CN207802189U - Discharging platform monitoring system for building - Google Patents

Discharging platform monitoring system for building Download PDF

Info

Publication number
CN207802189U
CN207802189U CN201820090007.0U CN201820090007U CN207802189U CN 207802189 U CN207802189 U CN 207802189U CN 201820090007 U CN201820090007 U CN 201820090007U CN 207802189 U CN207802189 U CN 207802189U
Authority
CN
China
Prior art keywords
processing
digital sampling
discharging platform
network
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820090007.0U
Other languages
Chinese (zh)
Inventor
杨绍伟
赵海军
李光如
丁小虎
薛海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Lihang Electrical Science & Technology Co Ltd
Original Assignee
Changzhou Lihang Electrical Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Lihang Electrical Science & Technology Co Ltd filed Critical Changzhou Lihang Electrical Science & Technology Co Ltd
Priority to CN201820090007.0U priority Critical patent/CN207802189U/en
Application granted granted Critical
Publication of CN207802189U publication Critical patent/CN207802189U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a kind of discharging platform monitoring systems for building, including weight sensor, digital sampling and processing, wireless data transfer module, buzzer and solar energy warning lamp, network cameras, battery pack and battery management module, the weight sensor is connected with the digital sampling and processing, the battery pack is connected with battery management module, the battery management module is connected with the digital sampling and processing, the buzzer and solar energy warning lamp, network cameras, wireless data transfer module is connected with the digital sampling and processing respectively, the wireless data transfer module is connected by network with the network platform.The utility model is efficiently solved using information-based detection regulatory measure and needs to solve discharging platform overload problems by statistical, field worker can be allowed to accelerate construction progress, improved operating efficiency.

Description

Discharging platform monitoring system for building
Technical field
The utility model is related to a kind of monitoring system more particularly to a kind of discharging platform monitoring systems for building.
Background technology
Recently as the high speed development of construction industry, discharging platform is extensive during construction " transfer, discharging " Using.Discharging platform is that various provisional operation consoles and crosshead are often set up in construction site, is generally used for the turnover of material.It unloads It is a variety of that material platform is divided into mobile discharging platform, console mode discharging platform, overhanging type discharging platform.Discharging platform generally uses slot Steel makes, and width is 2.5 meters, and length is 6.5 meters, upper boarding, draws anchor using steel wire rope, is taken in structure in structure connecting place Hole of boxing out is given on top plate, is attached thereto using wire line hitch.
Since equipment is simple, when worker's use, stacks material directly up, and material is deposited into certain amount, and passing through tower crane will Material is hung away;The material either to be come by tower crane allocation and transportation, which is put on discharging platform, to be run in floor.In use, on building site It is used for illustrating the bearing capacity of discharging platform by the way of listed.
At the construction field (site), worker is to accelerate speed of working, and whether majority is overloaded using discharging platform from the point of view of by the way of estimating, See that volume of material almost fills discharging platform and just stops filling thing, there are unwitting security risks when overload, seriously overload Even there is material platform overthrow accident.Discharging platform is in construction site, and quantity is more, and administrative staff cannot have found to overload in time Problem is supervised difficult problem and is also occurred along with the application of discharging platform.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of for building unload the problems of for prior art Expect platform monitoring system.
Technical solution used by the utility model technical problem:A kind of discharging platform monitoring system for building, including
Weight sensor, the weight for collecting discharging platform;
Digital sampling and processing, for sensor signal processing, data processing;
Wireless data transfer module, for connecting the network platform;
Buzzer and solar energy warning lamp are used for warning output;
Network cameras is used for surveillance video;
Battery pack and battery management module are used for system power supply;
The weight sensor is connected with the digital sampling and processing, the battery pack and battery management module phase Even, the battery management module is connected with the digital sampling and processing, the buzzer and solar energy warning lamp, network phase Machine, wireless data transfer module are connected with the digital sampling and processing respectively, and the wireless data transfer module passes through net Network is connected with the network platform.
Further, it there are two the weight sensor is set, is separately mounted on the force mechanism of discharging platform both sides.
The utility model has the beneficial effects that:
1, the utility model is efficiently solved using information-based detection regulatory measure and is needed to unload by statistical solution Expect platform overload problems, field worker can be allowed to accelerate construction progress, improve operating efficiency, is at the first time when operation Worker provides platform load reference data, and sound-light alarm informs that worker's platform overloads at the first time, stops stacking material, overload When short message, wechat notify administrative staff, provide management tool for administrative staff, prevent malicious operation behavior in time;
2, using battery powered, the problem of avoiding temporary electricity pulling electric wire on building site, without considering that Electrical Safety is asked Topic.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
In order to make the content of the utility model be easier to be clearly understood, below according to specific embodiment and combine attached Figure, is described in further detail the utility model.
It is flat to be located at discharging for a kind of discharging platform monitoring system for building as shown in Figure 1, including two weight sensors 1 On the force mechanism of platform both sides, the weight for collecting discharging platform;Digital sampling and processing 2, at sensor signal Reason, data processing;Wireless data transfer module 3, for connecting the network platform 4;Buzzer and solar energy warning lamp 5, for alarming Output;Network cameras 6 is used for surveillance video;Battery pack 7 and battery management module 8 are used for system power supply;The weight Sensor 1 is connected with the digital sampling and processing 2, and the battery pack 7 is connected with battery management module 8, the cell tube Reason module 8 is connected with the digital sampling and processing 2, the buzzer and solar energy warning lamp 5, network cameras 6, wireless data Transmission module 3 is connected with the digital sampling and processing 2 respectively, and the wireless data transfer module 3 passes through network and network Platform 4 is connected.
The operation principle of the utility model is as follows:
Weight sensor 1 acquires the stress data of discharging platform both sides respectively;Digital sampling and processing 2 is passed by weight Sensor 1 acquires the load data of discharging platform, compares by operation, with the setting that is stored in digital sampling and processing 2 Parameter is compared;When there is early warning to occur, digital sampling and processing 2 triggers network cameras 6 and starts beginning video record, and Storage;When alarm condition occurs, digital sampling and processing 2 sends out sound by buzzer, solar energy warning lamp 5 to Field Force Light alarm while triggering network cameras 6 take pictures, digital sampling and processing 2 by wireless data transfer module 3 by data, regard Frequency and photo are transmitted to the network platform 4.Battery pack 7 provides working power for whole system, and power management module 8 is for managing The power consumption state of system, it is ensured that electricity is sufficient when system works, and detection battery capacity, electricity are relatively low not in real time for power management module 8 When can meet darg, power management module 8 informs battery status information to digital sampling and processing 2, data acquisition Battery alarm information is passed to the network platform 4 by processing module 2 by wireless data transfer module 3.The network platform 4 is for managing Personal management equipment, the message such as discharging platform is alarmed, electricity is low are pushed to administrative staff by short message, wechat, convenient timely Recognize discharging platform situation, while administrative staff can transfer warning message and video by platform, convenient trace afterwards falls Real responsibility.
Particular embodiments described above has carried out into one the purpose of this utility model, technical solution and advantageous effect Step is described in detail, it should be understood that the foregoing is merely specific embodiment of the utility model, is not limited to this Utility model, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done should all wrap Containing being within the protection scope of the utility model.

Claims (2)

1. a kind of discharging platform monitoring system for building, it is characterised in that:Including:
Weight sensor, the weight for collecting discharging platform;
Digital sampling and processing, for sensor signal processing, data processing;
Wireless data transfer module, for connecting the network platform;
Buzzer and solar energy warning lamp are used for warning output;
Network cameras is used for surveillance video;
Battery pack and battery management module are used for system power supply;
The weight sensor is connected with the digital sampling and processing, and the battery pack is connected with battery management module, institute Battery management module is stated with the digital sampling and processing to be connected, it is the buzzer and solar energy warning lamp, network cameras, wireless Data transmission module is connected with the digital sampling and processing respectively, and the wireless data transfer module passes through network and network Platform is connected.
2. discharging platform monitoring system for building according to claim 1, it is characterised in that:The weight sensor is equipped with It two, is separately mounted on the force mechanism of discharging platform both sides.
CN201820090007.0U 2018-01-19 2018-01-19 Discharging platform monitoring system for building Expired - Fee Related CN207802189U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820090007.0U CN207802189U (en) 2018-01-19 2018-01-19 Discharging platform monitoring system for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820090007.0U CN207802189U (en) 2018-01-19 2018-01-19 Discharging platform monitoring system for building

Publications (1)

Publication Number Publication Date
CN207802189U true CN207802189U (en) 2018-08-31

Family

ID=63272658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820090007.0U Expired - Fee Related CN207802189U (en) 2018-01-19 2018-01-19 Discharging platform monitoring system for building

Country Status (1)

Country Link
CN (1) CN207802189U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111726066A (en) * 2020-07-30 2020-09-29 赣州德业电子科技有限公司 Adjustable solar power supply board protector for discharging platform safety monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111726066A (en) * 2020-07-30 2020-09-29 赣州德业电子科技有限公司 Adjustable solar power supply board protector for discharging platform safety monitoring system
CN111726066B (en) * 2020-07-30 2021-04-23 赣州德业电子科技有限公司 Adjustable solar power supply board protector for discharging platform safety monitoring system

Similar Documents

Publication Publication Date Title
CN201118280Y (en) Low-voltage electric network automatic monitoring system
CN202605566U (en) Monitoring device for using states of safety rope
CN201873469U (en) Safety control device for tower crane
CN202609720U (en) Mine hoist steel wire rope tension-monitoring device
CN101211470A (en) Mining manufacture safety management system and method
CN101670987B (en) Crane safe operation electronic monitoring networking system
CN210981351U (en) Wireless monitoring system of railway bridge girder erection machine based on DTU
CN103274303B (en) Control method for hoisting machinery safety monitoring and management system
CN106241631A (en) Tower crane Hoisting Security control system
CN207802189U (en) Discharging platform monitoring system for building
CN202657850U (en) Safety monitoring management system of crane
CN108271136A (en) Geotechnical engineering safety intelligent monitor system
CN201834683U (en) Weighing system of ship unloader
CN105215304B (en) A kind of conticaster integrated alarm platform
CN109916376A (en) A kind of Iron tower incline monitoring method based on Big Dipper short message communication
CN209821340U (en) Distribution lines fault monitoring equipment and system
CN108128704A (en) A kind of security monitoring management system for tower crane with improper power down function
CN203691539U (en) Field portable type all-wireless security monitoring machine
CN102842155A (en) Safety monitoring system for large-size hoisting machinery
CN203204439U (en) Wireless monitoring device for safety of tower erection
CN211569932U (en) Tower crane safety monitoring system using 5G technology
CN202808204U (en) Safety monitoring system for large hoisting machinery
CN107578219A (en) A kind of novel intelligent financial management system
CN104925609A (en) Elevator accelerated speed detection apparatus and system
CN201553568U (en) Crane safe operation electronic monitoring networking system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831