CN207794121U - A kind of anti-depression Toft foundation structure - Google Patents

A kind of anti-depression Toft foundation structure Download PDF

Info

Publication number
CN207794121U
CN207794121U CN201721864424.8U CN201721864424U CN207794121U CN 207794121 U CN207794121 U CN 207794121U CN 201721864424 U CN201721864424 U CN 201721864424U CN 207794121 U CN207794121 U CN 207794121U
Authority
CN
China
Prior art keywords
depression
soil
waterproof layer
layer
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721864424.8U
Other languages
Chinese (zh)
Inventor
李明
袁建伟
蔡俊勇
郭腾翔
何晓悦
王美英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721864424.8U priority Critical patent/CN207794121U/en
Application granted granted Critical
Publication of CN207794121U publication Critical patent/CN207794121U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of the problems such as anti-depression Toft foundation structure, the effective solution prior art cannot prevent building run-off the straight or depression well;Including multiple waterproof layers, waterproof layer one rectangle of formation positioned opposite two-by-two, it is surrounded by double cement-soil-stirred pile on the inside of waterproof layer, multiple concrete stakes are equipped on the inside of double cement-soil-stirred pile, concrete stake is at cross arrangement and forms the cornerwise structure of surrounding on the inside of double cement-soil-stirred pile, and the first dowel is equipped in concrete stake, mattress layer is equipped with above concrete stake and waterproof layer, flexible board basis is equipped with above mattress layer, flexible board is equipped with Bower Anchor muscle in basis;Using waterproof layer, it effectively prevent that cross concrete stake is arranged to weaken the intensity of ground in water or Groundwater infiltration to ground around the house and the first dowel reinforces the ability to bear of ground, this is simple in structure, fixation, and service efficiency is high.

Description

A kind of anti-depression Toft foundation structure
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of anti-depression Toft foundation structure.
Background technology
Foundation is the important component of building, and foundation is firm, just building above can be made to use more To be remote, because of some reasons such as foundation and the building own wt of top, pressure generated to natural ground, can be caused A series of influences for destroying structure stability, such as settlement of foundation, settlement of foundation are inevitable, the sedimentation journey of a ground Spend a big chunk factor depend on foundation stability and foundation to the pressure pressure size of subsoil.Mesh Before, it is increasingly deficient with urban resource with the development of economy, it is enterprising in coastal, riverine, waterfront areas subgrade in recent years Capable geotechnical engineering is increasing, since these grounds include a large amount of water source in water source, soil property, causes these soft Property ground compressibility is very strong, stability is very poor, result even in building run-off the straight or occur the phenomenon that sinking.
Utility model content
For the above situation, to overcome the defect of the prior art, the purpose of the utility model to be just to provide a kind of anti-depression The problems such as Toft foundation structure, the effective solution prior art cannot prevent building run-off the straight or depression well.
Its technical solution solved is that the utility model includes multiple waterproof layers, and waterproof layer is positioned opposite two-by-two to form one A rectangle, waterproof layer inside are surrounded by double cement-soil-stirred pile, multiple cement are equipped on the inside of double cement-soil-stirred pile Stake, concrete stake is at cross arrangement and forms the cornerwise structure of surrounding on the inside of double cement-soil-stirred pile, is equipped in concrete stake It is equipped with mattress layer above first dowel, concrete stake and waterproof layer, flexible foundation is equipped with above mattress layer, is equipped in flexible foundation Bower Anchor muscle.
Compared with prior art, the utility model has the beneficial effects that:Using waterproof layer, it effectively prevent water around the house Or to weaken the intensity of ground in Groundwater infiltration to ground, cross concrete stake is set and the first dowel reinforces bearing for ground Ability, this is simple in structure, fixation, and service efficiency is high.
Description of the drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the sectional view of A-A in the utility model Fig. 1.
Specific implementation mode
Specific embodiment of the present utility model is described in further detail below in conjunction with attached drawing.
It is provided by Fig. 1 to Fig. 2, the utility model includes multiple waterproof layers 1, and waterproof layer 1 is positioned opposite two-by-two to form one Rectangle, 1 inside of waterproof layer are surrounded by double cement-soil-stirred pile 2, and multiple cement are equipped in 2 inside of double cement-soil-stirred pile Stake 3, concrete stake 3 is at cross arrangement and forms the double 2 cornerwise structure of inside surrounding of cement-soil-stirred pile, in concrete stake 3 Equipped with the first dowel 4, concrete stake 3 and 1 top of waterproof layer are equipped with mattress layer 5, and 5 top of mattress layer is equipped with flexible foundation 6, flexible Bower Anchor muscle 7 is equipped in basis 6.
The waterproof layer 1 one enclosing square of composition sealed around.
The curing agent of the double cement-soil-stirred pile 2 is P32.5 or P42.5 Portland cements, double coagulation The stake diameter of native mixing pile 2 is 700mm, and stake spacing is 500mm, and row's spacing is 500mm, is respectively engaged 200mm.
First dowel, 4 upper end is stretched out mattress layer 5 and is welded together with Bower Anchor muscle 7.
Sand, coarse sand, graded sand and stone or rubble etc. during the mattress layer 5 uses, the maximum diameter grain of mattress layer 5 is less than 30mm, the thickness of mattress layer 5 are the length that 150mm-300mm and surrounding width are slightly wider than waterproof layer 1.
The surrounding width of the flexible foundation 6 is slightly less than the width of mattress layer 5.
When the utility model is used,
Waterproof layer 1 is placed downwards in 8 surrounding of ground and forms it into a closed rectangle, in 1 inside surrounding of waterproof layer Place forms double cement-soil-stirred pile 2 using jet mixing machine pore-forming grouting stirring, in the square that double cement-soil-stirred pile 2 is formed Concrete stake 3 is squeezed at surrounding and centre position on the inside of shape, the first dowel 4 is placed in concrete stake 3, in concrete stake 3 and waterproof layer 1 Flexible foundation 6 is arranged to form mattress layer 5 in sand, coarse sand, graded sand and stone or rubble etc. above mattress layer 5 during upper surface is placed, Bower Anchor muscle 7 in flexible foundation 6 is welded together with the first dowel 4.
In 8 surrounding digging groove of ground, waterproof layer 1 is placed in the trench, and waterproof layer 1 is made to form a closed rectangle, It prevents inside the Groundwater infiltration to ground 8 around the rainwater or ground 8 of sleet sky, to reinforce the whole fastness of ground 8, In 1 inside surrounding of waterproof layer, single cement-soil-stirred pile 2 is formed by the way that the slip casting of jet mixing machine pore-forming is repeatedly secondary, in coagulation Native mixing pile 2 continues second row of constructing in the same way before not solidifying, guarantee stake spacing is 500mm, and row's spacing is 500mm, Each occlusion 200mm, and double-row pile spacing is also engaged 200mm, and multiple concrete stakes 3 are arranged in 2 inside of double cement-soil-stirred pile, Before concrete stake 3 does not solidify, the first dowel 4 is set in concrete stake 3, the first dowel 4 is made to be welded by mattress layer 5 and Bower Anchor muscle 7 It is connected together, increases the basic integral strength of ground 8.Even if impacting house with sudden force in water or depositing the feelings of many water around the house Under condition, due to the effect of waterproof layer 1 and cement-soil-stirred pile 2 and concrete stake 3 etc., house run-off the straight or depression will not be made.
Using mattress layer 5 in order that reducing the stress concentration of the bottom of foundation.
Flexible foundation 6 is using tension, resistance to compression, bending resistance, the preferable Reinforced Concrete Materials of shearing resistance.
Compared with prior art, the utility model has the beneficial effects that:Using waterproof layer, it effectively prevent water around the house Or to weaken the intensity of ground in Groundwater infiltration to ground, cross concrete stake is set and the first dowel reinforces bearing for ground Ability, this is simple in structure, fixation, and service efficiency is high.

Claims (6)

1. a kind of anti-depression Toft foundation structure, including multiple waterproof layers(1), which is characterized in that waterproof layer(1)Two-by-two with respect to cloth It sets to form a rectangle, waterproof layer(1)Inside is surrounded by double cement-soil-stirred pile(2), in double cement-soil-stirred pile(2) Inside is equipped with multiple concrete stakes(3), concrete stake(3)At cross arrangement and form double cement-soil-stirred pile(2)Inside surrounding Cornerwise structure, concrete stake(3)Inside it is equipped with the first dowel(4), concrete stake(3)And waterproof layer(1)Top is equipped with mattress layer (5), mattress layer(5)Top is equipped with flexible foundation(6), flexible foundation(6)It is interior to be equipped with Bower Anchor muscle(7).
2. a kind of anti-depression Toft foundation structure according to claim 1, which is characterized in that the waterproof layer(1)Four Week sealing one enclosing square of composition.
3. a kind of anti-depression Toft foundation structure according to claim 1, which is characterized in that the double concrete stirs Mix stake(2)Curing agent be 5 Portland cement of P32. 5 or P42., double cement-soil-stirred pile(2)Stake diameter be 700mm, stake spacing are 500mm, and row's spacing is 500mm, is respectively engaged 200mm.
4. a kind of anti-depression Toft foundation structure according to claim 1, which is characterized in that first dowel(4) Mattress layer is stretched out in upper end(5)With Bower Anchor muscle(7)Weld together.
5. a kind of anti-depression Toft foundation structure according to claim 1, which is characterized in that the mattress layer(5)It adopts With middle sand, coarse sand, graded sand and stone or rubble, mattress layer(5)Maximum diameter grain be less than 30mm, mattress layer(5)Thickness be 150mm-300mm and surrounding width is slightly wider than waterproof layer(1)Length.
6. a kind of anti-depression Toft foundation structure according to claim 1, which is characterized in that the flexible foundation(6) Surrounding width be slightly less than mattress layer(5)Width.
CN201721864424.8U 2017-12-27 2017-12-27 A kind of anti-depression Toft foundation structure Expired - Fee Related CN207794121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721864424.8U CN207794121U (en) 2017-12-27 2017-12-27 A kind of anti-depression Toft foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721864424.8U CN207794121U (en) 2017-12-27 2017-12-27 A kind of anti-depression Toft foundation structure

Publications (1)

Publication Number Publication Date
CN207794121U true CN207794121U (en) 2018-08-31

Family

ID=63279227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721864424.8U Expired - Fee Related CN207794121U (en) 2017-12-27 2017-12-27 A kind of anti-depression Toft foundation structure

Country Status (1)

Country Link
CN (1) CN207794121U (en)

Similar Documents

Publication Publication Date Title
CN207793788U (en) A kind of porous pavement rain infiltration structure
WO2019169956A1 (en) Structured cemented gravel pile and construction method therefor
CN101736738A (en) Pressure resistance and pull-out resistance grouted gravel pile
CN209456912U (en) A kind of abrupt slope rockfall is blocked structure
CN103225267A (en) Construction method of deep and thick soft soil foundation bed bridge abutment
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN101555689A (en) Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation
CN109137872A (en) A kind of reinforced structure bag and the method using reinforced structure bag processing soft base
CN210066390U (en) Punishment structure suitable for deep weak soil roadbed
CN107419628A (en) A kind of construction method of the rapid build road on reclaimed ground
CN110387878A (en) A kind of anti-corrosion mixed mud precast square pile preparation process of internal layer impermeabilisation
CN107129208A (en) A kind of bioactivity, porous gap coarse aggregate ecological revetment matrix engineering material
CN207794121U (en) A kind of anti-depression Toft foundation structure
WO2021068262A1 (en) Artificial soil arch-based shape-adjustable soft foundation reinforcement member
CN208594460U (en) A kind of permeable pavement pavement structure applied to sponge urban construction
CN103806434B (en) A kind of level joins the method building the slag soil engineering bag front saturated over-wet soil ground of engineering of process brill
CN207794117U (en) A kind of foundation base configuration
CN109403304A (en) The compacted modified enhancing processing method of the discharging consolidation soil body joint soil body of mechanical compression
CN105780619B (en) Seashore soft base road structure
US20120014747A1 (en) Ecological board and its applications
CN209975287U (en) Mountain area highway subgrade structure in narrow construction operation area
CN208088230U (en) A kind of net dress Ke shell barricades
CN202466518U (en) Back pressure structure of soft soil foundation dam
CN106337411B (en) A kind of prefabricated pile and construction method of carrier pile
KR20110028801A (en) Planting consturuction using the straight bamboo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20201227