CN207811124U - It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform - Google Patents

It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform Download PDF

Info

Publication number
CN207811124U
CN207811124U CN201820077061.1U CN201820077061U CN207811124U CN 207811124 U CN207811124 U CN 207811124U CN 201820077061 U CN201820077061 U CN 201820077061U CN 207811124 U CN207811124 U CN 207811124U
Authority
CN
China
Prior art keywords
wall
tower body
tower
supporting table
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820077061.1U
Other languages
Chinese (zh)
Inventor
杜元龙
彭楠
李伟
丁帮俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Pang Yuan Mechanical Engineering Co Ltd
Original Assignee
Jiangsu Pang Yuan Mechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Pang Yuan Mechanical Engineering Co Ltd filed Critical Jiangsu Pang Yuan Mechanical Engineering Co Ltd
Priority to CN201820077061.1U priority Critical patent/CN207811124U/en
Application granted granted Critical
Publication of CN207811124U publication Critical patent/CN207811124U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses be arranged in special steel structure tower on concrete bearing platform to hang foundation platform, including tower body supporting table, the quadrangle of the tower body supporting table bottom outer wall has been bolted load-bearing pillar, and the bottom outer wall of load-bearing pillar has been bolted pedestal, pedestal is rectangular configuration, the bottom of load-bearing pillar side outer wall has been bolted the first end wall bracket, and first the top exterior walls of end wall bracket be bolted the bottom outer wall of tower body supporting table, side outer wall of the load-bearing pillar far from the first end wall bracket has been bolted auxiliary frame, and the top exterior walls of auxiliary frame are welded with mounting disc, the quadrangle of the mounting disc bottom outer wall is provided with threaded securing bores, and threaded securing bores inner wall has been connected through a screw thread fixed spiral pin.The utility model can detect the external applied load of foundation platform in real time when tower crane works, while improve the safety of construction, improve support strength, improve the external applied load ability to bear of foundation platform.

Description

It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform
Technical field
The utility model is related to tower crane base support device technical fields, more particularly to are arranged on concrete bearing platform special Different steel construction tower crane foundation platform.
Background technology
Tower crane is subject to the upper load that arm support drawstring and counter-jib drawstring transmit, and by turning round pylon, turntable, bearing Deng structure member formula tower body structure is directly passed to by turntable.There is truncated cone pillar from a liter tower top, lean forward or hypsokinesis truncated cone column Formula, herringbone posture and diagonal brace posture.Every upper rotary tower crane is both needed to set balance weight, and function is bearing balance weight, to constitute Trimming moment opposite with hoisting moment direction in terms of required effect in design.In addition to balance weight, also often filled in its tail portion If lifting mechanism.Why homostasis weight is placed in counter-jib tail end to lifting mechanism together.
With the expansion of architectural engineering scale and the raising of speed of application, tower crane is high with its lifting altitude, work range is big The features such as, it is had been more and more widely used in construction.Tower crane is the important component of tower crane, tower crane it is steady Qualitative primary factor is exactly tower crane, therefore the design of tower crane is critically important for the smooth construction of an engineering.
The existing special steel structure tower for being arranged in bearing platform, which hangs foundation platform, does not have real-time external applied load detection device, long Time overwork be easy to cause construction accident, damages the service life of equipment.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the concrete that is arranged in proposed is held Special steel structure tower hangs foundation platform on weight platform.
To achieve the goals above, the utility model uses following technical solution:
It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform, including tower body supporting table, the tower body branch The quadrangle of support platform bottom outer wall has been bolted load-bearing pillar, and the bottom outer wall of load-bearing pillar has been bolted bottom Seat, pedestal is rectangular configuration, and the bottom of load-bearing pillar side outer wall has been bolted the first end wall bracket, and the first diagonal brace The top exterior walls of frame are bolted the bottom outer wall of tower body supporting table, side of the load-bearing pillar far from the first end wall bracket Outer wall has been bolted auxiliary frame, and the top exterior walls of auxiliary frame are welded with mounting disc, the mounting disc bottom outer wall Quadrangle is provided with threaded securing bores, and threaded securing bores inner wall has been connected through a screw thread fixed spiral pin, the top exterior walls of mounting disc The bottom outer wall of tower body supporting table is fixed on by fixed spiral pin, the side outer wall of the load-bearing pillar is fixed with warning by screw Case, and the side inner wall of warning box is fixed with alarm by screw, the side outer wall of the warning box is provided with display channel, and aobvious Show that the inner wall of slot is fixed with display screen by screw.
Preferably, four sides of the tower body supporting table top exterior walls are both provided with connecting rod, and the side outer wall of connecting rod It is welded with eight to ten equidistant equally distributed sides and ties up column, while the bottom outer wall for tying up column is welded in outside the top of tower body supporting table Wall.
Preferably, the quadrangle of the tower body supporting table top exterior walls has been bolted support column, and support column Top exterior walls are welded with the auxiliary cushion cap of tower body, and the quadrangle of the auxiliary cushion cap bottom outer wall of tower body is welded with the second end wall bracket, the second diagonal brace The bottom outer wall of frame is welded in the outer wall of support column.
Preferably, the top exterior walls of the tower body supporting table are provided with tower body mounting groove, and tower body mounting groove bottom interior wall Surrounding is welded with equidistant equally distributed eight to ten tower bodies limited post.
Preferably, the alarm and display screen are respectively connected with switch, and switch is connected with controller.
Preferably, the bottom outer wall of the tower body supporting table is provided with mounting hole, and the inner wall of mounting hole is fixed by screw There are pressure sensor, the output end of pressure sensor to be connected with controller by signal wire.
The beneficial effects of the utility model are:
1. by the way that display screen and alarm is arranged, the external applied load of foundation platform can be detected in real time when tower crane works, had Effect avoids working overloadingly for a long time, improves the service life of tower crane cushion cap, while improving the safety of construction;
2. tying up column by the way that the auxiliary cushion cap of tower body and side is arranged, the outer wall in tower body can be facilitated to fix steel wire rope and reinforcing bar, Increase outer support outside tower body, improve support strength, while the first end wall bracket and the second end wall bracket are set, improves basis and holds The external applied load ability to bear of platform.
Description of the drawings
Fig. 1 be the utility model proposes the structure for being arranged in special steel structure tower on concrete bearing platform and hanging foundation platform Schematic diagram;
Fig. 2 be the utility model proposes the top for being arranged in special steel structure tower on concrete bearing platform and hanging foundation platform Overlooking structure diagram.
In figure:1 tower body supporting table, 2 first end wall brackets, 3 display screens, 4 pedestals, 5 load-bearing pillars, 6 mounting discs, 7 auxiliary frames, 8 Column, the auxiliary cushion cap of 13 tower bodies, 14 support columns, 15 tower bodies peace are tied up in alarm, 9 warning boxes, 10 connecting rods, 11 second end wall brackets, 12 sides Tankage, 16 tower body limited posts.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-2, it is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform, including tower body supporting table 1, The quadrangle of 1 bottom outer wall of tower body supporting table has been bolted load-bearing pillar 5, and the bottom outer wall of load-bearing pillar 5 passes through bolt It is fixed with pedestal 4, pedestal 4 is rectangular configuration, and the bottom of 5 side outer wall of load-bearing pillar has been bolted the first end wall bracket 2, and The top exterior walls of first end wall bracket 2 are bolted the bottom outer wall of tower body supporting table 1, and load-bearing pillar 5 is far from the first diagonal brace The side outer wall of frame 2 has been bolted auxiliary frame 7, and the top exterior walls of auxiliary frame 7 are welded with mounting disc 6,6 bottom of mounting disc The quadrangle of portion's outer wall is provided with threaded securing bores, and threaded securing bores inner wall has been connected through a screw thread fixed spiral pin, mounting disc 6 Top exterior walls are fixed on the bottom outer wall of tower body supporting table 1 by fixed spiral pin, and the side outer wall of load-bearing pillar 5 is fixed by screw There is warning box 9, and the side inner wall of warning box 9 is fixed with alarm 8 by screw, the side outer wall of warning box 9 is provided with display Slot, and the inner wall of display channel is fixed with display screen 3 by screw.
In the utility model, four sides of 1 top exterior walls of tower body supporting table are both provided with connecting rod 10, and the one of connecting rod 10 Side outer wall is welded with eight to ten equidistant equally distributed sides and ties up column 12, while the bottom outer wall for tying up column 12 is welded in tower body support The top exterior walls of platform 1, the quadrangles of 1 top exterior walls of tower body supporting table have been bolted support column 14, and support column 14 Top exterior walls are welded with the auxiliary cushion cap 13 of tower body, and the quadrangle of auxiliary 13 bottom outer wall of cushion cap of tower body is welded with the second end wall bracket 11, the The bottom outer wall of two end wall brackets 11 is welded in the outer wall of support column 14, and the top exterior walls of tower body supporting table 1 are provided with tower body mounting groove 15, and the surrounding of 15 bottom interior wall of tower body mounting groove is welded with equidistant equally distributed eight to ten tower bodies limited post 16, Alarm 8 and display screen 3 are respectively connected with switch, and switch is connected with controller, and the bottom outer wall of tower body supporting table 1 is provided with installation Hole, and the inner wall of mounting hole is fixed with pressure sensor by screw, the output end of pressure sensor passes through signal wire and control Device is connected, the model DATA-7311 of controller.
Operation principle:Pedestal 4 is fixed on concrete bearing platform, the tower of special steel construction is placed in tower body mounting groove 15 It hangs, the tower body of tower crane is fixed on tower body limited post 16 by bolt, and pass through the waist and tower body of reinforcing bar and iron wire tower body Auxiliary cushion cap 13 is fixed together, while tie up column 12 completed together with tower body bondage by steel wire rope special steel construction tower crane it is solid It is fixed.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. being arranged in special steel structure tower on concrete bearing platform hangs foundation platform, including tower body supporting table(1), feature exists In the tower body supporting table(1)The quadrangle of bottom outer wall has been bolted load-bearing pillar(5), and load-bearing pillar(5)Bottom Outer wall has been bolted pedestal(4), pedestal(4)For rectangular configuration, the load-bearing pillar(5)The bottom of side outer wall passes through spiral shell Bolt is fixed with the first end wall bracket(2), and the first end wall bracket(2)Top exterior walls be bolted tower body supporting table(1)'s Bottom outer wall, the load-bearing pillar(5)Far from the first end wall bracket(2)Side outer wall be bolted auxiliary frame(7), and it is auxiliary Help frame(7)Top exterior walls be welded with mounting disc(6), the mounting disc(6)The quadrangle of bottom outer wall is provided with threaded securing bores, And threaded securing bores inner wall has been connected through a screw thread fixed spiral pin, mounting disc(6)Top exterior walls be fixed on by fixed spiral pin Tower body supporting table(1)Bottom outer wall, the load-bearing pillar(5)Side outer wall warning box is fixed with by screw(9), and warn Case(9)Side inner wall alarm is fixed with by screw(8), the warning box(9)Side outer wall be provided with display channel, and it is aobvious Show that the inner wall of slot is fixed with display screen by screw(3).
It is arranged in special steel structure tower on concrete bearing platform 2. according to claim 1 and hangs foundation platform, feature exists In the tower body supporting table(1)Four sides of top exterior walls are both provided with connecting rod(10), and connecting rod(10)The weldering of side outer wall It is connected to eight to ten equidistant equally distributed sides and ties up column(12), while tying up column(12)Bottom outer wall be welded in tower body supporting table (1)Top exterior walls.
It is arranged in special steel structure tower on concrete bearing platform 3. according to claim 1 and hangs foundation platform, feature exists In the tower body supporting table(1)The quadrangle of top exterior walls has been bolted support column(14), and support column(14)Top Portion's outer wall is welded with the auxiliary cushion cap of tower body(13), the auxiliary cushion cap of tower body(13)The quadrangle of bottom outer wall is welded with the second end wall bracket (11), the second end wall bracket(11)Bottom outer wall be welded in support column(14)Outer wall.
It is arranged in special steel structure tower on concrete bearing platform 4. according to claim 1 and hangs foundation platform, feature exists In the tower body supporting table(1)Top exterior walls be provided with tower body mounting groove(15), and tower body mounting groove(15)The four of bottom interior wall Zhou Jun is welded with equidistant equally distributed eight to ten tower bodies limited post(16).
It is arranged in special steel structure tower on concrete bearing platform 5. according to claim 1 and hangs foundation platform, feature exists In the alarm(8)And display screen(3)It is respectively connected with switch, and switch is connected with controller.
It is arranged in special steel structure tower on concrete bearing platform 6. according to claim 1 and hangs foundation platform, feature exists In the tower body supporting table(1)Bottom outer wall be provided with mounting hole, and the inner wall of mounting hole is fixed with pressure sensing by screw The output end of device, pressure sensor is connected by signal wire with controller.
CN201820077061.1U 2018-01-17 2018-01-17 It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform Expired - Fee Related CN207811124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820077061.1U CN207811124U (en) 2018-01-17 2018-01-17 It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820077061.1U CN207811124U (en) 2018-01-17 2018-01-17 It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform

Publications (1)

Publication Number Publication Date
CN207811124U true CN207811124U (en) 2018-09-04

Family

ID=63326099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820077061.1U Expired - Fee Related CN207811124U (en) 2018-01-17 2018-01-17 It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform

Country Status (1)

Country Link
CN (1) CN207811124U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112242A (en) * 2020-09-17 2020-12-22 安徽林海园林绿化股份有限公司 Roadbed structure based on rainwater storage and regulation system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112242A (en) * 2020-09-17 2020-12-22 安徽林海园林绿化股份有限公司 Roadbed structure based on rainwater storage and regulation system and construction method thereof

Similar Documents

Publication Publication Date Title
CN207160539U (en) A kind of easy-to-dismount overhanging scaffold of high-mechanic
CN205189392U (en) Lift scaffold is adhered to to guide bracket formula
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN207811124U (en) It is arranged in special steel structure tower on concrete bearing platform and hangs foundation platform
CN107055340B (en) A kind of gantry crane that can detect the born weight of supporting rack
CN205892588U (en) Hoisting equipment
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN215055170U (en) Hanging basket system
CN206942333U (en) A kind of building construction enclosing
CN207513134U (en) A kind of construction stent being easily installed
CN216552983U (en) Novel hanging basket hanging mechanism
CN105236240A (en) Guide frame climbing type work platform
CN101985855B (en) Novel intelligent external wall lifting scaffold
CN206174438U (en) Prevent construction platform that inclines
KR200431439Y1 (en) Apparatus for enforcing vessel crane
JPH038707Y2 (en)
CN208361734U (en) A kind of tower crane operation monitoring system
CN208571526U (en) GIS bus installs carrying platform
CN106768216A (en) Container bare weight case automatic detection alarm device
CN209618738U (en) The light and small vertical auxiliary stand of heavy-duty hoisting equipment
US20100005751A1 (en) Substructure for a construction that is self-supporting without the substructure and use of the substructure
CN207245143U (en) A kind of fixation elevating mechanism painted for external wall of house
CN207608242U (en) Crane anti-rollover system
CN105818942A (en) Radar mast signal lamp with telescopic function and working method of radar mast signal lamp
CN2384929Y (en) Self-raising gantry crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20200117

CF01 Termination of patent right due to non-payment of annual fee