CN207776794U - The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism - Google Patents

The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism Download PDF

Info

Publication number
CN207776794U
CN207776794U CN201820120759.7U CN201820120759U CN207776794U CN 207776794 U CN207776794 U CN 207776794U CN 201820120759 U CN201820120759 U CN 201820120759U CN 207776794 U CN207776794 U CN 207776794U
Authority
CN
China
Prior art keywords
connecting rod
cam
drilling
screw
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820120759.7U
Other languages
Chinese (zh)
Inventor
田家林
黎根银
杨琳
何虹志
周思奇
周仪
熊洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Sealand Energy Technology Ltd.
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201820120759.7U priority Critical patent/CN207776794U/en
Application granted granted Critical
Publication of CN207776794U publication Critical patent/CN207776794U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of downhole tools that automatic vertical drilling is realized using cam four-bar mechanism in the fields such as oil drilling, it is to be axially moved by convert rotational motion, convert axial movement to radial motion again, in drilling process, when hole deviation occurs, it lays particular stress on the heavier side of casing and the low side of wellbore is automatically rotated to by bearing a and bearing c under the effect of gravity, drive connecting rod base rotation, connecting rod a and connecting rod b is set to be always positioned at wellbore flash, top connection drives central tube rotation, roller mount makes cam pump with central tube synchronous rotation, to drive connecting rod a and connecting rod b to be continuously urged to the borehole wall, the reaction force of a cycle is generated to correct hole deviation, realize normal drilling, improve drilling efficiency.The utility model realizes that the downhole tool of automatic vertical drilling can effectively correct hole deviation using cam four-bar mechanism, ensures the precision vertically crept into, to improve drilling efficiency and hole quality, saves production cost.

Description

The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism
Technical field
The utility model belongs to a kind of Novel down-hole drilling tool of oil-gas drilling engineering field, more particularly to a kind of The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism.
Background technology
With the increase of natural petroleum gas field degree, exploitation difficulty also continues to increase, the geology ring that drilling engineering faces Border also becomes increasingly complex with drilling technology.Ground environment difference proposes the use of downhole well tool new requirement, improves The service life of downhole tool improves drilling efficiency, and it is also the inexorable trend of energy conservation and environmental protection under the new situation to save drilling cost. In Vertical Well drilling process, due to the complexity on drilling stratum and boring mechanic and technique etc., drilling well bending hardly may be used It avoids, to be had an impact to drillng operation, reduces drilling efficiency, increase drilling cost, anti-oblique exactly one of straight well is generally deposited In, unusual distinct issues.
Vertical drilling tool is mainly used in oil and gas well drilling engineering.Since the anti-oblique well straightening technology of conventional straight well is applicable in It is limited in scope, has been unable to meet the needs of drilling well under such as high-dip structure, deep-well complex situations, and people also gradually recognize It arrives, drilling straight-hole is not low cost and simple drillng operation, and there is an urgent need to develop new anti-oblique technology.New anti-oblique technology should not But can it is anti-oblique, and can beat soon, by it is high-quality with efficiently effectively unite.Routine straight well is anti-oblique mainly with meeting the eye on every side group at present It closes " weight is bored soon ", with Man Baozhi, well straightening is using pendulum combination " light pressure is hung up and beaten ", and with slow well straightening, defect is:Rely solely on brill It is extremely limited to have the restoring force that the pendulum force of itself generates, and drilling quality is improved to sacrifice drilling speed, this method is difficult Reach not only fast but also drill out the high verticality borehole wall with saving target to be bored with sacrificing with bit pressure and height is sacrificed at small hole deviation is exchanged for originally Speed exchanges wellbore quality for, is not inconsistent with economic benefit.
Utility model content
For solve background technology described in Vertical Well drilling operation course since formation factor and technical reason are made At hole deviation situation, the problem low so as to cause drilling efficiency, drilling cost is high, drilling period is long, the utility model carries A kind of downhole tool for realizing automatic vertical drilling using cam four-bar mechanism is supplied.
The technical solution of the utility model is:Realize the downhole tool of automatic vertical drilling by upper using cam four-bar mechanism Connector, sealing ring, bearing a, lays particular stress on casing, is roller mount, idler wheel, screw a, cam, camb cap outer shroud, screw b, convex at central tube Wheel cap inner ring, spring, spring base, screw c, screw d, connecting rod base, flexural pivot, connecting rod a, roller, straight pin, joint pin, connecting rod b, Bearing b, sleeve, bearing c and lower contact composition, it is characterised in that:The idler wheel is mounted on by screw a in roller mount, flexural pivot It is installed on cam bottom by camb cap outer shroud, screw b and camb cap inner ring, connecting rod base is fixed on the outside of bearing b;On to Under roller mount, cam, spring, spring base, bearing b and sleeve are mounted on central tube successively, roller mount is by being screwed In on central tube, spring base is fixed on by screw d on central tube;Roller is mounted on connecting rod b right ends by straight pin, is utilized Connecting rod a is connected by joint pin with connecting rod b, then connecting rod a is connect with flexural pivot lower end, and connecting rod b is connect with connecting rod base;It in advance will be close Seal ring, which is installed to, to be laid particular stress on casing, is fixed on the outside of central tube using bearing a and bearing c by casing is laid particular stress on, and laying particular stress on casing can be around Central tube is freely rotated, and connecting rod base is fixed on by screw c and is laid particular stress on casing;Central tube upper end is threadedly coupled with top connection, under End is threadedly coupled with lower contact.
The downhole tool that automatic vertical drilling is realized using cam four-bar mechanism described in said program, feature are existed In:Casing screw hole, distance sleeve screw hole week are offered at the circumferential center of the heavier side middle and lower part of weighting casing Connecting rod telescopic mouth is offered to 180 °, connecting rod a and connecting rod b can be stretched by connecting rod telescopic mouth, lay particular stress on casing or more two End offers seal groove, for placing sealing ring;Connecting rod base screw hole on the connecting rod base and the installation places connecting rod b circumferential direction phase Away from 180 °, screw c connecting sleeves screw hole and connecting rod base screw hole, ensure connecting rod a and connecting rod b always with lay particular stress on the company on casing Bar telescopic mouth is opposite.
The downhole tool that automatic vertical drilling is realized using cam four-bar mechanism described in said program, feature are existed In:The cam bottom offers annular groove, and cam circularizes slideway, flexural pivot with camb cap outer shroud and camb cap annular It can be circumferentially rotated around cam in annular slide track, lubricating grease should be coated before installation in annular groove;The connecting rod b right ends peace Equipped with roller, becomes the sliding friction of drilling tool and the borehole wall as rolling friction, reduce working resistance.
The utility model has the beneficial effects that:(1) hole deviation is incuded using weighting principle in real time, induction is sensitive, and reaction is fast Speed, into Mobile state well straightening;(2) the well straightening operation principle of cam and four-bar mechanism implementation tool, structure novel is utilized to have Theoretical research value and further develop perfect possibility;(3) the utility model is purely mechanical structure, does not include electricity Magnetic measurement component and high pressure oil system, stable work in work, cost are low.
Description of the drawings
Fig. 1 is the downhole tool connecting rod a described in the utility model that automatic vertical drilling is realized using cam four-bar mechanism With the structural schematic diagram under connecting rod b stretching states.
Fig. 2 is the downhole tool connecting rod a described in the utility model that automatic vertical drilling is realized using cam four-bar mechanism With the structural schematic diagram under connecting rod b retracted states.
Fig. 3 is the Section A-A figure in the utility model Fig. 1.
Fig. 4 is link mechanism schematic three dimensional views.
Fig. 5 is roller mount, idler wheel and cam structure schematic three dimensional views.
Fig. 6 is cam, camb cap inner ring and camb cap outer ring structure schematic three dimensional views.
Fig. 7 is to lay particular stress on sleeve structure schematic three dimensional views.
1- top connections in figure, 2- central tubes, 3- sealing rings, 4- bearings a, 5- lay particular stress on casing, 6- roller mounts, 7- idler wheels, 8- Screw a, 9- cam, 10- camb cap outer shrouds, 11- screws b, 12- camb cap inner ring, 13- springs, 14- spring bases, 15- screw c, 16- screws d, 17- connecting rod base, 18- flexural pivots, 19- connecting rods a, 20- roller, 21- straight pins, 22- joint pins, 23- connecting rods b, 24- Bearing b, 25- sleeve, 26- bearings c, 27- lower contact.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
Referring to attached drawing 1, the downhole tool of automatic vertical drilling is realized using cam four-bar mechanism, by top connection 1, central tube 2, sealing ring 3, bearing a4, lay particular stress on casing 5, be roller mount 6, idler wheel 7, screw a8, cam 9, camb cap outer shroud 10, screw b11, convex Wheel cap inner ring 12, spring 13, spring base 14, screw c15, screw d16, connecting rod base 17, flexural pivot 18, connecting rod a19, roller 20, circle Pin 21, joint pin 22, connecting rod b23, bearing b24, sleeve 25, bearing c26 and lower contact 27 form, it is characterised in that:It is described Idler wheel 7 is mounted on by screw a8 in roller mount 6, and flexural pivot 18 passes through camb cap outer shroud 10, screw b11 and camb cap inner ring 12 It is installed on 9 bottom of cam, connecting rod base 17 is fixed on the outside of bearing b24;From top to bottom successively by roller mount 6, cam 9, spring 13, Spring base 14, bearing b24 and sleeve 25 are mounted on central tube 2, and roller mount 6 is relied on and is screwed on central tube 2, spring base 14 are fixed on by screw d16 on central tube 2;Roller 20 is mounted on connecting rod b23 right ends by straight pin 21, utilizes joint pin 22 are connected connecting rod a19 with connecting rod b23, then connecting rod a19 is connect with 18 lower end of flexural pivot, and connecting rod b23 is connect with connecting rod base 17; Sealing ring 3 is installed in advance and is laid particular stress on casing 5, is fixed on outside central tube 2 using bearing a4 and bearing c26 by casing 5 is laid particular stress on Side, laying particular stress on casing 5 can be freely rotated around central tube 2, and connecting rod base 17 is fixed on by screw c15 and is laid particular stress on casing 5;Central tube 2 Upper end is threadedly coupled with top connection 1, and lower end is threadedly coupled with lower contact 27;In drilling process, when hole deviation occurs, casing is laid particular stress on 5 heavier sides are automatically rotated to the low side of wellbore by bearing a4 and bearing c26 under the effect of gravity, and connecting rod base 17 is driven to rotate, Connecting rod a19 and connecting rod b23 is set to be always positioned at wellbore flash, top connection 1 drives central tube 2 to rotate, and roller mount 6 is same with central tube 2 Step rotation makes cam 9 pump, and to drive connecting rod a19 and connecting rod b23 to be continuously urged to the borehole wall, generates a cycle Reaction force correct hole deviation, realize normal drilling, improve drilling efficiency;When hole deviation does not occur, the deviation of casing 5 is laid particular stress on It is random, therefore the automatic vertical drilling tool not will produce the restoring force of constant side, not influence normally to creep into.
Casing screw hole, distance sleeve spiral shell are offered at the circumferential center of the 5 heavier side middle and lower part of weighting casing Connecting rod telescopic mouth is offered at nail hole is 180 ° circumferential, connecting rod a19 and connecting rod b23 can be stretched by connecting rod telescopic mouth, be laid particular stress on 5 upper and lower ends of casing offer seal groove, for placing sealing ring 3;Connecting rod base screw hole on the connecting rod base 17 and company Circumferential apart 180 ° of the installation places bar b23, screw c15 connecting sleeves screw hole and connecting rod base screw hole, ensure connecting rod a19 and connecting rod B23 is opposite with the connecting rod telescopic mouth laid particular stress on casing 5 always.
9 bottom of cam offers annular groove, and cam 9 forms ring with camb cap outer shroud 10 and camb cap inner ring 12 Shape slideway, flexural pivot 18 can circumferentially rotate in annular slide track around cam 9, should coat lubricating grease before installation in annular groove;Institute The connecting rod b23 right ends stated are equipped with roller 20, become the sliding friction of drilling tool and the borehole wall as rolling friction, reduce working resistance.

Claims (5)

1. the downhole tool of automatic vertical drilling is realized using cam four-bar mechanism, by top connection(1), central tube(2), sealing ring (3), bearing a(4), lay particular stress on casing(5), roller mount(6), idler wheel(7), screw a(8), cam(9), camb cap outer shroud(10), spiral shell Follow closely b(11), camb cap inner ring(12), spring(13), spring base(14), screw c(15), screw d(16), connecting rod base(17), ball Hinge(18), connecting rod a(19), roller(20), straight pin(21), joint pin(22), connecting rod b(23), bearing b(24), sleeve(25)、 Bearing c(26)And lower contact(27)Composition, it is characterised in that:The idler wheel(7)Pass through screw a(8)Mounted on roller mount(6) On, flexural pivot(18)Pass through camb cap outer shroud(10), screw b(11)And camb cap inner ring(12)It is installed on cam(9)Bottom, even Pole socket(17)It is fixed on bearing b(24)Outside;From top to bottom successively by roller mount(6), cam(9), spring(13), spring base (14), bearing b(24)And sleeve(25)Mounted on central tube(2)On, roller mount(6)By being screwed on central tube(2)On, Spring base(14)By screw d(16)It is fixed on central tube(2)On;By roller(20)Pass through straight pin(21)Mounted on connecting rod b (23)Right end utilizes joint pin(22)By connecting rod a(19)With connecting rod b(23)It is connected, then by connecting rod a(19)With flexural pivot(18)Lower end Connection, connecting rod b(23)With connecting rod base(17)Connection;In advance by sealing ring(3)It is installed to weighting casing(5)On, utilize bearing a (4)With bearing c(26)Casing will be laid particular stress on(5)It is fixed on central tube(2)Casing is laid particular stress in outside(5)It can be around central tube(2)Freely turn It is dynamic, connecting rod base(17)Pass through screw c(15)It is fixed on weighting casing(5)On;Central tube(2)Upper end and top connection(1)Screw thread connects It connects, lower end and lower contact(27)It is threadedly coupled;In drilling process, when hole deviation occurs, casing is laid particular stress on(5)Heavier side is in gravity Effect is lower to pass through bearing a(4)With bearing c(26)It is automatically rotated to the low side of wellbore, drives connecting rod base(17)Rotation, makes connecting rod a (19)With connecting rod b(23)It is always positioned at wellbore flash, top connection(1)Drive central tube(2)Rotation, roller mount(6)With central tube (2)Synchronous rotation makes cam(9)It pumps, to drive connecting rod a(19)With connecting rod b(23)It is continuously urged to the borehole wall, is produced The reaction force of raw a cycle corrects hole deviation, realizes normal drilling, improves drilling efficiency.
2. the downhole tool according to claim 1 for being realized automatic vertical drilling using cam four-bar mechanism, feature are existed In:The weighting casing(5)Casing screw hole, distance sleeve screw hole are offered at the circumferential center of heavier side middle and lower part Connecting rod telescopic mouth, connecting rod a are offered at 180 ° circumferential(19)With connecting rod b(23)It can be stretched, be laid particular stress on by connecting rod telescopic mouth Casing(5)Upper and lower ends offer seal groove, for placing sealing ring(3).
3. the downhole tool according to claim 1 for being realized automatic vertical drilling using cam four-bar mechanism, feature are existed In:The connecting rod base(17)On connecting rod base screw hole and connecting rod b(23)Circumferential apart 180 ° of installation place, screw c(15)Even Female connector pipe screw hole and connecting rod base screw hole ensure connecting rod a(19)With connecting rod b(23)Always with lay particular stress on casing(5)On connecting rod Telescopic mouth is opposite.
4. the downhole tool according to claim 1 for being realized automatic vertical drilling using cam four-bar mechanism, feature are existed In:The cam(9)Bottom offers annular groove, cam(9)With camb cap outer shroud(10)With camb cap inner ring(12)Shape Circularize slideway, flexural pivot(18)It can be in annular slide track around cam(9)It circumferentially rotates, profit should be coated before installation in annular groove Consistent lubricant.
5. the downhole tool according to claim 1 for being realized automatic vertical drilling using cam four-bar mechanism, feature are existed In:The connecting rod b(23)Right end is equipped with roller(20), become the sliding friction of drilling tool and the borehole wall as rolling friction, reduce work Make resistance.
CN201820120759.7U 2018-01-24 2018-01-24 The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism Active CN207776794U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820120759.7U CN207776794U (en) 2018-01-24 2018-01-24 The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820120759.7U CN207776794U (en) 2018-01-24 2018-01-24 The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism

Publications (1)

Publication Number Publication Date
CN207776794U true CN207776794U (en) 2018-08-28

Family

ID=63211309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820120759.7U Active CN207776794U (en) 2018-01-24 2018-01-24 The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism

Country Status (1)

Country Link
CN (1) CN207776794U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852358A (en) * 2020-08-25 2020-10-30 重庆科技学院 Multi-branch yield-increasing drilling stroke-increasing crawling tool
CN113027398A (en) * 2021-03-10 2021-06-25 大庆市天德忠石油科技有限公司 Water injection matching combined tool
CN116464390A (en) * 2023-04-04 2023-07-21 中国地质大学(北京) Mechanical type correction system suitable for polar region ice layer hot melt drilling tool

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852358A (en) * 2020-08-25 2020-10-30 重庆科技学院 Multi-branch yield-increasing drilling stroke-increasing crawling tool
CN111852358B (en) * 2020-08-25 2024-03-19 重庆科技学院 Multi-branch yield-increasing drilling Cheng Pahang tool
CN113027398A (en) * 2021-03-10 2021-06-25 大庆市天德忠石油科技有限公司 Water injection matching combined tool
CN113027398B (en) * 2021-03-10 2021-10-15 大庆市天德忠石油科技有限公司 Water injection matching combined tool
CN116464390A (en) * 2023-04-04 2023-07-21 中国地质大学(北京) Mechanical type correction system suitable for polar region ice layer hot melt drilling tool
CN116464390B (en) * 2023-04-04 2023-09-15 中国地质大学(北京) Mechanical type correction system suitable for polar region ice layer hot melt drilling tool

Similar Documents

Publication Publication Date Title
CN207776794U (en) The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism
CN202689934U (en) Underground vibration damper
WO2019144507A1 (en) Mechanical downhole tool for vertical well drilling using screw cam
CN201391245Y (en) Underground logging centralizer
CN108086922A (en) A kind of method for improving helicoid hydraulic motor performance and super helicoid hydraulic motor
WO2019061617A1 (en) Negative pressure pulse oscillator
CN108678674B (en) Shale gas developing double-acting coupling coiled tubing drag reducer
CN105649561A (en) Coiled tubing tractor
CN102767355A (en) Thick oil steam-huff-and-puff injection-production integrated oil production device
CN205100878U (en) Three -dimensional hydroscillator
CN207776817U (en) Lay particular stress on vane type underground auto-strengthening tool
CN108278083A (en) The downhole tool of automatic vertical drilling is realized using cam four-bar mechanism
CN209369725U (en) A kind of static, pushing type hydraulic rotating guide drilling tool
CN205172494U (en) Coiled tubing tractor
CN202745731U (en) Hydraulic centralizer
CN207776792U (en) The mechanical underground tool of vertical drilling is realized using pin cam
CN204457487U (en) A kind of geological resource reconnoitres well casing ball-type rigidity erection device
CN207776793U (en) Turbine cam-type down-hole centralizing device
CN107965279A (en) Lay particular stress on vane type underground auto-strengthening instrument
CN108708851A (en) A kind of heavy crude heat extraction multistage overlength submersible screw pumping system
CN201635670U (en) Synchronous straight-edge variable-diameter centralizer
CN2844394Y (en) A kind of completion mechanical type swivel joint
CN108561081A (en) Turbine cam-type down-hole centralizing device
CN202991456U (en) Novel inclined shaft thick oil pump
CN202039791U (en) Built-in fixed sucker rod centralizer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181129

Address after: 610500 No. 160 Huanghe Road, East Industrial District, Xindu District, Chengdu City, Sichuan Province

Patentee after: Chengdu Sealand Energy Technology Ltd.

Address before: 610500 Xindu Road, Xindu District, Chengdu, Sichuan Province, No. 8

Patentee before: Southwest Petroleum University

TR01 Transfer of patent right