CN207793152U - A kind of coke dry quenching furnace flue gas desulphurization unit - Google Patents

A kind of coke dry quenching furnace flue gas desulphurization unit Download PDF

Info

Publication number
CN207793152U
CN207793152U CN201820061183.1U CN201820061183U CN207793152U CN 207793152 U CN207793152 U CN 207793152U CN 201820061183 U CN201820061183 U CN 201820061183U CN 207793152 U CN207793152 U CN 207793152U
Authority
CN
China
Prior art keywords
connecting pipe
adsorbent equipment
dry quenching
quenching furnace
subtube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820061183.1U
Other languages
Chinese (zh)
Inventor
毛旸
孙文彬
石巧囡
霍海文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Huatai Ring Energy Engineering Technology Co Ltd
Original Assignee
Anshan Huatai Ring Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anshan Huatai Ring Energy Engineering Technology Co Ltd filed Critical Anshan Huatai Ring Energy Engineering Technology Co Ltd
Priority to CN201820061183.1U priority Critical patent/CN207793152U/en
Application granted granted Critical
Publication of CN207793152U publication Critical patent/CN207793152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, which includes:Second connecting pipe of the coke dry quenching furnace exhaust gas after the first connecting pipe, adsorbent equipment and discharge desulfurization process for importing coke dry quenching furnace exhaust gas;First connecting pipe one end is connected to adsorbent equipment bottom, and the other end of the first connecting pipe is connect with circulating fan diffusion mouth, and one end of the second connecting pipe is connected at the top of adsorbent equipment;Adsorbent is mounted in adsorbent equipment, adsorbent to the coke dry quenching furnace exhaust gas imported from the first connecting pipe for carrying out absorption desulfurization process.Adsorbent equipment is imported by the exhaust gas for discharging circulating fan diffusion mouth, in adsorbent equipment, using adsorbent to the SO in coke dry quenching furnace exhaust gas2Desulfurization process is carried out, the SO in the coke dry quenching furnace exhaust gas that can be discharged to circulating fan diffusion mouth2Desulfurization process is carried out, is reduced environmental pollution, also, by avoiding the desulfurizer using coke oven, so as to save resource.

Description

A kind of coke dry quenching furnace flue gas desulphurization unit
Technical field
The utility model is related to technical field of energy saving and environmental protection, more particularly to a kind of coke dry quenching furnace flue gas desulphurization unit.
Background technology
Quenching refers to that the high-temperature coke that will have been refined is cooled to the temperature for being readily transported and storing.The mode of quenching has in stove Outer two kinds of the quenching of quenching and stove, and to be the outer quenching of stove can be divided into Dry Quenching for quenching outside stove using wide at present With two class of wet quenching.
Wherein, Dry Quenching process is specially:The high-temperature coke released from coke oven is packed into dry by furnace roof charging apparatus Put out stove.Cryogenic inert gas is sent by the feeder at coke dry quenching furnace bottom in coke dry quenching furnace by circulating fan, in coke dry quenching furnace, high temperature Coke carries out heat exchange with the cryogenic inert in gas-circulating system, and high-temperature coke is cooled to form coke after cooling, low temperature Inert gas is thermally formed high temperature inert gas.Coke after cooling drains into conveying device through discharging device for coke, is then sent to The burnt system of sieve.The high temperature inert gas for being entrained with a large amount of coke powders is settled through disposable dust remover, and dry coke quenching pot is entered after sedimentation Stove exchanges heat.In coke dry quenching boiler, high temperature inert gas temperature is cooled, forms cryogenic inert gas.Cryogenic inert gas by Coke dry quenching boiler comes out, and after secondary filter, then is sent into coke dry quenching furnace by circulating fan and recycles.
However, in actual production, sulphur would generally be remained from the high-temperature coke that coke oven is released, also, due to gas Circulatory system negative pressure section can leak into air, and remaining sulphur can react with air and generate SO in high-temperature coke2, lazy to low temperature When property gas is diffused, the SO of generation2It can be emitted into air, pollute the environment with cryogenic inert gas.Through surveying It is fixed, diffuse the SO being discharged when cryogenic inert gas2Content has been far longer than《Coking chemistry emission of industrial pollutants standard》 (GB16171-2012) SO in being generated when Dry Quenching2The regulation of discharge capacity.
Therefore, it is necessary to the SO in recyclegas2It is handled, to reduce the pollution to environment.In a kind of feasible side In case, the recyclegas diffused can be delivered in the desulfurizer of coke oven and carry out desulfurization process, however, due to recyclegas Middle SO2Content be far smaller than the SO generated in coke oven2Content, therefore, if using the desulfurizer of coke oven to recyclegas In SO2Desulfurization is carried out, SO in the desulphurizing ability and recyclegas of the desulfurizer of coke oven can be caused2The mismatch of content, is caused The wasting of resources.
Utility model content
The utility model embodiment is designed to provide a kind of coke dry quenching furnace flue gas desulphurization unit, is produced to coke dry quenching furnace with realizing Raw exhaust gas carries out desulfurization process, saves resource, reduces environmental pollution.Specific technical solution is as follows:
The utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, which includes:For importing dry put out The first connecting pipe, adsorbent equipment and the second connecting pipe for discharging the coke dry quenching furnace exhaust gas after desulfurization process of furnace exhaust;
First connecting pipe one end is connected to adsorbent equipment bottom, and the other end and the circulating fan of the first connecting pipe diffuse One end of mouth connection, the second connecting pipe is connected at the top of adsorbent equipment;
Adsorbent is mounted in adsorbent equipment, adsorbent is used to carry out the coke dry quenching furnace exhaust gas imported from the first connecting pipe Adsorb desulfurization process.
Optionally, the utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, further includes:Third connecting tube Road and first composition analyzer;
One end of third connecting pipe is connected to the first connecting pipe, and the other end of third connecting pipe is connected to the second company Take over road;First composition analyzer be arranged in the first connecting pipe, and first composition analyzer be located at the first connecting pipe with Between third connecting pipe junction and circulating fan diffusion mouth.
Optionally, adsorbent equipment includes:First adsorbent equipment and the second adsorbent equipment;
First charging aperture is provided at the top of first adsorbent equipment, bottom is provided with the first discharge port, the second adsorbent equipment Top be provided with second charging aperture, bottom is provided with the second discharge port;
First connecting pipe includes the first total pipeline, the first air inlet subtube and the second air inlet subtube;First into qi leel One end of pipeline and the second air inlet subtube is connect with the bottom of the bottom of the first adsorbent equipment and the second adsorbent equipment respectively, the The other end of one air inlet subtube and the second air inlet subtube is connect with one end of the first total pipeline, the other end of the first total pipeline It is connect with circulating fan diffusion mouth;
Second connecting pipe includes the second total pipeline, the first outlet subtube and the second outlet subtube;First goes out qi leel One end of pipeline and the second outlet subtube is respectively connected to the top at the top and the second adsorbent equipment of the first adsorbent equipment, the The other end of one outlet subtube and the second outlet subtube is connect with one end of the second total pipeline.
Optionally, the utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, further includes:Second composition point Analyzer;
Second composition analyzer is arranged on the second total pipeline, and second composition analyzer is located at except the second total pipeline and the Position except one outlet subtube and the second outlet subtube junction.
Optionally, the utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, further includes:First exhaust gas returns Return pipe road and the second exhaust return line road;
The one end in the first exhaust return line road is connected on the first air inlet subtube, and the other end is connected to the second outlet and is in charge of On road;
The one end in the second exhaust return line road is connected on the second air inlet subtube, and the other end is connected to the first outlet and is in charge of On road.
A kind of coke dry quenching furnace flue gas desulphurization unit that the utility model embodiment provides, by discharging circulating fan diffusion mouth Exhaust gas import adsorbent equipment, in adsorbent equipment, using adsorbent to the SO in coke dry quenching furnace exhaust gas2Desulfurization process is carried out, it can With the SO in the coke dry quenching furnace exhaust gas that is discharged to circulating fan diffusion mouth2Desulfurization process is carried out, is reduced environmental pollution, also, pass through The desulfurizer using coke oven is avoided, so as to save resource.Certainly, implement the utility model any product or method simultaneously It is not necessarily required to reach simultaneously above all advantages.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of dry quenching system in the prior art;
Fig. 2 is a kind of structural representation of the first embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
Fig. 3 be the utility model embodiment a kind of dry coke quenching flue gas desulphurization unit in adsorbent equipment the first embodiment party The structural schematic diagram of formula;
Fig. 4 be the utility model embodiment a kind of dry coke quenching flue gas desulphurization unit in adsorbent equipment second of embodiment party The structural schematic diagram of formula;
Fig. 5 is a kind of structural representation of second of embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
Fig. 6 is a kind of structural representation of the third embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
Fig. 7 is a kind of structural representation of the 4th kind of embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
Fig. 8 is a kind of structural representation of the 5th kind of embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
Fig. 9 is a kind of structural representation of the 6th kind of embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Figure;
In figure:100- coke dry quenching furnaces, 110- disposable dust removers, 120- gas flow pipes road, 130- coke dry quenching boilers, 140- bis- Secondary deduster, 150- circulating fans, 160- circulating fan diffusion mouths, the second connecting pipes of 210-, 220- adsorbent equipments, 230- One connecting pipe, 240, first composition analyzer, 250- third connecting pipes, the second total pipelines of 2101-, the first outlets of 2102- Subtube, 2103- the second outlet subtubes, the first adsorbent equipments of 2201-, the second adsorbent equipments of 2202-, 2,203 first chargings Mouthful, the first discharge ports of 2204-, the second discharge ports of 2205-, 2206 second charging apertures, 2301- the first air inlet subtubes, 2302- the Two air inlet subtubes, the first total pipelines of 2303-, 260- second composition analyzers, the first exhaust return lines of 270- road, 280- second Exhaust return line road, 2207- adsorbent pallets, 2208- support plates, 2209- deflectors, 2210- adsorbent loading plates, 2211- Tank body.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the prior art, as shown in Figure 1, cryogenic inert gas passes through the confession of 100 bottom of coke dry quenching furnace by circulating fan 150 Device of air is sent into coke dry quenching furnace 100, and in coke dry quenching furnace 100, high-temperature coke carries out heat with the cryogenic inert in gas-circulating system It exchanges, high-temperature coke is cooled to form coke after cooling, and cryogenic inert gas is thermally formed high temperature inert gas.After cooling Coke be discharged through discharging device for coke.The high temperature inert gas for being entrained with a large amount of coke powders is settled through disposable dust remover 110, sedimentation Enter coke dry quenching boiler 130 by gas flow pipe road 120 afterwards to exchange heat.In coke dry quenching boiler 130, high temperature inert gas temperature It is cooled, form cryogenic inert gas.Cryogenic inert gas is come out by coke dry quenching boiler 130, after secondary filter 140, then Coke dry quenching furnace 100 is sent by circulating fan 150 to recycle.In actual production, in order to control containing for combustible component in coke dry quenching furnace Amount, it will usually which circulating fan diffusion mouth is set on the gas flow pipe road 120 between circulating fan 150 and coke dry quenching furnace 100 160.And circulating fan diffusion mouth 160 is to when diffusing cryogenic inert gas, remaining sulphur and air in high-temperature coke Reaction generates SO2It can be emitted into air, pollute the environment with recyclegas.Wherein, pass through circulating fan diffusion mouth 160 cryogenic inert gas diffused are alternatively referred to as dry coke quenching exhaust gas.
In order to solve this problem, the utility model embodiment provides a kind of coke dry quenching furnace flue gas desulphurization unit, by right The dry coke quenching exhaust gas that circulating fan diffusion mouth 160 diffuses carries out desulfurization process so that the dry coke quenching exhaust gas energy being emitted into air Enough pollutions reduced to environment, also, by a kind of dry coke quenching flue gas desulphurization unit of application the utility model embodiment, it can The desulfurizer using coke oven is avoided, so as to save resource.
Illustrate the utility model embodiment in order to clearer, in the following, to a kind of coke dry quenching furnace of the utility model embodiment Flue gas desulphurization unit illustrates, as shown in Fig. 2, for a kind of coke dry quenching furnace flue gas desulphurization unit first of the utility model embodiment The structural schematic diagram of kind embodiment, the device may include:For importing the first connecting pipe 230 of coke dry quenching furnace exhaust gas, inhaling Second connecting pipe 210 of the coke dry quenching furnace exhaust gas after adsorption device 220 and discharge desulfurization process;
First connecting pipe, 230 one end is connected to 220 bottom of adsorbent equipment, the other end of the first connecting pipe 230 with follow Ring wind turbine diffusion mouth 160 connects, and one end of the second connecting pipe 210 is connected to 220 top of adsorbent equipment;
Adsorbent is mounted in adsorbent equipment 220, adsorbent is used for useless to the coke dry quenching furnace imported from the first connecting pipe 230 Gas carries out absorption desulfurization process.
Coke dry quenching furnace exhaust gas is diffused specifically, the first valve can be arranged in the circulating fan diffusion mouth 160, by following The coke dry quenching furnace exhaust gas that ring wind turbine diffusion mouth 160 diffuses can enter adsorbent equipment 220 by the first connecting pipe 230.
In adsorbent equipment 220, the adsorbent loaded in adsorbent equipment 220 can carry out absorption desulfurization to coke dry quenching furnace exhaust gas Processing, adsorbing the coke dry quenching furnace exhaust gas after desulfurization process can be discharged by the second connecting pipe 210.
In one possible implementation, the other end of second connecting pipe 210 can be connected to ground station for dust removal (not shown).
In another possible realization method, adsorbent can be with uniformly dispersing in adsorbent equipment, for example, such as Fig. 3 institutes Show, for the structure of the first embodiment of adsorbent equipment in a kind of dry coke quenching flue gas desulphurization unit of the utility model embodiment Schematic diagram, in the figure, adsorbent equipment 220 may include:At least two adsorbent pallets 2207 and tank body can be wherein set 2211, adsorbent can be with uniformly dispersing on the adsorbent pallet 2207.Between at least two adsorbents pallet 2207 can wait It away from arrangement, can not also be equally spaced, multiple holes can be uniformly arranged on each adsorbent pallet 2207, so that dry put out Furnace exhaust can reach 220 top of adsorbent equipment with through hole from 220 bottom of adsorbent equipment.
In another possible realization method, as shown in figure 4, for a kind of dry coke quenching exhaust gas of the utility model embodiment The structural schematic diagram of second of embodiment of adsorbent equipment in desulfurizer, in the figure, adsorbent equipment 220 may include: Support plate 2208, deflector 2209, adsorbent loading plate 2210, tank body 2211 can be arranged on adsorbent loading plate 2210 more A hole, so that dry coke quenching exhaust gas can reach 220 top of adsorbent equipment with through hole from 220 bottom of adsorbent equipment.First connection Pipeline 230 can be connected to 2211 bottom of tank body, and the second connecting pipe 210 can be connected to 2211 top of tank body.Deflector 2209 can be detachable be mounted on tank body 2211.In this realization method, dry coke quenching exhaust gas passes through 2211 bottom of tank body Portion enters adsorbent equipment 220, is then turned back by deflector U-shaped, finally by the second connection for being connected to 2211 top of tank body Pipeline 210 is discharged.
Above-mentioned adsorbent equipment 220 is exemplary only to be illustrated, it is every can reach dry coke quenching exhaust gas is taken off The adsorbent equipment of sulphuring treatment, can be applied in the utility model embodiment.Which is not described herein again.Need further exist for explanation That the adsorbent used in the utility model can select each common adsorbent for being used for desulfurization, the utility model herein not into Row limits.
Specifically, above-mentioned adsorbent can be activated carbon or activated coke.
In some instances, the coke dry quenching furnace exhaust gas that circulating fan diffusion mouth 160 is discharged can pass through the first connecting pipe 230 It imports in adsorbent equipment 220, desulfurization process can be carried out to coke dry quenching furnace exhaust gas by the adsorbent loaded in adsorbent equipment 220, Coke dry quenching furnace exhaust gas after desulfurization process can be discharged by the second connecting pipe 210.
A kind of coke dry quenching furnace flue gas desulphurization unit that the utility model embodiment provides, by discharging circulating fan diffusion mouth Exhaust gas import adsorbent equipment, in adsorbent equipment, using adsorbent to the SO in coke dry quenching furnace exhaust gas2Desulfurization process is carried out, it can With the SO in the coke dry quenching furnace exhaust gas that is discharged to circulating fan diffusion mouth2Desulfurization process is carried out, is reduced environmental pollution, also, pass through The desulfurizer using coke oven is avoided, so as to save resource.
In order to realize to SO2Content is less or does not contain SO2Coke dry quenching furnace exhaust gas carry out different modes processing, this reality A kind of realization method is additionally provided with new embodiment, as shown in figure 5, for a kind of coke dry quenching furnace exhaust gas of the utility model embodiment The structural schematic diagram of second of embodiment of desulfurizer, the coke dry quenching furnace flue gas desulphurization unit can also include:Third connecting tube Road 250 and first composition analyzer 240;
One end of third connecting pipe 250 is connected to the first connecting pipe 230, and the other end of third connecting pipe 250 connects It is connected on the second connecting pipe 210;First composition analyzer 240 is arranged in the first connecting pipe 230, and first composition analyzer 240 between the first connecting pipe 230 and 250 junction of third connecting pipe and circulating fan diffusion mouth 160.
Specifically, in some instances, can in third connecting pipe 250, and close to third connecting pipe 250 with Second valve is arranged in any position of first connecting pipe, 230 junction;In the first connecting pipe 230 and adsorbent equipment One third valve is set between 220 junctions and third connecting pipe 250 and 230 junction of the first connecting pipe.
Embodiment as one preferred, the second above-mentioned valve and third valve can be solenoid valves, so as to logical Cross signal control more easily to the second valve carry out open and close and third valve open and close.
First composition analyzer 240 can be to SO in the coke dry quenching furnace exhaust gas of the first connecting pipe 230 of entrance2Content carry out Detection, as SO in coke dry quenching furnace exhaust gas2Content be less than the first predetermined threshold value when, close third valve, open the second valve, make to do Furnace exhaust is put out to be discharged by second connecting pipe 210 of the importing of third connecting pipe 250;
As SO in coke dry quenching furnace exhaust gas2Content be more than the first predetermined threshold value when, open third valve, close the second valve, Coke dry quenching furnace exhaust gas is set to import adsorbent equipment 220, adsorbent equipment 220 can be to the SO in coke dry quenching furnace exhaust gas2Desulfurization process is carried out, is taken off Coke dry quenching furnace exhaust gas after sulphuring treatment can be discharged by the second connecting pipe 210.
In some instances, the first above-mentioned predetermined threshold value can be the threshold value being arranged according to national standards, can also when The threshold value being rule of thumb arranged, the utility model is at this to the first predetermined threshold value without limiting.
In some instances, above-mentioned first composition analyzer 240 can send SO to a control centre2Content it is anti- Feedback signal, control centre can be compared according to feedback signal and the first predetermined threshold value, then according to comparing result to second Valve and third valve send the control signal being turned on and off.
Pass through above-described embodiment, SO2Content is less or does not contain SO2Coke dry quenching furnace exhaust gas can pass through third connecting tube Road 250 quickly introduces the second connecting pipe 210, and the larger coke dry quenching furnace exhaust gas of SO2 contents can then pass through the first connecting pipe 230 It imports in adsorbent equipment 220 and carries out desulfurization process, discharged again by the second connecting pipe 210 after desulfurization process.
In another possible realization method of the utility model embodiment, in order to adsorbent equipment desulphurizing ability with it is dry SO in quenching exhaust gas2The matching of content, on the basis of coke dry quenching furnace flue gas desulphurization unit shown in Fig. 2, the utility model is implemented Example additionally provides a kind of realization method, as shown in fig. 6, for a kind of coke dry quenching furnace flue gas desulphurization unit the of the utility model embodiment The structural schematic diagram of three kinds of embodiments, in the figure, adsorbent equipment 220 may include:First adsorbent equipment 2201 and second Adsorbent equipment 2202;
The top of first adsorbent equipment 2201 is provided with first charging aperture 2203, bottom is provided with the first discharge port 2204, The top of second adsorbent equipment 2202 is provided with second charging aperture 2206, bottom is provided with the second discharge port 2205;
Specifically, adsorbent can be loaded into the first adsorbent equipment 2201 by first charging aperture 2203, can pass through Second charging aperture 2206 is loaded into the second adsorbent equipment 2202.The adsorbent to fail in first adsorbent equipment 2201 can pass through First discharge port, 2204 discharging, the adsorbent to fail in the second adsorbent equipment 2202 can be by 2205 discharging of the second discharge port.
First connecting pipe 230 includes the first total pipeline 2303, the first air inlet subtube 2301 and the second air inlet subtube 2302;One end of first air inlet subtube 2301 and the second air inlet subtube 2302 bottom with the first adsorbent equipment 2201 respectively Connected with the bottom of the second adsorbent equipment 2202, the other end of the first air inlet subtube 2301 and the second air inlet subtube 2302 with One end of first total pipeline 2303 connects, and the other end of the first total pipeline 2303 is connect with circulating fan diffusion mouth 160;
Second connecting pipe 210 includes the second total pipeline 2101, the first outlet subtube 2102 and the second outlet subtube 2103;One end of first outlet subtube 2102 and the second outlet subtube 2103 is respectively connected to the first adsorbent equipment 2201 The other end of the top at top and the second adsorbent equipment 2202, the first outlet subtube 2102 and the second outlet subtube 2103 with One end of second total pipeline 2101 connects.
Specifically, can be in charge of in the first total pipeline 2303 and the junction of the first air inlet subtube 2301 and the first air inlet Between road 2301 and the junction of the first adsorbent equipment 2201 be arranged the 4th valve, the first total pipeline 2303 and second into It is arranged one between the junction of qi leel pipeline 2302 and the second air inlet subtube 2302 and the junction of the second adsorbent equipment 2202 A 5th valve.
By the way that the 4th valve and the 5th valve is arranged, coke dry quenching furnace exhaust gas enters the first absorption by the first total pipeline 2303 and fills Set 2201 and/or second adsorbent equipment 2202.Such as:
When the 4th valve is opened, and the 5th valve is closed, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303 and first Air inlet subtube 2301 enters the first adsorbent equipment 2201, makes the first adsorbent equipment 2201 to the SO in coke dry quenching furnace exhaust gas2It carries out Desulfurization process, the coke dry quenching furnace exhaust gas after desulfurization process import the second total pipeline 2101 by the first outlet subtube 2102 and are arranged It puts;
When the 4th valve is closed, and the 5th valve is opened, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303 and second Air inlet is in charge of 2302 and enters the second adsorbent equipment 2202, makes the second adsorbent equipment 2202 to the SO in coke dry quenching furnace exhaust gas2It carries out Desulfurization process, the coke dry quenching furnace exhaust gas after desulfurization process import the second total pipeline 2101 by the second outlet subtube 2103 and are arranged It puts.
When the 4th valve and the 5th valve open simultaneously, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303, first Air inlet subtube 2301 and the second air inlet are in charge of 2302 and are respectively enterd in the first adsorbent equipment 2201 and the second adsorbent equipment 2202, Make the first adsorbent equipment 2201 and the second adsorbent equipment 2202 to the SO in coke dry quenching furnace exhaust gas2Carry out desulfurization process, desulfurization process Coke dry quenching furnace exhaust gas afterwards by the first outlet subtube 2102 and the second outlet subtube 2103 import the second total pipeline 2101 into Row discharge.
In some instances, as SO in dry coke quenching exhaust gas2It, can be by opening simultaneously the 4th valve and when content is larger Five valves make the first adsorbent equipment 2201 and the second adsorbent equipment 2202 to the SO in coke dry quenching furnace exhaust gas2Carry out desulfurization process;
As SO in dry coke quenching exhaust gas2When content is smaller, the 4th valve can be opened, the 5th valve is closed, makes the second absorption Device 2202 is to the SO in coke dry quenching furnace exhaust gas2Desulfurization process is carried out, alternatively,
The 4th valve is closed, the 5th valve is opened, makes the second adsorbent equipment 2202 to the SO in coke dry quenching furnace exhaust gas2It is taken off Sulphuring treatment.
In one possible implementation, the first above-mentioned adsorbent equipment and the second adsorbent equipment can be used alternatingly, Such as:When adsorbent fails in the first adsorbent equipment, the second adsorbent equipment can be selected to carry out at desulfurization dry coke quenching exhaust gas Reason selects the first adsorbent equipment to carry out desulfurization process to dry coke quenching exhaust gas when adsorbent fails in the second adsorbent equipment.
In another possible realization method, the desulfurization process of the discharge of the second total pipeline of periodic detection 2101 can be passed through SO in dry coke quenching exhaust gas afterwards2Content, to judge whether adsorbent fails.
Embodiment as one preferred, the 4th above-mentioned valve and the 5th valve can be solenoid valves, so as to logical Cross signal control more easily to the second valve carry out open and close and third valve open and close.
A kind of dry coke quenching flue gas desulphurization unit provided by the utility model embodiment, may be implemented an adsorbent equipment Work, another adsorbent equipment is as spare adsorbent equipment in case Emergency use, can also realize that two adsorbent equipments alternately make With furthermore it is also possible to the desulphurizing ability and SO in dry coke quenching exhaust gas of realizing adsorbent equipment2The matching of content.
In another possible realization method of the utility model embodiment, coke dry quenching furnace exhuast gas desulfurization shown in Fig. 2 On the basis of device, the utility model embodiment additionally provides a kind of realization method, as shown in fig. 7, implementing for the utility model A kind of structural schematic diagram of the 4th kind of embodiment of coke dry quenching furnace flue gas desulphurization unit of example, in the figure, first composition analyzer 240 can be to SO in the coke dry quenching furnace exhaust gas of the first connecting pipe 230 of entrance2Content be detected, as SO in coke dry quenching furnace exhaust gas2 Content be less than the first predetermined threshold value when, make coke dry quenching furnace exhaust gas pass through third connecting pipe 250 import the second connecting pipe 210 into Row discharge;
As SO in coke dry quenching furnace exhaust gas2Content be more than the first predetermined threshold value when, open third valve, close the second valve.
It is then possible to open the 4th valve, the 5th valve is closed, coke dry quenching furnace exhaust gas is made to pass through the first total pipeline 2303 and the One air inlet subtube 2301 enters the first adsorbent equipment 2201;Or
The 4th valve is closed, the 5th valve is opened, coke dry quenching furnace exhaust gas is made to pass through the first total pipeline 2303 and second into qi leel Pipe 2302 enters the second adsorbent equipment 2202;Or
The 4th valve and the 5th valve are opened simultaneously, coke dry quenching furnace exhaust gas is made to pass through the first total pipeline 2303, first into qi leel Pipeline 2301 and the second air inlet are in charge of 2302 and respectively enter the first adsorbent equipment 2201 and the second adsorbent equipment 2202.
In another possible realization method of the utility model embodiment, in order to preferably detect the SO of discharge2's Whether content is qualified, and on the basis of coke dry quenching furnace flue gas desulphurization unit shown in Fig. 7, the utility model embodiment additionally provides one Kind realization method, as shown in figure 8, for a kind of the 5th kind of embodiment of coke dry quenching furnace flue gas desulphurization unit of the utility model embodiment Structural schematic diagram, coke dry quenching furnace flue gas desulphurization unit can also include:Second composition analyzer 260;
Second composition analyzer 260 is arranged on the second total pipeline 2101, and second composition analyzer 260 is located at except second Position except 2103 junction of total pipeline 2101 and the first outlet subtube 2102 and the second outlet subtube.
Specifically, when the 4th valve is opened, when the 5th valve is closed, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303 And first air inlet subtube 2301 enter the first adsorbent equipment 2201, second composition analyzer 260 can detect the first absorption dress Set SO in the coke dry quenching furnace exhaust gas after the desulfurization process of 2201 discharges2Content, when the first adsorbent equipment 2201 discharge desulfurization at SO in coke dry quenching furnace exhaust gas after reason2Content when being more than the second predetermined threshold value, control signal can be sent, the 4th valve of control closes It closes, the 5th valve is opened, so that coke dry quenching furnace exhaust gas enters the second adsorbent equipment 2202 by the second air inlet subtube 2302;
When the 4th valve is closed, and the 5th valve is opened, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303 and second Air inlet is in charge of 2302 and enters the second adsorbent equipment 2202, and second composition analyzer 260 can detect the second adsorbent equipment 2202 SO in coke dry quenching furnace exhaust gas after the desulfurization process of discharge2Content, when the second adsorbent equipment 2202 discharge desulfurization process after SO in coke dry quenching furnace exhaust gas2Content when being more than the second predetermined threshold value, can send control signal, the 4th valve of control is opened, the Five valves are closed, so that coke dry quenching furnace exhaust gas enters the first adsorbent equipment 2201 by the first air inlet subtube 2301;
When the 4th valve and the 5th valve open simultaneously, coke dry quenching furnace exhaust gas can pass through the first total pipeline 2303, first Air inlet subtube 2301 and the second air inlet are in charge of 2302 and are respectively enterd in the first adsorbent equipment 2201 and the second adsorbent equipment 2202, After second composition analyzer 260 can detect the desulfurization process of the first adsorbent equipment 2201 and the discharge of the second adsorbent equipment 2202 SO in coke dry quenching furnace exhaust gas2Content, when the desulfurization process that the first adsorbent equipment 2201 and the second adsorbent equipment 2202 are discharged after SO in coke dry quenching furnace exhaust gas2Content be more than the second predetermined threshold value when, second composition analyzer 260 can send adsorbent equipment failure Alarm signal so that staff can replace the suction in the first adsorbent equipment 2201 and the second adsorbent equipment 2202 in time Attached dose.
In some instances, above-mentioned second composition analyzer 260 can send SO to a control centre2Content it is anti- Feedback signal, control centre can be compared according to feedback signal and the second predetermined threshold value, then according to comparing result to the 4th Valve and the 5th valve send the control signal being turned on and off.
In some instances, the second above-mentioned predetermined threshold value can be the threshold value being arranged according to national standards, can also when The threshold value being rule of thumb arranged.
In some instances, the second predetermined threshold value can be identical as the first predetermined threshold value, can also be with the second predetermined threshold value It is different.
By increasing second composition analyzer 260, the SO of discharge can be preferably detected2Content it is whether qualified, simultaneously It realizes the more convenient control to the 4th valve and the 5th valve, the one of the utility model embodiment is more easily used to realize Kind dry coke quenching flue gas desulphurization unit.
In the possible realization method of another of the utility model embodiment, SO is further reduced in order to realize2Discharge, And then pollution of the coke dry quenching furnace exhaust gas to environment is reduced, on the basis of coke dry quenching furnace flue gas desulphurization unit shown in Fig. 8, this practicality is new Type embodiment additionally provides a kind of realization method, as shown in figure 9, for a kind of coke dry quenching furnace exhuast gas desulfurization of the utility model embodiment The structural schematic diagram of the 6th kind of embodiment of device, coke dry quenching furnace flue gas desulphurization unit can also include:First exhaust return line road 270 and the second exhaust return line road 280;
The one end in the first exhaust return line road 270 is connected on the first air inlet subtube 2301, and the other end is connected to second On outlet subtube 2103;
The one end in the second exhaust return line road 280 is connected on the second air inlet subtube 2302, and the other end is connected to first On outlet subtube 2102.
Specifically, the 6th valve can be arranged on the first exhaust return line road 270, in the second outlet subtube 2103 and second total pipeline 2101 junction and the second outlet subtube 2103 and the first exhaust return line road 270 junction Between be arranged the 7th valve.
By the way that the 6th valve and the 7th valve is arranged, the second adsorbent equipment can be detected in second composition analyzer 260 SO in coke dry quenching furnace exhaust gas after the desulfurization process of 2202 discharges2Content be more than the second predetermined threshold value, and send control signal control When making the 4th valve opening, the closing of the 5th valve, while control signal is sent to the 6th valve and the 7th valve, make the 6th valve It opens, the 7th valve is closed, and then the coke dry quenching furnace exhaust gas after the desulfurization process of the second adsorbent equipment 2202 discharge is made to pass through first Exhaust return line road 270 imports the first air inlet subtube 2301, and the first air inlet subtube 2301 is by the coke dry quenching furnace after desulfurization process Exhaust gas imports the first adsorbent equipment 2201 and carries out desulfurization process.
So that adsorbent fails in the second adsorbent equipment 2202, will be put out into the first the dry of total pipeline 2303 When burnt exhaust gas imports the first adsorbent equipment 2201, remaining dry coke quenching exhaust gas in the second adsorbent equipment 2202 is also introduced into the first suction In adsorption device 2201, to reduce SO2Discharge, reduce environmental pollution.
Specifically, the 8th valve can also be arranged on the second exhaust return line road 280, in the first outlet subtube 2102 and second total pipeline 2101 junction and the first outlet subtube 2102 and the second exhaust return line road 270 junction Between be arranged the 9th valve.
By the way that the 8th valve and the 9th valve is arranged, the first adsorbent equipment can be detected in second composition analyzer 260 SO in coke dry quenching furnace exhaust gas after the desulfurization process of 2201 discharges2Content be more than the second predetermined threshold value, and send control signal control When making the closing of the 4th valve, the 5th valve opening, while control signal is sent to the 8th valve and the 9th valve, make the 8th valve It opens, the 9th valve is closed, and then the coke dry quenching furnace exhaust gas after the desulfurization process of the first adsorbent equipment 2201 discharge is made to pass through second Exhaust return line road 280 imports the second air inlet subtube 2302, and the second air inlet subtube 2302 is by the coke dry quenching furnace after desulfurization process Exhaust gas imports the second adsorbent equipment 2202 and carries out desulfurization process;
So that adsorbent fails in the first adsorbent equipment 2201, will be put out into the first the dry of total pipeline 2303 When burnt exhaust gas imports the second adsorbent equipment 2202, remaining dry coke quenching exhaust gas in the first adsorbent equipment 2201 is also introduced into the second suction In adsorption device 2202, to reduce SO2Discharge, reduce environmental pollution.
Embodiment as one preferred, above-mentioned the 6th valve, the 7th valve, the 8th valve and the 9th valve can be Solenoid valve, so as to more easily be carried out to the 6th valve, the 7th valve, the 8th valve and the 9th valve by signal control It opens and closes.
By the utility model embodiment, may be implemented dry to put out to remaining in the first adsorbent equipment or the second adsorbent equipment The desulfurization process of burnt exhaust gas, so as to be further reduced SO2Discharge, reduce pollution of the dry coke quenching exhaust gas to environment.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
Each embodiment in this specification is all made of relevant mode and describes, identical similar portion between each embodiment Point just to refer each other, and each embodiment focuses on the differences from other embodiments.
The above is only the preferred embodiment of the utility model only, is not intended to limit the protection model of the utility model It encloses.Any modification, equivalent substitution, improvement and etc. made within the spirit and principle of the present invention, are all contained in this reality With in novel protection domain.

Claims (5)

1. a kind of coke dry quenching furnace flue gas desulphurization unit, which is characterized in that described device includes:First for importing coke dry quenching furnace exhaust gas Second connecting pipe of the coke dry quenching furnace exhaust gas after connecting pipe, adsorbent equipment and discharge desulfurization process;
First connecting pipe one end is connected to the adsorbent equipment bottom, the other end and cycle of first connecting pipe Wind turbine diffusion mouth connects, and one end of second connecting pipe is connected at the top of the adsorbent equipment;
Adsorbent is mounted in the adsorbent equipment, the adsorbent is used for the coke dry quenching furnace exhaust gas to being imported from the first connecting pipe Carry out absorption desulfurization process.
2. the apparatus according to claim 1, which is characterized in that described device further includes:Third connecting pipe and the first one-tenth Divide analyzer;
One end of the third connecting pipe is connected to first connecting pipe, the other end connection of the third connecting pipe In second connecting pipe;The first composition analyzer is arranged in first connecting pipe, and the first composition Analyzer is between first connecting pipe and third connecting pipe junction and the circulating fan diffusion mouth.
3. device according to claim 1 or 2, which is characterized in that the adsorbent equipment includes:First adsorbent equipment and Two adsorbent equipments;
It is provided with first charging aperture at the top of first adsorbent equipment, bottom is provided with the first discharge port, second absorption Second charging aperture is provided at the top of device, bottom is provided with the second discharge port;
First connecting pipe includes the first total pipeline, the first air inlet subtube and the second air inlet subtube;Described first into One end of qi leel pipeline and the second air inlet subtube respectively with the bottom of first adsorbent equipment and second adsorbent equipment Bottom connection, the other end of the first air inlet subtube and the second air inlet subtube connects with one end of first total pipeline It connects, the other end of first total pipeline is connect with circulating fan diffusion mouth;
Second connecting pipe includes the second total pipeline, the first outlet subtube and the second outlet subtube;Described first goes out One end of qi leel pipeline and the second outlet subtube is respectively connected to the top of first adsorbent equipment and second absorption The other end of the top of device, the first outlet subtube and the second outlet subtube connects with one end of second total pipeline It connects.
4. device according to claim 3, which is characterized in that described device further includes:Second composition analyzer;
The second composition analyzer is arranged on second total pipeline, and the second composition analyzer is located at except described the Two total pipelines and the position except the first outlet subtube and the second outlet subtube junction.
5. device according to claim 4, which is characterized in that described device further includes:First exhaust return line road and Second exhaust return line road;
The one end in first exhaust return line road is connected on the first air inlet subtube, and the other end is connected to described second On outlet subtube;
The one end in second exhaust return line road is connected on the second air inlet subtube, and the other end is connected to described first On outlet subtube.
CN201820061183.1U 2018-01-15 2018-01-15 A kind of coke dry quenching furnace flue gas desulphurization unit Active CN207793152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820061183.1U CN207793152U (en) 2018-01-15 2018-01-15 A kind of coke dry quenching furnace flue gas desulphurization unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820061183.1U CN207793152U (en) 2018-01-15 2018-01-15 A kind of coke dry quenching furnace flue gas desulphurization unit

Publications (1)

Publication Number Publication Date
CN207793152U true CN207793152U (en) 2018-08-31

Family

ID=63271903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820061183.1U Active CN207793152U (en) 2018-01-15 2018-01-15 A kind of coke dry quenching furnace flue gas desulphurization unit

Country Status (1)

Country Link
CN (1) CN207793152U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107987851A (en) * 2018-01-15 2018-05-04 鞍山华泰环能工程技术有限公司 A kind of coke dry quenching furnace flue gas desulphurization unit and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107987851A (en) * 2018-01-15 2018-05-04 鞍山华泰环能工程技术有限公司 A kind of coke dry quenching furnace flue gas desulphurization unit and method

Similar Documents

Publication Publication Date Title
CN101024143A (en) Sinter-smoke circulation collected desulfurizing method and apparatus
CN108592054B (en) VOCs processing system of coke-oven plant
CN205127741U (en) Coke oven burnt gas deNOx systems
CN108800171A (en) A kind of coke-oven plant VOCs burnings processing system
CN207793152U (en) A kind of coke dry quenching furnace flue gas desulphurization unit
CN205360996U (en) Environment-friendly steelmaking smoke and dust treatment facility
CN107899888A (en) A kind of VOCs processing units for being used for accurate coating apparatus
CN104707470B (en) Activated coke/soot desulfurization and desorbing integrated system
CN201411467Y (en) Converter gas dry dedusting system and explosion-proof device thereof
CN107987851A (en) A kind of coke dry quenching furnace flue gas desulphurization unit and method
CN211475964U (en) Tank field high concentration styrene exhaust-gas treatment system
CN204543984U (en) Activated coke/charcoal flue gas desulfurization and desorb integrated system
CN206192961U (en) Denitration catalyst capability test device
CN211921415U (en) Processing system of coke oven and dry quenching furnace diffused gas
CN212396382U (en) SCR catalyst online replacement reactor
CN209624517U (en) A kind of desulphurization denitration flue gas inspection device
CN212348255U (en) A flue gas desulfurization device for environmental protection field
CN201152536Y (en) Flue arrangement structure and flue gas desulfurization system containing same
CN209005551U (en) A kind of explosion-proof catalytic oxidizing equipment
CN209378716U (en) A kind of processing equipment of organic exhaust gas
CN110624377A (en) Dry quenching flue gas desulfurization system and desulfurization process
CN207805904U (en) VOCs processing units suitable for accurate coating apparatus
CN207162557U (en) A kind of methane purification exhaust gas processing device
CN106085477A (en) A kind of biomass become charcoal combustor
CN217526983U (en) Dry quenching double-circuit flue gas desulfurization device

Legal Events