CN207794582U CN201820016836.4U CN201820016836U CN207794582U CN 207794582 U CN207794582 U CN 207794582U CN 201820016836 U CN201820016836 U CN 201820016836U CN 207794582 U CN207794582 U CN 207794582U
Authority
CN
China
Prior art keywords
steel
channel steel
support
shuttering
beam channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820016836.4U
Other languages
Chinese (zh)
Inventor
沈黎兴
楼文轩
陈小红
楼永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAYU CONSTRUCTION GROUP CO Ltd
Original Assignee
HUAYU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAYU CONSTRUCTION GROUP CO Ltd filed Critical HUAYU CONSTRUCTION GROUP CO Ltd
Priority to CN201820016836.4U priority Critical patent/CN207794582U/en
Application granted granted Critical
Publication of CN207794582U publication Critical patent/CN207794582U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to build form erecting technology field, more particularly to a kind of hanging large span combines support for shuttering, including being set up in two secondary beam channel steels being arranged side by side on hanging structure layer lower layer Vierendeel girder, overhang in steel corbel and the horizontal bridge being spliced to form by Bailey bracket and longitudinal bridge on frame column, the steel corbel is disposed side by side on the both ends of the secondary beam channel steel, the bottom of the horizontal bridge is erected in the C-channel of the secondary beam channel steel, it is provided with scaffold board above the horizontal bridge, the long beam channel steel of system is equipped with above the scaffold board, the long beam channel steel of system is spaced apart, the longitudinal direction bridge is erected on two steel corbels of secondary beam channel steel the same end.The Bailey truss cantilever translation that the utility model use site on skyscraper is built, which is plugged into, builds the formwork platform of aerial vestibule behind opposite bank, and the working security good period is short, Bailey truss convenient for lease and can Reusability, construction cost is low, economic benefit.

Description

A kind of hanging large span combination support for shuttering
Technical field
The utility model is related to build form erecting technology field, more particularly to a kind of hanging large span combines support for shuttering.
Background technology
With the raising of domestic construction level, occur the aerial of cast in place reinforced bar silicon structure on more and more skyscrapers Vestibule.Since reinforcing bar silicon can not bear external force before solidification, applies man-hour requirement and build a formwork use in the air high in advance Operation platform, support for shuttering and scaffold are set on it and carry out pouring construction.It is existing to be hung between two high-rises Analysis frame makees the analysis frame that the construction method of platform needs job execution in the air to build two buildings of connection, and constructing operation is complicated, peace Full property is low, and operation is long in time limit, and progress is slow, and entire construction cost is high.
Utility model content
The purpose of this utility model is to provide a kind of hanging large span combination support for shuttering, stable structure, convenient and quick construction.
The above-mentioned purpose of the utility model technical scheme is that:A kind of hanging large span combination branch Mould bases, including two secondary beam channel steels being arranged side by side on hanging structure layer lower layer Vierendeel girder, overhanging are set up on frame column Steel corbel and the horizontal bridge being spliced to form by Bailey bracket and longitudinal bridge, the steel corbel are disposed side by side on the secondary beam slot The bottom at the both ends of steel, the horizontal bridge is erected in the C-channel of the secondary beam channel steel, and the top of the horizontal bridge is set up There is scaffold board, the long beam channel steel of system is equipped with above the scaffold board, the long beam channel steel of system is spaced apart, the longitudinal direction bridge frame It is provided on two steel corbels of secondary beam channel steel the same end.
Preferably, the steel corbel is equipped with the baffle for preventing the horizontal bridge transverse shifting.
Preferably, the baffle is channel steel of the C-channel notch towards horizontal bridge.
Preferably, the lower section of the steel corbel is equipped with diagonal brace, the upper end of the diagonal brace is welded on the steel corbel, Lower end is equipped with the support channel steel for being used to support the diagonal brace.
Preferably, the support channel steel is to be embedded on frame column, the support channel steel stretches out the length outside frame column For 150-200mm.
Preferably, the lower end of the diagonal brace is supported in the C-channel of the support channel steel.
Preferably, the C-channel notch of the long beam channel steel of system is arranged upward, it is equipped in slot for being set with steel pipe formwork The mounting post of bar is erected, the mounting post is to be welded on the vertical reinforcing bar of the long beam channel steel of system.
Preferably, the spacing of the long beam channel steel of system is 800-900mm.
Preferably, the scaffold board includes frame and scaffold board face, the scaffold board face is fixed on frame, the frame The both ends of frame are equipped with hook, described to hang on horizontal bridge, and the lower surface in the scaffold board face is equipped with to be set in right-angled intersection The support bar set, the side that the scaffold board is located at width direction are set there are two fillet.
The beneficial effects of the utility model:The Bailey truss cantilever that the utility model use site on skyscraper is built Translation, which is plugged into, builds the formwork platform of aerial vestibule behind opposite bank, and the working security good period is short, and Bailey truss is convenient for leasing and can Reusability, construction cost is low, economic benefit.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of scaffold board in the utility model embodiment;
In figure:1- secondary beam channel steels, 2- steel corbels, 3- baffles, 4- diagonal braces, 5- support channel steel, 6- horizontal bridges, 7- it is longitudinal across Beam, 8- scaffold boards, 81- frames, 82- scaffold boards face, 83- support bars, 84- hooks, 85- fillets, the long beam channel steel of 9- systems, 10- frames It sets a roof beam in place, 11- frame columns, 12- steel-tube die supports.
Specific implementation mode
In conjunction with attached drawing, the utility model is described in further detail.This specific embodiment is only to the utility model Explanation, be not limitations of the present invention, those skilled in the art, can be according to need after reading this specification The modification of not creative contribution is made to the present embodiment, but as long as in the right of the utility model all by The protection of Patent Law.
Embodiment:As depicted in figs. 1 and 2, a kind of hanging large span combines support for shuttering, including is set up under hanging structure layer Two secondary beam channel steels 1 being arranged side by side on layer Vierendeel girder, overhanging on frame column steel corbel 2 and be spliced to form by Bailey bracket Horizontal bridge 6 and longitudinal bridge 7.Horizontal bridge 6 is spliced to form along its length by multiple Bailey brackets, and longitudinal bridge 7 is It is made of single Bailey bracket or is spliced to form in the width direction by multiple Bailey brackets.Steel corbel 2 is disposed side by side on the secondary beam slot The bottom at the both ends of steel 1, the horizontal bridge 6 is erected in the C-channel of the secondary beam channel steel 1, the top of the horizontal bridge 6 It is provided with scaffold board 8,8 top of the scaffold board is equipped with the long beam channel steel 9 of system, and the long beam channel steel 9 of uniting is spaced apart, described vertical It is erected on two steel corbels 2 of 1 the same end of secondary beam channel steel to bridge 7.Long 9 method of beam channel steel of uniting sets up steel pipe branch Mould bases.
As shown in Figure 1, steel corbel 2 is equipped with the baffle 3 for preventing 6 transverse shifting of the horizontal bridge, baffle 3 is C-channel Channel steel of the notch towards horizontal bridge 6.The lower section of steel corbel 2 is equipped with diagonal brace 4, and the upper end of the diagonal brace 4 is welded on the steel ox On leg 2, lower end is equipped with the support channel steel 5 for being used to support the diagonal brace 4.Support channel steel 5 is to be embedded on frame column, the branch It is 150-200mm to support the length that channel steel 5 stretches out outside frame column.The lower end of diagonal brace 4 is supported in the C-channel of the support channel steel 5.
The C-channel notch of long beam channel steel 9 of uniting is arranged upward, and the installation for being set with steel-tube die support upright bar is equipped in slot Column, the mounting post are to be welded on the vertical reinforcing bar of the long beam channel steel 9 of uniting.Unite long beam channel steel 9 spacing be 800-900mm.
As shown in Fig. 2, scaffold board 8 includes frame 81 and scaffold board face 82, the scaffold board face 82 is fixed on frame 81, 82 surface of scaffold board face is equipped with anti-skid chequer.The both ends of frame 81 are equipped with hook 84, and the hook 84 is hung on horizontal bridge 6, institute The lower surface for stating scaffold board face 82 is equipped with the support bar 83 being arranged in right-angled intersection, and the side that scaffold board 8 is located at width direction is set There are two fillets 85, are easy for installation and removal.

Claims (9)

1. a kind of hanging large span combines support for shuttering, it is characterised in that:Including being set up on hanging structure layer lower layer Vierendeel girder simultaneously Arrange two secondary beam channel steels of setting(1), overhanging in the steel corbel on frame column(2)And by Bailey bracket be spliced to form laterally across Beam(6)With longitudinal bridge(7), the steel corbel(2)It is disposed side by side on the secondary beam channel steel(1)Both ends, the horizontal bridge (6)Bottom be erected at the secondary beam channel steel(1)C-channel in, the horizontal bridge(6)Top be provided with scaffold board(8), The scaffold board(8)Top is equipped with the long beam channel steel of system(9), the long beam channel steel of system(9)It is spaced apart, the longitudinal direction bridge (7)It is erected at and is located at secondary beam channel steel(1)Two steel corbels of the same end(2)On.
2. a kind of hanging large span according to claim 1 combines support for shuttering, it is characterised in that:The steel corbel(2)On Equipped with preventing the horizontal bridge(6)The baffle of transverse shifting(3).
3. a kind of hanging large span according to claim 2 combines support for shuttering, it is characterised in that:The baffle(3)For C-shaped Slot notch is towards horizontal bridge(6)Channel steel.
4. a kind of hanging large span according to claim 1 or 2 or 3 combines support for shuttering, it is characterised in that:The steel corbel (2)Lower section be equipped with diagonal brace(4), the diagonal brace(4)Upper end be welded on the steel corbel(2)On, lower end is equipped with for branch Support the diagonal brace(4)Support channel steel(5).
5. a kind of hanging large span according to claim 4 combines support for shuttering, it is characterised in that:The support channel steel(5) To be embedded on frame column, the support channel steel(5)The length stretched out outside frame column is 150-200mm.
6. a kind of hanging large span according to claim 5 combines support for shuttering, it is characterised in that:The diagonal brace(4)Under End is supported on the support channel steel(5)C-channel in.
7. a kind of hanging large span according to claim 1 combines support for shuttering, it is characterised in that:The long beam channel steel of system (9)C-channel notch be arranged upward, the mounting post for being set with steel-tube die support upright bar is equipped in slot, the mounting post is It is welded on the long beam channel steel of system(9)Vertical reinforcing bar.
8. a kind of hanging large span according to claim 7 combines support for shuttering, it is characterised in that:The long beam channel steel of system (9)Spacing be 800-900mm.
9. a kind of hanging large span according to claim 1 combines support for shuttering, it is characterised in that:The scaffold board(8)Packet Include frame(81)With scaffold board face(82), the scaffold board face(82)It is fixed on frame(81)On, the frame(81)Both ends Equipped with hook(84), the hook(84)Hang over horizontal bridge(6)On, the scaffold board face(82)Lower surface be equipped be in cross Support bar arranged in a crossed manner(83), the scaffold board(8)It is set there are two fillet positioned at the side of width direction(85).
CN201820016836.4U 2018-01-05 2018-01-05 A kind of hanging large span combination support for shuttering Active CN207794582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820016836.4U CN207794582U (en) 2018-01-05 2018-01-05 A kind of hanging large span combination support for shuttering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820016836.4U CN207794582U (en) 2018-01-05 2018-01-05 A kind of hanging large span combination support for shuttering

Publications (1)

Publication Number Publication Date
CN207794582U true CN207794582U (en) 2018-08-31

Family

ID=63277411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820016836.4U Active CN207794582U (en) 2018-01-05 2018-01-05 A kind of hanging large span combination support for shuttering

Country Status (1)

Country Link
CN (1) CN207794582U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319129A (en) * 2018-12-28 2022-04-12 中交路桥华南工程有限公司 Steel corbel and supporting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319129A (en) * 2018-12-28 2022-04-12 中交路桥华南工程有限公司 Steel corbel and supporting system
CN114319129B (en) * 2018-12-28 2023-10-20 中交路桥华南工程有限公司 Steel corbel and supporting system

Similar Documents

Publication Publication Date Title
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN211369053U (en) Frame construction end support node structure is striden to reinforcing bar truss plate
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN108625486A (en) A kind of across frame structure edge support node structure of steel bar girder plate
CN205576747U (en) Cast -in -place panel braced system of U type roof beam
CN106703407A (en) Construction method of double-layered shape steel supporting rack of cantilever beam plate
CN107882328B (en) Construction method of large-span steel truss suspension structure
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN207794582U (en) A kind of hanging large span combination support for shuttering
CN207700680U (en) A kind of roof boarding hangs mould
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN212507296U (en) High formwork system
CN212154127U (en) Roof post-cast strip quick detach bearing structure
CN103866692A (en) Novel assembling method for bent cap bearing frame
CN208472976U (en) A kind of across frame structure edge support node structure of steel bar girder plate
CN208533724U (en) A kind of detachable reinforcing steel truss edges of boards support node structure
CN210140771U (en) Construction work platform hoisting frame of high mound of bridge
CN106958233A (en) Hydraulic self-lifting formula cantilever form construction method for pouring Arch Dam Concrete
JP7370626B2 (en) Side span support structure for a continuous T-girder viaduct spanning the existing railway line
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN107882065B (en) Operating platform for concrete beam construction above rail-mounted area and building method thereof
CN216615730U (en) Inverted supporting platform for rear corbel of dam
CN109812001A (en) A kind of construction method of Super High bilayer I-steel overhanging support system
CN108691382A (en) Pin-connected panel precast floor slab and its construction method
CN108625487A (en) A kind of across frame structure end support node structure of steel bar girder plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant