibly, to neatly adjust the construction height of material distributing machine.
The above are only specific embodiments of the present invention, does not limit the scope of protection of the utility model with this;Not Any replacement and improvement made by violating on the basis of the utility model is conceived, belong to the scope of protection of the utility model.

Claims (9)

1. the self-crawling type electrical lift shaft form of material distributing machine can be carried, which is characterized in that including elevator wall, the elevator wall It is inside removably connected with the first girder steel and the second girder steel, frame body, guide rail and material distributing machine mounting bracket are fixed on first girder steel, Second girder steel is equipped with actuating unit, and the actuating unit is connected with the guide rail, and cylinder mould is lifted on the frame body.
2. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in claim 1, which is characterized in that first girder steel two End is equipped with flexible bracket, and the preformed hole to match with the flexible bracket is offered on the elevator wall;Second steel Beam both ends are equipped with support bracket, and the elevator wall is equipped with the support base to match with the support bracket.
3. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in claim 1, which is characterized in that the cylinder mould includes four Block standard form and back mode device, four pieces of standard forms are flexibly connected between any two by the back mode device and the side of being formed Shape closed is cyclic annular.
4. the self-crawling type electrical lift shaft form of material distributing machine can be carried as claimed in claim 3, which is characterized in that the back mode device packet The first connecting plate, the second connecting plate and adjusting rod are included, one piece of standard form is hinged with first connecting plate, another piece The adjoining standard form is hinged with second connecting plate;First connecting plate is mutually cut with scissors with second connecting plate Angle is connect and is formed, the adjusting rod is located in the angle and is hinged respectively with first connecting plate, the second connecting plate.
5. the self-crawling type electrical lift shaft form of material distributing machine can be carried as claimed in claim 4, which is characterized in that the adjusting rod includes Drive rod, connecting rod, the first screw rod and the second screw rod, the drive rod and connecting rod are vertically arranged, first screw rod one end Coordinate with the threaded one end of the connecting rod, the other end is hinged with first connecting plate;Second screw rod one end and institute The other end screw-thread fit of connecting rod is stated, the other end is hinged with second connecting plate.
6. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in any one of claim 1 to 5, which is characterized in that described Actuating unit includes hydraulic jack, and the hydraulic jack upper end is equipped with the first connector, and lower end is equipped with the second connector;Institute State the first connector, the second connector is slidably connected with the guide rail, the guide rail is evenly arranged with gear on vertically Block, is equipped with the first pawl in first connector, and second connector is equipped with the second pawl, first pawl with it is corresponding The block on position is in contact, and second pawl is in contact with the block on corresponding position, first pawl, Second pawl is respectively connected with reversing handle.
7. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in any one of claim 1 to 5, which is characterized in that described Frame body is equipped with chain block, and the cylinder mould is lifted on by the chain block on the frame body.
8. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in any one of claim 1 to 5, which is characterized in that described Frame body is equipped with directive wheel.
9. the self-crawling type electrical lift shaft form of material distributing machine can be carried as described in any one of claim 1 to 5, which is characterized in that described Material distributing machine mounting bracket includes material distributing machine standard knot and supporting beam, multiple material distributing machine standard knots be vertically superimposed installation and Installation frame body is formed, the supporting beam is located at the bottom of the installation frame body, and the installation frame body passes through the support Beam is fixed on first girder steel.
CN201820081002.1U 2018-01-17 2018-01-17 The self-crawling type electrical lift shaft form of material distributing machine can be carried Expired - Fee Related CN207813011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820081002.1U CN207813011U (en) 2018-01-17 2018-01-17 The self-crawling type electrical lift shaft form of material distributing machine can be carried

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820081002.1U CN207813011U (en) 2018-01-17 2018-01-17 The self-crawling type electrical lift shaft form of material distributing machine can be carried

Publications (1)

Publication Number Publication Date
CN207813011U true CN207813011U (en) 2018-09-04

Family

ID=63323751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820081002.1U Expired - Fee Related CN207813011U (en) 2018-01-17 2018-01-17 The self-crawling type electrical lift shaft form of material distributing machine can be carried

Country Status (1)

Country Link
CN (1) CN207813011U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235872A (en) * 2018-11-02 2019-01-18 四川省第六建筑有限公司 Building hoistway form frame system with material distributing machine
CN109763658A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of support device and its construction method for arrangement material distributing machine in elevator
CN110029821A (en) * 2019-04-23 2019-07-19 徐祥 A kind of hoistway climbing type concrete material distributing machine
WO2020142001A1 (en) * 2019-01-04 2020-07-09 Em Services Pte Ltd A moveable platform
CN111877725A (en) * 2020-07-02 2020-11-03 上海建工集团股份有限公司 Horizontal limiting system of integral steel platform formwork and installation method thereof
CN112695996A (en) * 2020-12-25 2021-04-23 中国建筑第二工程局有限公司 Self-climbing device in elevator shaft and construction method thereof
CN112900825A (en) * 2021-01-21 2021-06-04 中建三局四川建筑装备有限公司 Well is from climbing operation platform
CN113738098A (en) * 2021-09-14 2021-12-03 广州达蒙安防科技有限公司 One-way self-locking lifting mechanism for elevator shaft die
CN114105053A (en) * 2021-10-28 2022-03-01 中建三局第一建设工程有限责任公司 Climbing mechanism and material distributor

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235872A (en) * 2018-11-02 2019-01-18 四川省第六建筑有限公司 Building hoistway form frame system with material distributing machine
CN109763658A (en) * 2018-12-24 2019-05-17 中建三局集团有限公司 A kind of support device and its construction method for arrangement material distributing machine in elevator
WO2020142001A1 (en) * 2019-01-04 2020-07-09 Em Services Pte Ltd A moveable platform
CN110029821A (en) * 2019-04-23 2019-07-19 徐祥 A kind of hoistway climbing type concrete material distributing machine
CN111877725A (en) * 2020-07-02 2020-11-03 上海建工集团股份有限公司 Horizontal limiting system of integral steel platform formwork and installation method thereof
CN112695996A (en) * 2020-12-25 2021-04-23 中国建筑第二工程局有限公司 Self-climbing device in elevator shaft and construction method thereof
CN112695996B (en) * 2020-12-25 2022-04-12 中国建筑第二工程局有限公司 Self-climbing device in elevator shaft and construction method thereof
CN112900825A (en) * 2021-01-21 2021-06-04 中建三局四川建筑装备有限公司 Well is from climbing operation platform
CN113738098A (en) * 2021-09-14 2021-12-03 广州达蒙安防科技有限公司 One-way self-locking lifting mechanism for elevator shaft die
CN114105053A (en) * 2021-10-28 2022-03-01 中建三局第一建设工程有限责任公司 Climbing mechanism and material distributor

Similar Documents

Publication Publication Date Title
CN207813011U (en) The self-crawling type electrical lift shaft form of material distributing machine can be carried
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN109267494A (en) A kind of hood type hydraulic climbing formwork system and construction method for cylinder pier construction
CN206680962U (en) Hydraulic self-lifting truss-like cantilever heavy type arch dam template system
CN108868141B (en) Super high-rise building 3D printing device and method
CN109502480A (en) The hoisting that high building turns over
CN105839543A (en) High bridge pier self-lifting outer frame over-form construction technology
CN110805259A (en) Integral steel platform formwork equipment for synchronous construction and construction method
CN107829370B (en) High pier is from climbing liquid press to turn over molds construction technology
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN203269405U (en) Hoisting device for mounting side plates and upright columns of gas cabinet
CN205558786U (en) Hydraulic pressure lift electric power overhaul ladder
CN208122461U (en) The construction equipment of towering structure
CN106744553A (en) Automatically bar lowering or hoisting gear and climbing method are climbed
CN206298323U (en) Automatically bar lowering or hoisting gear is climbed
CN207348480U (en) High-order structural glass erecting device
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN205444867U (en) Novel elevartor shaft is from turning over formula handling frame
CN105715028A (en) Successive lifting device and lifting scaffold with same
CN209413291U (en) A kind of liquid press to turn over molds that climbs certainly
CN218664953U (en) Steel bar truss prefabricated plate lifting device
CN204122656U (en) Portable can the steel stranded wire penetrating adapter cutting chassis of automatic lifting
CN203097281U (en) Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN206667192U (en) Hydraulic self-lifting cantilever heavy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20200117