CN207777052U - Pump turbine guide vane end clearance adjusts structure - Google Patents

Pump turbine guide vane end clearance adjusts structure Download PDF

Info

Publication number
CN207777052U
CN207777052U CN201820018984.XU CN201820018984U CN207777052U CN 207777052 U CN207777052 U CN 207777052U CN 201820018984 U CN201820018984 U CN 201820018984U CN 207777052 U CN207777052 U CN 207777052U
Authority
CN
China
Prior art keywords
hole
guide vane
screw
pin hole
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820018984.XU
Other languages
Chinese (zh)
Inventor
余睿
林文峰
庄坚菱
郑宏用
陈星伊
胡海虹
覃海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN XIANYOU PUMPED STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
FUJIAN XIANYOU PUMPED STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN XIANYOU PUMPED STORAGE Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical FUJIAN XIANYOU PUMPED STORAGE Co Ltd
Priority to CN201820018984.XU priority Critical patent/CN207777052U/en
Application granted granted Critical
Publication of CN207777052U publication Critical patent/CN207777052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/16Mechanical energy storage, e.g. flywheels or pressurised fluids

Abstract

The utility model is related to a kind of pump turbine guide vane end clearances to adjust structure,Including lifting bolt,Guide vane teunnion,Guide vane lever,Guide vane lever upper end cover is equipped with end cap,It is provided with through-hole in the middle part of end cap,End cap periphery is evenly distributed in several mounting holes,Pin hole A,It is provided on guide vane lever and mounting hole,The matched screw holes of pin hole A,Pin hole B,Screw hole is arranged in a one-to-one correspondence with mounting hole,Pin hole A is arranged in a one-to-one correspondence with pin hole B,End cap, which wears long, mounting hole and to be locked with the end cap fixing bolt of screw hole screw-thread fit with guide vane lever,It is provided with pin in pin hole B corresponding pin hole A,Guide vane teunnion end set has threaded hole,Lifting bolt lower end wear through-hole and with threaded hole screw-thread fit,At least two adjusting screw hole of through-hole periphery circumference uniform distribution,The adjusting bolt with its screw-thread fit is provided in adjusting screw hole,Adjusting bolt lower end is against guide vane teunnion,The utility model gap adjustment is convenient,Without dismantling component when gap adjustment,Shorten adjustment time and maintenance duration.

Description

Pump turbine guide vane end clearance adjusts structure
Technical field
The utility model is related to a kind of pump turbine guide vane end clearances to adjust structure.
Background technology
Pump turbine is the Novel flush accumulation of energy unit occurred the 1930s, with the hydraulic turbine and the concatenated storage of water pump Energy unit is compared, and weight considerably reduces, and cost reduces, thus is used widely.Pump turbine be broadly divided into mixed-flow, Diagonal flow type and tubular, the range for being applicable in head/lift are different.Mixed-flow and the inclained flow type water pump hydraulic turbine are mainly used in big-and-middle Type hydroenergy storage station, wherein the most widely used is mixed flow pump turbine.It is tubular to be then applied to tidal power station more. In addition, in the pumping plant that some are equipped with axial-flow pump, also has and to be generated electricity using axial flow pump reversion.
Large capacity hydroenergy storage station head is higher, and pump turbine guide vane end clearance does not have sealing device, is metal Clearance seal, this controls guide vane end clearance and proposes requirements at the higher level, needs repetition measurement guide vane upper and lower side in unit maintenance every time Face gap, if unqualified readjusted, when ensureing unit normal operation, guide vane upper and lower end face meets service requirement, Conventional pilot end of blade face gap adjusting structure is adjustment guide vane shaft end spacer thickness, achievees the purpose that adjust guide vane end clearance, this When kind structure adjusts guide vane end clearance every time, need to tear open guide vane lifting bolt, end cap pin, end cap fixing bolt, end cap It removes, takes out adjustment cushion block and the thickness of cushion block is adjusted according to the upper and lower end face Gap Analysis of measurement, then guide vane is utilized to lift spiral shell Bolt control promotes the height of guide vane, realizes that guide vane end clearance adjusts purpose, adjusting process is time-consuming and laborious, especially in water wheel chamber Operation is even more difficulty in the confined space.
Invention content
The purpose of this utility model is to be directed to the above shortcoming, provides a kind of pump turbine guide vane end clearance tune Whole structure.
Scheme is used by the utility model solves technical problem:A kind of pump turbine guide vane end clearance adjustment knot Structure, including lifting bolt, guide vane teunnion, the guide vane lever being set on guide vane teunnion, the guide vane lever upper end cover is equipped with end cap, in end cap Portion is provided with through-hole, and end cap periphery is evenly distributed in several mounting holes, pin hole A, is provided on guide vane lever and mounting hole, pin hole A Matched screw hole, pin hole B, screw hole are arranged in a one-to-one correspondence with mounting hole, and pin hole A is arranged in a one-to-one correspondence with pin hole B, and end cap wears long Mounting hole is simultaneously locked with the end cap fixing bolt of screw hole screw-thread fit with guide vane lever, is set in pin hole B corresponding pin hole A Be equipped with pin, guide vane teunnion end set has a threaded hole, lifting bolt lower end wear through-hole and with threaded hole screw-thread fit, outside through-hole At least two adjusting screw hole of all circumference uniform distributions, is provided with the adjusting bolt with its screw-thread fit in adjusting screw hole, under adjusting bolt It holds against guide vane teunnion.
Further, the axial line of mounting hole, the axial line of pin hole A are identical as the distance between the axle center of through-hole, through-hole It is located in mounting hole side.
Further, pin hole A is symmetrical arranged two.
Further, screw hole is arranged 6.
Further, adjusting screw hole is arranged three.
Further, adjusting bolt is carbon steel bolt.
Compared with prior art, the utility model has following advantageous effect:Simple in structure, setting is reasonable, cancels existing knot The adjustment cushion block of the guide vane shaft end of structure uses adjusting bolt instead and adjusts guide vane end clearance, and gap adjustment is convenient, when gap adjustment without Component need to be dismantled, adjustment time and maintenance duration are shortened.
Description of the drawings
The utility model patent is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structure top view of the utility model.
In figure:
1- guide vane levers;2- drag rings;3- end caps;4- fixing bolts;5- pins;6- adjusting bolts;7- adjusting screw holes;8- is carried Draw bolt;9- through-holes;10- guide vane teunnions;11- break pins;12- guide vane pins.
Specific implementation mode
The utility model is further illustrated with reference to the accompanying drawings and detailed description.
As shown in Figs. 1-2, a kind of pump turbine guide vane end clearance adjusts structure, including lifting bolt, installation guide vane Guide vane teunnion, the guide vane lever that is set on guide vane teunnion, the guide vane lever upper end cover is equipped with end cap, through-hole is provided in the middle part of end cap, End cap periphery is evenly distributed in several mounting holes, pin hole A, be provided on guide vane lever with mounting hole, the matched screw holes of pin hole A, Pin hole B, screw hole are arranged in a one-to-one correspondence with mounting hole, and pin hole A is arranged in a one-to-one correspondence with pin hole B, end cap wear long mounting hole and and spiral shell End cap fixing bolt and the guide vane lever of hole screw-thread fit are locked, and are provided with pin in pin hole B corresponding pin hole A, lead Rachis end set has a threaded hole, lifting bolt lower end wear through-hole and with threaded hole screw-thread fit, through-hole periphery circumference uniform distribution At least two adjusting screw holes, are provided with the adjusting bolt with its screw-thread fit in adjusting screw hole, and adjusting bolt lower end is against guide vane Axis.
In the present embodiment, the axial line of mounting hole, the axial line of pin hole A are identical as the distance between the axle center of through-hole, Through-hole is located in mounting hole side.
In the present embodiment, pin hole A is symmetrical arranged two.
In the present embodiment, screw hole is arranged 6.
In the present embodiment, adjusting screw hole is arranged three.
In the present embodiment, adjusting bolt is carbon steel bolt.
When gap adjusts, guide vane upper and lower end face gap is measured, upper surface is then determined according to the end clearance measured Gap increases or reduces(It is that lower face gap reduces or increases accordingly).First, first each adjusting bolt is unclamped, if It needs to reduce guide vane upper surface gap(Increase guide vane lower face gap), guide vane lifting bolt is corresponding urgent whole by guide vane teunnion Body is lifted up, then measures whether guide vane upper and lower end face gap meets adjustment requirement, if not satisfied, continuing urgent guide vane lifting spiral shell Then bolt adjustment uniformly fastens each adjusting bolt until clearance between guide vanes are met the requirements, then the urgent guide vane of torque as required again Lift bolt;If desired increase guide vane upper surface gap(Reduce lower face gap), guide vane lifting bolt is unclamped, then towards tight Gu uniformly guide vane teunnion is integrally pressed downward by urgent each adjusting bolt in direction, then measures whether guide vane upper and lower end face gap meets tune Whole requirement, if not satisfied, continuing uniformly urgent each adjusting bolt adjustment until clearance between guide vanes are met the requirements, then as requested The urgent guide vane of torque lifts bolt.After the completion of finally adjusting process, it is welded and fixed each adjusting bolt with locking plate and guide vane lifts Bolt prevents from loosening in unit running process.
Entire guide vane end clearance adjusts process, need not remove guide vane lifting bolt, end cap pin, end cap again and fix spiral shell These components of bolt, end cap, then the thickness of adjustment adjustment cushion block, directly utilizes adjusting bolt to replace original adjustment cushion block, It is convenient to adjust polyvinyl chloride, saves manpower and time.
Above-listed preferred embodiment has been further described the purpose of this utility model, technical solution and advantage, It should be understood that the above is only the preferred embodiment of the utility model only, it is not intended to limit the utility model, it is all Within the spirit and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this practicality Within novel protection domain.

Claims (6)

1. a kind of pump turbine guide vane end clearance adjusts structure, it is characterised in that:Including lifting bolt, guide vane teunnion, it is arranged Guide vane lever on guide vane teunnion, the guide vane lever upper end cover are equipped with end cap, are provided with through-hole in the middle part of end cap, end cap periphery circumference is equal Be furnished with several mounting holes, pin hole A, be provided on guide vane lever with mounting hole, the matched screw holes of pin hole A, pin hole B, screw hole with it is solid Determine hole to be arranged in a one-to-one correspondence, pin hole A is arranged in a one-to-one correspondence with pin hole B, end cap wear long mounting hole and with the end of screw hole screw-thread fit Lid fixing bolt is locked with guide vane lever, and pin is provided in pin hole B corresponding pin hole A, and guide vane teunnion end set has Threaded hole, lifting bolt lower end wear through-hole and with threaded hole screw-thread fit, through-hole periphery circumference uniform distribution at least two adjusts spiral shell Hole, is provided with the adjusting bolt with its screw-thread fit in adjusting screw hole, and adjusting bolt lower end is against guide vane teunnion.
2. pump turbine guide vane according to claim 1 end clearance adjusts structure, it is characterised in that:The axis of mounting hole Heart line, the axial line of pin hole A are identical as the distance between the axle center of through-hole, and through-hole is located in mounting hole side.
3. pump turbine guide vane according to claim 1 end clearance adjusts structure, it is characterised in that:Pin hole A is symmetrical Setting two.
4. pump turbine guide vane according to claim 1 end clearance adjusts structure, it is characterised in that:Screw hole setting 6 It is a.
5. pump turbine guide vane according to claim 1 end clearance adjusts structure, it is characterised in that:Adjusting screw hole is set Set three.
6. pump turbine guide vane according to claim 1 end clearance adjusts structure, it is characterised in that:Adjusting bolt is Carbon steel bolt.
CN201820018984.XU 2018-01-05 2018-01-05 Pump turbine guide vane end clearance adjusts structure Active CN207777052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820018984.XU CN207777052U (en) 2018-01-05 2018-01-05 Pump turbine guide vane end clearance adjusts structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820018984.XU CN207777052U (en) 2018-01-05 2018-01-05 Pump turbine guide vane end clearance adjusts structure

Publications (1)

Publication Number Publication Date
CN207777052U true CN207777052U (en) 2018-08-28

Family

ID=63222519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820018984.XU Active CN207777052U (en) 2018-01-05 2018-01-05 Pump turbine guide vane end clearance adjusts structure

Country Status (1)

Country Link
CN (1) CN207777052U (en)

Similar Documents

Publication Publication Date Title
CN207777052U (en) Pump turbine guide vane end clearance adjusts structure
CN204858400U (en) Slope shaft tower unscrambler
CN208310952U (en) A kind of pre-embedded bolt structure of adjustment type wind electricity blade blade root
CN109931225B (en) Non-welded connection structure of fan tower platform
CN204250308U (en) A kind of jacking apparatus of hatch cover
CN106523673B (en) A kind of gear box vibration damping device and vibration damping means of defence
CN108757298A (en) A kind of pre-embedded bolt structure of wind electricity blade blade root
CN207777051U (en) A kind of guide vanes of water turbine end clearance adjusting apparatus
CN209818207U (en) Yaw brake system of wind turbine generator
CN104668933A (en) Disassembling and assembling supporting seat and assembling and disassembling method used for rotating arm and pivot of turbine runner
CN205096774U (en) Wind power generation tower section of thick bamboo flange assembly platform
CN210033715U (en) Non-welded connection structure of fan tower platform
CN202483781U (en) Water turbine rotating wheel supporting device
CN201943935U (en) Motor centering displacement regulator
CN210317605U (en) Maintenance and installation tool for yaw brake of wind generating set
CN210239898U (en) Middle hole plugging device for rotating shaft of middle-dismantling type water turbine
CN203715084U (en) Novel crane wheel set
CN202556667U (en) Injection molding machine rotating injection platform
CN207062762U (en) Bridge inspection vehicle slewing equipment
CN209482264U (en) Pin assembling/disassembling fast-positioning device
CN204450399U (en) Guide vane lever dismantling device
CN216510985U (en) Shield segment conveying line convenient for adjusting pulley damping
CN208702175U (en) The novel sand discharging box structure of piston type self-unloading
CN207328161U (en) The preposition fast charge socket mounting structure of electric automobile
CN213333294U (en) Mounting device for mounting electromechanical equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant