CN207794750U - Roofing signal tower - Google Patents

Roofing signal tower Download PDF

Info

Publication number
CN207794750U
CN207794750U CN201721889569.3U CN201721889569U CN207794750U CN 207794750 U CN207794750 U CN 207794750U CN 201721889569 U CN201721889569 U CN 201721889569U CN 207794750 U CN207794750 U CN 207794750U
Authority
CN
China
Prior art keywords
pedestal
roofing
pillar
guide rail
signal tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721889569.3U
Other languages
Chinese (zh)
Inventor
姜桂凤
李怡苓
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Halo Telecom Ltd By Share Ltd
Original Assignee
Beijing Halo Telecom Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Halo Telecom Ltd By Share Ltd filed Critical Beijing Halo Telecom Ltd By Share Ltd
Priority to CN201721889569.3U priority Critical patent/CN207794750U/en
Application granted granted Critical
Publication of CN207794750U publication Critical patent/CN207794750U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of roofing signal towers, its key points of the technical solution are that including pedestal and the pillar being fixedly connected with pedestal, signal lever is fixed on pillar, and multiple guide rails for increasing the strip of pedestal weight are connected with around the pedestal.The utility model solves the problems, such as to need to punch in roofing installation signal tower at present to lead to the reduction of top layer water resistance.

Description

Roofing signal tower
Technical field
The utility model is related to communications facility technical fields, more specifically, it is related to a kind of roofing signal tower.
Background technology
In the process of construction of city mobile communication base station, since expropriation of land difficulty is big, multiselect location is built a station on built house, therefore It need to consider to build simple tower mast in built house roofing to install communication antenna.
The connection structures such as the newly-increased communication shaft tower generally use expansion bolt in roof are solid by communication antenna bracket (communication shaft tower) Roof waterproof layer can be destroyed although such mode can realize the setting and positioning of communication shaft tower due to roof construction layer, is easily caused The unfavorable phenomenon such as house leak.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of roofing signal tower, do not destroy Roof waterproof layer can be configured.
To achieve the above object, the utility model provides following technical solution:A kind of roofing signal tower, including pedestal and The pillar being fixedly connected with pedestal is fixed with signal lever on pillar, is connected with around the pedestal multiple for increasing pedestal weight The guide rail of the strip of amount.
By using above-mentioned technical proposal, pedestal is placed on roofing, mounting column and signal lever, and around pedestal Guide rail is connected, guide rail increases the counterweight of pedestal, improves the stability of pedestal.In addition, guide rail increases between pedestal and roofing Contact area, further pedestal stability, then pillar mounted thereto is more firm, is not easy to topple over.Due to not having to destroy room Face keeps the good waterproof effect of roofing.
The utility model is further arranged to:The pedestal is detachably connected with pillar, and the pillar and signal lever are removable Unload connection.
By using above-mentioned technical proposal, each component of signal tower detachably assembles, and is conducive to mobile and transports.
The utility model is further arranged to:The pedestal is detachably connected with guide rail.
By using above-mentioned technical proposal, pedestal is detached with guide rail when transport, is reduced occupied space, is readily transported.It uses When guide rail is connect with pedestal, increase floor space improve stability.
The utility model is further arranged to:Pedestal corresponding rails both sides are equipped with otic placode, and otic placode is equipped with via, leads Rail corresponded to hole site and is equipped with perforation, and axis pin is equipped in perforation, and axis pin end thread is connected with nut, and rail end is supported the bottom of to Seat side wall.
By using above-mentioned technical proposal, guide rail is simple with base connector, easy for assemble or unload.Rail end is supported extremely Base side wall, such guide rail will not be rotated by when external force around axis pin, improve fastness.
The utility model is further arranged to:The drawstring of tensioning is equipped between the pillar and guide rail.
By using above-mentioned technical proposal, drawstring provides pulling force to pillar so that pillar is not easy to tilt, and it is firm to improve pillar Property.
The utility model is further arranged to:Fixation kit, the sliding of fixation kit opposite rail are connected on the guide rail Or it is fixed, one end of drawstring is fixed on pillar, and the other end of drawstring is fixedly connected with fixation kit.
By using above-mentioned technical proposal, first drawstring is connected on fixation kit in a relaxed state when installation, then Mobile fixation kit makes it be slid to far from pedestal one end along guide rail, and drawstring is gradually tightened, fixation kit is fixed.Compared to straight Fixed pulling rope operation under drawstring tensioning state is connected on to be easier.
The utility model is further arranged to:The rail crown is provided along its length raised line, the cross section of raised line Shape with a narrow upper and lower width, the fixation kit include along raised line Relative sliding sliding block and be arranged on sliding block for by its with The fixed fixing piece of guide rail, drawstring are connect with fixing piece.
By using above-mentioned technical proposal, raised line is wide at the top and narrow at the bottom, and limitation sliding block is detached from from guide rail.Make when sliding block is moved to After obtaining drawstring tension position, it is fixed with fixing piece.
The utility model is further arranged to:The one end of the raised line far from pedestal is equipped with rack.
By using above-mentioned technical proposal, sliding block be moved to after suitable position fixing piece end can be supported to rack it Between, anti-limited slip block causes to relax under drawstring pulling force effect to pillar sliding.
The utility model is further arranged to:The sliding block is lead.
By using above-mentioned technical proposal, lead increases guide rail weight, further increases pedestal stability.
The utility model is further arranged to:The top of the signal lever is equipped with lightning rod.
By using above-mentioned technical proposal, lightning rod reduces signal lever by the possibility of broken by lightning, improves service life.
In conclusion the utility model has the advantages that compared with the prior art:
1. signal tower does not destroy roof waterproof layer when being installed on roofing, the good waterproof effect of top layer is kept;
2. each component of signal tower is detachably connected, occupy little space after dismounting, convenience in transport;
3. signal tower and roofing contact area are big, bottom heaviness is big, improves signal tower stability, is not easy to be fallen by wind.
Description of the drawings
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is to show guide rail and pedestal and the explosive view of fixation kit structure;
Fig. 3 be show pillar and pedestal and guide rail connection relation in Fig. 1 A-A to sectional view.
In figure:1, pedestal;11, otic placode;12, axis pin;2, guide rail;21, raised line;211, rack;22, it perforates;3, pillar; 31, lower flange;32, upper flange;33, link;4, signal lever;41, connecting flange;42, gusset;5, lightning rod;6, fixation kit; 61, sliding block;611, sliding slot;612, threaded hole;62, fixing piece;621, retaining ring;7, drawstring.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
Wherein identical parts are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing 1, word " bottom surface " and " top surface ", "inner" and "outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment:A kind of roofing signal tower is uniformly provided in 1 side of pedestal along week multiple as shown in Figure 1, including pedestal 1 Guide rail 2, the top of pedestal 1 are vertically fixed pillar 3, and guide rail 2 is equipped with fixation kit 6, pillar 3 by drawstring 7 respectively with it is each Fixation kit 6 connects, and signal lever 4 is coaxially fixed on pillar 3, and the top of signal lever 4 is fixed with lightning rod 5, and guide rail 2 increases The connection area of pedestal 1 and roofing so that pillar 3 is more firm, without anchor bolt is arranged on roofing, keeps roofing good Waterproof effect.
With reference to figure 2, pedestal 1 is in disk form, it is preferable to use stainless steel makes, and corrosion resistant and is unlikely to deform.1 side wall edge of pedestal It is equipped with multipair otic placode 11 week, each pair of otic placode 11 corresponds to a guide rail 2, formed between each pair of otic placode 11 for accommodating 2 end of guide rail Fluting.Otic placode 11 is preferably three pairs and is uniformly distributed, and otic placode 11 is equipped with via.
With reference to figure 2, guide rail 2 is elongated plates, it is preferable to use stainless steel makes.It is equipped with perforation in the one end side of guide rail 2 22, attaching nut is connected and fixed after guide rail 2 passes through via and perforation 22 on otic placode 11 with pedestal 1 by axis pin 12.Guide rail 2 End support on 1 side wall of pedestal.
It is integrally formed with raised line 21 along its length in 2 top surface of guide rail, the cross section of raised line 21 is trapezoidal, or presents Small other shapes under big.It is equipped with rack 211 in the one end of 21 top surface of raised line far from perforation 22.
With reference to figure 2, pillar 3 is cylindrical, can also be other shapes such as prism.Aluminium alloy making may be used in pillar 3, With higher intensity and light weight.The bottom end of pillar 3 is equipped with lower flange 31, lower flange 31 and 1 company of being bolted of pedestal It connects, gusset is installed between pillar 3 and lower flange 31.The top of pillar 3 is equipped with upper flange 32, between pillar 3 and upper flange 32 It is installed with gusset.Pillar 3 is equipped with multiple links 33 close to 32 one end side wall of upper flange, and link 33 is corresponded with guide rail 2.
With reference to figure 2, signal lever 4 is used to install the antenna for receiving or emitting signal, and the bottom end of signal lever 4 is equipped with connecting flange 41, gusset 42, signal lever 4 and 3 flanged joint of pillar are installed between signal lever 4 and connecting flange 41.
Lightning rod 5 is connect with ground by conductive iron wire, avoids signal lever 4 by broken by lightning.
Referring to figs. 2 and 3, fixation kit 6 includes sliding block 61 and fixing piece 62, and the bottom of sliding block 61 is equipped with takes turns with raised line 21 The adaptable sliding slot 611 of exterior feature, 611 top of sliding slot are spaced a distance with raised line 21.It is equipped with the spiral shell of penetrability in 61 top surface of sliding block Pit 612, threaded hole 612 are connected to sliding slot 611.Sliding block 61 can be the larger lead of density, further increase the weight of guide rail 2 Amount.
Fixing piece 62 passes through threaded hole 612 and is threadedly coupled with it, and the bottom end of fixing piece 62 is supported to the tooth socket of rack 211 It is interior.The top of fixing piece 62 is rotatably connected to retaining ring 621.
One end of drawstring 7 is fixed on the link 33 of pillar 3, and the other end is fixed on retaining ring 621.Drawstring 7 can be steel There is higher intensity to be not easy to break for cord or nylon rope, improve service life.
The installation method of the roofing signal tower is as follows:
Pedestal 1 is placed on roofing, then three guide rails 2 respectively by axis pin 12 be fixed on pedestal 1 otic placode 11 it Between.Sliding block 61 is slid onto 211 position of rack along raised line 21 from the end of guide rail 2, fixing piece 62 is threaded in sliding block On 61.
Pillar 3 is fixed on by screw on pedestal 1 vertically, then signal lever 4 is fixed on pillar 3.Then drawstring 7 One end be fixed on link 33, the other end passes through retaining ring 621 and is solid.Mobile sliding block 61 makes drawstring 7 be in tensioned state, Rotational fixture 62 is so that its end is supported to rack 211.
It is arranged and increases the weight of pedestal 1 since guide rail 2 is triangular in shape, improves the stability of pedestal 1, branch thereon Column 3 is not easy to topple over.Pedestal 1 does not have to anchor pole with roofing or screw rivets, and will not destroy roof waterproof layer, maintain roofing good Waterproof effect.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (10)

1. a kind of roofing signal tower, including pedestal (1) and the pillar (3) that is fixedly connected with pedestal (1), pillar are fixed on (3) Signal lever (4), it is characterised in that:It is connected with around the pedestal (1) multiple for increasing leading for the strip of pedestal (1) weight Rail (2).
2. roofing signal tower according to claim 1, it is characterised in that:The pedestal (1) detachably connects with pillar (3) It connects, the pillar (3) is detachably connected with signal lever (4).
3. roofing signal tower according to claim 2, it is characterised in that:The pedestal (1) detachably connects with guide rail (2) It connects.
4. roofing signal tower according to claim 3, it is characterised in that:Pedestal (1) corresponding rails (2) both sides are equipped with Otic placode (11), otic placode (11) are equipped with via, and guide rail (2) corresponded to hole site and is equipped with perforation (22), and was equipped in perforation (22) Axis pin (12), axis pin (12) end thread are connected with nut, and guide rail (2) end is supported to pedestal (1) side wall.
5. roofing signal tower according to claim 1, it is characterised in that:It is equipped with and opens between the pillar (3) and guide rail (2) Tight drawstring (7).
6. roofing signal tower according to claim 5, it is characterised in that:It is connected with fixation kit on the guide rail (2) (6), fixation kit (6) opposite rail (2) sliding or fixed, one end of drawstring (7) are fixed on pillar (3), drawstring (7) it is another One end is fixedly connected with fixation kit (6).
7. roofing signal tower according to claim 6, it is characterised in that:It is set along its length at the top of the guide rail (2) It includes opposite along raised line (21) to have raised line (21), the cross section shape with a narrow upper and lower width of raised line (21), the fixation kit (6) The sliding block (61) of sliding and be arranged on sliding block (61) for by itself and guide rail (2) fixed fixing piece (62), drawstring (7) with it is solid Determine part (62) connection.
8. roofing signal tower according to claim 7, it is characterised in that:The one end of the raised line (21) far from pedestal (1) Equipped with rack (211).
9. roofing signal tower according to claim 8, it is characterised in that:The sliding block (61) is lead.
10. roofing signal tower according to claim 1, it is characterised in that:The top of the signal lever (4) is equipped with lightning rod (5)。
CN201721889569.3U 2017-12-28 2017-12-28 Roofing signal tower Expired - Fee Related CN207794750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721889569.3U CN207794750U (en) 2017-12-28 2017-12-28 Roofing signal tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721889569.3U CN207794750U (en) 2017-12-28 2017-12-28 Roofing signal tower

Publications (1)

Publication Number Publication Date
CN207794750U true CN207794750U (en) 2018-08-31

Family

ID=63280358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721889569.3U Expired - Fee Related CN207794750U (en) 2017-12-28 2017-12-28 Roofing signal tower

Country Status (1)

Country Link
CN (1) CN207794750U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847682A (en) * 2019-11-26 2020-02-28 六安丰恺尼机电科技有限公司 Base component of 5G signal supporting tower
CN111827764A (en) * 2020-07-20 2020-10-27 许昌学院 Electronic information is with multi-functional shockproof communication tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847682A (en) * 2019-11-26 2020-02-28 六安丰恺尼机电科技有限公司 Base component of 5G signal supporting tower
CN111827764A (en) * 2020-07-20 2020-10-27 许昌学院 Electronic information is with multi-functional shockproof communication tower

Similar Documents

Publication Publication Date Title
CN207794750U (en) Roofing signal tower
CN107425475B (en) Overhead ground wire lifter and lifting in-place method thereof
CN206158310U (en) Wire pole that possesses lightning protection function
CN204023319U (en) For the triangular tower of cableway of constructing
CN211974541U (en) Communication tower that stability is good
CN212802772U (en) High-strength combined type communication 5G tower
CN215336091U (en) Windproof solar street lamp
CN209948028U (en) Omnidirectional adjustment antenna support
CN211600467U (en) LED view light is used in municipal administration
CN213142839U (en) Warning device for construction
CN213539887U (en) Emergency repair electric pole
CN214091259U (en) Steel pipe power transmission tower capable of preventing lightning stroke
CN210032841U (en) Novel electronic information engineering communication tower
CN209434369U (en) A kind of type micro-wave ultra-wideband antenna stage by stage
CN110836350A (en) Integrated solar street lamp
CN109386795A (en) A kind of power transmission line steel pipe rod structure of solar street light
CN213980158U (en) Communication tower antenna platform installs structure additional
CN221031769U (en) Liftable formula communication tower
CN215933810U (en) Holding pole mounting device for mounting communication antenna
CN218770553U (en) Novel manual lifter
CN215553377U (en) Special vehicle for transporting pump house pipelines
CN220080984U (en) Holding pole communication pole tower
CN115839488B (en) Airport visibility observation target lamp
CN116959848B (en) Transformer hanging hanger
CN216345110U (en) Camera stand column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20211228