CN207794587U - A kind of attaching scaffold is connected and fixed device - Google Patents

A kind of attaching scaffold is connected and fixed device Download PDF

Info

Publication number
CN207794587U
CN207794587U CN201721143530.7U CN201721143530U CN207794587U CN 207794587 U CN207794587 U CN 207794587U CN 201721143530 U CN201721143530 U CN 201721143530U CN 207794587 U CN207794587 U CN 207794587U
Authority
CN
China
Prior art keywords
twin adapter
fixing bolt
scaffold
shaped fixing
adapter spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721143530.7U
Other languages
Chinese (zh)
Inventor
蔡宁建
何文林
荀名红
付兵
张鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jianzhong Construction Technology Co ltd
Original Assignee
Fujian Jianzhong Construction Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jianzhong Construction Polytron Technologies Inc filed Critical Fujian Jianzhong Construction Polytron Technologies Inc
Priority to CN201721143530.7U priority Critical patent/CN207794587U/en
Application granted granted Critical
Publication of CN207794587U publication Critical patent/CN207794587U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

A kind of attaching scaffold described in the utility model is connected and fixed device, including J-shaped fixing bolt and twin adapter spiral cone sleeve;The horizontal ends of the J-shaped fixing bolt are provided with screw thread, and J-shaped fixing bolt described in two groups is embedded into according to setting interval in concrete, and setting accommodates the hole of twin adapter spiral cone sleeve in concrete.The twin adapter spiral cone sleeve is in truncated cone-shaped, and round steel piece is provided among the twin adapter spiral cone sleeve, the twin adapter spiral cone sleeve is divided into front and rear, the top surface radius of front is less than the bottom surface radius at rear portion.The front and rear is hollow, and inner wall is provided with internal thread.Portion's tail end is provided with rotation slot in the rear.Twin adapter spiral cone sleeve described in two groups screws in described hole respectively, the front and the J-shaped fixing bolt screw-tightened, tommyhead bolt passed through the hole of scaffold support and screws in the rear portion and realizes is fixedly connected with scaffold.J-shaped structure can enhance the outside pulling force support of fixing bolt.

Description

A kind of attaching scaffold is connected and fixed device
Technical field
The utility model is related to construction scaffolds to assemble field, be connected more particularly to a kind of attaching scaffold solid Determine device.
Background technology
In modern architecture construction, scaffold is as important construction auxiliary security facility.With the fixation of concrete wall surface Usually with through-wall bolt and tapered sleeve.If concrete walls wall is blocked up or concrete walls wall seal is more demanding, no When allowing bolt through walls fixed, ordinary straight type bolt just can not be preferably fixed in concrete walls, while the spiral shell of prominent wall Stud portion also more difficult dismounting, influences use and the beauty of wall.
Utility model content
For this purpose, the technical problems to be solved in the utility model is how can be by spiral shell in the case where being not provided with bolt through walls What bolt was stablized fixes with wall connecting, and does not influence use and the beauty of wall after scaffold dismounting.
To achieve the above object, the utility model uses following technical scheme:
A kind of attaching scaffold attachment device, including J-shaped fixing bolt and twin adapter spiral cone sleeve;The J-shaped is fixed The horizontal ends of bolt are provided with screw thread, J-shaped fixing bolt described in two groups are embedded into according to setting interval in concrete, and mixed Setting accommodates the hole of twin adapter spiral cone sleeve in solidifying soil;The twin adapter spiral cone sleeve is in truncated cone-shaped, the twin adapter spiral It is provided with round steel piece among tapered sleeve, the twin adapter spiral cone sleeve is divided into front and rear, after the top surface radius of front is less than The bottom surface radius in portion;The front hollow, and the internal thread for matching the J-shaped fixing bolt is provided in inner wall;The rear portion It is hollow, and inner wall is provided with internal thread, and portion's tail end is provided with rotation slot in the rear;Twin adapter screw conic described in two groups Set screws in described hole respectively, and tommyhead bolt is passed through scaffold branch by the front and the J-shaped fixing bolt screw-tightened The hole of bearing member simultaneously screws in the rear portion and realizes and be fixedly connected with scaffold.
Wherein, twin adapter spiral cone sleeve surface, which is sticked, oil film.
Wherein, the front is not attached to lead to the rear portion.
Wherein, the internal diameter of the front hollow is less than the hollow internal diameter in the rear portion.
Wherein, after the front of the twin adapter spiral cone sleeve is fastened with the J-shaped fixing bolt, entire twin adapter screw conic Set is fully embedded in described hole.
The utility model has the advantages that:
A kind of attaching scaffold attachment device described in the utility model, including J-shaped fixing bolt and twin adapter spiral Tapered sleeve.Two groups of J-shaped fixing bolts are embedded into according to setting interval in concrete, the structure of J-shaped can enhance fixing bolt to Outer pulling force support, prevents bolt from pulling out concrete by scaffold, causes safety accident.Twin adapter spiral cone sleeve is in truncated cone-shaped Can be firm pierce in hole and full of hole, can cause the J-shaped fixing bolt to avoid the additional force of upper and lower directions is generated Loosening.The twin adapter spiral cone sleeve is screwed in into J-shaped fixing bolt by screw thread, is reduced while promoting connective stability The exposed volume outside concrete makes scaffold connective stability higher.
A kind of attaching scaffold attachment device described in the utility model, twin adapter spiral cone sleeve surface are sticked and have Oil film facilitates back-out to dismantle.
A kind of attaching scaffold attachment device described in the utility model, the hollow of the front and rear are not attached to It is logical, it avoids the twin adapter spiral cone sleeve from screwing in too deep, can not remove.
Description of the drawings
In order to make the content of utility model be more likely to be clearly understood, below according to specific embodiment of the utility model And in conjunction with attached drawing, the utility model is described in further detail, wherein
Fig. 1 is the structural schematic diagram that a kind of attaching scaffold of the utility model is connected and fixed device;
Fig. 2 is the structural decomposition diagram that a kind of attaching scaffold of the utility model is connected and fixed device;
Fig. 3 is the right view for the twin adapter spiral cone sleeve that a kind of attaching scaffold of the utility model is connected and fixed device;
Fig. 4 is the schematic diagram that a kind of attaching scaffold of the utility model is connected and fixed device connection scaffold support.
Reference numeral is expressed as in figure:1-J shape fixing bolts;2- twin adapter spiral cone sleeves;The fronts 21-;22- round steel pieces; The rear portions 23-;231- rotates slot;3- scaffold supports;31- bolt cutters;4- concrete;5-T shape bolts.
Specific implementation mode
Referring to Fig. 1-4, a kind of attaching scaffold described in the utility model is connected and fixed device, including J-shaped fixes spiral shell Bolt 1 and twin adapter spiral cone sleeve 2.The horizontal ends 1 of the J-shaped fixing bolt 1 are provided with screw thread, and J-shaped described in two groups is fixed spiral shell Bolt 1 is embedded into according to setting interval in concrete 4,240 millimeters is divided between setting, this interval support effect is best.And mixed Setting accommodates the hole of twin adapter spiral cone sleeve 2 in solidifying soil 4.The twin adapter spiral cone sleeve 2 is in truncated cone-shaped.The twin adapter spiral shell It is provided with round steel piece 22 among rotation tapered sleeve 2, the twin adapter spiral cone sleeve 2 is divided for front 21 and rear portion 23, the top of front 21 Radius surface is less than the bottom surface radius at rear portion 23, a diameter of 40 millimeters of top surface, and basal diameter is 60 millimeters, and entire length is 150 millis The length of rice, front 21 is 70 millimeters, and the length at rear portion 23 is 70 millimeters, and the width of round steel piece 22 is 10 millimeters.The front 21 is hollow, and the internal thread for matching the J-shaped fixing bolt 1 is provided in inner wall.The rear portion 23 is hollow, and is arranged in inner wall There is internal thread, and 23 tail end of portion is provided with rotation slot 231 in the rear.Twin adapter spiral cone sleeve 2 described in two groups screws in respectively In described hole, screw-in mode is to rotate slot 231 by insertion using the bolt cutter 31 or Flathead screwdriver of linear type It is screwed into.The front 21 and 1 screw-tightened of J-shaped fixing bolt.The width of the rotation slot 231 is 10 millimeters.The J The hollow diameters of the front 21 of shape fixing bolt 1 are 24 millimeters, and rear 23 hollow diameters of mending are 30 millimeters.The J-shaped fixes spiral shell The reach of bolt 1 is 70 millimeters, and the diameter of bolt is 24 millimeters.As shown in figure 4, tommyhead bolt 5 is passed through scaffold support 3 Hole and screw in the rear portion 23, realize that a kind of attaching scaffold is connected and fixed device and scaffold after tightening It is fixedly connected.
A kind of attaching scaffold attachment device described in the utility model, including J-shaped fixing bolt 1 and twin adapter spiral Tapered sleeve 2.Two groups of J-shaped fixing bolts 1 are embedded into according to setting interval in concrete, the structure of J-shaped can enhance fixing bolt Outside pulling force support, prevents bolt from pulling out concrete by scaffold, causes safety accident.Twin adapter spiral cone sleeve 2 is in round platform What shape can consolidate pierces in hole and is full of hole, the J-shaped can be caused to fix spiral shell to avoid the additional force of upper and lower directions is generated The loosening of bolt 1.The twin adapter spiral cone sleeve 2 is screwed in into J-shaped fixing bolt 1 by screw thread, is promoting the same of connective stability When reduce the exposed volume outside concrete, make scaffold connective stability higher.
Preferably, 2 surface of twin adapter spiral cone sleeve, which is sticked, oil film.Back-out is facilitated to dismantle.
Preferably, the front 21 is not attached to lead to the rear portion 23.The twin adapter spiral cone sleeve is avoided to screw in too deep, It can not remove.
Preferably, the hollow internal diameter in the front 21 is less than the hollow internal diameter in the rear portion 23.
After the front 21 of the twin adapter spiral cone sleeve 2 is fastened with the J-shaped fixing bolt 1, entire twin adapter screw conic Set 2 is fully embedded in described hole.
Above-mentioned specific implementation mode is only explained in detail the technical solution of the utility model, and the utility model is not It is only limited only to above-described embodiment, it will be understood by those skilled in the art that every according to above-mentioned principle and spiritual in this practicality Improvement, replacement on novel foundation, should all be within the protection scope of the utility model.

Claims (5)

1. a kind of attaching scaffold is connected and fixed device, which is characterized in that including J-shaped fixing bolt (1) and twin adapter spiral Tapered sleeve (2);The horizontal ends of the J-shaped fixing bolt (1) are provided with screw thread, and J-shaped fixing bolt (1) is according between setting described in two groups Every being embedded into concrete (4), and setting accommodates the hole of twin adapter spiral cone sleeve (2) in concrete (4);The twin adapter Spiral cone sleeve (2) is in truncated cone-shaped, round steel piece (22) is provided among the twin adapter spiral cone sleeve (2), by the twin adapter spiral shell Rotation tapered sleeve (2) is divided into front (21) and rear portion (23), and the top surface radius of front (21) is less than the bottom surface radius of rear portion (23);It is described Front (21) is hollow, and the internal thread for matching the J-shaped fixing bolt (1) is provided in inner wall;The rear portion (23) is hollow, and Inner wall is provided with internal thread, and portion's tail end is provided with rotation slot (231) in the rear;Twin adapter spiral cone sleeve described in two groups (2) it screws in described hole respectively, the front (21) and J-shaped fixing bolt (1) screw-tightened wear tommyhead bolt (5) It crosses the hole of scaffold support (3) and screws in the rear portion (23) and realize and be fixedly connected with scaffold.
2. a kind of attaching scaffold as described in claim 1 is connected and fixed device, which is characterized in that the twin adapter spiral Surface is sticked tapered sleeve (2) oil film.
3. a kind of attaching scaffold as claimed in claim 2 is connected and fixed device, which is characterized in that the front (21) with The rear portion (23) is not attached to lead to.
4. a kind of attaching scaffold as claimed in claim 3 is connected and fixed device, which is characterized in that in the front (21) Empty internal diameter is less than the rear portion (23) hollow internal diameter.
5. a kind of attaching scaffold as claimed in claim 4 is connected and fixed device, which is characterized in that the twin adapter spiral With after the J-shaped fixing bolt (1) fastening, entire twin adapter spiral cone sleeve (2) is fully embedded described for the front (21) of tapered sleeve (2) In hole.
CN201721143530.7U 2017-09-07 2017-09-07 A kind of attaching scaffold is connected and fixed device Expired - Fee Related CN207794587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721143530.7U CN207794587U (en) 2017-09-07 2017-09-07 A kind of attaching scaffold is connected and fixed device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721143530.7U CN207794587U (en) 2017-09-07 2017-09-07 A kind of attaching scaffold is connected and fixed device

Publications (1)

Publication Number Publication Date
CN207794587U true CN207794587U (en) 2018-08-31

Family

ID=63273993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721143530.7U Expired - Fee Related CN207794587U (en) 2017-09-07 2017-09-07 A kind of attaching scaffold is connected and fixed device

Country Status (1)

Country Link
CN (1) CN207794587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296086A (en) * 2018-11-07 2019-02-01 湖北旺科模板有限公司 One kind can have enough to meet the need the pre-buried worm screw of concrete taper and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296086A (en) * 2018-11-07 2019-02-01 湖北旺科模板有限公司 One kind can have enough to meet the need the pre-buried worm screw of concrete taper and its construction method

Similar Documents

Publication Publication Date Title
CN204435843U (en) A kind of steel tube scaffold linkage
CN207794587U (en) A kind of attaching scaffold is connected and fixed device
CN204512120U (en) Connect bearing pin
CN204139578U (en) The pre-buried assembling wall attaching parts of scaffold
CN204186058U (en) A kind of multipurpose wall-connecting piece
CN104538752A (en) Grounded drill rod easy to insert and pull and special inserting and pulling tool
CN104372939A (en) Scaffold
CN203034804U (en) Three-section type water-sealing screw for basement exterior wall
CN204405423U (en) A kind of New type coal mine anchor rod quality testing draw-off gear
CN204174904U (en) Scaffold
CN204098513U (en) A kind of combined type cleaver
CN203808433U (en) Positioning and pull-blasting dry hanging member
CN208503207U (en) A kind of assembled wallboard connection bolt special
CN208996432U (en) A kind of Novel wall connector
CN207161498U (en) A kind of wear-resisting stud of baking vanish conveniently screwed
CN205956164U (en) Female connection spare
CN212453098U (en) Building embedded part
CN202611240U (en) Plastic sleeve for building formwork
CN201184208Y (en) Coal mine support anchor rod erector
CN204983621U (en) Connection device of scaffold
CN205689541U (en) Aluminium connecting means for furniture
CN201905847U (en) Garbage shovel
CN219691061U (en) Wall-connected pull node structure of scaffold
CN215064969U (en) Scaffold steel pipe butt joint fastener and stress monitoring device
CN201650985U (en) Land drawing screw

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 350015 Jinlan Building, 33 Zhaoqiang Road, Mawei District, Fuzhou City, Fujian Province, 2002 (Free Trade Test Zone)

Patentee after: Fujian Jianzhong Construction Technology Co.,Ltd.

Address before: 350015 Jinlan Building, 33 Zhaoqiang Road, Mawei District, Fuzhou City, Fujian Province, 2002 (Free Trade Test Zone)

Patentee before: FUJIAN JIANZHONG CONSTRUCTION TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831